Page 1: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

Spill Prevention Control & Spill Prevention Control & CountermeasureCountermeasure

(SPCC) Presentation (SPCC) Presentation

Prepared by: Environmental Advisors and Engineers, Inc.

Environmental Advisors and Engineers19211 W. 64th Terrace, Shawnee, KS 66218(913) 599-4326 www.spccplan.com

Page 2: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

2

Explain EAE’s Capability andExperience in Assisting with EPA

SPCC Requirements and the Resulting Impacts,

Challenges, and Risks for AboveGround Bulk Oil

Storage Facilities

Goal Of Presentation

Page 3: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

3

Outline

History of SPCC (Spill Prevention Control and Countermeasure)

Facilities Requiring SPCC Plans General SPCC Requirements SPCC Plan Required Elements SPCC Challenging Situations EAE SPCC Capability and Experience

Page 4: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

4

Clean Water Act

•• Passed in 1972, the Clean Water Act was a Passed in 1972, the Clean Water Act was a response to the nearly unchecked dumping of response to the nearly unchecked dumping of pollution into our waterways. At the time, twopollution into our waterways. At the time, two--thirds of the country's lakes, rivers and coastal thirds of the country's lakes, rivers and coastal waters had become unsafe for fishing or waters had become unsafe for fishing or swimming. The goal of the Clean Water Act swimming. The goal of the Clean Water Act was to reduce pollution in all U.S. waters to was to reduce pollution in all U.S. waters to "restore and maintain the chemical, physical, "restore and maintain the chemical, physical, and biological integrity of our nation's waters.and biological integrity of our nation's waters.““

Page 5: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

5

Original SPCC Prevention Regulation

Promulgated on December 10, 1973

Effective on January 10, 1974

Largely unchanged for 28 years

Authority: Clean Water Act (CWA) 311(j)(1)(C) and 501, and codified under 40 CFR part 112

Page 6: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

6

Purpose of SPCC Rule 40 CFR 112

To prevent oil discharges from reaching navigable waters of the U.S. or adjoining shorelines by requiring site specific plans.

To ensure that effective/proactive measures are implemented to prevent or in response to an oil discharge.

Page 7: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

7

2002 SPCC Rule

Publication Date: July 17, 2002 Effective Date: August 16, 2002 December 5, 2008 Amendments effective

January 14, 2010 Published November 20, 2008 Final

Extension Dates for all facilities November 10, 2010

Page 8: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

8

Why Ruling was Amended

In January 1988, a four-million gallon aboveground storage tank in PA, experienced a brittle fracture of the tank shell, which then released approximately 3.8 million gallons of diesel fuel.

An SPCC Task force was formed to examine AST federal regulations.

Page 9: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

9

Elements of New Rule

Clarification that the new rule is mandatory (should to must).

Raises the threshold by eliminating the 660 gallon/single container criterion.Now total >1,320 gallons.

Exempts containers less than 55 gallons from capacity calculation.

Page 10: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

10

Sites Requiring SPCC Plans

The aggregate aboveground storage capacity of the facility is 1,320 gallons or greater of oil.

Only containers with a capacity of 55 gallons or greater are counted.

The aggregate aboveground storage capacity of a facility excludes the capacity of a container that is “permanently closed” if proper labeling is present.

Page 11: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

11

Example Facilities

Page 12: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

12

Facilities Requiring SPCC Plans

••Filling StationsFilling Stations••Construction Contractor SitesConstruction Contractor Sites••FarmsFarms••Manufacturing PlantsManufacturing Plants••Fuel Production FieldsFuel Production Fields••QuarriesQuarries••MarinasMarinas••Facilities with BackFacilities with Back--Up Generator TanksUp Generator Tanks••Many OthersMany Others

Page 13: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

13

General SPCC Requirements

•• The management acknowledges its The management acknowledges its responsibility to its neighbors, employees, responsibility to its neighbors, employees, and the community to take all reasonable and the community to take all reasonable steps necessary to prevent spills to protect steps necessary to prevent spills to protect human health and the environment.human health and the environment.

•• The owner shall see that its agents and The owner shall see that its agents and employees are properly informed of the employees are properly informed of the SPCC Plan and know their role in maintaining SPCC Plan and know their role in maintaining the SPCC Plan or in minimizing a spill.the SPCC Plan or in minimizing a spill.

Page 14: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

14

General SPCC Requirements cont.

The SPCC Plan must be maintained on site for The SPCC Plan must be maintained on site for any any facility manned a minimum of 4 hours daily.facility manned a minimum of 4 hours daily.

The SPCC Plan must be updated a minimum of The SPCC Plan must be updated a minimum of once every 5 years or when there is a change once every 5 years or when there is a change in in the facility design, construction, operation, or the facility design, construction, operation, or maintenance affecting its potential for discharge.maintenance affecting its potential for discharge.

SPCC Plans must be sealed by a Professional SPCC Plans must be sealed by a Professional Engineer unless the facility meets the qualified Engineer unless the facility meets the qualified facility qualification criteria.facility qualification criteria.

Page 15: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

15

Qualified Facility Requirements

10,000 US gallons or less aggregate above ground oil storage capacity

Within any 12 month period in the last 3 years:– No single discharge of oil greater than 1,000

gallons– No two discharges of oil each exceeding 42

gallons

Page 16: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

16

SPCC Plan Elements

Facility address and location within state Site and area topography Direction from which traffic enters facility Type of facility and operations Number of dispensers and dispenser islands

Page 17: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

17

Facility Diagram

The facility diagram must mark the location and contents of each oil container and the contents of each container and secondary containment provided.

Page 18: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

18

AST Piping

Aboveground valve and piping shall be inspected on a regular basis and shall be marked with the product content, origin, and direction of flow.

All aboveground piping is and shall remain protected from vehicular traffic.

Page 19: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

19

Loading and Unloading

•• Minimize fire hazards Minimize fire hazards –– no smoking or fire, no smoking or fire, engine stopped (unless required for pump).engine stopped (unless required for pump).

•• Handbrake set and cargo truck attended at all Handbrake set and cargo truck attended at all times within 25 feet.times within 25 feet.

•• Facility manager confirms types and amounts Facility manager confirms types and amounts of fuel delivered to each tank.of fuel delivered to each tank.

•• Signage or equivalent method to prevent Signage or equivalent method to prevent vehicles from departing prior to disconnecting vehicles from departing prior to disconnecting transfer lines and to check for leaks.transfer lines and to check for leaks.

Page 20: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

20

Secondary Containment

Secondary containment is designed to contain the volume of the largest tanks plus additional volume for precipitation.

Overfill protection is required on all tanks receiving fuel deliveries.

Page 21: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

21

Secondary Containment cont.

The entire containment system must be capable of containing oil and constructed so that a discharge will not escape the containment system before cleanup occurs.

No vegetation shall be allowed to grow or debris accumulated in the containment area.

Page 22: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

22

Secondary Containment cont.

Sized secondary containment must be provided (sufficient to contain a release from the single largest compartment of the cargo tank vehicle) for any loading racks.

Page 23: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

23

If a spill occurs…

Spill Response Procedures must be posted. The facility personnel are and shall continue to

be trained to respond to spills of less than 100 gallons at the facility.

Employees should identify source, type, and approximate amount of spill.

Evaluate the possibility of fire hazard to inform the Fire Department accordingly.

Page 24: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

24

Inspections

•• Employees need to periodically observe the Employees need to periodically observe the Aboveground Storage tanks, valves, Aboveground Storage tanks, valves, aboveground piping and dispensers for aboveground piping and dispensers for potential problems and document inspection potential problems and document inspection results according to accepted industry results according to accepted industry procedures. If a problem is observed the procedures. If a problem is observed the employee shall inform the facility manager, employee shall inform the facility manager, who will in turn take necessary action.who will in turn take necessary action.

Page 25: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

25

Security

Specified security measures must be in place or are to be implemented to minimize the opportunity for vandalism.

Page 26: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

26

SPCC Challenging Situations

Page 27: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

27

Loading Racks

Stand – alone dual walled AST

Loading Rack utilized for USTs only

Is the loading rack subject to SPCC regulations?

Page 28: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

28

New Loading Rack Clarification

December 2008 Rule Clarification 40 CFR 112.7 (h) Since transfers from loading racks are a

potential source of discharge and additionally because a loading rack is not typically subject to UST regulations 40 CFR 280 and 281, EPA believes loading racks should be regulated under the SPCC regulations at an otherwise regulated SPCC facility.

Page 29: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

29

Best Drum Secondary Containment

Concrete Floor Storage Warehouse

Multiple areas of oil drum storage

For business reasons drums moved often with forklifts

Optimum method of secondary containment?

Page 30: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

30

Impervious Floor?

Concrete retaining walls

Gravel over packed dirt containment floor

Drainage records kept to show that containment area holds spills

Is floor sufficiently impervious?

Page 31: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

31

Impermeability Determination

40 CFR 112.8 (c)(2) states “You must ensure that diked areas are sufficiently impervious to contain discharged oil until cleanup can occur.”

This is an engineer decision based upon– Type and viscosity of oil contained– Frequency of containment area inspection and

likelihood that a release will be discovered quickly– Soil type and presence of drainage records

Page 32: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

32

EAE Capability and Experience

EAE in Partnership with Williams & Company– Developed SPCC Plan shells and site visit

checklists.– Completed over 150 SPCC Plans in 16 states to

date.– Provide consulting services to facilities before,

during, and after EPA inspections.– Aid clients in requesting and obtaining KS state

funds for HB2756 that reimburses facilities with retail fuel sales for SPCC expenses.

Page 33: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

33

EAE has Experience in a Wide Range of SPCC Facility Types

•• Filling/ Service StationsFilling/ Service Stations•• Bulk fuel plantsBulk fuel plants•• Manufacturing FacilitiesManufacturing Facilities•• Commercial Fleet Vehicle Maintenance FacilitiesCommercial Fleet Vehicle Maintenance Facilities•• Biodiesel Fuel PlantBiodiesel Fuel Plant•• MarinasMarinas•• QuarriesQuarries•• Construction ContractorsConstruction Contractors•• Facilities with BackFacilities with Back--Up Generator TanksUp Generator Tanks

Page 34: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

34

EAE Unique Staff Qualifications

EAE is a woman owned business certified in Kansas, Missouri, and Nebraska.

7 Professionals trained to visit facilities, draft SPCC Plans and make cost effective recommendations.

3 engineers – 2 of which are P.E. licensed. EAE Staff member, Gale Wright, is a former EPA

Branch Chief with wide range of regulatory experience. Engineering Staff maintain close ties with EPA SPCC

contacts and track changes to SPCC Regulations and Policy.

Partner Firm, Williams & Company, Inc., has in depth knowledge in AST and UST tank systems

Dedicated Administrative SPCC Specialist support.

Page 35: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

35

Unique SPCC Capabilities

We guarantee to cover any EPA imposed fines attributed to the SPCC Plan.

We offer EPA required SPCC training. We provide all forms for tank, piping, and

containment inspection, training, revisions, and drainage records.

We provide a dedicated storage system for electronic files to simplify future revisions.

We offer the unique option to modify the facility prior to SPCC Plan publishing to limit exceptions.

Page 36: Spill Prevention Control & Countermeasure (SPCC) Presentation · PDF fileSpill Prevention Control & Countermeasure (SPCC) Presentation Prepared by: Environmental Advisors and Engineers,

36

Additional Resources

Partnership with regional certified tank inspection firm

Structural Engineer employee of EAE available to aid in facility design

Capability to address state and/or local petroleum/oil storage requirements if requested

Capability to create SWPPP Plans if requested Website for additional Information