Tekla Infrastructure & BIM
By Paul Wallett Area Director
[email protected] +971 50 551 4796
mailto:[email protected]
-
2
This is Tekla We provide model-based software for
customers in construction, infrastructure and energy industries
worldwide.
-
Introduction to Tekla
Tekla is part of structures division of Trimble
3
1966
-
Tekla Company Worldwide
4
Finland
Russia
UK
France
UAE
KSA
Qatar
India
China
Malaysia
South Africa Australia
Philippines
Turkey
Chile
Brazil
USA
Mexico
Canada
Colombia
Singapore Indonesia
Thailand
Spain
Tekla has over 20 offices worldwide and a global network of resellers.
Tekla Office
Reseller
HQ
South Korea
Japan
http://www.tekla.com/contact/offices-and-resellershttp://www.tekla.com/contact/offices-and-resellershttp://www.tekla.com/contact/offices-and-resellershttp://www.tekla.com/contact/offices-and-resellers
-
Tekla Offices
5
102
Building No.3
Dubai Internet City
P.O. Box 500103 Dubai
United Arab Emirates
www.Tekla.com
Dubai Qatar KSA
Tekla Qatar
B-Ring Road
Roudha Al Khail , Street No 220
Building No 66756.
+974 5024 1874
Office 316
Riyadh Gallery Business Center
Olia Road
Riyadh
Saudi Arabia
+966 50 447 2607
http://www.tekla.com/tel:+966504472607tel:+966504472607
-
Tekla Provides Solutions For:
6
Concrete Contractors General Contractors Rebar Fabricators
Offshore EPC Steel Fabricators
Precast Fabricators Structural Engineers Students
http://www.tekla.com/solutions/concrete-contractorshttp://www.tekla.com/solutions/general-contractorshttp://www.tekla.com/solutions/rebar-fabricatorshttp://www.tekla.com/solutions/offshorehttp://www.tekla.com/solutions/epchttp://www.tekla.com/solutions/steel-fabricatorshttp://www.tekla.com/solutions/precast-fabricatorshttp://www.tekla.com/solutions/structural-engineershttp://www.tekla.com/solutions/students
-
7
Projects in Tekla Structures Software
Infrastructures Projects
-
Projects in Tekla
8
Midfield Terminal Building
King Abdulaziz Airport
Salalah Airport
Muscat Airport
-
Projects in Tekla
9 Peace Bridge
Peace Bridge
-
Projects in Tekla
10
Chenab Bridge
Varikko depot bridge
Finland
-
Projects in Tekla
11
Crusell Bridge Crusell Bridge
-
12
Projects in Tekla Structures Software
Vertical Structures
-
August 24, 2015
Capital Gate
Al Dar
ADIC
Khalifa
Louvre Museum Gate Towers
http://www.google.ae/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAcQjRw&url=http://www.thenational.ae/business/property/in-pictures-megaprojects-coming-to-the-uae&ei=jTWiVdePBcmQsgHwjayoBQ&psig=AFQjCNHtOqSsRpVXwXRsZ7KgpZW8rLiVyA&ust=1436780292246479
-
August 24, 2015
Sheikh Zayed Mosque Dome
Yas Marina F1 Circuit
Kingdom Tower Riyadh
QPICO Tower Qatar
Ski Dubai
http://upload.wikimedia.org/wikipedia/commons/3/34/Abu_Dhabi_0701-0422.JPG
-
August 24, 2015
Cleveland Clinic Zayed University
St. Regis Hotel
-
August 24, 2015
Shangri La Hotel
KAPSARC
Presidential Palace
Sorbonne University
-
17 King Abdullah Sports City
Masdar HQ
National Museum Qatar
-
18
King Abdulaziz Center for World Culture
King Abdullah Financial District
Madinah Airport
-
What is BIM?
19
Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. BIM is a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life-cycle (defined from earliest conception to demolition).
-
Government Mandates BIM
20
BIM is mandated
Building+Information+Modeling+-+BIM+No.196.pdf
-
Reduction in costs by implementing BIM
21
Collaborative BIM vs. 2D or lonely BIM.
There is a dramatic business improvement moving from 2D projects to collaborative BIM.
http://www.teklabimsight.com/what-is-bim/path-to-bim
The contractor J. C. Cannistraro, LLC analyzed
cost data from 408 projects performed over 6 years. Their total value was $558,858,574. The percentage of change orders in relation to all costs
drops significantly when BIM use increases.
http://www.teklabimsight.com/what-is-bim/path-to-bimhttp://www.cannistraro.com/Newsletter Q3 09(final).pdf
-
Modeling for construction, not for drawings
22
We have seen cases where the costs have
been reduced by 50 % by using BIM. Having constructability issues sorted out before starting construction will inevitably lead to less errors. Charles Eastman professor Georgia Tech college of Architecture
http://www.tekla.com/company/building-construction/constructability
http://www.tekla.com/company/building-construction/constructabilityhttp://www.tekla.com/company/building-construction/constructabilityhttp://www.tekla.com/company/building-construction/constructabilityhttp://www.tekla.com/company/building-construction/constructability
-
23 Bigger, better, cheaper, faster now
Modeling for construction, not for drawings
We develop Building Information Modeling (BIM) software that allows the construction industry work more efficiently. Our BIM software solutions are used around the world to create, combine, manage and distribute accurate, constructible multi-material models of all structures, from residential buildings and offshore platforms to complex landmark structures.
http://www.tekla.com/company/building-construction/what-is-bimhttp://www.tekla.com/company/building-construction/constructability
-
24
BIM Tools Really Help
-
BIM Technologies
25
-
Accurate, Constructible Infra Models
26
BIM software for accurate, constructible modeling of any structure
Key benefits Collaborate and integrate
thanks to open BIM approach.
Model all materials. Handle even the largest,
most complex structures. Create accurate,
constructible models. Let information flow from
design and detailing to construction site.
Tekla Structures
http://www.tekla.com/company/building-construction/Open-BIM
-
27
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination &
communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
28
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
15.Sep.09 Week 0
Bank Council
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
In Progress
Concrete Slab
Concrete Columns
Concrete Walls
Steel
Mshrabiya
Month
http://www.tekla.com/products/tekla-structures
-
29
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
30
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
31
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
32
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
33
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
34
Tekla Structures
Accurate, Constructible Infra Models
http://www.tekla.com/products/tekla-structures
-
35
Tekla Structures
Accurate, Constructible Infra Models
Used For: 3D modeling 4D simulation Materials takeoff & Estimation Design integration Design coordination & communication Drawing production CNC linking Site layout and positing
http://www.tekla.com/products/tekla-structures
-
BIM Technologies
36
-
Fast-Track Value-Engineering
37
Analyze and design buildings efficiently
Key benefits Achieve faster design times Establish the best solution
quickly Manage changes easily Maximize profitability and
efficiency
Tekla Structural Designer
-
BIM Technologies
38
-
High Quality Communication
39
Key benefits Combine and share models Check for conflicts Communicate using notes
The professional tool for construction project collaboration.
TeklaBIMsight
Seattle's massive tunnel makes travel safer with Tekla BIMsight
In BIM collaboration, we utilized the models in weekly all-discipline coordination meetings. With all of the discipline models loaded into Tekla BIMsight, we were able to see conflicts and possible
design changes.
http://www.tekla.com/products/tekla-bimsighthttp://www.tekla.com/products/tekla-bimsight
-
BIM Technologies
40
-
Mobile Your Project for better Stakeholders Transparency
41
Key benefits Easily view and navigate
your 3D models Share your models within
the project Collaborate with the
project team
BIM collaboration in your pocket.
Tekla Field 3D
http://www.tekla.com/products/tekla-field3d
-
BIM Technologies
42
-
Improve Documentation Processes
43
Key benefits Increase productivity Transparent calculations Minimize errors
Powerful software to automate your repetitive Civil/Structural calculations
Tekla Tedds
-
Real Examples (Bridges & Railway Models)
44
Gare de Mons
-
Real Examples (Bridges & Railway Models)
45
-
E.Pihl & Son Bridge BIM project
46
This video shows how Danish contractor, E.Pihl & Son, used BIM in a Cast-in-Place concrete bridge project in Denmark and Sweden. See how they use the model on construction site management and how they have integrated model-based, accurate data even to the Celsa rebar factory production line.
-
E.Pihl & Son Bridge BIM project
47
Fully parametric model Easy manage the model changes Central model for all the project participants Procurement & fabrication of reinforcement Collusion checking to solve the model issues
Transferring the model reinforcement information to the ERP system (CELSA)
Automatic reinforcement fabrication production by using Tekla CELSA BIM technology
Number of rebar, size, cutting length, weight & all the measurements.
Accurate cut & bend from Tekla BIM 3D model information
Rebar marked with tags and shipped to the site If using traditional methods, errors would need to be
correct at site, which will cost time and money Minimize the cutting and bending on site and reduce
the waste of material
-
E.Pihl & Son Bridge BIM project
48
Reduce a lot of time from the 3D visualization ease of understanding
The 3D models made it easy for communication between office and site people
20 - 25 errors using the traditional method of working from the procurement side
Which will cost of doing a lot of cutting and bending on site
New way of working, narrow down to 0 2 errors by doing clash checking before work starts on site
Same work in 7 -9 days instead of 23 workdays for the reinforcement work
Production time has reduced to 2/3
BIM is expanding to all the project parties in the company
-
49
-
Thanks by Paul Wallett Area Director