survey work job progress rev 01 date 19062015
TRANSCRIPT
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish Date
Berati
1 DMA 1
1.1 Site Syrvey 6 13/05/2015 20/05/2015
1.2 Office Work 1 19/06/2015 20/06/2015
1.3 Final Survey Document
1.4 Other Works
1.5
1.6
1.7
2 DMA 2
2.1 Site Survey 3 9/5/15 11/5/15
2.2 Office Work 3 9/5/15 11/5/15 12/6/15
2.3 Final Survey Document
2.4 Other Works
2.5
2.6
2.7
3 DMA 3
3.1 Site Syrvey 3 6/5/15 8/5/15
3.2 Office Work 3 6/5/15 8/5/15 4/6/15
3.3 Final Syrvey Document
3.4 Other Works
3.5
3.6
3.7
4 DMA 4
4.1 Site Syrvey 4 30/4/2015 5/5/15
4.2 Office Work 4 30/4/2015 5/5/15 27/5/2015
4.3 Final Syrvey Document
4.4 Other Works
4.5
Total Working Days
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
4.6
4.7
5 DMA 8
5.1 Site Syrvey 6 21/5/2015 26/5/2015
5.2 Office Work
5.3 Final Syrvey Document
5.4 Other Works
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
5.5
5.6
5.7
6 DCI DN 700 mm
6.1 Site Syrvey 1 14/4/2015 15/4/2015 Punuar nga:Aurel Beluli
6.2 Office Work
6.3 Final Syrvey Document
6.4 Other Works
6.5
6.6
6.7
7 DCI DN 600 mm
7.1 Site Syrvey 4 6/4/15 9/4/15 Punuar nga:Aurel Beluli
7.2 Office Work
7.3 Final Syrvey Document
7.4 Other Works
7.5
7.6
7.7
7 DCI DN 400 mm 1 11/4/15 12/4/15 Punuar nga:Aurel Beluli
7.1 Site Syrvey
7.2 Office Work
7.3 Final Syrvey Document
7.4 Other Works
7.5
7.6
7.7
Administartion Building1 Adiministration Building
1.1 Site Syrvey 1 2/6/15 2/6/15
1.2 Office Work
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
1.3 Final Syrvey Document
1.4 Other Works
1.5
1.6
1.7
1.8
1.9
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
KUCOVA1 DMA 1
1.1 Site Syrvey 3 27/5/2015 29/4/2015 14/4/2015
1.2 Office Work
1.3 Final Syrvey Document
1.4 Other Works
1.5
1.6
1.7
2 DMA 2
2.1 Site Syrvey 3 24/4/2015 26/4/2015 14/4/2015
2.2 Office Work
2.3 Final Syrvey Document
2.4 Other Works
2.5
2.6
2.7
3 DMA 3 14/4/2015
3.1 Site Syrvey 3 22/4/2015 23/4/2015
3.2 Office Work
3.3 Final Syrvey Document
3.4 Other Works
3.5
3.6
3.7
4 DMA 4
4.1 Site Syrvey 3 13/4/2015 15/4/2015 14/4/2015
4.2 Office Work
4.3 Final Syrvey Document
4.4 Other Works
4.5
4.6
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
4.7
5 DMA 5
5.1 Site Syrvey 2 20/4/2015 21/4/2015 14/4/2015
5.2 Office Work
5.3 Final Syrvey Document
5.4 Other Works
5.5
5.6
5.7
6 DMA 6
6.1 Site Syrvey
6.2 Office Work
6.3 Final Syrvey Document
6.4 Other Works
6.5
6.6
6.7
7 DMA 7
7.1 Site Syrvey
7.2 Office Work
7.3 Final Syrvey Document
7.4 Other Works
7.5
7.6
7.7
8 DMA 8
8.1 Site Syrvey 3 1/6/15 3/6/15
8.2 Office Work
8.3 Final Syrvey Document
8.4 Other Works
8.5
8.6
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
8.7
9 DMA 9
9.1 Site Syrvey 2 16/4/2015 17/4/2015 14/4/2015
9.2 Office Work
9.3 Final Syrvey Document
9.4 Other Works
9.5
9.6
9.7
10 DMA 10
10.1 Site Syrvey 3 3/6/15 5/6/15
10.2 Office Work
10.3 Final Syrvey Document
10.4 Other Works
10.5
10.6
10.7
11 DMA 11
11.1 Site Syrvey 3 6/6/15 9/6/15
11.2 Office Work
11.3 Final Syrvey Document
11.4 Other Works
11.5
11.6
11.7
12 DMA 12
12.1 Site Syrvey 4 27/5/2015 30/5/2015
12.2 Office Work
12.3 Final Syrvey Document
12.4 Other Works
12.5
12.6
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
No. Topogarfi Survey
Planned
Delivered Day Email Date of Rev. Delivered Approved Date NotesStarting Date Finish DateTotal Working Days
12.7
13 DMA 15a 1 18/4/2015 18/4/2015 14/4/2015
13.1 Site Syrvey
13.2 Office Work
13.3 Final Syrvey Document
13.4 Other Works
13.5
13.6
13.7
14 DCI DN 200 mm
14.1 Site Syrvey 1 10/4/15 10/4/15 14/4/2015
14.2 Office Work
14.3 Final Syrvey Document
14.4 Other Works
14.514.614.715 DCI DN 300 mm
15.1 Site Syrvey 1 9/4/15 9/4/15 14/4/2015
15.2 Office Work
15.3 Final Syrvey Document
15.4 Other Works
15.515.615.7
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Berati
Bllokim I ruges ne nyjen (np274)
Bllokimi I rruges ne nyjen (np65-np53)
Kalimi I linjes tone te shkolla UFO
Bllokim ruges ne nyjen (np250-np589)
Bllokim ruges ne nyjen (np645-np318-340)
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
Devijim ruges
Bllokimi I ruges te nyja (np8-np15)
Mosperputhja hartes n nyjen (np785)
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
Administartion Building
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
KUCOVA
Bllokimi ne nyjen (np582-np382)
Bllokimi I ruges ne nyjet (np348)
Bllokimi I ruges ne nyjet (np330)
Bllokimi I ruges ne nyjet (np290-np316)
Bllokimi I ruges ne nyjen (np432-np401)
si pasoj tjetersimi I prones
Ndodhja e objektit ne drejtimin e shtrirjes linjes.
Mos gjetja e ruges ne nyjet(np605-np485)
si pasoj tjetersimi I prones.
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
Bllokimi I ruges si pasoj tjetersimi I prones ne
nyjen (np628-np556)dhe (np561-np554)
Bllokimi I ruges ne nyjet (np859-np188)
Bllokimi I ruges ne nyjet (np856-np857)
Bllokim I ruges ne nyjen(np588-np617)
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
Ndodhje e shtylles ne mes te ruges.(np6-np1)
Devijim I ruges dhe bllokim
Mos perputhja ruges me harten
-
file:///var/www/apps/conversion/tmp/scratch_7/300292001.xlsx 1of 1
Topographic Survey Job Progress
Problematika ( ketu do te shenohen problemet si rastet e bllokimit te rrugeve,paqartesi,mosperputhje dhe cdo info
qe ti konsideron te tille )
Status WD