shipyard layout - hcmutvtcang/course/spman-205/ontap... · shipyard layout week 5 ... •ship types...

14
© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000 Shipyard Layout Shipyard Layout Week Week 5 İ .T.Ü. Faculty of Naval Architecture and Ocean Engineering .T.Ü. Faculty of Naval Architecture and Ocean Engineering Ship Shipyard Organization yard Organization - GEM GEM 412 412-E © A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000 Sumitomo Oppama Shipyard Sumitomo Oppama Shipyard

Upload: trinhngoc

Post on 03-Apr-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

1

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Shipyard LayoutShipyard Layout

Week Week 55

İİ.T.Ü. Faculty of Naval Architecture and Ocean Engineering.T.Ü. Faculty of Naval Architecture and Ocean EngineeringShipShipyard Organizationyard Organization -- GEM GEM 412412--EE

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Sumitomo Oppama ShipyardSumitomo Oppama Shipyard

2

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Mitsubishi Mitsubishi KyogiKyogi ShipyardShipyard

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Plant CapacityPlant Capacity

Single shift capacity

Overtime capacity

Extra shift capacity

Internal capacity

Total capacity

External capacity

(subcontracting)

3

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Layout LogicLayout Logic

Develope layout objectives

Determine capacity requirements

Locate structures on land site

Establish the type of layout necessary

Obtain building floor plans

Establish product work flow patterns

Locate major workstations and develope layout for each of them

Evaluate the proposed layout

Acceptable

Not acceptable

STOP

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- Main Horizontal Work Flow TypesMain Horizontal Work Flow Types

4

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- Main Main VerticalVertical Work Flow TypesWork Flow Types

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- LinearLinear

5

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- Steel Hull, I Type FlowSteel Hull, I Type Flow

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- Steel Hull, U & L Type FlowsSteel Hull, U & L Type Flows

6

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Layout Alternatives Layout Alternatives -- (9!)(9!)

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Process Type Process Type

7

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Product Type Product Type

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow LayoutsWork Flow Layouts

8

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Product Type LayoutProduct Type Layout

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Process Type LayoutProcess Type Layout

9

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Mixed Type LayoutMixed Type Layout

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Comparison ofComparison ofDifferent LayoutsDifferent Layouts

10

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Work Flow Work Flow -- River ApproachRiver Approach

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Relationship ChartRelationship Chart

11

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Layout Performance Layout Performance

CRITERIA•Cost minimization•Transport distance minimization•Maximization of the volume of transported units•Maximization of communication and control

CRITERIA SELECTION•Physical attributes of the product•Volume of units travelling amongst processes•Frequency of transportation amongst processes•Material handling cost (cost per movement x number of movements)

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Shipyard Layout Shipyard Layout -- Factors effecting the development of facilitiesFactors effecting the development of facilities

•Welded ships•Block assembly•Cranes•Ship types•Ship dimensions•Dry docks•Gantry cranes•Cutting systems•Panel & Web lines•Automated welding systems•Pre-outfitting

12

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Shipyard Layout Shipyard Layout -- Factors effecting the developmentFactors effecting the development

•Type and quantity of ships to be built•Area requirement•Existing area•Degree of mechanization•Material handling and transfer systems•Production methods adopted•NC processes•Panel Lines•Block and sub-assemblies•Shotblast and painting•Covered space

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Marmara Transport Marmara Transport –– As is!As is!

13

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Marmara Transport Marmara Transport –– AlternativeAlternative

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Steel WorksSteel Works

14

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

Marmara Transport Marmara Transport –– Pipe WorksPipe Works

© A.Y.Odabaşı, S.Alkaner, A.İ.Ölçer, İ.T.Ü., 2000

End of Week End of Week 55

Questions ?Questions ?