1 download

TRANSCRIPT

Page 1: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR development and deployment Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 13 February 2015 Rolf TUCHHARDT European Commission, DG MOVE

Page 2: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR – Technological pillar of the SES 3 interrelating phases

Pilot Common Project

Page 3: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

The political long term vision

Enabling EU skies to handle 3 times

more traffic

Improving safety by a factor of 10

Reducing the environmental impact per flight by

10%

Cutting ATM cost per flight

by 50%

Page 4: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

The SESAR Joint Undertaking – Public Private Partnership

European Commission EUROCONTROL

• EUR 2.1 bio • 15 other members • 13 associate partners = 110 companies in total • 20+ countries • 3000 people working on SESAR • 300+ projects

Page 5: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR is organized along three main phases

SESAR Phases

2005 2010 2015 2020+

2005 2010 2015 2020+

Development

Deployment

Planning work

Development work

SESAR Joint Undertaking

Implementation

Current work

Definition

European ATM Master Plan

Page 6: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

The central role of the ATM Master Plan • The most recent update of the ATM

Master Plan, approved in 2012, identifies the "Essential Operational Changes" that need to be implemented to lead to the full deployment of the new SESAR concept by 2030

• Contains: – Performance objectives (The Why) – Description and prioritization of technical

solutions (The What) – Deployment scenarios per stakeholders

(The Where and When) – Investment needs and performance gains

over time (The How Much) – Standardization and regulatory roadmap,

Risk Management Plan (The How)

To be updated in 2015

Page 7: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

ICAO GANP, SESAR & NextGen • Same philosophy

– Need to improve ATM performance – Aim at the Global ATM Operational

Concept – Through deployment of a series of

step changes

• Mutual impact, Global Regional – From concept definition to

operations – For timely and useful standards – With all other national programmes

Page 8: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Performance targets in the Master Plan Baselines overall performance needs required at network level at a given point in time on the basis of traffic forecasts and business priorities; defines SESAR performance targets in four KPAs:

To be updated in 2015

Safety

Environment Cost Efficiency

Airspace Capacity

Runway Capacity

Page 9: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

OPERATIONAL REQUIREMENTS SYSTEM PROTOTYPES VALIDATION ACTIVITIES & RESULTS

PERFORMANCE VALIDATION TARGETS CONCEPT & ARCHITECTURE OPERATIONAL & TECHNOLOGY SOLUTIONS CASES STANDARDISATION & REGULATION PREP.

PERFORMANCE NEEDS OPERATIONAL IMPROVEMENTS & ENABLERS HIGH LEVEL DEPLOYMENT & DEVELOPMENT TIMELINE

R&

D P

RO

JEC

TS

MAS

TER

PLA

N

PRO

GR

AMM

E

4D Trajectory

Traffic Synchronisation

Airport Integration

Airport Throughput

Network Management

Conflict Management & Automation

Page 10: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR development – gate to gate

Page 11: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

V-cycle system approach to development • SESAR primary projects carry out validation exercises to:

– validate the operational improvement against operational requirements – evaluate the benefit to be expected from the operational change

ATM Master Plan

Performance Driven CONOPS

& roadmap

Validation targets and KPIs

Performance Assessment

Validation Exercises

Business Case

Deployment Scenarios

Gap Analysis

Page 12: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR validation targets: Basis for R&D performance • Validation activities are driven by Validation Targets for a set of selected

KPAs and development phases of the SESAR Concept Steps

Page 13: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Consolidated performance assessment • The final objective is to ensure that developed solutions appropriately

contribute to the achievement of the targets

Cost

Effi

cien

cy

Envi

ronm

ent

Safety: Qualitatively Assessed

Capa

city

Runway

DB (Deploymentbaseline) DB+STEP1 DB+STEP1

+STEP2DB+STEP1+

STEP2+STEP3Target -0,30% -2,80% -5,65% -8,50%Cycle 3 assessment -0,30% -1,45%

-9%-8%-7%-6%-5%-4%-3%-2%-1%0%

Tota

l EC

AC

Fue

l sav

ings

Target Cycle 3 assessment

DB(Deployment baseline)

DB+STEP1 DB+STEP1+STEP2

DB+STEP1+

STEP2+STEP3

Target 8,50% 30,40% 73,10% 175,00%Cycle 3 assessment 8,50% 24,22%

0%20%40%60%80%

100%120%140%160%180%200%

Incr

ease

in a

ircra

ft pe

r vol

ume

in c

urre

nt "a

t-lim

it"

airs

pace

EN

RO

UTE

Target Cycle 3 assessment

DB (Deploymentbaseline) DB+STEP1 DB+STEP1

+STEP2DB+STEP1+

STEP2+STEP3Target 2,40% 10,40% 15,40% 18,40%

Cycle 3assessment 2,40% 12,10%

0%2%4%6%8%

10%12%14%16%18%20%

Incr

ea

se in

ru

nw

ay

thro

ugh

pu

t (a

t B

est

in C

lass

Airp

ort

s)

Target Cycle 3 assessment

DB (Deploymentbaseline) DB+STEP1 DB+STEP1

+STEP2DB+STEP1+

STEP2+STEP3Target 8,50% 30,40% 73,10% 175,00%Cycle 3 assessment 8,50% 32,80%

0%20%40%60%80%

100%120%140%160%180%200%

Incr

ease

in a

ircra

ft pe

r vol

ume

in c

urre

nt "

at-li

mit"

ai

rspa

ce T

MA

Target

Cycle 3 assessment

DB (Deployment baseline) DB+STEP1 DB+STEP1

+STEP2DB+STEP1+

STEP2+STEP3Target 2.57% 17.97% 33.30% 68.57%

Cycle 3 assessment 2.57% 15.80%

0%

10%

20%

30%

40%

50%

60%

70%

80%

% A

TCO

Pro

duct

ivity

impr

ovem

ent

Target

Cycle 3 assessment

TMA En-route

Page 14: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Linking development to deployment • The ATM Master Plan is for the European Union the sole source of ATM

technology development and implementation • Common projects are the tools chosen to deploy those selected ATM

functionalities that will achieve the Master Plan’s Essential operational changes (Article 4.1 of Common projects IR (EU)No 409/2013)

• Common projects aim at deploying in a coordinated and timely manner technology this “essential technology” when it is:

– Mature – Bringing significant performance benefits at network level – Requiring coordination at European level

P1 P2 Pn …

Implementation projects

Common project ATM Master Plan Deployment programme Planning view Business view Project view

Page 15: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Pilot Common Project: first set of functionalities ready for deployment

• The PCP aims at coordinating and synchronizing the implementation of the most relevant ATM functionalities (AF) developed by SESAR.

• AF are logical groupings of essential operational / technical changes identified in the ATM Master Plan that imply an overall global positive CBA

• The Commission adopted on 27 June 2014 the Regulation (EU) 716/2014 , making binding the implementation of the six first AF: – AF # 1: Extended AMAN and PBN in high density TMAs – AF # 2: Airport Integration and Throughput Functionalities – AF # 3: Flexible Airspace Management and Free Route – AF # 4: Network Collaborative Management (Flow & NOP) – AF # 5: iSWIM: Ground-ground integration and aeronautical data

management and sharing – AF # 6: Initial Trajectory Information Sharing: air-ground integration

towards i4D with enhanced Flight Data Processing performances

Page 16: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Pilot Common Project: final impact assessment

Main influence factors for PCP

benefits

ANS Productivity

(+3,2%)*

Airspace Capacity

(+12,5% TMA, +8,7 En-Route)

Airport Capacity (+3,9%)

Delayed flights (-9,8%)

Delay length (-12,2%)

Fuel Burn (85,8 Kg/flight

-2,1%)

*Result of ATCO productivity gains of : 12%

Page 17: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Link between performance and charging scheme and SESAR

• Performance plans shall include a description of the investment, including that necessary to achieve the performance targets, detailing their relevance to the ATM Master Plan and the common projects

This description is submitted to Commission scrutiny

• User charges may be modulated to optimise the use of air navigation services, reduce the environmental impact of flying, reduce congestion and to accelerate the deployment of SESAR ATM capabilities.

Page 18: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Pilot common project - deployment

Page 19: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR JU and SESAR Deployment Manager: two pillars, one project

Page 20: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

SESAR Deployment Manager

Page 21: SESAR development and deployment - isr.umd.edu · PDF fileSESAR development and deployment ... The SESAR Joint Undertaking ... – Standardization and regulatory roadmap, Risk Management

Transport

Conclusions • The Single European Sky initiative aims at improving

ATM performance through a set of interrelated activities

• The ATM Master Plan is the roadmap towards technology deployment and has a structuring impact on both development and deployment activities now running in parallel

• Technology development and deployment are directly hooked to ATM Master Plan performance expectations and to the SES policy