Page 1: Status of NA62 straw electronics

Status of NA62 straw electronics

WebsCovers

ServicesReadout

Page 2: Status of NA62 straw electronics

Webs• Production approaching the

end• Few problems with cut lines

on flexible part• Discovered with noise_scan

program when mounted on the detector

• Special test bench for this problem was discussed at the beginning but deemed not needed – Probably not justified for few

cases• Current test bench proved to

be very efficient to discover majority of the problems

Page 3: Status of NA62 straw electronics

COVER• Full production

arrived delayed and damaged– FedEx subcontracted

the delivery to CERN – Test all boards ASAP

to know the yield and possible problems

– 20 left to test– 1 damaged

mechanically– 10 did not pass the

test

Page 4: Status of NA62 straw electronics

COVER• Keep covers in place when

installed on the detector– 2 modules completely

installed– Tested with final LV patch

panels– Few bad straw wires and

web connections discovered during tests

• Remote programming– Firmware version 10 bugs

for remote programming– Firmware version 11

• Remote pgm now works• Fixed bug in multi-edge

bit• Improved timing for DAC

read-back

Page 5: Status of NA62 straw electronics

SERVICES• Patch panels and on-

detector cabling (Johan)– Dense but feasible– LV and HV cover cables

with different lengths– All LV and HV cables

ordered with timed delivery– RJ45 needs careful planning

• How many different lengths?

• Storage behind rack ~1 meter

• Wait for chamber installed in the pit?

• UK company ready to produce batches of different lengths

Page 6: Status of NA62 straw electronics

SERVICES• Patch panels LV and HV

– HV ordered at CERN• Modification with copper GND plate instead od aluminium

– LV tested completely by Johan• DCS control in advanced state• Still open

– External temperature sensors– Humidity measurement ?

– LV production tight• Organized by TE-MPE group• Fast PCB production• Components for assembly prepared • Total time ~6 weeks• ½ March at CERN• Johan to organize the test

Page 7: Status of NA62 straw electronics

SERVICES• MPOD ordered

– … but order lost– Delivered to ELCOTRON– Missing in Wiener– End of January not possible– Now end of February– HV modules new production

• Not on stock• Will deliver 8-channel HV modules• Swap with final when delivered

• As soon as we receive our MPOD– We have to return mini-MPOD which we have used till now– Test power supply of 1 module/2 views (full chamber?)

• Order the rest 3 MPODs, eventually 1 spare

Page 8: Status of NA62 straw electronics

SRB

• 2 FPGAs ready for schematics– Event manager– Frontend interface– Work is now focusing on vme and trigger

• Changes in connectivity and data flow– Input FPGA FESRB

• Added data/cmd direct links to vme_bm – For control and cover tests– Use of event_mgr unpractical

– Delay of every cover clock line (16 lines) must be adjustable• Trying 2 solutions

– Use FPGA feature– Specialized clock generation chips with 8 outputs

Page 9: Status of NA62 straw electronics

SRB – components

TTC

LEMO

L0 OUT

COVERS

TTCRx

COVER CONTROL,

DATA, SYNCH

EVENT PROCESSOR

2(4)GB DDR3

DATA TO PC FARM

TIME REMAP

L0 PROCESSOR

VME INTFON-LINE

MONITOR

L0 LOOK_UPTABLE

WORK

Page 10: Status of NA62 straw electronics

SRB – data flow

16x2x320Mbit/s ~10Gbit/s

2.5 Gbit/s

2x Gbit ethernet

VME

1.6 Gbit/s

Page 11: Status of NA62 straw electronics

SRB

• Schematics + PCB design– Feb-> March foreseen – Possible delay of 2 weeks

• Prototype April/May