RSID Consultancy Services: Monitoring Table / Matrix on contracted Deliverables/Outputs & Payments(PMU/ OWD Officers have to modify the YELLOW Coloured Filled Coloumns only)
Sl. No. Deliverable/Output as per Contract[mobilization April 2012]
(per TOR)
1 5% 5% 26.11.2012 Submitted, Approved and Payment done.End of week 8 End May 2012 Sep-12
2 7th QPR- 01.02.2014(7 x 1%)
6%7%
3 N/A0<10<
4 01.02.2014 3% Not PaidEnd of month 8 End Dec-12
5 22.10.2013
3%
3% 07.11.2013End of month 8 End Dec-12
‘Due Timing’ as per Contract
Resultant Expected Timing
Actual Completion Timing
Percentage of Total Payments Percentage of
Total Payments (per Contract)
Actual Date of Payment
STATUS /Reason for OVER DUE /SOON DUE &Non-payments as per TOR / CONTRACT AGREEMENT
Remedial Measure / Way forward action taken by PMU/ Consultant
Inception Report (IR). Inception Report based on consultant’s post-mobilisation approach to the requirements of the main elements, finalisation of both the phasing of inputs and the overall work program for the Services period, and outlining any key issues needing further resolution by the client for efficient execution of the overall assignment.
Quarterly Progress Reports (QPR) x 7. These reports shall be submitted at the end of each quarter indicating the progress made on various s integrated in TOR during last 3 months.
End of each calendar quarter
Each July, October, January & April
26.11.2012 ,
15.01.2013, 20.06.2013,12.11.2013,
Approved and Paid upto QPR-6. QPR-7 submitted and approved by OWD ISAP Review Committee & ISAP Working Group.
Workshops: associated Presentations/Working Papers/Materials) up to ten (10) workshops. These will be conducted as per details indicated in No. 807 of Description of Services given in Appendix A in CA.
09.11.2012 and 19.02.2014
One workshop conducted. Second Workshop scheduled on 19th Feb. 2014 on Road Policy, Road Fund and Road Safety Action Plan.
Timings to be resolved with OWD
Working Paper on Short-to-Medium Term OWD Restructuring and Reorganization. This will be submitted as per the details indicated in No. 503 of Description of Services given in Appendix A in CA.
Submitted to PMU in March 2013. Two meetings have been conducted by PMU with representatives from other wings of OWD in presence of Dy. TL and HRD Specialist of RSID Consultants.Revised Report has been submitted after consultantion with PMU and CE(DPI & Roads). This report has been discussed in ISAP Review Committee and Secretary( Works) has suggested to discuss more with other Chief Engineers and Stakeholders. Presented to the Interim WB Mission on 17.02.2014.
Interim Report on Revision of OPWD Code and Manual (Structuring, Content, Issues, Timing). This will be submitted as per the details indicated in No. 212 of Description of Services given in Appendix A in CA.
Approved by OWD ISAP Review Committee and Paid. Code Review Committee Meeting on 25.02.2014.
(Only 1 payable item anticipated in TOR, not 4)
6 End of month 9 End Jan-13
7 End of month 12 End April-13
Consultant Submitted and under scrutiny at PMU
8 End of month 13 End May-13 2% Pending
9 End of month 9 End Jan-13 5% Not paid
10 End of month 10 End Feb-13
5%
11 End of month 10 End Feb-13 05.12.2013 5% 5% 26.12.2013
12 End of month 12 End April-13 31.05.2013 5% 5% 12.06.2013
13 End of month 12 End April-13
14 End of month 14 End June-13 3% Yet to be submitted
15 End of month 14 End June-13 01.02.2014 7%
16 End Aug-13 05.12.2013 3% 3% 26.12.2013End of month 16
Interim Report on Revision of Contract Procurement Manual for Works, Goods and Services
Consultant submitted draft SBDs for Goods, Works and Consultancy Services. The SBD for works has been hoisted in OSRP Website to elicit comments from Stakeholders.
Final Report on Revision of Contract Procurement Manual for Works, Goods and Services
Final OPWD Code and Manual. This document shall be submitted as per the details indicated in No. 214 of Description of Services given in Appendix A in CA.
OPWD Code is being reviewed and updated regularly. Hoisted in OSRP Website to elicit comments from Stakeholders. This has been also shared with the World Bank and it will be placed before the Committee of C.E.s on 25th Feb. 2014.
Report on Training Needs Assessments (TNA) Results, Proposed TNA-Based Program(s) and OWD ‘Training’ Role. This report shall be submitted as per details indicated in No. 402 of Description of Services given in Appendix A in CA.
TNA & Training Plan : 01.02.2014
This has been cleared by ISAP Review Committee.Placed before World Bank Interim Mission on 17.02.2014.
Draft Report on Odisha Road Sector Policy and requirements for its Implementation. This report shall be submitted as per details indicated in No. 312 and 313 of Description of Services given in Appendix A in CA.
Submitted and under review at PMU/ ISAP Cell. This shall be shared with the Stakeholders in the proposed Workshop on 19th Feb 2014 and Interim World Bank Mission in Feb 2014.
(Now 2 outputs?
See*below)
Interim Report on Preparations for Inaugural Master Plan for Main Road Network in Odisha. This report shall be submitted as per details indicated in No. 708 of Description of Services given in Appendix A in CA.
Approved by ISAP Review Committee based on April 2013 Aide Memoire of WB ; Accepted and Paid.
Report on Road Infrastructure Safety Management Review. This report shall be submitted as per details indicated in No. 602 of Description of Services given in Appendix A in CA.
Approved by ISAP Review Committee and WB Accepted and Paid.
Final Report on Odisha Road Sector Policy. This report shall be submitted as per the details indicated in No. 313 of Description of Services given in Appendix A in CA.
*No provision in TOR
Report on Management of Out-sourced Road Toll Collection and Maintenance/Operations. This report shall be submitted as per details indicated in No. 909 of Description of Services given in Appendix A in CA.
Mid-Term Status Report (MTSR). The consultants shall submit the overall progress report of all activities of the project work after completion 50% of work. pending for
paymentSubmitted by firm.Reviewed and cleared by ISAP Review Committee; Shared with World Bank.
Report on Vehicle Axle Load Regulation and Management. This report shall be submitted as per details indicated in No. 1006 of Description of Services given in Appendix A in CA.
Approved by ISAP Review Committee on the basis of observation by the WB vide their E-mail Dated November 07, 2013. and paid.
17 End of month 16 End Aug-13 5%
18 End of month 16 End Aug-13 05.12.2013 3% 3% 26.12.2013
19 End of month 19 End Nov-13
20 End of month 22 End Feb-14 5% Report yet to be submitted by the Consultant.
21 End of month 22 End Feb-14 7%
22 End of month 24 End April-14 7% NA
23 End of month 26 End June-14
24 End of month 28 End Aug-14 10%
25 End of month 30 End Oct-14 10%
Total 100% 30%
Preliminary Report on Study of Main Roads Funding Options and Possible Road Fund. This report shall be submitted as indicated in No. 808 of Description of Services given in Appendix A in CA.
Report submitted. This shall be shared with the Stakeholders in the proposed Workshop on 19th Feb 2014.
Draft Report on Proposed ‘Odisha Road Safety Action Plan’. This report shall be submitted as per the details indicated in No. 611 of Description of Services given in Appendix A in CA. Report approved by ISAP Review Committee and clearance
given by WB vide E-mail dated 7.11.2014 s.t. compliance by revising the report and Paid.
Final Report on Proposed ‘Odisha Road Safety Action Plan’. This report shall be submitted as per details indicated in No. 611 of Description of Services given in Appendix A in CA. (Provision for 1
payment only)Under preparation by the Consultant. Will submit after incorporating the findings in the Workshop.
Completion Report on Inaugural Master Plan for Main Road Network in Odisha. This report shall be submitted as per the details indicated in No. 712 of Description of Services given in Appendix A in CA.
Final Report on Study of Main Roads Funding Options and Recommendations on Road Fund. This report shall be submitted as indicated in No. 808 of Description of Services in Appendix A in CA.
Draft Report on Medium-to-Longer Term Strengthening of the Institutional Framework/Structures of Odisha’s Roads Sector. This report shall be submitted as per the details indicated in No. 1110 of Description of Services given in Appendix A in CA.
Final Report on Strengthening of the Institutional Framework/Structures. This report shall be submitted as per the details indicated in No. 1110 of Description of Services given in Appendix A in CA. (Provision for 1
payment only)
Draft Final Report (DFR). This report shall be submitted one month before completion date of Services which will indicate comprehensively the consultants Services, results and achievement against the requirement of the TOR
Final Report (after OWD/GOO response to DFR). This report shall be submitted within two weeks of receipts of Clients comments on draft final report, upon completion of Services.
Deliverable / Output Tentative Percentage of Payment
Per Contract ‘Due Timing’
Inception Report (IR) End of week 4 10 5%
7 (1% each)
7%
10 --
End of month 6 7 5%
End of month 6 7 3%
End of month 9 7 5%
End of month 10 7 5%
End of month 10 7 5%
End of month 12 10 5%
End of month 14 7 3%
End of month 14 7 7%
End of month 16 7 3%
Quantity Due in each case
Quarterly Progress Reports (QPR) x 7
End of each calendar quarter
Workshops: associated Presentations / Working Papers / Materials) – up to ten (10) workshops
Timings to be resolved in IR
Working Paper on Short-to-Medium Term OWD Re-structuring & Reorganization
Interim Report on Revision of OWD Code & Manual (Structuring, Content, Issues, Timing)
Report on Training Needs Assessments (TNA) Results, Proposed TNA-Based Program(s) and OWD ‘Training’ Role
Report on draft Orissa Road Sector Policy and requirements for its implementation
Interim Report on Preparations for Inaugural Master Plan for Main Road Network in Orissa
Report on Road Infrastructure Safety Management Review
Report on Management of Out-sourced Road Toll Collection & Maintenance / Operations
Mid-Term Status Report (MTSR)
Report on Vehicle Axle Load Regulation & Management
End of month 16 7 5%
End of month 16 10 3%
End of month 22 7 5%
End of month 22 7 7%
End of month 25 7 7%
Draft Final Report (DFR) End of month 28 7 10%
End of month 30 7 10%
Preliminary Report on Study of Main Roads Funding Options & Possible Road Fund
Report on Proposed ‘Orissa Road Safety Action Plan’
Completion Report on Inaugural Master Plan for Main Road Network in Orissa
Main Report on Study of Main Roads Funding Options & Recommendations re Road Fund
Report on Medium-to-Longer Term Strengthening of the Institutional Framework / Structures of Orissa’s Roads Sector
Final Report (after OWD / GOO response to DFR)
ISAP(RSID ) CALENDER,OSRPISAP (RSID)DELIVERABLES
Contract Signed : 16th March 2012 ; Effective Date : 2nd April, 2012; Commencement of Services :9th April 2012;Time period of the assignment : 30 Months
May-12 Jun-12
Nov-12 Dec-12
Monthly Progress Review by PMU
May-13 Jun-13
Nov-13 Dec-13
May-14 Jun-14
Ten Nos of Workshops will be finalised in the IR after duly consultation with Client/OWD
Training Exposure Visits to OWD Officers at different times to differennt Organisations to be finalised.Also some field surveys regarding Axle Load Survey and others need to be finalised in consultation with OWD/PMU
Monthly Progress Review by PMU,Submission of INCEPTION
REPORT(IR)
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be finalised
in the IR)
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be finalised
in the IR)
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU(a)Report on Management of Outsourced
Road Toll Collection & Maintenance/Operations by Working Group
(b)Mid-Term Status Report(MTSR) by Review Committee/Working Group
Monthly Progress Review by PMU,Final Report on Proposed Road Safety Action Plan by Working
Group
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be finalised
in the IR)
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU,Final Report on Strengthening of the Institutional Framework/Structures of
Odisha Road Sector by Working Group
ISAP(RSID ) CALENDER,OSRPISAP (RSID)DELIVERABLES
Contract Signed : 16th March 2012 ; Effective Date : 2nd April, 2012; Commencement of Services :9th April 2012;Time period of the assignment : 30 Months
Jul-12 Aug-12
Monthly Progress Review by PMU
Jan-13 Feb-13
Jul-13 Aug-13
Jan-14 Feb-14
Jul-14 Aug-14
Ten Nos of Workshops will be finalised in the IR after duly consultation with Client/OWD
Training Exposure Visits to OWD Officers at different times to differennt Organisations to be finalised.Also some field surveys regarding Axle Load Survey and others need to be finalised in consultation with OWD/PMU
Monthly Progress Review by PMU,QPR-1/10-Review Committee
Meeting/Working Group
Monthly Progress Review by PMU(a) QPR-3/10-Review Committee
Meeting/Working Group(b)Final OPWD Code & Manual by
Working Group(c) Report on TNA by Working Group
Monthly Progress Review by PMU(a) Draft Report on Road Sector Policy &
requirements for Implementations by Working Group
(b)Interim Report on Inagural Master Plan for Main Road Network of Odisha by
Working Group
Monthly Progress Review by PMUQPR-5/10-Review Committee
Meeting/Working Group
Monthly Progress Review by PMU
(a)Report on Vehicle Axle Load Regulation & Management by Working
Group(b)Preliminary Report on Study of Road Funding Options & Possible Road Fund
by Working Group(c) Draft Report on Proposed Road Safety
Action Plan
Monthly Progress Review by PMU,QPR-7/10-Review Committee
Meeting /Working Group
Monthly Progress Review by PMU(a)Final Report on Master Plan of Odisha
Road Network by Working Group(b)Final Report on Study of Road Funding
Options & Possible Road Fund by Working Group
Monthly Progress Review by PMU,QPR-9/10-Review Committee
Meeting / Working Group
Monthly Progress Review by PMU,Draft Final Report(DFR)-Review &
Response by OWD/GOO
ISAP(RSID ) CALENDER,OSRPISAP (RSID)DELIVERABLES
Contract Signed : 16th March 2012 ; Effective Date : 2nd April, 2012; Commencement of Services :9th April 2012;Time period of the assignment : 30 Months
Sep-12 Oct-12
Mar-13 Apr-13
Sep-13 Oct-13
Mar-14 Apr-14
Sep-14 Oct-14
Ten Nos of Workshops will be finalised in the IR after duly consultation with Client/OWD
Training Exposure Visits to OWD Officers at different times to differennt Organisations to be finalised.Also some field surveys regarding Axle Load Survey and others need to be finalised in consultation with OWD/PMU
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU(A)QPR-2/10-Review Committee
Meeting//Working Group(B)Working Paper(Short-to-Medium Term OWD Restructuring & Reorganisation) by
Working Group(c) Interim Report on OPWD Code Revision
& Manual by Working Group
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU(a)QPR-4/10-Review Committee
Meeting/Working Group(b) Report on Road Safety Management
Review of OWD by Working Group(c) Final Odisha Road Sector Policy by
Working Group
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU,QPR-6/10-Review Committee Meeting /
Working Group
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU(a)QPR-8/10-Review Committee Meeting
/Working Group(b)Draft Report on Medium-to-Longer Term
Strengthening of the Institutional Framework/Structures of Odisha Road
Sector
Monthly Progress Review by PMU,Workshop(Proposed by PMU,to be
finalised in the IR)
Monthly Progress Review by PMU(a)QPR-10/10-Review Committee
Meeting /Working Group(b)Final Report after OWD/GOO Response
to DFR
Odisha State Roads Project- Responsibility Matrix for ISAP Activities
SE ISAP CELL, ER. RASHMI RANJAN BOHIDAREE Dr. NC Pal MR Misra GD PANIGRAHI BC Tripathy
CE/EIC
EIC, Rural Works
CE, DPI& Roads
N B Cacal/A Basu
EIC, Civil
CE, Buildings
CE, NH
CE, Designs
MD, OBCC
The Ten(10) Tasks of RSID Consultancy Services are being monitored by Chief Engineers of OWD with some Nodal Officers as per the outcome of meetings of CEs of OWD under the Chairmanship of E.I.C.( Civil), Odisha in presence of ISAP Facilitator , Mr. V. Murahari Reddy. The Responsibility Matrix is attached herewith.
Road Network Master Planning
N B Cacal/ P K Nanda/ Chandi Ganguly/ B
Muthuthevar/ D Vasudevan
Road Sector policy & Strategy
Future Road Sector
Institutional Options
N B Cacal/ Chandi Ganguli/ B
Muthuthevar/ Deepak Rao
Addl. Secy ( Works)
Reorganization & Strengthening
of OWD
N B Cacal/ C P Bohra/ S N Swaroop/Amitav
Basu
Road Toll Collection &
Management
`CE, World Bank Projects
Road Safety Engg. & Planning
N B Cacal/ P K Nanda/ P K Sikdar/DSipak Rao
CE,
e-procurement
CE, RDQP
3 3 1 1
`CE, World Bank Projects
N B Cacal/ A Basu/B R Suri/ Dipak Rao
Vehicle Axle Load Regulation & Management
N B Cacal/ P K Nanda/P K Sikdar/ B R Suri
OWD Staff Training &
HRD
C P Bohra / S Jagota / S N Swaroop /
Dipak RaoTotal No. of Activities
Odisha State Roads Project- Responsibility Matrix for ISAP Activities
SE ISAP CELL, ER. RASHMI RANJAN BOHIDARKB Panda
1
3
1
1
1
11
4
The Ten(10) Tasks of RSID Consultancy Services are being monitored by Chief Engineers of OWD with some Nodal Officers as per the outcome of meetings of CEs of OWD under the Chairmanship of E.I.C.( Civil), Odisha in presence of ISAP Facilitator , Mr. V. Murahari
Total No. of Activities
Revision Of Codes And Manuals
N B Cacal / Deepak Narayan / B R Suri/
Deepak Rao
Future Road Management &
Funding
4
1
12 10*
Future Road Management &
Funding
N B Cacal/ A Basu/C Ganguly/B Muthuthevar/
Dipak Rao