Arturo Samper M.Arch. / M.CPPRINCIPAL, URD CONSULTANTS

URD Consultants

Good  Prac2ces  in  the  Construc2on  Permit  Process    and  the  Case    in  Maputo

Page 2: Session 3 ppt 1 construction_permits_a_samper

Presenta2on  Contents

Arturo Samper M.Arch. / M.CPURD Consultants

Page 3: Session 3 ppt 1 construction_permits_a_samper

Presenta2on  Contents

Arturo Samper M.Arch. / M.CPURD Consultants

Page 4: Session 3 ppt 1 construction_permits_a_samper

Presenta2on  Contents

Arturo Samper M.Arch. / M.CPURD Consultants

Page 5: Session 3 ppt 1 construction_permits_a_samper

Presenta2on  Contents

Arturo Samper M.Arch. / M.CPURD Consultants

Page 6: Session 3 ppt 1 construction_permits_a_samper

About  the  Project1

To  simplify  the  process  required  to  obtain  a  construc2on  license,  from  access  to  land,  to  the  occupa2on  and  opera2on  of  the  new  construc2on.

Objective

Page 7: Session 3 ppt 1 construction_permits_a_samper

Context2

Page 8: Session 3 ppt 1 construction_permits_a_samper

Tabela 4 - Caso DBR vs Real (2009)

DBR 2011 Caso Real total Caso Real – Construção Dias naturais ou calendário 381 703 474 Fonte: Cálculos do autor com base em estudo de caso real do arquivo.

Tabela 3 - DBR 2011

Processo Dias

1 Pedido de DUAT 45 2 Pedido de plano topográfico 120 3 Pedido de licença de construção 60 4 Inspeção para o início da construção 1 5 Segunda inspecção 1 6 Pedido de licença de ocupação 95 7 Inspeção final 1 8 Inspeção de agua, saneamento e eletricidade 1 9 Ligação às redes de esgoto, água e elétrica 43 10 Solicitação linha telefonica de terra 2 11 Solicitação de certidão de benferitorias 30 12 Pedido de título de propriedade 30 13 Registo de Propriedade 30 Total 459 Actividades ocorrer em paralelo, mas No. 6 é contingente a 7-10 Fonte: DBR + Cálculos do autor baseados em entrevistas

Context2

Tabela 4 - Caso DBR vs Real (2009)

DBR 2011 Caso Real total Caso Real – Construção Dias naturais ou calendário 381 703 474 Fonte: Cálculos do autor com base em estudo de caso real do arquivo.

Tabela 4 - Caso DBR vs Real (2009)

DBR 2011 Caso Real total Caso Real – Construção Dias naturais ou calendário 381 703 474 Fonte: Cálculos do autor com base em estudo de caso real do arquivo.

2009

Page 9: Session 3 ppt 1 construction_permits_a_samper

Tabela 1 - Principais Economias

País / Região DB Ranking Dias DCPI (1)

OECD 53 152 UE 65 189 América Latina 97 296 SADC 109 238 Moçambique 126 381 Fonte: relatório Doing Business em 2012. (1) O tempo médio medido em dias ou natural.

Tabela 2 - SADC

Economia DCPI Ranking

DCPI N º de

Procedimentos

DCPI N º de dias (1)

Mauritius 39 18 107 Botswana 127 24 167 South Africa 52 17 174 Media SADC 119 17 176 Angola 128 12 328 Tanzania 179 22 328 Mozambique 155 17 381 Fonte: relatório Doing Business em 2011. (1) O tempo médio medido em dias ou natural.

Context2

Page 10: Session 3 ppt 1 construction_permits_a_samper

Tabela 6 - Custo de uma licença de construção de um armazém de 2000 m2

Variável Maputo Palmira Cali Area (M2) 2000 2000 2000 Custou $992 $5,579 $7,268

Fontes: Colombia: Cálculos do autor com base em dados de 2010. Moçambique caso, estudado para este relatório. Os valores são em dólares americanos.

Context2BARRANQUILLA,  COLOMBIA

Page 11: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

Page 12: Session 3 ppt 1 construction_permits_a_samper

Aprovação  e  autorização  da  

obra

Construção,  inspeção  e  ocupação  do  

ediLcio

Condições  e  limitações  à  propriedade  

(Plano  de  u2lização,  códigos  de  construção,  

condicionantes,  servidoes)

Acordo  com  as  condições  e  limitações  (competência  profissional,  de  segurança)

O  acesso  à  terra  e  formação  /  

transferencia  da  propriedade

Work  in  Maputo3

A  intervenção  do  governo  nos  cinco  processos

DC DPU DUC DUC DUC

5  ‘classic’  elements:

Page 13: Session 3 ppt 1 construction_permits_a_samper

CRPDC

DUAT  Direito  de  uso  e  Aproveitamento  

da  Terra

Condições  e  limitações  à  propriedade  

(Plano  de  u2lização,  códigos  de  construção,  gravames)

Acordo  com  as  condições  e  limitações

Aprovação  e  autorização  da  obra

Construção,  inspeção  e  ocupação  do  

ediNcio

CerOdão  de  Benfeitorias

Título  de  propriedade

Registro  da  propriedade

DC DPU DUC DUC DUC  /  AM  /  EM DUC

Work  in  Maputo3 8  different  stages  or  processes

Ø Uma  en2dade/departamento  envolvida  em  vários  processos  e  vários  tempos.  

Ø Várias  en2dades  que  fazem  a  mesma  a2vidade  Ø Cada  processo  está  sujeito  à  anterior  Ø No  final,  um  processo  que  deve,  em  vez  disso,  ser  o  início

Page 14: Session 3 ppt 1 construction_permits_a_samper

DMI

Outras*en-dades

DMPUA

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Work  in  Maputo3 In  some  cases,  a  relatively  clear,  

straight  through  process

<  10  STORY  RESIDENTIAL  OR  COMMERCIAL  BUILDING

Page 15: Session 3 ppt 1 construction_permits_a_samper

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Work  in  Maputo3 In  other  cases,  a  multi-­‐institutional  

process,  easy  to  become  ad  hoc...

<  10  STORY  RESIDENTIAL  OR  COMMERCIAL  BUILDING

Page 16: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

ADM

...  that  can  be  very  frustrating!

Page 17: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 A  look  at  the  organizational  chart  

as  it  applies  to  this  process

Ø In  a  26  member  Cabinet

Page 18: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 A  look  at  the  organizational  chart  

as  it  applies  to  this  process

Ø In  a  26  member  Cabinet  Ø Three  Cabinet  members  have  a  mandate  on  the  process

Page 19: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 A  look  at  the  organizational  chart  

as  it  applies  to  this  process

Ø In  a  26  member  Cabinet  Ø Three  Cabinet  members  have  a  mandate  on  the  process  Ø Who  manage  4  departments  and  13  sec2ons

Page 20: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 A  look  at  the  organizational  chart  

as  it  applies  to  this  process

20Org.  Chart  Boxes 42Specialists 27Support  

Personnel

Page 21: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

LICE

NÇA

Most  of  the  complexity  has  to  do  with  access  to  land  and  property  formation

PROPR

IEDA

DE

Page 22: Session 3 ppt 1 construction_permits_a_samper

Registry  Mod.PROMAPUTO  II

Work  in  Maputo3 Reform  in  progress

DMI

Outras*en-dades

DMPUA

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Our  focus

Page 23: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

LICE

NÇA

1. Duração  do  processo  com  base  em  documentos  oficiais.  

2.Duração  do  processo  em  um  caso  real.  3. ¿DUAT  antes  ou  durante  a  construção?  4.Algumas  análises  de  fluxo  baseado  em  caso  real.  

5.Algumas  análises  quan2ta2vas.

Page 24: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

40  dias  naturais29  dias  úteis

171 40 36

35130

40

8740 3

207  dias  úteis,  290  dias  naturais7  processos

Ø Sem  o  processo  DUAT  Ø Sem  o  processo  de  construção  Ø Sem  o  processo  de  otulo  e  registro

29 122 29 26

93 25

29 621

1.  Duração  do  processo   com  base  em  documentos  oficiais.

Legend

Page 25: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo31º  ano 2º  ano

207  du 290  dn

338  du 474  dn

2.  Duração  do  processo  em  um  caso  real  (2009).

40  dias  naturais29  dias  úteis

Legend

Page 26: Session 3 ppt 1 construction_permits_a_samper

Most  likely  to  be  the  case

Work  in  Maputo3

1 2 3

3.  ¿DUAT  antes  ou  durante  a  construção?

539  du 754  dn

338  du 474  dn

207  du 290  dn

Page 27: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

Três  visitas

Once  viagens

Duas  desições

Duas  assinaturas

Doze  operações

Onze  operações

4.  Algumas  análises  de  fluxo  baseado  em  caso  real

Page 28: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

7  procesos

140  pasos

4.  Algumas  análises  de  fluxo  baseado  em  caso  real

Page 29: Session 3 ppt 1 construction_permits_a_samper

5.  Algumas  análises  quan2ta2vasWork  in  Maputo3 The  municipality  is  re-­‐distributing  94%  -­‐  

95%  of  income  from  licensing  fees  to  other  areas  of  operationTabela 5 - DUC proveitos e custos de operação

Variable 2011 % %

Rendimento sobre licenças de construção Mts. 15,260,121 100% Rendimento doutras fontes Mts. 5,256,148

Renda total Mts. 20,518,280 100% Remunerações (média anual) Mts. 47,600 Remunerações e segurança social (.5 factor multiplicador)

Mts. 71,400

Custos operacionais (1) Mts. 900,000 Custos totais Mts. 971,400 4.73% 6.36%

Diferencia Mts. 19,546,880 95.27% 93.63 Fonte: DUC + cálculos do autor. (1) Valores aproximados baseados no relatório financeiro do ano 2008 do DUC.

In  2011,  the  municipality  assigned  just  6.36%  of  the  revenue  from  licenses  to  DUC  or  4.73%  of  total  revenue.

Fontes:  DUC  +  cálculos  do  autor  baseados  no  relatórios  financieros  do  anos  2008  a  2011.  Dados  de  salario,  meusalario.org.  Os  valores  monetários  T5  estão  en  Mts.  e  T7  estão  en  dólares  Americanos.

Page 30: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 While  the  monthly  averages  indicate  

that  the  DUC  is  operating  at  a  deficit

Tabela 5 - DUC proveitos e custos de operação

Variable 2011 % %

Rendimento sobre licenças de construção Mts. 15,260,121 100% Rendimento doutras fontes Mts. 5,256,148

Renda total Mts. 20,518,280 100% Remunerações (média anual) Mts. 47,600 Remunerações e segurança social (.5 factor multiplicador)

Mts. 71,400

Custos operacionais (1) Mts. 900,000 Custos totais Mts. 971,400 4.73% 6.36%

Diferencia Mts. 19,546,880 95.27% 93.63 Fonte: DUC + cálculos do autor. (1) Valores aproximados baseados no relatório financeiro do ano 2008 do DUC. Tabela 7 - Diferença entre receitas e despesas mensais

Variável 2011

Número de licenças (média anual) 458 Número de licenças (média mensal) 38 Receitas de licenças (média anual) $321,882 Receitas de licenças (média mensal) $26,823 Renda média por licença por mes $703 Empregados 37 Custos laborais (média mensal) $3,967 Diferença entre receitas e custos $(3,263.87) Fontes: DUC www.meusalario.org. Cálculos da autor. Os valores monetários estão em dólares

What  is  costing  the  municipality  produce  one  month  of  licenses,  is  US$  3,263  more  than  what  it  receives  monthly  from  construction  licensing  fees,  which  is  US$703.

Fontes:  DUC  +  cálculos  do  autor  baseados  no  relatórios  financieros  do  anos  2008  a  2011.  Dados  de  salario,  meusalario.org.  Os  valores  monetários  T5  estão  en  Mts.  e  T7  estão  en  dólares  Americanos.

In  2011,  the  municipality  assigned  just  6.36%  of  the  revenue  from  licenses  to  DUC  or  4.73%  of  total  revenue.

Page 31: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

DUC:  aumento  do  número  de  actos  administra2vos,  com  e  sem  aumento  progressivo  do  #  de  propriedades  formais

Growth  in  administrative  acts  (linear  trend)

Page 32: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

DUC:  aumento  do  receitas,  com  e  sem  aumento  progressivo  do  #  de  propriedades  formais

Growth  in  revenue  (linear  trend)  

Page 33: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

Ø Não  é  economicamente  viável  aumentar  o  pessoal.  Isso  inclui  a  implementação  de  programas  de  desconcentração.  

Ø No  longo  prazo,  irá  ser  necessário  aplicar  uma  solução  estrutural  para  reduzir  os  custos  de  tempo  e  de  serviço.

Tabela 7 - Diferença entre receitas e despesas mensais

Variável 2011 2014 Delta

Número de licenças (média anual) 458 1088

Número de licenças (média mensal) 38 91

Receitas de licenças (média anual) $321,882 $950,156

Receitas de licenças (média mensal) $26,823 $79,180

Renda média por licença por mes $703 $910 1.3

Empregados 37 87

Custos laborais (média mensal) $3,967 $9,327 2.3

Diferença entre receitas e custos $(3,263.87) $(8,416.92) 2.6

Fontes: DUC www.meusalario.org. Cálculos da autora. Os valores monetários estão em dólares

Tabela 7 - Diferença entre receitas e despesas mensais

Variável 2011 2014 Delta

Número de licenças (média anual) 458 1088

Número de licenças (média mensal) 38 91

Receitas de licenças (média anual) $321,882 $950,156

Receitas de licenças (média mensal) $26,823 $79,180

Renda média por licença por mes $703 $910 1.3

Empregados 37 87

Custos laborais (média mensal) $3,967 $9,327 2.3

Diferença entre receitas e custos $(3,263.87) $(8,416.92) 2.6

Fontes: DUC www.meusalario.org. Cálculos da autora. Os valores monetários estão em dólares

Tabela 7 - Diferença entre receitas e despesas mensais

Variável 2011 2014 Delta

Número de licenças (média anual) 458 1088

Número de licenças (média mensal) 38 91

Receitas de licenças (média anual) $321,882 $950,156

Receitas de licenças (média mensal) $26,823 $79,180

Renda média por licença por mes $703 $910 1.3

Empregados 37 87

Custos laborais (média mensal) $3,967 $9,327 2.3

Diferença entre receitas e custos $(3,263.87) $(8,416.92) 2.6

Fontes: DUC www.meusalario.org. Cálculos da autora. Os valores monetários estão em dólares

Page 34: Session 3 ppt 1 construction_permits_a_samper

What  we  recommendWork  in  Maputo3

Ø Implementação  do  Regulamento  do  Solo  Urbano  que  transforma  o  DUAT  em  TUATU.  

Independência  entre  processo  DUAT  /  TITULO,  eo  processo  de  construção

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Page 35: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Um  único  ator  e  momento  para  revisão  ex-­‐ante

Page 36: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 Um  único  ator  e  momento  

para  revisão  ex-­‐ante

CRP

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

MCAA

MS

MTC

EDM

AdRM

DMI

Outras*en-dades

DMPUA

DUC DCDUC DUC CRPDC DPU Opção  1:  delegar  a  responsabilidade  sobre  o  DUC.  No  entanto,  parece  que  isso  não  seria  economicamente  e  poli2camente  viável  Opção  2:  Transferência  de  responsabilidade  o  ônus  da  revisão  ex-­‐ante  para  o  profissional(s)  encarregado  do  projeto.  Exigir  a  compra  de  seguro  de  responsabilidade  civil.    Ø Maior  u2lização,  apoio  e  fortalecimento  

das  qualificações  profissionais  Ø Profissional  põe  em  risco  a  sua  matrícula  Ø Contribui  para  o  desenvolvimento  da  boa-­‐

fé  Ø Oportunidade  de  negócio  para  as  

seguradoras

Page 37: Session 3 ppt 1 construction_permits_a_samper

Opção  1:  melhorar  a  produ2vidade  de  especialistas  de  departamentos,  fornecendo  ferramentas  e  mecanismos.  Opção  2:  Concessão  do  serviço  de  expedição  de  licenciamento  de  construção:

Ø A  um  profissional  (Colombia:  curadores  urbanos)  

Ø A  uma  associação  de  profissionais  (Costa  Rica  –  Peru)  

Ø Oportunidade  de  negócio  para  as  seguradoras    

Work  in  Maputo3 Mecanismo  eficaz  de  expedição  de  

licenciamento  de  construção

CRP

MCAA

MS

MTC

EDM

AdRM

DMI

Outras*en-dades

DMPUA

DUC DCDUC DUC CRPDC DPU

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Page 38: Session 3 ppt 1 construction_permits_a_samper

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Work  in  Maputo3 Um  único  ator,  e  momento  para  

revisão  da  após  a

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Ø Uma  forte  função  de  fiscalização,  como  corresponde  ao  Estado.

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

DMI

Outras*en-dades

DMPUA

MCAA

MS

MTC

MCAA

MS

MTC

DUC DC

EDM

AdRM

DC DPU DUC DUC DUC CRP

EDM

AdRM

Page 39: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3

Condições  e  limitações  à  propriedade

Uma  en2dade  indpendiente,  um  papel  forte

Construção,  inspeção  e  ocupação

Uma  en2dade,  um  papel  forte

Iden2dade,  otulo,  e  registro

Um  processo  separado

Aprovação  e  autorização  da  

obra

O  serviço  em  concessão.  Respaldado  por  empresa  seguradora  

Acordo  com  as  condições  e  limitações

Profissional  é  responsável.Respaldado  por  empresa  seguradora  

Sintesis:  Os  cinco  elementos  clássicos.  Mais  ..

Page 40: Session 3 ppt 1 construction_permits_a_samper

1  Delegação  da  autoridade  para  aprovar  todos  os  projectos  para  o  Director  Adjunto  do  DUC.  2  Eliminação  de  requisito  de  anexar  estudos  hidráulicos  e  elétricos,  ao  pedido  de  aprovação  da  licença  de  construção.  3  Formalização  da  licença  de  u2lização  como  o  único  documento  necessário  para  se  conectar  a  construção  das  redes  de  esgoto,  água  e  eletricidade.  4  Averbamento  de  prorrogação  de  licença  de  construção.  5  Implementação  de  uma  tarifa  de  processamento.  6  Fusão  do  Cer2dão  de  Benfeitorias  e  Licença  de  U2lização.  7  Delegação,  do  Director  Adjunto  ao  chefes  de  divisão  diferentes,  da  autoridade  para  assinar  documentos  oficiais  

intermediários.  8  Desenho  e  implementação  de  um  sistema  ‘intermediario’  de  banco  de  dados,  fluxo  

de  trabalho,  comunicações  e  serviços  da  Web,  capaz  de  se  conectar  no  futuro  com  o  SIGEM.    9  REFORMA  DMPUA  (1):  Implementação  do  Regulamento  do  Solo  Urbano  que  transforma  o  DUAT  em  TUATU.  Emissão  de  o  número  de  polícia,  de  plano  topográfico  e  de  registro  catastral  ao  mesmo  tempo  que  o  documento  DUAT  /  TUATU  é  emi2do.  Pedido  de  informação  

prévia  é  emi2da  pela  DMPUA.  10  REFORMA  DMPUA  (2):  Divisão  do  DMPUA  em  duas  direções  independentes:  (i)  Direção  de  Serviço  Municipal  de  Cadastro  (ii)  Direção  de  Serviço  Municipal  de  Planeamento  Urbano  e  Meio  Ambiente.  

11  Transferência  de  responsabilidade  o  ônus  e  responsabilidade  da  revisão  ex-­‐ante  para  o  profissional(s)  encarregado  do  projeto.  Exigir  a  compra  

de  seguro  de  responsabilidade  civil.  12  Concessionar  a  autoridade  de  licenciamento  a  os  operadores  privados  ou  a  uma  organização  semi-­‐pública,  como  as  associações  de  arquitetura  e  /  ou  de  engenharia.  Exigir  a  compra  de  seguro  de  responsabilidade  

civil.  13  Aumentar  o  orçamento  DUC  para  refle2r  uma  redistribuição  justa  da  renda  gerada  pelo  departamento.  Isto  permite  a  instalação  imediata  e  manutenção  de  melhores  equipamentos,  so|ware  e  programas  de  treinamento.

Work  in  Maputo3 In  total,  13  reforms  are  proposed

Page 41: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 In  Phase  II,  these  are  analyzed  in  

terms  of  impact  and  effort

Page 42: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 Resulting  in  5  ‘structural’,  long  

term  reforms.

1  Delegação  da  autoridade  para  aprovar  todos  os  projectos  para  o  Director  Adjunto  do  DUC.  2  Eliminação  de  requisito  de  anexar  estudos  hidráulicos  e  elétricos,  ao  pedido  de  aprovação  da  licença  de  construção.  3  Formalização  da  licença  de  u2lização  como  o  único  documento  necessário  para  se  conectar  a  construção  das  redes  de  esgoto,  água  e  eletricidade.  4  Averbamento  de  prorrogação  de  licença  de  construção.  5  Implementação  de  uma  tarifa  de  processamento.  6  Fusão  do  Cer2dão  de  Benfeitorias  e  Licença  de  U2lização.  7  Delegação,  do  Director  Adjunto  ao  chefes  de  divisão  diferentes,  da  autoridade  para  assinar  documentos  oficiais  

intermediários.  8  Desenho  e  implementação  de  um  sistema  ‘intermediario’  de  banco  de  dados,  fluxo  

de  trabalho,  comunicações  e  serviços  da  Web,  capaz  de  se  conectar  no  futuro  com  o  SIGEM.    9  REFORMA  DMPUA  (1):  Implementação  do  Regulamento  do  Solo  Urbano  que  transforma  o  DUAT  em  TUATU.  Emissão  de  o  número  de  polícia,  de  plano  topográfico  e  de  registro  catastral  ao  mesmo  tempo  que  o  documento  DUAT  /  TUATU  é  emi2do.  Pedido  de  informação  

prévia  é  emi2da  pela  DMPUA.  10  REFORMA  DMPUA  (2):  Divisão  do  DMPUA  em  duas  direções  independentes:  (i)  Direção  de  Serviço  Municipal  de  Cadastro  (ii)  Direção  de  Serviço  Municipal  de  Planeamento  Urbano  e  Meio  Ambiente.  

11  Transferência  de  responsabilidade  o  ônus  e  responsabilidade  da  revisão  ex-­‐ante  para  o  profissional(s)  encarregado  do  projeto.  Exigir  a  compra  

de  seguro  de  responsabilidade  civil.  12  Concessionar  a  autoridade  de  licenciamento  a  os  operadores  privados  ou  a  uma  organização  semi-­‐pública,  como  as  associações  de  arquitetura  e  /  ou  de  engenharia.  Exigir  a  compra  de  seguro  de  responsabilidade  

civil.  13  Aumentar  o  orçamento  DUC  para  refle2r  uma  redistribuição  justa  da  renda  gerada  pelo  departamento.  Isto  permite  a  instalação  imediata  e  manutenção  de  melhores  equipamentos,  so|ware  e  programas  de  treinamento.

Page 43: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 And  8  ‘quick  win’  reforms

1  Delegação  da  autoridade  para  aprovar  todos  os  projectos  para  o  Director  Adjunto  do  DUC.  2  Eliminação  de  requisito  de  anexar  estudos  hidráulicos  e  elétricos,  ao  pedido  de  aprovação  da  licença  de  construção.  3  Formalização  da  licença  de  u2lização  como  o  único  documento  necessário  para  se  conectar  a  construção  das  redes  de  esgoto,  água  e  eletricidade.  4  Averbamento  de  prorrogação  de  licença  de  construção.  5  Implementação  de  uma  tarifa  de  processamento.  6  Fusão  do  Cer2dão  de  Benfeitorias  e  Licença  de  U2lização.  7  Delegação,  do  Director  Adjunto  ao  chefes  de  divisão  diferentes,  da  autoridade  para  assinar  documentos  oficiais  

intermediários.  8  Desenho  e  implementação  de  um  sistema  ‘intermediario’  de  banco  de  dados,  fluxo  

de  trabalho,  comunicações  e  serviços  da  Web,  capaz  de  se  conectar  no  futuro  com  o  SIGEM.    9  REFORMA  DMPUA  (1):  Implementação  do  Regulamento  do  Solo  Urbano  que  transforma  o  DUAT  em  TUATU.  Emissão  de  o  número  de  polícia,  de  plano  topográfico  e  de  registro  catastral  ao  mesmo  tempo  que  o  documento  DUAT  /  TUATU  é  emi2do.  Pedido  de  informação  

prévia  é  emi2da  pela  DMPUA.  10  REFORMA  DMPUA  (2):  Divisão  do  DMPUA  em  duas  direções  independentes:  (i)  Direção  de  Serviço  Municipal  de  Cadastro  (ii)  Direção  de  Serviço  Municipal  de  Planeamento  Urbano  e  Meio  Ambiente.  

11  Transferência  de  responsabilidade  o  ônus  e  responsabilidade  da  revisão  ex-­‐ante  para  o  profissional(s)  encarregado  do  projeto.  Exigir  a  compra  

de  seguro  de  responsabilidade  civil.  12  Concessionar  a  autoridade  de  licenciamento  a  os  operadores  privados  ou  a  uma  organização  semi-­‐pública,  como  as  associações  de  arquitetura  e  /  ou  de  engenharia.  Exigir  a  compra  de  seguro  de  responsabilidade  

civil.  13  Aumentar  o  orçamento  DUC  para  refle2r  uma  redistribuição  justa  da  renda  gerada  pelo  departamento.  Isto  permite  a  instalação  imediata  e  manutenção  de  melhores  equipamentos,  so|ware  e  programas  de  treinamento.

Page 44: Session 3 ppt 1 construction_permits_a_samper

Work  in  Maputo3 PHASE  II:  quick  wins  defined  and  

implemented.  ±  80  days.

Page 45: Session 3 ppt 1 construction_permits_a_samper

Conclusions4

Page 46: Session 3 ppt 1 construction_permits_a_samper

Conclusions41. The  land  administra2on  system,  its  dynamics,  its  logic,  are  

at  the  core  of  the  ‘problem’.  • Construc2on  licensing:  a  func2on  of  property  forma2on.  • Keeping  within  the  parameters  of  the  la�er  takes  precedence.  • Urban  planning:    is  subject  to  the  (highly  poli2cal)  dynamics  of  assigning  land  development  rights.  No  plan,  par2cularly  long  term,  can  survive  these  forces.    

2. The  social  instruments  of  spa2al  transforma2on  and  economic  growth  at  the  service  of  the  government  as  opposed  to  the  government  at  the  service  of  the  social  instruments.

Page 47: Session 3 ppt 1 construction_permits_a_samper

Conclusions43. Some  gains  can  be  a�ained  through  technology  and  

process  re-­‐engineering.  However,  significant  gains  will  only  be  a�ained  with  structural  reform.  • Can  be  done  within  the  framework  of  public  ownership  of  land.  • Enabling  a  modern  market  of  land  rights  that  allows  free  circula2on  of  TUATU’s.  Can  be  an  excellent  tool  for  an  agile  real  estate  market.  (Land  rights  exchange,  such  as  CEPACs  in  Brazil;  leasing  of  public  land  as  a  mechanism  to  control  specula2on;  etc)  

• Intervening  with  strength  and  quality  on  key  areas  of  the  process:  the  land  planning  phase  and  the  ‘ex-­‐post’  review  and  control  phase.    

• The  ‘in-­‐between’  is  be�er  le|  to  the  professionals  and  associa2ons  with  proper  checks  and  balances,  especially  financial  (insurance).  

• There  is  proof  that  these  mechanisms  work  (Colombia,  Costa  Rica,  Peru).  Needs  strong  professional  associa2ons.  

Page 48: Session 3 ppt 1 construction_permits_a_samper

Conclusions44. Strong  leadership  from  the  private  sector  is  required  for  

this  to  happen.  5. The  poli2cal  economy  of  land  administra2on  and  its  

ins2tu2onal  arrangement  have  to  be  addressed.  • Promaputo  II  seems  to  have  fallen  short  • The  Registry  Moderniza2on  Program  is  stalled    

6. About  State  reform:  • Some2mes  =  get  rid  of  government  interven2on,  let  private  actors  deal  

with  differences  • Other  2mes  =  strong  government,  capable,  well  paid  human  resources  +  

modern  processes  and  tools.  (Could  be  the  case  here  if  more  resources  were  invested  from  the  revenue  brought  by  CPP)  

• In  this  case  =  limit  government  interven2on  to:  • Property  rights  • Land  use  • Controlling  professional  prac2ce  (during  process  and  ex-­‐post)

Page 49: Session 3 ppt 1 construction_permits_a_samper

Arturo Samper M.Arch. / M.CPURD Consultants

Thank you! !