    Whatever it Takes!Within the boundaries of Sanger Unied is the city of Sanger and the communities of Centerville, Del Rey, Fairmont,Lone Star, Tivy Valley and portions of the Sunnyside area of metropolitan Fresno. Attendance in the Districts schoolscurrently numbers 10,500 students.

  • 7/29/2019 Sanger Facilities Master Plan

    4/106F A C I L I T I E S M A S T E R P L A N | Sanger Unified School DistrictF A C I L I T I E S M A S T E R P L A N | Sanger Unified School DistrictF A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    A C K N O W L E D G M E N T S | Sanger Unified School District

    In addition, SUSD would like to thank the following consultants for their professionalservices conducted in this Facilities Master Plan process:

    School Business Consulting, for advising theDistrict through the entire master plan process.

    Darden Architects, for assisting the District inreviewing the existing school sites, developing need-related improvements and improvement budgets,preparing this master plan report, and creatingpossible draft concept solutions for the issuesidentified at the existing school sites.

    Odell Planning & Research, for studying thestudent enrollment growth and identifying newfacility requirements.

    School Facility Consultants, for analyzing the StateSchool Facility Program (SFP) eligibility.

    Keygent Advisors, for analyzing the prospective2012 General Obligation Bond scenarios.

    Acknowledgments

    Sanger Unified School District would like to thank all of the district staff

    whooffered their time, comments, and overall vision for this Facilities Master Plan.

    Facilities Task Force

    Marcus P. Johnson, Superintendent

    W. Richard Smith, DeputySuperintendent

    Eduardo Martinez, AdministrationAssociate Superintendent

    Jon Yost, Associate Superintendent

    Richard Sepulveda, Chief OperationsOfficer

    Brad Pawlowski, Director, SupportServices

    Terry Tilley, Administration Director ofMaintenance & Operations

    Tim Lopez, Area Administrator

    Matt Navo, Area Administrator

    Adela Jones, Area Administrator

    Lisa Houston, Ed.D.,Principal,Centerville ES

    Susan Fitzgerald, Principal, Del Rey ES

    Jared Savage, Principal, Fairmont ES

    Debra Santos, Principal, Jackson ES

    Cathy Padilla, Principal, Jefferson ES

    Donna Vincenti, Principal, John Wash ES

    JoDee Marcellin, Principal, Lincoln ES

    Lori Welch, Principal, Lonestar ES

    Stephanie Rodriguez, Principal,Madison ES

    John Hannigan, Principal, Reagan ES

    Karl Kesterke, Principal, Sequoia ES

    Ken Garcia, Principal, Wilson ES

    Jamie Nino, Principal, WashingtonAcademic MS

    Nick Taylor, Principal, Community Day HS

    Rick Church, Principal, Kings River HS/Taft Independent Study School

    Dan Chacon, Principal, Sanger HS

    Alfred Sanchez, Principal, HallmarkCharter School

    Amy Williams, Principal, Quail LakeEnvironmental Charter School

    Christy Platt, Principal, Sanger AcademyCharter School

    Nancy Penny, Principal, Sanger AdultSchool

  • 7/29/2019 Sanger Facilities Master Plan

    5/106

    T A B L E O F C O N T E N T S | Sanger Unified School District

    SECTION 1 | Overview of the Facilities Master Plan Process .............4

    SECTION 2 | Executive Summary .......................................................10

    SECTION 3 | Existing School Facilities Needs ...................................18

    Elementary Schools ..........................................................................................20

    Secondary Schools ............................................................................................44

    Charter Schools ..................................................................................................56

    SECTION 4 | Enrollment Projections .................................................64

    SECTION 5 | New School Facility Needs ............................................72SECTION 6 | District Facilities Needs .................................................76

    Site Plans | District Facilities ...........................................................................78

    SECTION 7 | Financing the Facilities Master Plan ............................88

    Funds Currently Available ...............................................................................88

    State School Building Eligibility ...................................................................89

    General Obligation Bond ................................................................................97

    Summary of Propositions 46 and 39/AB1908 .................................97

    Comparison Between Prop. 46 and Prop. 39/AB1908 ..................98

    Proposition 39 Scenarios .......................................................................99

  • 7/29/2019 Sanger Facilities Master Plan

    6/106

    This page was intentionally left blank

  • 7/29/2019 Sanger Facilities Master Plan

    7/106

    1O V E R V I E W O F T H E F A C I L I T I E S M A S T E R P L A N P R O C E S S

  • 7/29/2019 Sanger Facilities Master Plan

    8/106

  • 7/29/2019 Sanger Facilities Master Plan

    9/106

    O V E R V I E W O F T H E FA C I L I T I E S M A S T E R P L A N P R O C E S S | Sanger Unified School District

    OverviewThe Sanger Unified School District Facilities Master Plan (FMP) isintended to establish a framework for the orderly development of facilityimprovements for the next 10 years or more.

    In the process of defining the parameters and needs for the FMP,the SUSD utilized the expertise and skill of specialty consultants andDistrict staff.

    Of noteworthy importance, this FMP study is intended to be a dynamicplanning document, not merely a printed report on the Districtsfacilities. This FMP process focuses on how existing and future

    buildings can best serve the students, staffand community of SUSD.That said, t he FMP process is the Distric ts planning tool and strateg yto look at and address facility improvements, their associated capitalneed, and a financial plan to fund the improvements.

    An FMP is a data-driven process that provides the District with the abilityto move master plan needs from the conceptual, need-oriented phase,toward a vision, and finally into the ultimate reality of completed projects.

    This report will present the data that has been c ollected, analyzedand synthesized into need-oriented improvements, with associatedconceptual budgets. This FMP provides the SUSD leadership with a

    planning tool and road map for success.

    Using the FMP as a facilities planning tool, more specific details aroundthe master plan improvements will unfold as the District defines itsinitial priorities for new and existing facility projects, based on availablefunds. The improvement needs will likely outweigh the available capitalresources. As each need is coupled with a financial budget, the Districtcan then refine the initial priorities into a set of short-term, medium-termand long-term goals. Once these master plan priorities are set, this FMPwill then be used as a planning tool to direct both the Districts humanresources and capital resources.

    The SUSD FMP reflec ts the needs and goals t hat were captured and

    identified through several meetings as well as an evaluation of thecondition of existing schools and District administrative facilities. In aneffort to align these activities with the District goals, the SUSDs MissionStatement was used by the committee as a standard for guiding thedirection and purpose of this FMP.

    This FMP is not a static document and will require review and periodicupdating. For example, the FMP will require updating as the first roundof prioritized improvements are being completed, and also as theassessment and impact of these improvements are understood. As thesecond round of prioritized improvements are being planned, the FMPshould be updated to capture any additional improvement needs and/orchanging needs that have arisen since the initial preparation of this FMP.

    5

  • 7/29/2019 Sanger Facilities Master Plan

    10/106

  • 7/29/2019 Sanger Facilities Master Plan

    11/106

  • 7/29/2019 Sanger Facilities Master Plan

    12/106

  • 7/29/2019 Sanger Facilities Master Plan

    13/106

    2E X E C U T I V E S U M M A R Y

    |

  • 7/29/2019 Sanger Facilities Master Plan

    14/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    S E C T I O N 2 | Executive Summary

    SECTION 2 | EXECUTIVE SUMMARY:

    The following list of facilities needs and t heir associated costs i s asummarization of the detailed findings presented in:

    t Section3 | Existing School Facilities Needs

    t Section 4 | Enrollment Projections

    t Section 5 | New School Facility Needs

    t Section 6 | District Facilities Needs

    t Section 7 | Financing the Facilities Master Plan

    The needs represented h ave been derived from data from a number ofsources and information, including but not limited to, individual schoolsite input, District staffmeetings, enrollment studies, school buildinganalysis by qualified, licensed architects, and input from the Districtssupport services.

    Total Existing School Facilities Needs $182,590,800

    Total New School Facilities Needs $165,768,000

    Total District Facilities Needs $34,604,600

    SUSD TOTAL FACILITIES NEEDS $382,963,400

    Table 2.1 Summarized Facilities Needs Total

    Project Budget

    10

    E X E C U T I V E S U M M A R Y | S U ifi d S h l Di i

  • 7/29/2019 Sanger Facilities Master Plan

    15/106

    E X E C U T I V E S U M M A R Y | Sanger Unified School District

    ELEM

    ENTARY

    Centerville Elementary School $11,317,700

    Del Rey Elementary School $9,032,600

    Fairmont Elementary School $6,793,100

    Jackson Elementary School $10,772,100

    Jefferson Elementary School $3,262,100

    John S. Wash Elementary School $2,460,200

    Lincoln Elementary School $8,862,400Lone Star Elementary School $8,054,300

    Madison Elementary School $10,411,800

    Ronald W. Reagan Elementary School $464,600

    Sequoia Elementary School $78,100

    Wilson Elementary School $8,945,800

    SECONDARY

    Washington Academic Middle School $28,206,000

    Community Day School $2,961,000

    Kings River High (Cont)/Taft High School $3,225,900

    Child Welfare & Attendance Offi

    ce $1,366,600Adult School $4,695,500

    Sanger High School $ 14,016,800

    SUSD Agricultural Center $10,751,800

    CHARTER Hallmark Charter School $13,437,000

    Quail Lake Environmental Charter School $10,004,400

    Sanger Academic Charter School $13,471,000

    TOTAL EXISTING SCHOOL FACILITIES NEEDS $182,590,800

    Table 2.2 Summarized Existing School Facilities Needs

    Project Budget

    Existing School Facilities NeedsThe existing school facilities needs identified in this FMP weregathered as a result of visiting each of the school sites, asnecessary, talking with the school site staff, and conducting visualobservations of the facilities and assessing their conditions. TheSUSDs Mission Statement Guiding Principles were utilized todetermine and shape how the built environment of the existingschool sites could be transformed to support:

    t Student achievement

    t

    SUSD staff

    t Site safety

    t The effective learning environment

    Table 2.2 summarizes the total cost of existing school facilityneeds as identified in Section 3 | Existing School Facilities Needs of this report.

    11

    S E C T I O N 2 | E ti S

  • 7/29/2019 Sanger Facilities Master Plan

    16/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    S E C T I O N 2 | Executive Summary

    CHART 2.1Sum of Schools Total District K-12

    Enrollment ProjectionsSection 4| Enrollment Projections of the FMP is the result of anEnrollment Projections and Future School Needs report. It is projectedthat the total District enrollment will increase by 3,100 students duringthe next 10 years, with an average annual growth rate of 2.54 percentper year.

    Table 2.3 summarizes the projected enrollment growth in theDistrict for the next 10 years by school type. Chart 2.1shows theprojected enrollment growth in the Sanger Unified School District forthe next 10 years.

    TABLE 2.3 Projected Enrollment 2021-2022 School Year

    *Other includes Independent Study, Continuation, Community Day and SDC**Includes all District students

    SCHOOLS 201112 202122AVERAGE ANNUAL

    GROWTH RATES

    Sanger Area Elementary 2,453 2,777 1.25%

    Southeast Fresno Area K-6 1,165 2,087 7.24%

    Rural Area Elementary 1,037 1,243 1.83%

    Washington AcademicMiddle School

    1,578 2,111 2.95%

    Sanger High 2,694 3,399 2.35%Charter 1,604 1,930 1.87%

    Other* 342 426 2.23%

    Total District EnrollmentProjection**

    10,873 13,973 2.54%

    12

    E X E C U T I V E S U M M A R Y | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    17/106

    E X E C U T I V E S U M M A R Y | Sanger Unified School District

    Table 2.5 Summarized District Facilities Needs

    Project Budget

    District Facilities NeedsThe distric t facili ties needs identified in the FMP were gathered as aresult of talking with District site staff, as necessary, and conductingvisual observations of the facilities. District facilities needs areimprovements that increase the operational efficiency and capacity ofthe District.

    Table 2.5 summarizes the total cost of district facilities needs asidentified in Section 6 | District Facilities Needs.Table 2.4 Summarized New School Facility Needs

    Project Budget

    New School Facility NeedsThe new school facilit y needs identified in the FMP were gathered fromthe results of demographic enrollment projections over the next 10 years.

    Table 2.5 summarizes the total cost of new school facilities needs asidentified in Section 5 | New School Facility Needs

    Elementary School $23,568,000Middle School $44,587,000

    High School $97,613,000

    TOTAL NEW SCHOOL FACILITY NEEDS $165,768,000

    District Office $3,216,000

    Transportation Yard/Bus Maintenance $8,204,300

    Warehouse $3,463,100

    Maintenance and Operations $2,906,300

    Tom Flores Stadium $3,564,900

    New Stadium $13,250,000

    TOTAL DISTRICT FACILITIES NEEDS $34,604,600

    13

    S E C T I O N 2 | Executive Summary

  • 7/29/2019 Sanger Facilities Master Plan

    18/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    S E C T I O N 2 | Executive Summary

    Funds Currently Available for Capital Projects

    Uncommitted capital facility funds $11,472,937

    Developer fees (current and future) $0

    Sub-Total $11,472,937

    Funding Sources From State School Building Program

    New Construction Program Eligibility $38,134,633

    Modernization Program Eligibility $24,908,546

    Sub-Total $63,043,179

    TOTAL AVAILABLE FUNDS

    WITHOUT VOTER APPROVAL $74,516,116

    Possible Voter-Approved General Obligation Bond

    $30 Tax Rate Increase $24,460,000**

    $60 Tax Rate Increase $50,000,000**

    Extend Existing Tax Rate $30,000,000

    TOTAL AVAILABLE FUNDSIF $24,460,000 BOND APPROVED

    $98,976,116

    TOTAL AVAILABLE FUNDSIF $50,000,000 BOND APPROVED

    $124,516,116

    TOTAL AVAILABLE FUNDSIF $30,000,000 BOND APPROVED

    $104,516,116

    Table 2.6 Funding SourcesFinancing the Capital Facilities Master Plan

    Section 7 | Financing the Facilities Master Plan of this FMPidentifies the funding sources available to the District that can be

    used to meet the facility needs identified in this FMP including localfunds that do not require further voter-approval, State facility fundsfor which the District is eligible under the existing State facilityprogram (SB 50) and three different scenarios of proceeds the Districtcould receive from a voter-approved general obligation bondmeasure in 2012. Table 2.6 is a brief summary of the aforementionedfunding sources.

    ** Tax rate increase is based on the am ount listed above ($30 or $60) per $100,000 of assessed valuation.

    14

    E X E C U T I V E S U M M A R Y | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    19/106

    E X E C U T I V E S U M M A R Y | Sanger Unified School District

    Need to Establish Priorities in Implementing the FMP

    Based on the previously cited cost projections, SUSD would need a combined total of$382,963,400 to meet all the facility needs identified at existing school sites; construct three

    new schools to accommodate expected student growth during the next 10 years or more; andcomplete district wide improvements that enhance academic programs, increase safety, andreduce operational costs by increasing efficiency. It will be necessary for the district to prioritizeimprovements identified in the FMP as the estimated available resources of approximately$98,976,116 to $124,516,116 (depending on the size of a possible general obligation bondmeasure) are insufficient to meet all of the identified facility needs of the District.

    It will be the responsibility of the SUSD staff(administrator, certificated and classifiedemployees)to establish facility priorities. Those determinations will be offered asrecommendations to the Districts Governing Board for consideration of approval. The mostcritical facility needs of the District will likely be a balance between the needs of existingschools and the future needs to accommodate projected enrollment growth in the district.

    15

  • 7/29/2019 Sanger Facilities Master Plan

    20/106

    This page was intentionally left blank

  • 7/29/2019 Sanger Facilities Master Plan

    21/106

    3E X I S T I N G S C H O O L F A C I L I T I E S N E E D S

  • 7/29/2019 Sanger Facilities Master Plan

    22/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    23/106

    The following graphic si te plans i llustrate the existing sc hool sites and

    an accompanying draft conceptual vision. The draft conceptual visionis intended to identify in graphic form the list of improvements andtheir associated budgets. The draft concepts are not intended to bethe final design solution, but rather to illustrate the improvements thatwould be suitable for the school site.

    Each of the school sites will have a list of Proposed Improvementsand an associated project budget in 2014 dollars. The Master PlanImprovement Total is the sum of the individual improvements. Thisfigure then represents the financial need necessary to fund theidentified improvements. To offset these costs, the District is eligiblefor funds through the State of California via the School Facility

    Program (SFP).

    The listing of the Proposed State Funding identifies the year andfinancial amount of the potential modernization eligibility grants. TheAvailable State Funds is the sum of potential State funded grants.

    The Local Funds Required is the difference between the Master PlanImprovement Total and the Available St ate Funds, and represents theadjusted financial need.

    NOTE: The School Facility Program is subject to change, requires the District tomatch the State contribution, and it also requires the voters of the State to pass afuture State school facility bond.

    ELEMENTARY

    Centerville Elementary School 20

    Del Rey Elementary School 22

    Fairmont Elementary School 24

    Jackson Elementary School 26

    Jefferson Elementary School 28

    John S. Wash Elementary School 30

    Lincoln Elementary School 32

    Lone Star Elementary School 34Madison Elementary School 36

    Ronald W. Reagan Elementary School 38

    Sequoia Elementary School 40

    Wilson Elementary School 42

    SEC

    ONDARY

    Washington Academic Middle School 44

    Community Day School 46

    Kings River High (Cont)/Taft High School 48

    Child Welfare & Attendance Office 50

    Adult School 51Sanger High School 52

    SUSD Agricultural Center 54

    CHARTER Hallmark Charter School 56

    Quail Lake Environmental Charter School 58

    Sanger Academic Charter School 60

    Table of contents

    School Page

    19

  • 7/29/2019 Sanger Facilities Master Plan

    24/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | CENTERVILLE ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    25/106

    FACILITY NEEDS: COST

    Proposed Improvements

    MCP-E2 Mechanical Central Plant, Equipment: Replace $164,700BN-T Building New, Toilets $249,600

    BI-T4 Building Interior, Toilets: Reconfigure $104,700ID-S1 Identification Device, Site: School Marque $32,900PF-B3 Play Fields, Backstops: New $107,100TE-C2 Technology Equipment, Classroom: New $51,000BO-W2 Building Openings, Windows: Partial Replacement $148,900BE-F1 Building Exterior, Finishes: Clean & Paint $80,000BE-R2 Building Exterior, Roofing: Remove & Replace $308,600S-SD2 Site, Storm Drainage: New $105,900MB-E3 Mechanical Building, Equipment: Replace $303,400S-SW1 Site, Sewer: Modify $42,500FS-S3 Fire Sprinklers, Site: New $567,200EP-G3 Electrical Power, Generator: New $95,500

    PA-S1 Public Address, Site: Modify $32,900PL-S3 Parking Lot, Staff: New $915,100PC-2 Play Court: Remove & Replace $331,600PG-2 Play Ground: Remove & Replace $177,300BN-MP Building New, Multi-Purpose $5,176,400BI-L4 Building Interior, Library: Reconfigure Spaces $170,800BI-C2 Building Interior, Classroom: New Finishes $47,500BN-K Building New, Kindergarten $731,600LZ-B3 Loading Zone, Bus: New $143,400BN-C Building New, Classrooms $1,186,600BP-SP2 Building Portable, Special Programs: Relocate $42,500

    Master Plan Improvement Total $11,317,700

    Proposed State Funding

    2018 State SFP Modernization Match (60%) $344,2582019 State SFP Modernization Match (60%) $513,712

    Available State Funds $857,970

    TOTAL LOCAL FUNDS REQUIRED $10,459,730

    21

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    26/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | DEL REY ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    27/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-L3 Building Interior, Library: New Finishes + MEP $868,900MB-E3 Mechanical Building Equipment: Replacement $148,500

    BI-PA2 Building Interior, Auditorium: New Finishes $131,200BI-MP3 Building Interior, Multi-Purpose: Reconfigure Spaces $73,400BI-C3 Building Interior, Classrooms: Finishes+MEP $463,600TB-C1 Technology Building, Classroom: Equipement $153,100ID-S1 Identification Devices, Site: School Marque $32,900S-WA1 Site, Walkways Accessibility: Partial Replacement $113,400S-FO3 Site, Fencing Ornamental: New $77,200S-FS1 Site, Fencing Security: Repair $69,400PC-2 Play Courts: Remove & Replace $218,300PF-1 Play Fields: Regrade & Turf $499,300PF-B3 Play Fields, New: Backstops $107,100BO-W2 Building Opening, Windows: Partial Replacement $298,000

    BO-D3 Building Opening, Doors: Partial Replacement $93,900BE-F1 Building Exterior, Finishes: Clean & Paint $136,100BE-R1 Building Exterior, Roofing: Maintenance $249,100BE-R3 Building Exterior, Roofing: Partial Replacement $153,400MCP-E3 Mechanical Central Plant, Equipment: Replacement $65,900BN-T Building New, Toilets $1,985,200BI-T4 Building Interior, Toilets: ADA Reconfiguration $302,700BN-K Building New, Kindergarten $1,787,600BI-P3 Building Interior, Pre-School: Finishes + MEP $42,500BI-SP4 Building Interior, Spec. Prog.: Reconfigure Spaces $135,900LZ-B3 Loading Zone, Bus: New $143,400

    LZ-P3 Loading Zone, Parent: New $143,400PL-S3 Parking Lot, Staff: New $294,000PL-P3 Parking Lot, Parent: New $143,400S-FE3 Site, Fencing Enclosure: New $101,800

    Master Plan Improvement Total $9,032,600

    Proposed State Funding

    2015 State SFP Modernization Match (60%) $776,000

    Available State Funds $776,000

    TOTAL LOCAL FUNDS REQUIRED $8,256,600

    23

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    28/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | FAIRMONT ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    29/106

    FACILITY NEEDS: COST

    Proposed Improvements

    LZ-B3 Loading Zone, Bus: New $143,400LZ-P1 Loading Zone, Parent: Seal & Strip $143,400

    PL-S3* Parking Lot, Staff

    : New $294,000BI-C2 Building Interior, Classroom: New Finishes $485,100BI-A4 Building Interior, Admin.: Reconfigure Spaces $126,000BI-T3 Building Interior, Toilets: Finishes+MEP $116,200ID-S1 Identification Devices, Site: School Marque $32,900PF-1 Play Fields: Regrade & Turf $499,300S-LF1 Site, Lighting field: Practice $29,800BO-W2 Building Openings, Windows: Partial Replacement $233,100BO-D2 Building Openings, Doors: Partial Replacement $62,600BE-F1 Building Exterior, Finishes: Clean & Paint $136,100BE-R1 Building Exterior, Roofing: Maintenance $55,200MCP-E3 Mechanical Central Plant, Equipment: Replacement $98,800

    BN-T Building New, Toilets $349,500BN-C Building New, Classrooms $3,522,700S-SS2 Site, Shade Structure: Relocate $231,400PC-2 Play Courts: Remove & Replace $233,600

    Master Plan Improvement Total $6,793,100

    Proposed State Funding

    Current Available Funding (60%) $565,6862014 State SFP Modernization Match (60%) $205,6862015 State SFP Modernization Match (60%) $998,616

    2016 State SFP Modernization Match (60%) $91,2542018 State SFP Modernization Match (60%) $237,344

    Available State Funds $2,098,586

    TOTAL LOCAL FUNDS REQUIRED $4,694,514

    * Cost does not include purchase of additional site acreage.

    25

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    30/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | JACKSON ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    31/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-C2 Building Interior, Classrooms: New Finishes $421,900ID-S1 Identification Device, Site: School Marque $32,900

    S-WA2 Site, Walkway Accessibility: Partial Replacement $113,400S-FE3 Site, Fence Enclosure: New $109,400ID-B2 Identification Device, Building: Signs $18,600P-DF3 Plumbing, Drinking Fountains: New $19,800BO-W2 Building Openings, Windows: Partial Replacement $138,700BO-D2 Building Openings, Doors: Partial Replacement $54,800BE-R3 Building Exterior, Roof: Replace $82,600S-SD2 Site, Storm Drainage: Modify $49,000MCP-E3 Mechanical Central Plant, Equipment: Replace $65,900MB-E1 Mechanical Building, Equipment: Replace $453,000BN-MP Building New, Multi-Purpose $4,201,700BI-C4 Building Interiors, Classrooms: Reconfigure Spaces $348,800

    BI-T2 Building Interiors, Toilets: New Finishes $49,800LZ-B2 Loading Zone, Bus: Remove & Replace $143,400LZ-P3 Loading Zone, Parent: New $143,400PL-S3 Parking Lot, Staff: New $694,100PC-2 Play Courts: Remove & Replace $254,200BN-K Building New, Kindergarten $682,000BN-C Building New, Classrooms $2,373,200PF-B3 Play Fields, Backstops: New $107,100BE-F1 Building Exterior, Finishes: Clean & Paint $122,500TE-C3 Technology Equipment, Classrooms: New $91,900

    Master Plan Improvement Total $10,772,100

    Proposed State Funding

    Current Available Funding (60%) $969,8222016 State SFP Modernization Match (60%) $84,1842018 State SFP Modernization Match (60%) $227,2742019 State SFP Modernization Match (60%) $173,9682022 State SFP Modernization Match (60%) $440,290

    Available State Funds $1,895,538

    TOTAL LOCAL FUNDS REQUIRED $8,876,562

    27

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    32/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | JEFFERSON ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    33/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-C3 Building Interior, Classroom: Finishes+MEP $433,000BI-C2 Building Interior, Classroom: New Finishes $98,900

    ID-S1 Identification Devices, Site: School Marque $32,900PC-1 Play Courts: Remove & Replace $53,300S-SS3 Site, Shade Structure: New $71,500PG-1 Play Grounds: Remove & Replace $4,500BO-G1 Building Openings, Glass: Partial Replacement $218,000BE-F2 Building Exterior, Finishes: Repairs $16,500BE-F1 Building Exterior, Finishes: Clean & Paint $104,800S-LI1 Site, Landscape & Irrigation: Soil Treatment $156,000S-LI2 Site, Landscape & Irrigation: Equipment $82,400MCP-E3 Mechanical Central Plant, Equipment: Replacement $65,900MB-E2 Mechanical Building, Equipment: Replacement $263,800BN-A Building New, Administration $375,300

    BI-A4 Building Interior, Administration: Reconfigure Spaces $133,100PL-V3 Parking Lot, Visitors: New $47,800LZ-P3 Loading Zone, Parents: New $143,400OS-W2 Off-Site, Walkway: Infill Sidewalk $79,400S-FO3 Site, Fencing Ornamental: New $77,200BN-K Building New, Kindergarten $804,400

    Master Plan Improvement Total $3,262,100

    Proposed State Funding

    2018 State SFP Modernization Match (60%) $374,954

    2019 State SFP Modernization Match (60%) $886,986Available State Funds $1,261,940

    TOTAL LOCAL FUNDS REQUIRED $2,000,160

    29

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    34/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | JOHN S. WASH ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    35/106

    FACILITY NEEDS: COST

    Proposed Improvements

    MB-E3 Mechanical Building, Equipment: Replace $236,200BI-C3 Building Interior, Classroom: Finishes + MEP $306,500TE-C1 Technology Equipment, Classroom: New $91,900ID-S1 Identification Devices, Site: School Marque $32,900PC-1 Play Courts: Seal & Stripe $13,300BO-W1 Building Opening, Glass: Partial Replacement $112,000BE-F1 Building Exterior, Finishes: Clean & Paint $125,000PL-S3 Parking Lot, Staff: New $821,500S-SS3 Site, Shade Structure: New $214,400BN-K Building New, Kindergarten: New $446,900S-FL1 Site, Lighting Field: Practice $59,600

    Master Plan Improvement Total $2,460,200

    Proposed State Funding

    Current Available Funding (60%) $1,210,000

    Available State Funds $1,210,000

    TOTAL LOCAL FUNDS REQUIRED $1,250,200

    31

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    36/106

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | LINCOLN ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    37/106

    FACILITY NEEDS: COST

    Proposed Improvements

    PF-3* Play Fields: New $751,500BI-A4 Building Interior, Admin.: Reconfigure Spaces $184,800ID-S1 Identification Devices, Site: School Marque $32,900S-FO3 Site, Fencing Ornamental: New $77,200S-FE3 Site, Fencing Enclosures: New $37,100BI-C3 Building Interior, Classrooms: Finishes+MEP $214,400BO-G2 Building Openings, Glass: Partial Replacement $219,700BO-D2 Building Openings, Doors: Partial Replacement $78,200BE-F1 Building Exterior, Finishes: Clean & Paint $149,000BP-PS3 Building Portables, Pre-School: New $1,787,600BN-K Building New, Kindergarten $1,564,100BI-C4 Building Interior, Classroom: Reconfigure Spaces $184,800BN-SE Building New, Special Education $1,564,100BN-C Building New, Classrooms $618,000

    LZ-B3 Loading Zone, Bus: New $143,350LZ-P3 Loading Zone, Parent: New $143,350SL-P3 Site Lighting, Parking: New $14,200S-FS2 Site Fencing, Enclosure: Replace $77,200S-LF1 Site Fencing, Ornamental, New $77,200PC-2 Play Courts: Remove & Replace $302,900PG-3 Play Grounds: New $28,400S-SS3 Site, Shade Structures: New $107,200BI-K2 Building Interiors, Kindergarten: New Finishes $505,200

    Master Plan Improvement Total $8,862,400

    Proposed State Funding

    2013 State SFP Modernization Match (60%) $1,268,2042016 State SFP Modernization Match (60%) $121,4742018 State SFP Modernization Match (60%) $137,7482019 State SFP Modernization Match (60%) $62,600

    Available State Funds $1,590,026

    TOTAL LOCAL FUNDS REQUIRED $7,272,374

    * Any costs associated with District reacquiring use of City Park are not

    included.

    33

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    38/106

    MASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | LONE STAR ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    39/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-F2 Building Interior, Finishes: New $519,500ID-S1 Identification Device, Site: School Marque $32,900S-WA2 Site, Walkway Accessibility: Partial Replacement $113,400S-LB3 Site, Lighting Bus: New $9,800S-SS3 Site, Shade Structure: New $35,700PC-3 Play Courts: Remove & Replace $268,000PF-B3 Play Fields, Backstops: New $107,100BO-D1 Building Opening, Doors: Partial Replacement $31,300BE-F1 Building Exterior, Finishes: Clean & Paint $136,100BE-R1 Building Exterior, Roof: Maintenance $23,500MCP-E2 Mechanical Central Plant, Equipment: Replace $164,700BN-MP Building New, Multi-Purpose $5,261,500FS-S3 Fire Sprinklers, Site: New $567,200BI-L4 Building Interior, Library: Reconfigure Spaces $400,200

    BI-K4 Building Interior, Kindergarten: Reconfigure Spaces $128,100S-LP3 Site, Lighting Parking: New $33,700S-SS3 Site, Shade Structure: New $71,500PG-3 Play Ground: New $143,500S-DF3 Site, Drinking Fountain: New $6,600

    Master Plan Improvement Total $8,054,300

    Proposed State Funding

    2015 State SFP Modernization Match (60%) $950,000

    Available State Funds $950,000

    TOTAL LOCAL FUNDS REQUIRED $7,104,300

    35

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    40/106

    MASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | MADISON ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    41/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-C3 Building Interiors, Classrooms: Finishes+MEP $878,400ID-S1 Identification Devices, Site: School Marque $32,900S-FO3 Site Fencing, Ornamental: New $77,200BO-D1 Building Openings, Doors: Partial Replacement $39,100BE-F1 Building Exterior, Finishes: Clean & Paint $120,500BE-R2 Building Exterior, Roofing: Remove & Replace $212,900MCP-E2 Mechanical Central Plant, Equipment: Replace $65,900BN-MP Building New, Multi-Purpose $5,176,400PC-2 Play Courts: Remove & Replace $334,100BI-L4 Building Interiors, Library: Reconfigure Spaces $387,100S-WA2 Site, Walkways Accessibility: Remove & Replace $141,800S-LW3 Site, Lighting Walkways: New $29,800BI-T1 Building Interiors, Toilets: Clean & Paint $294,300PG-4 Play Ground: New Equipment $56,700

    S-SS3 Site, Shade Structure: New $85,100PF-B3 Play Fields, Backstops: New $107,100S-LF1 Site, Lighting Fields: Practice $113,100BN-K Building New, Kindergarten $732,900BN-C Building New, Classrooms $1,526,500

    Master Plan Improvement Total $10,411,800

    Proposed State Funding

    Current Available Funding $1,445,2142018 State SFP Modernization Match (60%) $270,000

    2019 State SFP Modernization Match (60%) $223,336Available State Funds $1,938,550

    TOTAL LOCAL FUNDS REQUIRED $8,473,250

    37

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    42/106

    MASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | RONALD W. REAGAN ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    43/106

    FACILITY NEEDS: COST

    Proposed Improvements

    TE-C3 Technology Equipment, Classroom: New $214,400MB-E1 Mechanical Building, Equipment: Repairs $8,200ID-S1 Identification Devices, Site: School Marque $32,900

    PG-1 Play Ground: Modify $20,400BE-F1 Building Exterior, Finishes: Clean & Paint $153,000S-SS3 Site, Shade Structure: New $35,700

    Master Plan Improvement Total $464,600

    Proposed State Funding

    Not yet eligible

    Available State Funds N/A

    TOTAL LOCAL FUNDS REQUIRED $464,600

    39

    MASTER PLAN

  • 7/29/2019 Sanger Facilities Master Plan

    44/106

    MASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | SEQUOIA ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    45/106

    FACILITY NEEDS: COST

    Proposed Improvements

    S-SS3 Site, Shade Structure: New $71,500S-DF3 Site, Drinking Fountain: New $6,600

    Master Plan Improvement Total $78,100

    Proposed State Funding

    Not yet eligible

    Available State Funds N/A

    TOTAL LOCAL FUNDS REQUIRED $78,100

    41

  • 7/29/2019 Sanger Facilities Master Plan

    46/106

    FACILITY NEEDS: COSTMASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | WILSON ELEMENTARY

  • 7/29/2019 Sanger Facilities Master Plan

    47/106

    FACILITY NEEDS: COST

    Proposed Improvements

    S-LF1 Site, Lighting Fields: Practice $35,400BI-FS3 Building Interior, Food Service: Reconfigure Spaces $434,900BI-T2 Building Interior, Toilets: Finishes + MEP $192,700

    ID-S1 Identification Devices, Site: School Marque $32,900S-FO3 Site, Fencing Ornamental: New $154,400BO-W1 Building Openings, Windows: Partial Replacement $289,800BO-D1 Building Openings, Doors: Partial Replacement $43,800BE-F1 Building Exterior, Finishes: Clean & Paint $154,700MB-E2 Mechanical Building, Equipment: Repairs $165,300BI-L4 Building Interiors, Library: Reconfigure Spaces $373,600BI-SP4 Building Interiors, Sp. Prog.: Reconfigure Spaces $401,200BI-A4 Building Interiors, Admin.: Reconfigure Spaces $136,100LZ-B3 Loading Zone, Bus: New $143,400LZ-P3 Loading Zone, Parent: New $143,400

    PL-S4 Parking Lot, Staff

    : New $505,200S-SS3 Site, Shade Structures $71,400PC-2 Play Courts: Relocate $391,700PF-B3 Play Fields, Backstops: New $107,100PG-E2 Play Ground, Equipment: Relocate $28,400BN-K Building New, Kindergarten $1,564,100BN-C Building New, Classrooms $1,789,200BP-C2 Building Portable, Classroom: Relocate $141,800S-SA3 Site, Student Amphitheater $231,400S-FE3 Site, Fence Enclosure: New $143,400BI-MP4 Building Interior, MP: Reconfigure Space $984,800TE-C3 Technology Equipment, Classroom: New $142,900

    BI-T3 Building Interiors, Toilet: Reconfigure Spaces $142,800

    Master Plan Improvement Total $8,945,800

    Proposed State Funding

    Current Available Funding $480,0002018 State SFP Modernization Match (60%) $1,135,000

    Available State Funds $1,615,000

    TOTAL LOCAL FUNDS REQUIRED $7,330,800

    43

  • 7/29/2019 Sanger Facilities Master Plan

    48/106

  • 7/29/2019 Sanger Facilities Master Plan

    49/106

  • 7/29/2019 Sanger Facilities Master Plan

    50/106

  • 7/29/2019 Sanger Facilities Master Plan

    51/106

  • 7/29/2019 Sanger Facilities Master Plan

    52/106

  • 7/29/2019 Sanger Facilities Master Plan

    53/106

  • 7/29/2019 Sanger Facilities Master Plan

    54/106

  • 7/29/2019 Sanger Facilities Master Plan

    55/106

  • 7/29/2019 Sanger Facilities Master Plan

    56/106

  • 7/29/2019 Sanger Facilities Master Plan

    57/106

  • 7/29/2019 Sanger Facilities Master Plan

    58/106

  • 7/29/2019 Sanger Facilities Master Plan

    59/106

  • 7/29/2019 Sanger Facilities Master Plan

    60/106

  • 7/29/2019 Sanger Facilities Master Plan

    61/106

  • 7/29/2019 Sanger Facilities Master Plan

    62/106

    FACILITY NEEDS: COST

    Proposed Improvements

    MASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | QUAIL LAKE ENVIRONMENTAL CHARTER

  • 7/29/2019 Sanger Facilities Master Plan

    63/106

    Proposed Improvements

    BI-K3 Building Interiors, Kitchen: Finishes + MEP $310,600TE-MP2 Technology Equipment, Multi-Purpose: Replace $32,900BI-T2 Building Interior, Toilets: Finishes + MEP $85,100

    BI-C2 Building Interiors, Classrooms: New Finishes $332,200BI-MP2 Building Interiors, Multi-Purpose: New Finishes $169,100BE-F1 Building Exterior, Finishes: Clean & Paint $139,700BN-C Building New, Classrooms $3,176,300BN-C Building New, Classrooms $3,460,900LZ-B3 Loading Zone, Bus: New $143,400LZ-P3 Loading Zone, Parent: New $143,400PL-S3 Parking Lot, Staff: New $1,394,100S-LI1 Site, Landscape & Irrigation: Soil Treatment $186,100PC-3 Play Courts: New $165,700PG-2 Play Grounds: Remove & Replace $28,400PG-3 Play Grounds: New $129,300

    S-SS3 Site, Shade Structure: New $107,200

    Master Plan Improvement Total $10,004,400

    Proposed State Funding

    Not yet eligible

    Available State Funds N/A

    TOTAL LOCAL FUNDS REQUIRED $10,004,400

    59

  • 7/29/2019 Sanger Facilities Master Plan

    64/106

    FACILITY NEEDS: COST

    Proposed Improvements

    M A S T E R P L A N | REEDLEY HIGH SCHOOL

    MASTER PLANMASTER PLAN

    E X I S T I N G S C H O O L F A C I L I T I E S N E E D S | SANGER ACADEMY SCHOOL

  • 7/29/2019 Sanger Facilities Master Plan

    65/106

    Proposed Improvements

    BI-T3 Building Interior, Toilets: Reconfigure Spaces $415,400

    TE-C3 Technology Equipment, Classroom: New $234,800BI-C3 Building Interiors, Classrooms: Finishes+MEP $1,123,100

    BO-W3 Building Openings, Windows: Partial Replacement $284,800BO-D3 Building Openings, Doors: Partial Replacement $131,400BE-F1 Building Exterior, Finishes: Clean & Paint $147,700ID-S1 Identifying Devices, Site: School Marque $32,900

    LZ-P2 Loading Zone, Parent: Remove & Replace $143,400S-LI2 Site, Landscape & Irrigation: Grading $29,100MS-D2 Mechanical Site, Distribution: Pipe Replacement $823,400

    MB-E2 Mechanical Building, Equipment: Replacement $260,200BP-C2 Building Portable, Classroom: Relocate $14,200BN-K Building New, Kindergarten $1,287,100

    BN-MP Building New, Multi-Purpose $5,777,300PL-S3 Parking Lot, Staff: New $716,800

    S-SA2 Site, Student Ampitheater: Reconstruct $231,400PC-3 Play Courts: Relocate $222,700PG-3 Play Ground: Relocate $28,400S-SS4 Site,Shade Structure: New $71,500

    PF-L1 Play Fields, Layout: Reconfigure $65,900PF-B3 Play Fields, Backstops: New $41,200S-LF1 Site, Lighting Fields: New $129,300

    BI-L3 Building Interiors, Library: Reconfigure Spaces $334,500BI-A3 Building Interiors, Admin.: Reconfigure Spaces $158,300BI-S3 Builidng Interiors, Science: Reconfigure Spaces $405,500

    BI-LS2 Building Interiors, Locker/Shower: New Finishes $360,700

    Master Plan Improvement Total $13,471,000

    Proposed State FundingCurrent Available Funding $95,298

    2014 State SFP Modernization Match (60%) $158,7002016 State SFP Modernization Match (60%) $418,0662018 State SFP Modernization Match (60%) $84,640

    2019 State SFP Modernization Match (60%) $1,774,036

    Available State Funds $2,530,740

    TOTAL LOCAL FUNDS REQUIRED $10,940,260

    61

  • 7/29/2019 Sanger Facilities Master Plan

    66/106

    This page was intentionally left blank

    4E N R O L L M E N T P R O J E C T I O N S

  • 7/29/2019 Sanger Facilities Master Plan

    67/106

    4

    SECTION 4 | ENROLLMENT PROJECTIONS

    S E C T I O N 4 | Enrollment Projections

  • 7/29/2019 Sanger Facilities Master Plan

    68/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    SECTION 4 | ENROLLMENT PROJECTIONS

    Introduction

    The Enrollment Projections and Future School Needs 2012-2021 report,

    prepared by Odell Planning & Research, Inc., serves as the basis forSection 4. The report projects District enrollment for the next ten yearsand makes recommendations as to the number, type, and generallocation of the school facilities needed to accommodate projectedgrowth. This section presents a summarized version of the report.

    Enrollment Projections

    Table 4.1 summarizes the projected enrollment growth in the Districtfor the next 10 years by school type. Chart 4.1 shows the projectedenrollment growth in the Sanger Unified School District for the next 10years.

    Sanger Unified K-12 enrollment is projected to increase from 10,873 in2011-12 to 13,973 in 2021-22. This is an increase of 3,100 students and anaverage growth rate of 2.54 percent per year.

    *Other includes Independent Study, Continuation, Community Day and SDC**Includes all District students

    SCHOOLS 201112 202122AVERAGE ANNUAL

    GROWTH RATES

    Sanger Area Elementary 2,453 2,777 1.25%

    Southeast Fresno Area K-6 1,165 2,087 7.24%

    Rural Area Elementary 1,037 1,243 1.83%

    Washington Academic Middle 1,578 2,111 2.95%

    Sanger High 2,694 3,399 2.35%

    Charter 1,604 1,930 1.87%

    Other* 342 426 2.23%

    Total District Enrollment Projection** 10,873 13,973 2.54%

    TABLE 4.1 Projected Enrollment 2021-2022 School Year

    CHART 4.1Sum of Schools Total District K-12

    64

    E N R O L L M E N T P R O J E C T I O N S | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    69/106

    Area-Specific Projections and Future School Needs

    Rural Schools

    The sch ools serving the more rural a reas of the D istrict are Fairmont,Del Rey, and Centerville Schools. Each of these schools is projected tobe below its District-defined operational capacity for the entire ten-year projection period. Therefore, no new rural-serving elementaryschool capacity will be needed.

    Charter Schools

    The thr ee charter s chool s Hallmark, Sanger Academy, and QuailLake each have unique features and facilities issues.

    Hallmark Charter operates as an independent study program anda significant portion of the students reside outside the District. Assuch, Hallmark Charter has no traditional school facilities needs.

    Sanger Academy Charter has no defined attendance area, primarilyserves students that reside in the District, and is projected to beabove operational capacity beginning in 2014. However, as a charterschool, Sanger Academy has the option of limiting its enrollment

    to space available. Any students denied admission because ofinsufficient capacity can be accommodated in the projected excesscapacity in the Sanger area K-5 schools.

    Quail Lake Environmental Charter has no defined attendance areaexcept that residents of the Quail Lake development are givenpreferential status for admission. Quail Lake Charter is currentlyoperating above District-defined operational capacity and willcontinue to be above operational capacity for the ten-year projectionperiod. However, the school has the option of limiting enrollmentto space available; and District resident students denied admissioncan be accommodated in other District elementary schools with the

    closest school being Fairmont Elementary.

    65

  • 7/29/2019 Sanger Facilities Master Plan

    70/106

    E N R O L L M E N T P R O J E C T I O N S | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    71/106

    Southeast Fresno Area Elementary Schools

    The elementary schools ser ving southe ast Fresno area are Sequoia,John Wash, and Lone Star Elementary Schools. Projected enrollmentfor these schools is shown on Chart 4.3.

    As a group, the three southeast Fresno schools will exceed theircombined operational capacity in 2015 and are projected to be 537above operational capacity at the end of the ten-year projectionperiod. Based on the projection, an additional elementary schoolwill be needed in the southeast Fresno area by approximately 2016.However, the timing for an additional elementary school may beimpacted by the potential need for an additional middle school and

    the fact that the District is in the process of acquiring a combinedmiddle school/high school site in the southeast Fresno area.

    CHART 4.3Southeast Fresno Area K-6

    67

    S E C T I O N 4 | Enrollment Projections

  • 7/29/2019 Sanger Facilities Master Plan

    72/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    Middle School

    Washington Academic Middle School (WAMS) is the only middle schoolin the District. Projected enrollment for WAMS is shown on Chart 4.4.

    WAMS is projected to exceed its District-defined operational capacityin 2013 and be approximately 500 students above operationalcapacity by the end of the ten-year projection period. The timing fora new middle school is dependent on several factors: 1) grade levelconfiguration; 2) shared facilities use and program integration with afuture high school; 3) and timing of high school facilities needs. Forexample, if the school is planned to operate as a grades 6-8 schooland serves the grade 6 students that now attend the southeast Fresno

    area K-6 schools, a future middle school in the southeast Fresno areacould have an enrollment of between 700 and 800 in 2016. Under thisscenario, a new middle school should be constructed in southeastFresno by the 2016-17 school year, if not earlier.

    CHART 4.4Washington Academic Middle School

    68

    E N R O L L M E N T P R O J E C T I O N S | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    73/106

    High School

    Sanger High School (WAMS) is the only comprehensive highschool in the District. Projected enrollment for Sanger High isshown on Chart 4.5.

    Sanger High School is currently operating above its District-definedoperational capacity and is projected to be 969 above operationalcapacity by the end of the ten-year projection period. The District isin the process of acquiring a future high school/middle school site inthe southeast area of the District to meet the needs of existing andfuture southeast Fresno and southern Clovis area growth. In part, thetiming for a new southeast Fresno area high school is dependent on

    factors relating to the timing for a future middle school discussedpreviously and the extent to which the middle and high schoolprograms share facilities and have program integration. It is probablethat some type of phased construction will be required to makethe construction of the high school and middle school feasible, asinitially there will be insufficient enrollment for a full school of eitherconfiguration. Nonetheless, by 2016 it is probable that the combinedgrades 6-8 middle school and high school potential enrollment for asoutheast Fresno area campus would be 1,400 or greater. Therefore,2016 is a reasonable target date for the addition of some type ofmiddle/high school capacity to relieve both WAMS and Sanger High.

    CHART 4.5Sanger High School

    69

  • 7/29/2019 Sanger Facilities Master Plan

    74/106

    This page was intentionally left blank

    5N E W S C H O O L F A C I L I T Y N E E D S

  • 7/29/2019 Sanger Facilities Master Plan

    75/106

    5

    S E C T I O N 5 | New School Facility Needs

    SECTION 5 | NEW SCHOOL FACILITY NEEDS

  • 7/29/2019 Sanger Facilities Master Plan

    76/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    As student enrollment changes each year, the District must be in aposition to understand enrollment trends and react to the impactprojected student enrollment increases or decreases will have on theDistricts ability to adequately house its students in qual ity facilities.Because the enrollment projections over the 10 year life of this FMPreferenced in Section 4 | Enrollment Projections indicates that theDistrict will not have sufficient student capacity, it is projected theDistrict will be required to build new schools. Since new facilitiestake time to plan, the timing of when a facility is needed is critical. Inaddition to projecting student enrollment over the next 10 years, thisFMP identifies the communities where these changes in enrollmentare potentially to occur, and when the unmet student housing needswill require new facilities to house these additional students. This datainforms the District as to when to time the need for new facilities. This

    master plan identifies a housing strategy, and the types and sizes of thenew schools.

    Table 5.1 summarizes the new facility needs required based on theOdell Planning & Research, Enrollment Projections and Future SchoolNeeds, 2012-2021 report.

    As the new facility needs were defined, the associated capital costs wereestimated, gathered and defined. The capital needs for the new schoolfacilities are based upon the anticipated project costs for the forecastedyear of 2016. These costs include the construction costs (hard costs) andother non-direct costs (soft costs). These facilities were estimated in thevalue of todays dollars (2012), and then escalated to include inflationforces to 2016.

    72

    N E W S C H O O L F A C I L I T Y N E E D S | Sanger Unified School District

    Table 5 1 Enrollment Growth and Facility Requirements Study

  • 7/29/2019 Sanger Facilities Master Plan

    77/106

    Note:The capital needs for the new school facility projects are based upon the anticipated project costs for the forecasted year thefacility is required. These costs include the construction costs (hard costs) and other non direct costs (soft costs). These projectswere estimated in the value of 2016 dollars.

    Table 5.1 Enrollment Growth and Facility Requirements Study

    Project Budget

    Project Development Costs

    Elementary School

    Purchase Site $1,100,000

    Site Acquisition, Environmental Documents, or Other Planning Costs $152,000

    Develop Architectural Plans & Specifications $1,322,000

    Middle School

    Site Purchase $2,520,000

    Site Acquisition, Environmental Documents, or Other Planning Costs $287,000

    Develop Architectural Plans & Specifications $2,260,000

    High School

    Site Purchase $5,880,000

    Site Acquisition, Environmental Documents, or Other Planning Costs $713,000

    Develop Architectural Plans & Specifications $4,565,000

    Total Project Development Needs $18,799,000

    Construction Project Costs

    Elementary School $20,994,000

    Middle School $39,520,000

    High School $86,455,000

    Total Construction Project Needs $146,969,000*

    TOTAL NEW SCHOOL FACILITY NEEDS $165,768,000

    73

  • 7/29/2019 Sanger Facilities Master Plan

    78/106

    This page was intentionally left blank

    6D I S T R I C T F A C I L I T I E S N E E D S

  • 7/29/2019 Sanger Facilities Master Plan

    79/106

    S E C T I O N 6 | District Facilities Needs

    SECTION 6 | DISTRIC T FACILITIES NEEDS

  • 7/29/2019 Sanger Facilities Master Plan

    80/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    The capital needs for the District facilities needs are based upon the ant icipated project costs for the forecasted year the facility is required.These costs include the construction costs (hard costs) and other non direct costs (soft costs). These improvements were estimated in thevalue of 2014 dollars.

    Table 6.1 District Facilities Needs

    Project Budget

    District Facilities Needs

    The Distric t Facil ities Needs are non -school sp ecific improvement s.The identified imp rovements are op erationally efficiency needorientated and based in part on the Di stricts Facilities Crisis andManagement Assessment Team (FCMAT) report.

    Table 6.1 lists improvements that have been identified as District

    District Office $3,216,000

    Transportation Yard/Bus Maintenance $8,204,300

    Warehouse $3,463,100

    Maintenance and Operations $2,906,300

    Tom Flores Stadium $3,564,900

    New Stadium $13,250,000

    TOTAL DISTRICT FACILITIES NEEDS $34,604,600

    76

    D I S T R I C T F A C I L I T I E S N E E D S | Sanger Unified School District

  • 7/29/2019 Sanger Facilities Master Plan

    81/106

    The following graphic si te plans i llustrate the existing Districtfacility sites and an accompanying draft conceptual vision. The draftconceptual vision is intended to identify in graphic form the list of

    improvements and their associated budgets. The draft concepts arenot intended to be the final design solution, but rather to illustrate theimprovements that would be suitable for the District facility.

    Each of the sites will have a list of Proposed Improvements andan associated project budget in 2014 dollars. The Master PlanImprovement Total is the sum of the individual improvements. Thisfigure then represents the financial need necessary to fund theidentified improvements.

    The listing of the Proposed State Funding identifies the year andfinancial amount of the potential modernization eligibility grants. The

    Available State Funds is the sum of potential State funded grants.

    The Local Funds Required is the difference between the Master PlanImprovement Total and the Available St ate Funds, and represents theadjusted financial need.

    DISTRICT

    District Office 78

    Transportation Yard/Bus Maintenance 80

    Warehouse 82

    Maintenance and Operations 82

    Tom Flores Stadium 84

    Table of contents

    School Page

    77

  • 7/29/2019 Sanger Facilities Master Plan

    82/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BE-F3 Building Exteriors, Finishes: Replace $344,400

    MASTER PLAN

    D I S T R I C T F A C I L I T I E S N E E D S | DISTRICT OFFICE

  • 7/29/2019 Sanger Facilities Master Plan

    83/106

    ID-S1 Identification Devices, Site: Marque Sign $32,900ID-B3 Identification Devices, Building: Signs $26,600PL-1 Parking Lot: Seal & Strip $17,500

    MB-E3 Mechanical Building, Equipment: Replacement $120,100BI-A4 Building Interiors, Admin.: Reconfigure Spaces $376,500BI-A3 Building Interiors, Admin.: New Finishes + MEP $162,300BO-W4 Building Openings, Windows: Partial Replacement $62,700BO-D4 Building Openings, Doors: Partial Replacement $156,500BE-F1 Building Exteriors, Finishes: Clean & Paint $47,400BE-R1 Building Exterior, Roof: Maintanence $142,300BI-A3 Building Interiors, Admin: Reconfigure Spaces $834,000BA-IT Building Addition, Technology $709,000BP-T Building Portables, Toilets: New $183,800

    Master Plan Improvement Total $3,216,000

    Proposed State Funding

    Not eligible

    Available State Funds N/A

    TOTAL LOCAL FUNDS REQUIRED $3,216,000

    79

  • 7/29/2019 Sanger Facilities Master Plan

    84/106

  • 7/29/2019 Sanger Facilities Master Plan

    85/106

  • 7/29/2019 Sanger Facilities Master Plan

    86/106

  • 7/29/2019 Sanger Facilities Master Plan

    87/106

  • 7/29/2019 Sanger Facilities Master Plan

    88/106

    FACILITY NEEDS: COST

    Proposed Improvements

    BI-F3 Building Interior, Finishes: New + MEP $108,300BI-F1 Building Interior, Finishes: Clean & Paint $20,100

    MASTER PLAN

    D I S T R I C T F A C I L I T I E S N E E D S | TOM FLORES STADIUM

  • 7/29/2019 Sanger Facilities Master Plan

    89/106

    g , $ ,BO-D3 Buiding Opening, Doors: Partial Replacement $16,400BE-F1 Building Exterior, Finishes: Clean & Paint $10,100

    BE-R1 Builidng Exterior, Roofing: Maintenance $38,500IS-B Identification Device, Site: Buildings $3,700BN-SB Building New: Snack Bar $593,000BN-T Building New, Toilets $576,900BE-F1 Building Exterior, Finishes: Clean & Paint $10,100OS-RD OffSite, Roadway Development $146,100S-DI Site, Demolition Improvements $341,800S-UC Site, Utility Connections $293,200S-EW Site, Earthwork $151,300ID-S1 Identification Devices, Site: Facility Marque $98,700ID-S2 Identification Devices, Site: Wayfinding $5,300PL-S3 Parking Lot, Staff: New $753,500S-FS3 Site, Fencing Security: New $34,400S-FO3 Site, Fencing Ornamental: New $89,400S-W3 Site, Walkways: New $179,700S-LI Site, Landscape & Irrigation: $94,400

    Master Plan Improvement Total $3,564,900

    Proposed State Funding

    Not eligible

    Available State Funds N/A

    TOTAL LOCAL FUNDS REQUIRED $3,564,900

    85

  • 7/29/2019 Sanger Facilities Master Plan

    90/106

    This page was intentionally left blank

    7F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N

  • 7/29/2019 Sanger Facilities Master Plan

    91/106

    S E C T I O N 7 | Financing the Facilities Master Plan

    Section 7 | FINANCING THE FACILITIES MASTER PLAN

    Introduction

  • 7/29/2019 Sanger Facilities Master Plan

    92/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    Developer Fee Funds

    The Distric t currently has $0 in uncommitted developer fee funds and has$0 in developer fee funds to support this FMP.

    Capital Facility Funds Available in the next 10 years

    t Uncommitted capital facility funds $11,472,937

    t Developer Fee funds $0

    Total Capital Facility Funds Available $11,472,937

    Financing a Facilities Master Plan requires an aggressive plan that takesinto consideration all possible funding options including, but not limitedto, local funding options, general obligation bonds, the State schoolbuilding program (Senate Bill 50), federal funding opportunities, grantsfor capital facility projects, and the inclusion of current capital fundsavailable to the District. This section of the report will summarize theDistricts capital funds currently available, estimate their eligible Statecapital facility funds for new construction and modernization projects,and identify the estimated proceeds they would receive based on threedifferent general obligation bond measure scenarios, along with theimpact of the each scenario on property tax rates. Further, this sectionwill summarize other State and federal programs that provide fundingfor capital facility programs.

    Funds Currently Available for Capital Projects

    Because of excellent planning along with aggressively pursuing Statecapital facility funds, the SUSD was able to complete a majority of theprojects included in the previous capital Facilities Master Plan withouthaving to expend the total amount of capital funds available. As aresult, these capital funds are available to be used for partially fundingthe existing and new construction projects highlighted in this report.

    The following is a summar y of the capital facility funds that wi ll beavailable to the District during the next 10 years that do not requirevoter approval.

    Capital Facility Fund Balance

    The Distric t currently has $11,472,937 in uncommitted capital fundsthat will be available to fund improvements highlighted in this FMP.

    88

    F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    State School Building Eligibility

  • 7/29/2019 Sanger Facilities Master Plan

    93/106

    Introduction

    The State Sc hool Facili ty Program (SFP) provides funding grant s for school district s to acquireschool sites, construct new school facilities, or modernize existing school facilities. Althoughthere are several boutique programs included in the SFP, the two major funding typesavailable to school districts are the New Construction and Modernization programs. TheNew Construction grant provides funding on a 50/50 State and local match basis and theModernization grant provides funding on a 60/40 State and local match basis. The remainder ofthe SFP programs are summarized under Additional State Facility Programs in this section.

    Funding Sources for the SFP

    Funding for the SFP comes from statewide general obligation bonds approved by Californiavoters. The State Allocation Board (SAB) is responsible for determining the allocation of State

    funds used for the SFP. The SAB is comprised of ten members, including three State Senators,three State Assembly Members, the Superintendent of Public Instruction, the Director of theDepartment of Finance, the Director of the Department of General Services and one personappointed by the Governor.

    The Office of Public School Construction (OPSC) is staffto the SAB and is responsiblefor verifying applicant school districts eligibility, processing funding applications andadministering all SAB programs including preparing regulations, policies and procedures forapproval by the SAB. The OPSC also prepares the SAB meeting agendas, which serve as sourcedocuments used by the State Controllers Office for fund releases and as historical records for allSAB decisions.

    Because there has not been a State school bond measure since 2006, most of the Stateauthorization for facility programs has been exhausted and will definitely be exhausted by thetime the SUSD will have its matching funds for new construction and modernization projects.It is unlikely a State school bond measure will be placed on the November 2012 statewideelection ballot. The next possible State school bond measure will be in June or Novemberof 2014. The eligibility amounts listed on the following pages are based on the current SFP,which is subject to modification with new legislation and/or regulation changes by the State

    89

    S e c t i o n 7 | Financing the Facilities Master Plan

    Allocation Board (SAB).

    N C i Eli ibili f SUSD

  • 7/29/2019 Sanger Facilities Master Plan

    94/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    New Construction Eligibility for SUSD

    The SFP New Construction program funding may be used to purchase and/or build new schoolsor classrooms for eligible K-12 students. Eligibility for this program is based upon enrollmentprojections and seating capacity in the District. The District must provide an equal match to theStates contribution for projects.

    New construction eligibility is calculated annually based on the October enrollment of thedistrict. Based on a preliminary review of the Districts enrollment, the District is eligible forapproximately $38,134,633 in State new construction funds.

    Table 7.1 provides a more detailed summary of the Districts New Construction Eligibility.

    90

    F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    Table 7.1 New Construction Eligibility

    Pupil Grants

  • 7/29/2019 Sanger Facilities Master Plan

    95/106

    Pupil Grants

    K-6 7-8 9-12 Non-Severe Severe Total

    2011/12 10-Year Draft Projection 7,849 2,179 3,906 119 3 14,056

    Baseline Capacity Adjustment* (3,790) (2,862) (2,430) (120) 0 (9,202)

    2011/12 Total Draft Eligibility Calculation 4,059 (683) 1,476 (1) 3

    2011/12 Total Draft Eligibility (Net) 4,059 0 1,476 0 3 5,535

    Project Drawdown

    Project Number Site SAB Date

    50/62414-00-001 New Elementary (Quail Lake) 1/26/00 (219) (246) 0 0 0 (465)

    50/62414-00-002 John Wash (Design) 5/28/03 (150) 0 0 0 0 (150)

    50/62414-00-003 Lone Star (Design) 5/28/03 (150) 0 0 0 0 (150)

    50/62414-00-004 New Elementary (Reagan) (Design) 5/28/03 (403) (124) 0 (5) 0 (532)

    50/62414-00-002 John Wash (Adjusted) 5/25/05 (25) 0 0 0 0 (25)

    50/62414-00-003 Lone Star (Adjusted) 5/25/05 75 (27) 0 0 0 48

    50/62414-00-004 New Elementary (Reagan) (Adjusted) 5/27/07 (172) 124 0 5 0 (43)

    50/62414-00-006 Sanger High 5/28/08 (135) 0 0 0 0 (135)

    50/62414-00-007 Quail Lake 6/25/08 (16) 0 0 0 0 (16)

    50/62414-00-008 Sanger Academy Charter 6/25/08 (25) 0 0 0 0 (25)

    50/62414-00-009 Lone Star 6/25/08 (50) 0 0 0 0 (50)

    50/62414-00-010 John Wash (Unfunded) 10/6/10* (50) 0 0 0 0 (50)

    50/62414-00-011 Jefferson (Unfunded) 10/6/10* (50) 0 0 0 0 (50)

    50/62414-00-012 Fairmont (Unfunded) 10/6/10* (50) 0 0 0 0 (50)

    50/62414-00-013 Lincoln (Unfunded) 10/6/10* (50) 0 0 0 0 (50)

    50/62414-00-004 New Elementary (Sequoia) (Unfunded) 7/12/11 (550) 0 0 0 0 (550)

    Total Project Drawdown (2,020) (273) 0 0 0 (2,293)

    Net Remaining Eligibility 2,039 0 1,476 0 3 3,515

    50% State Share $19,278,745 $0 $18,776,196 $0 $79,692 $38,134,633

    50% District Match $19,278,745 $0 $18,776,196 $0 $79,692 $38,134,633

    Total Estimated Project Funding $38,557,490 $0 $37,552,392 $0 $159,384 $76,269,266

    Notes:

    t Existing School Building Capacity from SAB 50-02 provided by OPSC

    t Utilizes pupil grant amounts as approved by the State Allocaton Boardon January 25, 2012

    t Four Unfunded Approvals of 10/6/10 were provided Final Apportionments on 12/14/11

    t Based upon the timing of the drawdowns, Projects -001, -00 3, and -004 would not have had eligibility in the 7-8 Gradecategory. Use of K-6 or 9-12 Grants would have been available starting in March 200 3.

    91

    S e c t i o n 7 | Financing the Facilities Master Plan

    Modernization

    SFP Modernization program funding is available for the renovation or replacement of existing buildings. This funding may not be used to increase the capacity at a site.

  • 7/29/2019 Sanger Facilities Master Plan

    96/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    Modernization eligibility is site-specific and is generated by permanent buildings over 25 years of age and portable buildings over 20 years of age.

    The Distric t currently has modernization eligibility totaling approximately $7,293,016 in base grant State funding through 2011 and approximately $24,908,546 through2023. This modernization eligibility includes a draw down for the projects approved by the SAB. The District will need to update its modernization eligibility annually foreach school site in order to maximize its modernization funding during the life of this FMP.

    Table 7.2 provides a more detailed summary of the Districts 10 year modernization eligibility analysis.

    School Site Estimated CurrentFunding Available

    2012 Funding 2013 Funding 2014 Funding 2015 Funding 2016 Funding 2017 Funding 2018 Funding 2019 Funding 2020 Funding 2021 Funding 2022 Funding 2023 Funding Total Funding

    Centerville Elementary $0 $344,258 $513,712 $857,970

    Del Rey Elementary $0 $776,000 $776,000

    Fairmont Elementary $565,686 $205,686 $998,616 $91,254 $237,344 $2,098,586

    Jackson Elementary$969,822 $84,184 $227,274 $173,968 $440,290 $1,895,538

    Jefferson Elementary $0 $374,954 $886,986 $1,261,940

    Lincoln Elementary $0 $1,268,204 $121,474 $137,748 $62,600 $1,590,026

    Lone Star Elementary $0 $950,000 $950,000

    Madison Elementary $1,445,214 $270,000 $223,336 $1,938,550

    Ronald W. Reagan Elementary* $0 $0

    Sequoia Elementary* $0 $0

    John S. Wash Elementary $1,210,000 $1,210,000

    Wilson Elementary $480,000 $1,135,000 $1,615,000

    Washington Academic MS (Old) $95,298 $158,700 $418,066 $84,640 $1,774,036 $2,530,740

    Sanger High (Old) $1,494,231 $200,825 $176,858 $326,016 $4,953,501 $7,151,431

    Sanger High (New)* $0 $0

    Kings River High (Cont)/Taft High $1,032,765 $1,032,765

    Community Day*** $0 $0

    Hallmark Charter** $0Quail Lake Environmental Charter* $0 $0

    TOTAL $7,293,016 $0 $1,268,204 $565,211 $2,724,616 $891,836 $326,016 $2,811,218 $3,634,638 $0 $0 $440,290 $4,953,501 $24,908,546

    Table 7.2 10 year Modernization Eligibility Summary Sheet | Updated to 2012 Pupil Grant Amounts

    * These schools are newer and do not yet generate modernization eligibility

    ** Hallmark Charter consists of facilities that were moved to the site from other locations.Additional data needed to determine potential eligibility.

    *** Community Day is housed in leased facilities, therefore no eligibility is generated.

    Notes:

    t All dollar amounts are listed as the State's share .

    t All dollar amounts are based on the current adjusted Modernization Grant Amounts passed by the SAB effective as of 1/1/2012. As future modernization grant amounts change, funding may change.

    t Future year eligibility estimates assume no increase in enrollment. Should enrollment increase, eligibility may increase.

    92

    F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    Additional State Facility Programs

    The fol lowin g is a brief sum mary of funding oppor tuniti es available to school distric ts forwhich the SUSD could be eligible for depending upon the District securing matching fundsor meeting eligibility requirements.

    Summary of State Funding Eligibility

    t State funds for new construction projects $38,134,633

  • 7/29/2019 Sanger Facilities Master Plan

    97/106

    or meeting eligibility requirements.

    Overcrowding Relief Grant (ORG) ProgramThe ORG program is available to d istricts that have school sites that exceed a c ertain pupildensity based on 2005/06 October enrollments. In order to reduce densities and relieveovercrowding, districts are required to remove portable classrooms from classroom use andreplace them with an equal amount of permanent capacity. The eligibility for this programis based on a calculation of existing portables and does not utilize traditional SFP newconstruction eligibility. Districts who submit applications are provided funds based upondensity ratios, from most dense sites to least dense.

    Charter School Facility Program

    This program allows charter schools with preliminary apportionments to renovate existing

    facilities or to construct new facilities. To qualify for funding, a charter must be deemedfinancially sound by the California School Finance Authority. Charter schools can access thisfunding directly or through the school district in which the site will be located, and they havefour years to convert a preliminary apportionment to a final apportionment. The school districtin which the charter school is physically located no longer requires SFP new constructioneligibility; however, new construction eligibility will be adjusted by the number of districtunhoused pupils the CSFP project will serve (as determined by the District).

    At this time the OPSC is not accepting any additional preliminary apportionment applicationsand there are no future funding rounds planned. However, if additional funds become availabledue to project rescissions, additional rounds may be opened. It is important to monitor thisprogram regularly.

    Facility Hardship

    This program is designed to provide funds to repair or replace facilities that have ei ther animminent health or safety threat, or for facilities that have been lost due to a natural disastersuch as a flood, fire, or earthquake. This program requires extensive agency-supporteddocumentation and special approval from the SAB.

    t State funds for modernization projects $24,908,546

    Total State Funding Eligibility $63,043,179

    93

    S e c t i o n 7 | Financing the Facilities Master Plan

    Additional State Facility Programs continued

    Financial Hardship

    Financial hardship assistance is available for districts that cannotid ll f h i f di h f S h l F ili P

    Career Technical Education Facilities Program (CTEFP)

    CTEFP grants are available to school districts operating a comprehensive high school, andid t $3 illi j t f t ti f C T h i l f iliti d t

  • 7/29/2019 Sanger Facilities Master Plan

    98/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    provide all or part of their funding share of a School Facility Programproject. In order to receive financial hardship assistance, a districtmust have made all reasonable efforts to raise local funding and mustalso demonstrate that it is unable to contribute all or a portion of thematching share requirement.

    In order a new construction or modernization project to be considereda financial hardship application, the district must have an approvedfinancial hardship status prior to submitting the new construction ormodernization project application.

    In order to be eligible to apply for financial hardship status the districtmust meet the following legal requirements: levy the maximumdevelop fee allowable and demonstrate local effort to raise facilityrevenue having bonded indebtedness of at least 60 percent of itscapacity or the district bonding capacity is less than $5 million or thedistrict had a successful registered voter bond election for at least themaximum allowed under Proposition 39 within the previous 2 yearsor other evidence which demonstrates that all reasonable local effortshave been made to secure the districts matching share requirementsfor the new construction and/or modernizations projects.

    In addition to the above, in order for the district to receive financialhardship assistance, all local facility funds available to the district mustbe counted as part of the districts local match. Once approved for

    financial hardship, new construction and modernization project costmust fall within State allowances. Thus, this method of funding worksbest for modernization projects because districts find it very difficult toconstruct an adequate new facility based on financial hardship funding.

    provide up to $3 million per project for new construction of Career Technical facilities and up to$1.5 million per project for the modernization of Career Technical facilities. Projects may consistof equipment only. Traditional SFP eligibility is not required and will not be adjusted for theseprojects. The CDE must first approve the districts Career Technical Education Plan and proposedproject. Districts must provide the anticipated costs and square footage to determine thefunding amount.

    High Performance Incentive (HPI) Grant

    The HPI program provides funding on a sliding scale point system based on the Collaborative forHigh Performance Schools (CHPS) standards. The project must meet the pre-requisites in eachof the High Performance Rating Criteria (HPRC) and will receive a score based on the numberof HPRC components that are included in the project. The Division of the State Architect (DSA)will review the project and will verify the final score, which will in turn determine the HPI grant

    amount. Based on the score, the base grant could increase from approximately 2-10%. Regulationchanges, which took effect in early 2011, provide Base Incentive Grant (BIG) funding in additionto the percentage increase for the point score received. The BIG for new schools is $150,000 and$250,000 for additions and modernization projects. All funds received for high performance mustbe used on high performance related costs. In addition, the school district must have a resolutionon file that demonstrates support for the HPI grant request as well as the intent to incorporatehigh performance features in future facilities projects.

    Joint-Use Program (AB 16)

    The Joint-Use Program allows district s to obtain funding from a joint-use partner and a matc hfrom the State in order to build joint-use projects (divided into two categories). The program

    has a 50/50 funding split, with the State providing up to $2 million per project, dependingupon grade level, site characteristics, and project scope. The joint-use partner must provideat least 50% of the local match, unless a districts bond language meets the requirements ofthe education code. Facilities that may qualify for joint-use funding are gymnasiums, libraries,multi-purpose rooms, child care facilities and teacher education facilities.

    94

    F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    New Construction Additional Grant for District-Owned SiteAcquisition Cost (AB 401)

    Thi ll di i l f ddi i l i

    Federal Programs

    In a much more limited capacity than the State of California, the Federal government hasprovided some facility funding and financing options for California school districts. A summaryof some of these options are outlined below.

  • 7/29/2019 Sanger Facilities Master Plan

    99/106

    This program allows distr icts to apply for additional new constr uction

    funding if the district is vacating non-school space that has beenproductively used for at least the past five years, such as administrationspace, and placing students into the vacated facility.

    New Construction Additional Grant for Replaced Facilities(AB 801)

    This program provides funding for the replacement cost of single-storybuildings that are demolished

    Williams Settlement

    School Facilities Needs Assessment Grant Program: Funding for

    this program is available to schools ranked in deciles 1 through 3, asidentified by performance on the 2003 Academic Performance Index(API). Under the School Facilities Needs Assessment Grant Program,eligible schools received funding to conduct a one time assessment offacilities. Each eligible school received $10 per pupil (based on October2003 enrollment) to complete the review, with a minimum grant amountof $7,500.

    Emergency Repair Program: Funding for this program was availableto schools ranked in deciles 1 through 3, as identified by performanceon the 2006 Academic Performance Index (API). Funds are allocatedfor qualifying emergency repairs made to existing building systems or

    structural components that are broken and not functioning properly andthat pose a health and safety threat to pupils and staff.

    Emergency Repair Program funds are made available through theBudget Act and the program will be active until the $800 millionassociated with this program is exhausted. Currently there are moreprojects included on the workload list than funds available for theprogram and the OPSC is no longer accepting applications.

    p

    Safe Routes to SchoolsThere are two separate Safe Routes to Schools programs administered by CalTrans. Thereis the State program know as SR2S and the Federal program known as SRTS. The programsaim to improve and enhance the safety of pedestrians and bicyclists by improving relatedinfrastructure such as sidewalks, trails, traffic calming/control devices, and bike paths.

    SR2S:To date there have been nine program cycles for the California Safe Routes to SchoolProgram. A 10th cycle was recently announced on December 20, 2011, with a target fundingamount of $45 million. Applications for Cycle 10 are due on March 30, 2012. Typically, applicantsmust be any incorporated city or a county within the state of California. SR2S applications shouldbe submitted to the attention of your Caltrans District Local Assistance Engineer.

    SRTS:To date there have been t wo program c ycles for the Federal Safe Routes to SchoolProgram. The projects list for Cycle 3 was approved on October 17, 2011, for $66 million inFederal funding.

    Qualified School Construction Bonds (QSCB)

    QSCBs are authorized by the federal government through the American Recovery andReinvestment Act (ARRA) of 2009. The bonds provide federal tax credits for bondholders in lieuof interest in order to significantly reduce an issuers cost of borrowing. The ARRA provides foran allocation to each state, along with separate allocations for large school districts.

    Qualified Zone Academy Bonds

    The QZAB Program provides interest- free school renovation bonds for sites that houseeducational programs that strive to improve and promote graduation rates and job skills inpartnership with interested private entities. The American Recovery and Reinvestment Actincreased the QZAB program from $400 million a year to $1.4 billion for 2009 and $1.4 billionfor 2010. This program provides the bondholder with a federal tax credit in lieu of a cashinterest payment. As the federal government is providing the interest payment, the district istypically only responsible for repaying the value of the bond.

    95

    S e c t i o n 7 | Financing the Facilities Master Plan

    Federal Programs continued

    Clean Renewable Energy Bonds (CREBs)

    CREBs are used primarily by public sector entities to finance qualified renewable energyfacilities including: a wind facility a closed loop biomass facility an open-loop biomass facility

    Energy Efficiency Retrofit Loan Program

    Using PG&Es Energy Efficiency Retrofit Loan Program, or On-BillFinancing (OBF), the District is able to access financing at a 0% interest.The monthly payment on the Districts energy pay ment will be a

  • 7/29/2019 Sanger Facilities Master Plan

    100/106

    F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    facilities including: a wind facility, a closed loop biomass facility, an open-loop biomass facility,a geothermal or solar energy facility, a small irrigation power facility, a landfill gas facility,a trash combustion facility, a qualified hydropower facility, or a marine and hydrokineticrenewable energy facility.

    CREBs are authorized by the federal government through the American Recovery andReinvestment Act (ARRA) of 2009. The Recovery Act authorized an additional $1.6 billion ofClean Renewable Energy Bonds (CREBs), which help facilitate the finance of renewable facilities.This sum rais es the previously capped $800 mi llion c eiling on CREB issuanc es, and raises themaximum allowable issuance to $2.4 billion dollars. These bonds function as tax credit bondswhich allow investors to receive federal tax credits in lieu of the payment of a portion of theinterest on the bond. CREBs tax credits are treated as taxable income for the bondholder.Applications must be filed by issuers with the Internal Revenue Service when the CREB window

    is opened. The most recent issuance expired on December 31, 2010.

    Pre-Disaster Mitigation (PDM)

    PDM funds flow from FEMA to individual states and are administered in California by theCalifornia Emergency Management Agency (CalEMA). The program was created when theDisaster Mitigation Act of 2000 amended the Stafford Act to provide a funding mechanismthat is not dependent on a presidential disaster declaration. The estimated amount toCalifornia for the 2011 fiscal year is $200,000,000. PDM funding requires at least a 25% match(75% federal share of project cost).

    Grants are available for the creation of Local Hazard Mitigation Plans (LHMPs) and for theimplementation of mitigation projects prior to a disaster event. To apply for funding, applicants

    must complete a Notice of Interest (NOI) available on the CalEMA website. Eligible applicantswho submit an NOI for an eligible activity will be given the code to access the Federal eGrantssystem to complete an application.

    School districts and Local Educational Agencies (LEAs) with LHMPs, which are part of a multi-jurisdic tional LHMPs, are eligible applicants. Please note, the fiscal year 2011 Hazard MitigationAssistance (HMA) application period opened on June 1, 2010 and is currently closed. However,this program operates in an annual funding cycles based on the fiscal year.

    Please note, funds are allocated when FEMA approves the application and they must be usedwithin 18 months of FEMA approval.

    payment neutral experience. In other words, the monthly energy

    savings will pay for energy efficient retrofit project costs.

    96

    F I N A N C I N G T H E F A C I L I T I E S M A S T E R P L A N | Sanger Unified School District

    General Obligation Bonds

    Introduction

    General Obligation Bonds are the major source of loc al revenue forcapital facility projects From June 1978 with the passage of Proposition