• TURNKEY SUPPLIER AND INDEPENDENT OPERATOR OF 1 MW TO 100 MW POWER DEVELOPMENTS• BUILDER, OPERATOR, FINANCIER FOR PPA, BOT OR PURCHASE

PROJECTS• INTEGRATED EPC PARTNER IN POWER CONSTRUCTION• KEY PROJECT: UNITED NATIONS NYC HEADQUARTERS

UPGRADE

• EXPERIENCED POWER PROVIDER, GLOBAL QUALIFICATIONS• ROBERT BUCHER: 4-TIME NASDAQ CEO/COO * FK ENG POWER

& WATER• HANNA KHOURI: COO FK ENG GLOBAL EPC AND

CONSTRUCTION• JOSUE ALTOMONTE: PRESIDENT NOVOSOL USA * FK ENG

BUSINESS DEV

• EXTENSIVE ADVISORY AND PARTNERS• SMART GRIDS, POWER TURBINES, NATURAL GAS SUPPLY AND

LOGISTICS• TRADITIONAL AND ALTERNATIVE ENERGY • WORLD BANK & FINANCIAL AID ORGANIZATIONS

The NOVOsol FK Company

NOVOsol & FK Engineering

Plan / Company History

•Private Corporation established In 2011 to develop, manage and operate distributed energy production.•Partners, who combined, have well over 100 years of experience in the Energy Sector globally in management, operation and trading. •Acquired Technology Rights, Contracts and Licenses to sell power.•Operate in undeveloped, stringent and remote areas of the globe

Plan / Company History(30% owner of NOVOsol Power)•One-stop-shop management, construction and engineering firm with about 50 years of experience•Dependable, no-nonsense developer who consistently delivers rock-solid results on time and within the budget.•FKC is uniquely qualified in building teams of local companies to build local content.•With diverse experience using subsidiaries, strategic partnerships, and joint ventures worldwide, thus establishing an enviable reputation in the engineering market.

4

Last NOVOsol FK Eng Infrastructure Project - WAGP

The 678 kilometer West African Gas Pipeline (WAGP) links into the existing Escravos-Lagos pipeline at the Nigeria Gas Company’s Itoki Natural Gas Export Terminal

NOVOsol FK Power Plant Packages

ENGINEERING

Packaged GE Gas Turbine Power Plant, most efficient power plant available

Sole User LNG mini-terminal with long term fuel contract

Combined Cycle HRSG system boosts plant output

50 years of power plant development

INSTALL POWER IN THE ONES TO TENS OF MEGAWATTS (MW) FOR IMMEDIATE POWERSTRATEGIC LOCATING CAN CUT GRID TRANSMISSION LOSSES IMMEDIATELY REDUCE RISK OF WIDESPREAD POWER CUTS, AND THE ECONOMIC DAMAGE THAT RESULTS.FAST POWER VERSUS YEARS OF PERMITTING AND CONSTRUCTION OF BIG POWER STATIONSCHOOSE FUEL BY AVAILABILITY, LOCATION AND COST

Immediate & Mobile Power Programs

CAT MODULAR 5.7 MW GAS TURBINE

• DEVELOPMENT OF NEW EFFICIENT COMBUSTION AND TURBINE ENGINES FOR DISTRIBUTED POWER GENERATORS

• DEVELOPMENT OF MID-SCALE MOBILE POWER GENERATION USING TURBINE TECHNOLOGY THAT CAN BE PLACED IN DAYS WITH MINIMAL PREPARATION

• MODULAR POWER PLANTS THAT CAN BE PLACED, ASSEMBLED AND COMMISSIONED IN DAYS VERSUS MONTHS

• ADVANCED CONTROLS THAT CAN COMBINE AND SYNCHRONIZE MID-POWER INTO LARGE SCALE POWER

Efficient Gas Turbine Solutions

GE MODULAR / MOBILE 25 MW GAS TURBINE

LM2500 modular power system

GE TM2500 MOBILE POWER STATION

HIGH EFFICIENCY POWER GENERATION

• EFFICIENT DIESEL OR NATURAL GAS POWER STATION

• MODULAR SYSTEM ASSEMBLY

• DELIVER BASE-LOAD OR PEAKING

• DELIVER ON OR OFF THE GRID

• SYNCHRONIZE WITH MULTIPLE UNITS

• 60 TO 90 DAY CONSTRUCTION SCHEDULE

• 37% TO 44% EFFICIENCY

9

Combined Cycle Option

• Organic Rankine Cycle (ORC) turbine.

• Combined with the TM2500™ system produces added 5 MW of power for total 33 MW package at 53.8% efficiency in combined cycle.

LNG OPPORTUNITYLONG TERM SUPPLY CONSTRUCT MINI-TERMINAL OCEAN OR TRANSPORTSTART WITH DIESEL, MOVE TO LNGTHREE LNG GLOBAL SUPPLIERS

RATES10 YEAR TERM$0.14 TO $0.16 PER MMBTU

Mini-Terminal LNG Program

Aeroderivative Gas Turbine Power Packages

System combines traditional power industry frame technology with aircraft industry aero-derivative gas turbine technology developments into a next generation gas fired power generation package

• POWER RANGE: 25 to 103 MW simple; 30 to 150 MW combined

• RELIABILITY: 99.5%• EFFICIENCY: 47 to 53%• TURBINE SPEED: 3,600 rpm• MODULAR DESIGN and

CONSTRUCTION• Over 2000 installed systems

Quick assembly and Pre-tested

• The gas turbine is preassembled for low installation time.

• Power package can be shipped by truck.

• The auxiliary systems are mounted on a single skid in front of the power package.

• Connects with the base plate through short, flexible connectors.

• Maintenance intervals of 25,000 hours for hot section repair and 60,000 hours overhaul intervals.

• Rated for 85-dBA average at 3 feet with a silent option for 80-dBA. With increased

NOVOsol Solution: LM2500 with Balance of Plant

Features & Benefits• Low cost and fast installation from modular design • Fast start capability and full power output within 10

minutes• Excellent reliability and availability from aircraft proven

aero-derivative design• High simple-cycle and combined cycle efficiency• Base, Peaking, Reserve Power• Excellent hot day performance• Load following and cycling capabilities for grid

management• No maintenance penalties for cycling• Low NOx, requires minimal emission control requirement

Low Cost Modular Power

Power Systems

COST OF POWER:$0.0913 (PHP 4.11)/KWHCAPEX RECOVERY$0.0671 (PHP 3.02)/ KWH

ROI BASED ON SALES OF 60% UN INTERNAL& 40% WESM SOLD POWER= 2.221 YEARS