tekla global bim awards 2013
Embed Size (px)
DESCRIPTION
Tekla presents the Global BIM Awards 2013 winners and the finalists. Learn more about these impressive projects from this presentation. This year the categories were Total BIM, Cast in place concrete, Engineering, Precast concrete and Steel.TRANSCRIPT

Tekla Global BIM Awards 2013

Tekl
a G
loba
l BIM
Aw
ards
201
3
2

Tekl
a G
loba
l BIM
Aw
ards
201
3
Tekla Global BIM Awards OverviewFirst organized in 2009
Competitors are winners of regional Tekla BIM Awards
Five categories: – Total BIM
– Cast in place
– Engineering
– Precast
– Steel
Winners chosen by jury and public vote
3

Tekla Global BIM Awards JuryLeading international BIM experts
Tekl
a G
loba
l BIM
Aw
ards
201
3
John Bacus
Product Management Director, Trimble SketchUp
Ashwin Mahalingam
Assistant Professor,Indian Institute of Technology Madras
Richard Ogden
Chairman, Buildoffsite Director, acumen7
Risto Räty
Executive Vice President, Tekla CorporationGeneral Manager, Trimble Buildings Structures Division
Viktor Várkonyi
CEO, Graphisoft
4

ContentsProject Company CategoryPuuvilla Shopping Centre Project group of multiple companies Total BIM
BB&T Ballpark Wayne Brothers Inc. & Harris Steel Cast in place
Kalasatama Fiskari and Fregatti Insinööritoimisto Mäkeläinen Oy Precast
Gap Ice-skating Rink Sarl Patrick Millet Steel
Tesco Sheringham Pinnacle Engineering
Baku Olympic Stadium Tekfen & Sdeng Total BIM
Sengenthal Biomass Heat and Max Bögl Total BIMPower Plant
Pantin – Terralia Vinci, CBC, BET Le Joncour & Cast in placeAtelier d’Architecture Téqui
Knislinge Power Plant WSP Bridge & Civil Engineering Cast in place
Jepua Waste-to-Energy Plant Wise Group Finland Oy Steel
Kapelanka 42 Consolis Polska Precast
Nye Gand Videregåend School Constravia Precast
SAFI SAP – Sidi Rosia Plant OCP / JESA / JACOBS France Engineering
King Abdulla Sports City Six Construct Engineering
5
Tekl
a G
loba
l BIM
Aw
ards
201
3

Puuvilla Shopping Center
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Puuvilla Shopping Center project group
In Pori, Finland– Mixes 100-year-old and contemporary structures for
creating 100,00m2 of retail space
– A true product of collaboration: 13 companies teamed up for modeling
– BIM used in structural design, precast detailing, steel roof structures and façade elements to architectural, MEP and sprinkler design
6

Puuvilla Shopping Center
Tekl
a G
loba
l BIM
Aw
ards
201
3
7

BB&T Ballpark
Tekl
a G
loba
l BIM
Aw
ards
201
3
Concrete and coordination by Wayne Brothers Inc., Rebar by Harris Steel
In Charlotte, USA– 10,000 seat stadium used for baseball games, concerts,
festivals and community events
– Wayne Brothers modeled cast in place and sitework, and planned pours, tracked progress and coordinated sequences with other trades
– Layout managed with points created in Tekla and placed with Trimble Robotic Total Station
8

BB&T Ballpark
Tekl
a G
loba
l BIM
Aw
ards
201
3
9

Kalasataman Fiskari and Fregatti
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Engineering Office Mäkeläinen Oy
In Helsinki, Finland– Two 6-7 story residential building with yard deck
– Modeling from conceptual design to construction site
– Challenging facade with 30 structure types
– Model includes the piled foundations, detailed and reinforced concrete elements, load-bearing structures and thermal insulation and brickwork
10

Tekl
a G
loba
l BIM
Aw
ards
201
3
Kalasataman Fiskari and Fregatti
11

Gap Ice-skating Rink
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Sarl Patrick Millet
In Gap, France– 1970s ice-skating rink updated to match today´s
seismological and other norms
– Original timber trusses had to be preserved
– Timber and steel structures in the model
12

Gap Ice-skating Rink
Tekl
a G
loba
l BIM
Aw
ards
201
3
13

Tesco Sheringham
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Pinnacle
In Sheringham, UK– Everyday yet bespoke Tesco supermarket with a complex
timber roof structure
– BIM used for structural design and detailing of foundations and concrete and steel frame, facade, prefabrication, and creating drawings and bills of materials
– Thanks to modeling, the client could visualize the complete shopping experience
14

Tesco Sheringham
Tekl
a G
loba
l BIM
Aw
ards
201
3
15

Baku Olympic Stadium
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Tekfen Engineering and Sdeng Steel & Structural Detail Engineering
In Baku, Azerbaijan– 68,000 seats
– Designers working in several countries and limited time demanded lot from communication tools
– Team modeled precast, reinforced concrete, steel structures and extracted fabrication drawings for fabrication facility in Turkey
– 3D animation of the complex roof installation developed using Tekla
16

Baku Olympic Stadium
Tekl
a G
loba
l BIM
Aw
ards
201
3
17

18
Tekla Global BIM Awards 2013
Finalists
Tekl
a G
loba
l BIM
Aw
ards
201
3

Sengenthal Biomass Heat and Power Plant
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Max Bögl
In Sengenthal, Germany– Supplies heat from biomass
combustion and gasification to the headquarters of Max Bögl
– Includes a main hall, carburetor building and a wood chip store
– A Max Bögl project from planning to assembly
19

Tekl
a G
loba
l BIM
Aw
ards
201
3
Sengenthal Biomass Heat and Power Plant
20

Pantin - Terralia
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Vinci, CBC, BET Le Joncour & Atelier d’Architecture Téqui
In Paris– Residential cast in place building project with
41 apartments and a canal-side brasserie
– The team modeled the concrete frame and planned the pour program
– Documents on planning and structures including daily formwork created from the model
21

Tekl
a G
loba
l BIM
Aw
ards
201
3
Pantin - Terralia
22

Knislinge Power Plant
Tekl
a G
loba
l BIM
Aw
ards
201
3
By WSP Bridge & Civil Engineering
In Skåne, Sweden– Hydropower plant producing 4GWh
– Tricky geometry around the waterway made modeling concrete and reinforcement challenging
– WSP modeled parts that supplement the frame, including wood battens, furring, isolation and facade materials, plus extracted drawings from the Tekla model
23

Tekl
a G
loba
l BIM
Aw
ards
201
3
Knislinge Power Plant
24

Jepua Waste-To-Energy Plant
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Wise Ground Finland Oy
In Jepua, Finland– Several buildings including gas
processing, reception and 24-meter high boiler buildings
– Structural designer Wise and general contractor Fira collaborated extensively
– Models of process equipment and structures combined to avoid clashes
25

Tekl
a G
loba
l BIM
Aw
ards
201
3
Jepua Waste-To-Energy Plant
26

Kapelanka 42
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Consolis Polska
In Cracow, Poland– 25,000m2 of office space in two
buildings
– Tekla utilized for designing and detailing the precast concrete elements plus monolithic and steel parts
– Creating the model in the tendering phase allowed the team to make quantity takeoffs and present structural changes to the client understandably
27

Tekl
a G
loba
l BIM
Aw
ards
201
3
Kapelanka 42
28

Nye Gand Videregåend Skole
Tekl
a G
loba
l BIM
Aw
ards
201
3
By Costravia
In Stavanger, Norway– A school building designed to last seismic
activity
– Constravia modeled precast concrete structures including columns, beams, hollow-core slabs and internal walls, and cast in place concrete foundations & steel parts of frame
– Very tight schedule and simultaneous work on design and construction on site
29

Tekl
a G
loba
l BIM
Aw
ards
201
3
Nye Gand Videregåend Skole
30

SAFI SAP - Sidi Rosia Plant
Tekl
a G
loba
l BIM
Aw
ards
201
3
By OCP / JESA / JACOBS France
In Sidi Rosia, Morocco– Two production units for sulfuric acid, both producing 3,400 tons of acid per day
– Effective design process: The units are designed 80% alike although differently integrated
– Interoperability crucial: PDMS reference models of initial process design and piping were exported into Tekla, and further exported from Tekla to Tekla BIMsight and Navisworks
31

Tekl
a G
loba
l BIM
Aw
ards
201
3
SAFI SAP - Sidi Rosia Plant
32

Tekl
a G
loba
l BIM
Aw
ards
201
3
King Abdulla Sport City
By Six Costruct
In Saudi Arabia– 60,000 seat stadium with 500 person
Mosque and a minaret plus 8 km asphalted road and 2 km pedestrian walkways
– BIM used in structural design and detailing of the frame and foundations, modeling precast and cast in place concrete
– Drawing and bills of materials extracted from the Tekla model
33

King Abdulla Sport City
Tekl
a G
loba
l BIM
Aw
ards
201
3
34