to: mayor and city council from: date: re
TRANSCRIPT
TO: Mayor and City Council
FROM: Karen Gallagher, Transportation Planner
DATE: March 5, 2020
RE: Annual Transportation Requests
ACHD’s FY2021-2025 Integrated Five Year Work Plan DESCRIPTION OF ISSUE:
Annually, the Ada County Highway District (ACHD) solicits the city’s prioritized transportation project requests to inform ACHD’s next Integrated Five Year Work Plan (IFYWP). There are several opportunities for input before the IFYWP is adopted by ACHD. The schedule is attached.
BACKGROUND:
Each March, the City Council approves a prioritized list of requested transportation projects for ACHD to construct, including road and intersection projects, bicycle/pedestrian projects and studies. In the roadway category, the State Street transit corridor continues to be a top priority for the city and accounts for six of the city’s top ten requests for road and intersection improvements. ACHD has been improving the intersections first, as outlined in the State Street Transit and Transportation Plan. The most recent intersections completed are Collister Road and Veterans Memorial Parkway. The Pierce Park Road intersection is scheduled next for construction in 2021. ACHD’s Community Programs funds pedestrian and bicycle improvements. ACHD has identified 750-plus projects listed in ACHD’s various neighborhood bike and pedestrian plans in Boise. ACHD currently constructs three to seven pedestrian or bicycle projects per year in Boise. Last year, the City Council selected a short list of projects for each planning area that work together to improve livability through transportation across the city (maps attached). The criteria remained the same with emphasis given to projects with stacking benefits that connect to schools, grocery stores/activity centers, libraries, parks, major employment
Page 2 of 3
centers, and transit, especially the best in class transit routes of State Street, Fairview Avenue, and Vista Avenue. If ACHD increased the number of pedestrian/bicycle projects to nine per year, each planning area could improve with one project per year and result in a logical expansion of the bicycle and pedestrian network after five or ten years. Funding Buckets Due to the large backlog of projects in the community programs category, the city has consistently requested that ACHD change their funding structure or increase the funding for Community Programs. This aligns with the strategies contained in Boise’s Transportation Action Plan and the Keep Boise Moving discussions to date to emphasize enhanced bicycle, pedestrian and transit facilities. ACHD has three main buckets for funding construction: Maintenance $24-34 million annually Capital Projects $23-30 million annually (of which ~$7.5 million funds bike
facilities, sidewalks, and pedestrian crossings) Community Programs $5-7 million annually When funding is allocated by categories, it creates barriers to constructing projects based on a city’s priorities, values, and needs. The funding buckets show that 4 times more money is spent on Capital Projects compared to specific sidewalk projects, and even less is spent on economic development projects. In Boise’s case there is a large backlog of sidewalk and bicycle needs compared to new or expanded roadway needs. This is due to the city’s fairly mature transportation system and is further evidenced by the growing backlog of bicycle and pedestrian projects as the as each planning area’s pedestrian and bicycle plan is completed. In the FY2020 budget, the ACHD Commission approved an additional $3 million for pedestrian and bicycle gap projects. The Commission is considering a similar action this year. Completed Projects Last year the city requested 17 capital projects and 69 community program projects (see attached spreadsheet). Two capital projects and two community projects were completed in 2019 or have been bid and are proceeding to construction in 2020.
Capital Project Under Construction 1. Fairview Ave and Main St, Whitewater Park Blvd / 16th St, add on-street parking 2. Cole & Victory Intersection
Community Programs to be Completed in 2020 1. Jefferson Street Bike Lanes, 8th St to 13th St (pavement rehab with restriping
proceeding) 2. Warm Springs Ave Sidewalk, Glacier Dr to Glacier Dr (project has been bid)
Page 3 of 3
New Requests This year, the PDS team recommends including two projects and a concept study.
1. Longfellow School Pedestrian Safety, key intersections on 8th St & 9th St (North End/EastEnd Planning Area)
2. Two Digital Speed Readers on Warm Springs Ave near Teresa Dr (Barber ValleyPlanning Area)
3. Concept Study/Plan for 6-Legged Intersection at Boise Ave, Highland & Vermont(Southeast Planning Area)
The city’s Community Programs list includes 69 recommended bicycle and pedestrian projects. The PDS team maintains an internal, un-prioritized list of an additional 48 projects that will feed into the prioritized list in future years. The attached prioritized list is a consolidation of the individual lists created for each planning area. Note the Central Bench has 13 projects, which is more than the other planning areas, because it was the first area to have the city’s Energize focus and the first bicycle/pedestrian plan with ACHD. Many of the projects in Central Bench are now cycling to the top of the list for design and construction.
Economic Development Funding In 2017, after a thorough review of revenues available versus Commission-directed targets and priorities, ACHD found that there is not adequate general fund revenue available to continue a set-aside for this program. In turn, the Commission elected to review project requests against available revenues on a year by year basis. ACHD is not soliciting Economic Development Funding projects this year.
REQUESTED ACTION:
Approval the annual list of prioritized projects to send to ACHD by March 20, 2020.
The PDS team recommends sending the attached project request list with a letter requesting ACHD to continue to provide additional funds for Community Programs.
ATTACHMENTS:
• Draft Prioritized Request Listo Roads and Intersectiono Community Programs
• Maps of Priority Projects by Planning Area• ACHD’s Request Letter to Boise City• ACHD’s Schedule
City of Boise 2020 Prioritization Request Form
Design YR ROW YRConstruction
YR
1 1aState St and Pierce Park Ln Intersection Widening Widen intersection to 4 lanes on Pierce Park and 7 lanes on State St in accordance with the State St TTOP
and the 2016 CIP.2018-2019 2019-2020 2021 Project to be built in 2021. State St and Pierce Park Ln
2 1bState St Transit Lanes, Glenwood St to Pierce Park Ln
Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and bike lanes, in accordance with the State St TTOP and the 2016 CIP. Will be incorporated with State & Pierce Park intersection.
Future Future Future ACHD to advance project in accordance with the TTOP triggers.
State St, Glenwood St / Pierce Park Ln
3 2a
5th and 6th Street, convert to two-way Convert 5th and 6th to two-way travel from Fort St to Myrtle Street. Perform road rehabilitation and 2- way conversion of select streets in downtown Boise in concert with CCDC and other projects in accordance with the Downtown Boise Implementation Plan.
2018-2019 N/A Future Economic Development Program on hold. 05th St and Fort St and Hays St
4 2bFort St / Hays St / 5th St Intersection Include with 5th and 6th two-way conversion. Future Future Future Economic Development Program on hold. 05th St and 06th St, Myrtle St / Fort St, Two-Way
Conversion
completed 3 Fairview Ave and Main St, Whitewater Park Blvd / 16th St, add on-street parking
Restripe to add on-street parking by removing a travel lane. Complete Complete Complete Project complete 2019. Microseal (2019) - HB312 Project
5 4
State St Transit Lanes, 36th St to 27th St Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and bike lanes, in accordance with the State St TTOP and the 2016 CIP. This project may include an access management component.
Future Future Future ACHD to advance project in accordance with the TTOP triggers.
State St, 36th St / 27th St
6 5
State St Transit Lanes, Collister Dr to 36th St Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and bike lanes, in accordance with the State St TTOP and the 2016 CIP. This project may include an access management component.
Future Future Future ACHD to advance project in accordance with the TTOP triggers.
State St, Collister Dr / 36th St
7 6
State St Transit Lanes, Pierce Park Ln to Collister Dr Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and bike lanes, in accordance with the State St TTOP and the 2016 CIP. This project may include an access management component.
Future Future Future ACHD to advance project in accordance with the TTOP triggers.
State St, Pierce Park Ln / Collister Dr
8 7
State St and Glenwood St Intersection Improvements
Improve intersection for all modes at this TOD intersection. Improve comfort for pedestrians and bicyclists (Level 3 facilities). Work within the existing curb lines in order to improve traffic and transit operations in accordance with the State St TTOP. Joint project with ITD.
Future Future Future Construction timeline pending coordination with ITD on funding.
State St and Glenwood St
9 8 Five Mile, Overland Rd to Franklin Rd (Five Mile I-84 Overpass) Improvements
City requests bike facilities and sidewalk in conjunction with ACHD project to widen Five Mile Rd and overpass from 2 to 5 lanes with curb, gutter, sidewalk, and bike lanes.
Future Future Future ACHD to begin coordination with ITD on possible funding. Five Mile Rd, Overland Rd / Franklin Rd
10 9 Maple Grove Rd Widening & Improvements, Victory Rd to Overland Rd
Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the 2016 CIP. Project includes bridges #1237, #1238, and #1242.
2018 2019-2020 2021 Project to be built in 2021. Maple Grove Rd, Victory Rd / Overland Rd
11 10 Orchard St Realignment, Gowen Rd to I-84 On-Ramp
Realign/widen Orchard St to 5 lanes with curb, gutter, detached sidewalks or multiuse paths. Project includes reconstruction of the Gowen Rd intersection to be a multi-lane roundabout.
2019-2020 2021-2022 2023 Project to be built in 2023. Orchard St Realignment, Gowen Rd / I-84 On-Ramp
UnderConstruction 11
Cole Rd and Victory Rd Intersection Widen intersection to 6 lanes on Victory Rd and 7 lanes on Cole Rd in accordance with the 2016 CIP. Project includes widening of Cole Rd from McGlochlin St to Victory Rd to 5 lanes and Cole Rd Bridge #1261.
2018-2019 2019 2020 Project to be built in 2020. Cole Rd and Victory Rd
12 12 Maple Grove Rd Widening & Improvements, Amity Rd to Victory Rd
Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the 2016 CIP. Project includes bridge #1239.
2022 2023 2024 Project to be built in 2024. Maple Grove Rd, Amity Rd / Victory Rd
13 13 Lake Hazel Extension, Orchard to Eisenman Construct 2 lanes. Not
ProgrammedNot
ProgrammedNot
ProgrammedProject to occur in coordination with new development in the area.
Lake Hazel Rd, Pleasant Valley Rd / Eisenman Rd
14 14 32nd St Extension, Moore St to Whitewater Park Blvd
Extend roadway. Not Programmed
Not Programmed
Not Programmed
Per ACHD Commission decision on development application, roadway will not be extended.
32nd St Extension, Moore St / Whitewater Park Blvd
15 15
Eckert Road Bridge Replace existing bridge over Boise River with wider/longer bridge providing pedestrian and low-stress bike facilities on both sides of Eckert as well as providing for Boise River Greenbelt connectivity under the bridge adjacent to the Boise River (both sides).
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Eckert Rd Bridge #2147 and #2148, Boise River / Ridenbaugh Canal
16 16
Broadway Ave/Avenue B and Idaho St/Warm Springs Ave Intersection Modification
Modify intersection to improve safety for all users in accordance with the Broadway Ave / Avenue B and Idaho St / Warm Springs Ave Concept Design. Project includes bridge #1499 (MI214-20).
Future Future Future Economic Development Program on hold. Broadway Ave/Avenue B and Idaho St/Warm Springs Ave
17 17 23rd Street On-Ramp to I-184 New on-ramp to I-184. Not
ProgrammedNot
ProgrammedNot
ProgrammedACHD to share request with ITD, but encourage City to work with ITD directly.
23rd Street On-Ramp to I-184
3. Blank lines are provided at the end of each category to add additional projects. Provide a clear description of the project request.
Updates include adoption of the FY2020-2024 IFYWP. Programming status is subject to change.
Ranking Instructions:1. Rank your project request using only one number per project (Please avoid using 2a, 2b, 2c, etc.). 2. Utilize the first column to reevaluate your prioritization ranking. Adjust as needed.
Roads & Intersections
4. Remember to identify projects for removal.2020
Priority Ranking
2019 Priority Ranking Agency Project Name Agency Project Description
Current IFYWP Programming Status
ACHD Response ACHD Implementation Project Name
Design YR ROW YRConstruction
YR
2020 Priority Ranking
2019 Priority Ranking Agency Project Name Agency Project Description
Current IFYWP Programming Status
ACHD Response ACHD Implementation Project Name
1 1 Overland Rd and Phillippi St Pedestrian Crossing Install an enhance pedestrian crossing (pedestrian hybrid beacon) on Overland Rd at Phillippi St.2020 2020 2021
Project to be built in 2021. Overland Rd and Phillippi St Pedestrian Crossing
2 2 Nez Perce Bikeway with Vista Ave and Nez Perce Pedestrian Signal
Low stress bikeway from Roosevelt to Columbus with an enhanced pedestrian crossing on Vista Ave at Nez Perce (signal location changed from Spaulding in 2017/2018), including bike push buttons. Connects to Best in Class transit route. 2022 2023 2023
Project to be built in 2023. Vista Ave and Nez Perce St Pedestrian Crossing
3 3 Kootenai St Traffic Calming, Orchard to Vista Ave Add traffic calming features in accord with approved traffic calming plan that includes bulb outs, medians, and sidewalk. Neighborhood very supportive. 2021 2022 2024
Project to be built in 2024. Kootenai St Traffic Calming (Phase 3), Orchard St / Roosevelt St
4 4 Allumbaugh St Sidewalk, Fairview Ave to Northview St
Complete curb, gutter, and sidewalk on the both sides of Allumbaugh St, between Fairview Ave and Northview St. ACHD says sidewalk on east side infeasible at this time due to significant land use, utility, and drainage impacts. Connects to Fairview Transit Route. 2022 2023 2024
Project to be built in 2024. Allumbaugh St, Fairview Ave / Northview St
5 5 Columbia Village Bikeway, Mimosa to Hwy 21 at Technology Way
Bikeway, buffered if possible, to connect Holcomb Rd bike lanes through Columbia Village to access Micron and shopping center. 2022 2022 2023
Project to be built in 2023. Columbia Village Bikeway, Hwy 21 / Boise Ave
6 6a 11th St Bikeway, River St to Heron Explore diverters in the North End.2019-2020 2020 2022
Project to be built in 2022 as adopted in the concept study. 11th St Maintenance and Bikeway, State St / Heron St - Bikeway
6 6b Hays St and 11th St Pedestrian/Bike Crossing Install an enhanced crossing (bulb-outs and rectangular rapid flashing beacon) on Hays St at 11th St in accordance with the North Boise Neighborhood Plan. 2020 2020 2022
Project to be built in 2022. 11th St Maintenance and Bikeway, State St / Heron St - Bikeway
6 6c Fort St and 11th St Pedestrian/Bike Crossing Install an enhanced crossing (bulb-outs and rectangular rapid flashing beacon) on Fort St at 11th St in accordance with the North Boise Neighborhood Plan. 2020 2020 2022
Project to be built in 2022. Hays St at 11th St and 12th St Pedestrian Crossings
7 7 Flume Enhanced Bicycle Crossing at Bannock Bike/Ped Crossing (per East Boise Bike/Ped Plan Project C-9).2022 2022 2024
Project to be built in 2024. Bannock St Maintenance and Bikeway, Broadway Ave / Greenbelt - Bikeway
8 8 Bicycle Enhance Crossing at Five Mile & Sandpiper/Martingale
Existing bikeways needs an enhanced crossing to navigate safely across Five Mile Road.2020 N/A 2020
Project to be built in 2020. Five Mile Rd and Sandpiper St / Martingale Dr, Enhanced Bike Crossing
9 9 Northwest Bikeway, Horseshoe bend Rd to 36th St at Taft
Install a bikeway from Horseshoe Bend Road 36th St.2022 2022 2023
Project to be built in 2023. Northwest Boise Bikeway, Horseshoe Bend Rd / 36th St
10 10 Collister Rd Pedestrian & Bicycle Improvements, State St to Hill Rd
Improve Collister with comfortable pedestrian and bicycle facilities to access the library, transit on State Street and Hill Rd, Greenbelt connection, and activity center. Not
ProgrammedNot
ProgrammedNot
Programmed
ACHD to complete a concept evaluation in FY2021 to work with residents and the neighborhood association to determine appropriate treatment.
Collister Dr, State St / Hill Rd (Pedestrian Improvements)
11 11 Broadway Ave Pedestrian & Bicycle Improvements, Richmond to Federal Way
Complete Multi-Use Pathway on the east and west sides of Broadway Ave from Richmond to Federal Way (i.e. along the ramp connecting Federal Way to Broadway). This extends the Leadville Bikeway. Supported by Energize Our Neighborhoods. Coordinate with ITD.
Not Programmed
Not Programmed
Not Programmed
ACHD has no jurisdiction at this location. ACHD to share request with ITD, but encourage City to work with ITD directly.
Broadway Ave , Richmond St / Federal Way
12 12 Shoshone St Bikeway, Canal St to Capitol Blvd Improve Shoshone St as a bikeway to include wayfinding signage, shared lane markings, signal modification at Overland Rd, and pedestrian ramps in accordance with the Central Bench Neighborhood Plan. Project includes an enhanced pedestrian signal to replace existing flashing caution light at Rose Hill St and enhancement to the Alpine/Peasley RRX. Concept design will further clarify.
2018-2019 2019-2020 2020-2021
Project to be built in 2020-2021. Shoshone St Bikeway, Canal St / Capital Blvd
13 13 Cassia Street Bikeway, Allumbaugh to Columbus Develop a low-stress bikeway. Connect to proposed Columbus Street Bikeway.2018-2019 2020 2021
Project to be built in 2021. Cassia St Bikeway and Pedestrian Improvements
14 14 Phillippi St Sidewalk, Targee St to Overland Rd Construct curb, gutter and sidewalk on both the sides of Phillippi St, between Targee St and Overland Rd in accordance with the Central Bench Neighborhood Plan. Project includes full road rehabilitation.
2017 2019 2021
Project to be built in 2021. Phillippi St, Targee St / Overland Rd - Sidewalk
15 15 Nez Perce St Sidewalk, Vista Ave to Columbus St Construct curb, gutter, and sidewalk on the south side of Nez Perce St between Vista Ave and Columbus St. Switched from Spaulding to connect to planned signal at Vista. Connects to Best in Class Transit route.
2022 2023 2023
Project to be built in 2023. Vista Ave and Nez Perce St Pedestrian Crossing
16 N/A Longfellow School Pedestrian Safety Enhance key intersections on 8th and 9th 17 16 Northview-Ustick Bikeway, Shamrock to
MilwaukeeLow-stress Bikeway and crossing improvements. Provides access to grocery store at Five Mile. Not
ProgrammedNot
ProgrammedNot
ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP update.
Ustick-Northview Bikeway Connection, Shamrock Ave / Milwaukee St
18 17 Boise Hills Dr Sidewalk, 7th St to Mesa Grande Ln Complete sidewalk on the north side of Boise Hills Dr from 7th St to Mesa Grande Ln in accordance with the North Boise Neighborhood Plan.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Boise Hills Dr, 07th St / Mesa Grande Ln
19 18 Coston St Sidewalk, Bannock St to Franklin St Construct sidewalk on the west side of Coston St between Bannock St and Franklin St. 2022 2023 2024 Project to be built in 2024. Coston St, Bannock St / Franklin St20 19 8th St Contraflow Protected Bike Lane, Bannock to
UnionContraflow protected bike lane. Can be phased. Not
ProgrammedNot
ProgrammedNot
ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.
08th St, Bannock St to Union St - Bikeway
21 20 Horseshoe Bend Rd Bikeway, Hill Rd to State St with wayfinding to Greenbelt and Enhanced Crossing at Utahna
Multiuse path on the east side of Horseshoe Bend Rd. Project includes road rehabilitation due to poor pavement condition. Bikeway and way finding extending to Greenbelt. Install an enhance pedestrian crossing on Horseshoe Bend Rd at Utahna Rd. 2021 2022 2023
Project to be built in 2023. Horseshoe Bend Rd, State St / Hill Rd
Community Programs
Design YR ROW YRConstruction
YR
2020 Priority Ranking
2019 Priority Ranking Agency Project Name Agency Project Description
Current IFYWP Programming Status
ACHD Response ACHD Implementation Project Name22 21 Holcomb Rd Sidewalk & Bike Lanes, Mimosa Way
to Amity RdConstruct detached 5’ sidewalk on the east side of Holcomb Rd between Mendota Dr and Amity Rd in accordance with the Southeast Boise Neighborhood Plan. Stripe bike lane and install wayfinding signage for a bike facility from Amity to Mimosa Way. Project will provide ped/bike connection from Oregon Trail Heights/Columbia Village to Holcomb path/bridge and Southeast Boise.
2016 2017 2020-2021
Project to be built in 2020-2021. Holcomb Rd, Mimosa Way / Amity Rd
Bid Awarded 22 Warm Springs Ave Sidewalk, Glacier Dr to Glacier Dr
Construct sidewalk on the north side of Warm Springs Ave, between Glacier Dr East and Glacier Dr West.2019 N/A 2020
Project to be built in 2020. Warm Springs Ave, Glacier Dr / Glacier Dr
23 23 Phillippi St Sidewalk & Bike Lanes, Overland Rd to Franklin
Rebuild roadway to include 5' attached 8' detached sidewalk, parking, 5' bike lanes, 2 auto lanes, and a center turn land/island. Full rebuild of roadway required due to steep cross slope issues. Includes replacement of bridge #1366 or #404. Includes filling sidewalk gaps just north of Cassia.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Phillippi St, Overland Rd / Franklin Rd
24 24 Highland View Dr Traffic Calming & Pedestrian Facilities
Highland View Traffic Calming & Pedestrian Facilities. Project can be phased. Priority is to install sidewalk on one side with a combination of chokers/bulb-outs, chicanes, and/or center islands, but no speed cushions. Not
ProgrammedNot
ProgrammedNot
Programmed
To be considered only in accordance with ACHD's adopted Traffic Plan for the Highland View area.
Highland View Dr Pedestrian Facilities
25 25 K Bar T Bikeway, Cloverdale to Maple Grove Low stress bikeway as an alternate route to Overland and Victory. After this east-west route is established, a connection to the activity center at Five Mile and Overland can be added (separate project also listed below). 2022-2023 2024 Future
Project to begin design in 2022-2023. Hollandale-Targee Bikeway, Locust Grove Rd / Targee St
26 26 Manitou Bikeway with Enhanced Crossing at Boise Ave & Manitou
Enhanced pedestrian/bike crossing for access to Boise State and Manitou Park (University to Howard). Manitou is a bikeway to Boise State. Improve Manitou Ave as a low-stress bikeway to include wayfinding and bikeway signage, enhanced crossing at Boise Ave, and markings in accordance with the Bike Master Plan
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Manitou Ave Bikeway, Leadville Ave / University Dr
27 27 Franklin St Bikeway, 18th St to 6th St Improve Franklin St as a bikeway including enhanced crossings, shared lane markings, wayfinding, and traffic calming in accordance with the North Boise Neighborhood Plan. Concept design will further refine project scope.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Franklin St Bikeway, Resseguie St / Bannock St
28 28 Columbus St Bikeway, Canal St to Kootenai St Improve Columbus St as a bikeway to include way finding signs and/or shared lane markings in accordance with the Central Bench Neighborhood Plan. Concept design will further clarify project scope.
2022 2022 2023
Project to be built in 2023. Columbus St Bikeway, Victory Rd / Kootenai St
29 29 Phillippi St Sidewalk, Malad St to Targee St Complete curb, gutter and sidewalk improvements on both sides of Phillippi St, between Malad St and Targee St in accordance with the Central Bench Neighborhood Plan. 2016 2017 2021
Project to be built in 2021. Phillippi St, Malad St / Targee St
30 30 Poplar St Bikeway, Milwaukee St to Mountain View Dr
Improve Poplar St (including Wesley and Plymouth) as a low-stress bikeway to include wayfinding and bikeway signage, modified/relocated crossing at Cole Rd, and markings in accordance with the Bike Master Plan and the West Bench Neighborhood Plan. Concept design will further clarify project scope. Not
ProgrammedNot
ProgrammedNot
Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Poplar St Bikeway, Milwaukee St / Mountain View Dr
31 31 Garden St & Franklin Ped/Bike Signal Enhanced ped/bike signal. 2019 2020 2022 Project to be built in 2022. Garden St, Franklin Rd / Bethel St32 32 Garden St Sidewalk & Bikeway Phase 1: Franklin
Rd to Bethel StConstruct curb, gutter and sidewalk on both sides of Garden Street from Bethel St to Franklin Road to provide pedestrian connectivity in an established neighborhood. This project is being phased due to large cost. Include a bikeway. 2019 2020 2022
Project to be built in 2022. Garden St, Franklin Rd / Bethel St
33 33 Liberty St Sidewalk & Bikeway, Denton to Douglas Complete sidewalk on the both sides of Liberty St in accordance with the Central Bench Neighborhood Plan. Include a bikeway. 2022 2022 2023
Project to be built in 2023. Liberty St Sidewalk and Bikeway, Douglas St / Denton St
34 34 Clubview Dr Chicane Construct a traffic calming chicane near Boise Hills Park. Not Programmed
Not Programmed
Not Programmed
ACHD Traffic Engineering accessing conditions for traffic calming measures. Report pending.
Clubview Dr Chicane
35 35 Bannock Bikeways, Whitewater Park Blvd to 15th Wayfinding signage and arterial crossings. Install an enhanced bike/ pedestrian crossings, with bike pushbutton on Bannock St at both 15th and 16th St.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C
Completed 36 Jefferson Street Bike Lanes Install bike lanes on Jefferson Street from 2nd to 16th. Review parking impacts and the need for enhanced crossings.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Jefferson St, 02nd St 16th St
36 37 Harrison Blvd & Irene St Pedestrian Crossing Install an enhanced crossing (rectangular rapid flashing beacon) on Harrison Blvd at Irene St in accordance with the North Boise Neighborhood Plan.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Harrison Blvd and Irene St Pedestrian Crossing
37 38 Warm Springs Ave & Old Penitentiary Ped/Bike Crossing
Enhanced Pedestrian Crossing on Warm Springs at Old Penitentiary (per East Boise Bike/Ped Plan Project C-25).
Not Programmed
Not Programmed
Not Programmed
To be completed in connection with State of Idaho reconstruction of Penitentiary Rd.
Warm Springs Ave and Old Penitentiary Rd Pedestrian Crossing
38 39 Linden Bikeway, Broadway to Boise Ave Bikeway and crossing improvements per Leadville Bikeway Plan. Complete Complete Complete Project completed in 2018. Leadville Ave Bikeway, Linden St / Greenbelt39 40 Level 2/3 Bikeway Connection on Five Mile Rd, K
Bar T Dr to OverlandWithin the existing curbs, add protection or candle sticks to bike lane on Five Mile Road to increase comfort of bicyclists in the neighbor to reach the shopping at Five Mile and Overland.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Five Mile Rd, K Bar T Dr / Overland - Bikeway
40 41 Fairview Ave Hill Cycle Track, Orchard to Garden Street
Two-Way Bicycle Access from Bench to West Downtown, north of I-184. May require vehicle lane number or width reduction. Connects to bike lanes on Main and Fairview. (ACHD: Enhance current bike lane to create a two-way cycle track, north of I-84. )
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Fairview Ave Hill, Orchard St / Garden St
41 42 Victory Temporary Multiuse Path, Cloverdale to Five Mile
Possible solution to add asphalt and extruded curb. Library at east end. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Victory Rd, Cloverdale Rd / Five Mile Rd
42 43 Garden St Sidewalk & Bikeway Phase 2: Bethel to Emerald
Construct curb, gutter and sidewalk on both sides of Garden Street from Bethel St to Emerald to provide pedestrian connectivity in an established neighborhood. This project is being phased due to large cost.
2024 Future Future
Project to begin design in 2024. Garden St, Bethel St / Emerald St
Design YR ROW YRConstruction
YR
2020 Priority Ranking
2019 Priority Ranking Agency Project Name Agency Project Description
Current IFYWP Programming Status
ACHD Response ACHD Implementation Project Name43 44 Hill Rd & Lancaster Enhanced Pedestrian Crossing Install pedestrian-activated enhanced pedestrian signal/beacon to assist pedestrians crossing Hill Road. Not
ProgrammedNot
ProgrammedNot
ProgrammedACHD Traffic Engineering to evaluate request. Hill Rd and Lancaster Dr Pedestrian Crossing
44 45 Mitchell Sidewalk, Amity to Victory Add sidewalks on both sides. First priority is extending sidewalk to Amity Rd and Amity Elementary. Remainder aids school and neighborhood connectivity on this mid-mile collector. Not
ProgrammedNot
ProgrammedNot
Programmed
ACHD to prioritize and scope. Mitchell St, Amity Rd / Victory Rd
45 46 Chinden-McMillen Bikeway (Phase 1), Bennington Way to Mitchell St
Install bikeway (signage, pavement markings) from Demeyer / Cloverdale to Lena / Arlen. Extends Shamrock bikeway to Cloverdale.
Not Programmed
Not Programmed
Not Programmed
City requested bikeway improvements are included within this bikeway project scope. To be evaluated and prioritized for possible inclusion into future IFYWP update
Chinden-McMillen Bikeway (Phase 1), Bennington Way / Mitchell St
46 47 13th St Traffic Calming, Fort St to Hill Rd Construct traffic calming on 13th St from Fort St to Hill Rd in accordance with the North Boise Neighborhood Plan. 2020 N/A 2021
Project to be built in 2021. 13th St Traffic Calming (Phase 1), Fort St / Hill Rd
47 48 13th St Sidewalk, Fort St to Hill Rd Construct detached sidewalk on the east side of 13th St from Heron St to Irene St. Not Programmed
Not Programmed
Not Programmed
Project being evaluated for inclusion as part of Traffic Calming project.
13th St Traffic Calming (Phase 1), Fort St / Hill Rd
48 49 Federal Way Multi-Use Pathway, Gowen Rd to Micron Entrance
2800 ft long multi-use pathway to fill existing sidewalk gap between Gowen Road and Micron. 10' wide multi-use pathway requested.
Not Programmed
Not Programmed
Not Programmed
ACHD to prioritize and scope. Federal Way, Gowen Rd / Micron
49 50 De Meyer St Sidewalk, Cloverdale Rd to Lena Ave; and Lena Ave Sidewalk, De Meyer St to Arlen St
Complete sidewalk on the south side of DeMeyer St by narrowing the roadway and constructing sidewalk on the inside of existing curb. Construct at-grade sidewalks through asphalt eyebrows to connect sidewalk segments. Connects to DeMeyer Park and signalized crossing at Cloverdale.
Not Programmed
Not Programmed
Not Programmed
Scoped. To be evaluated and prioritized for possible inclusion into future IFYWP update.
De Meyer St, Cloverdale Rd / Lena Ave; Lena Ave, DeMeyer St / Arlen St
50 51 Amity Bikeway with Multiuse Path from Federal Way to Holcomb Rd
Install pathway on the south side of Amity Rd, between Federal Way and Rimview Way. Install an enhanced pedestrian crossing (pedestrian hybrid beacon) at Amity and Rimview to access the pathway on the north side of Amity and the regional pathway system in the area.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Amity Rd Bikeway, Federal Way / Surprise Way
51 52 Manitou Sidewalk, Howard to Garfield Sidewalk to Manitou Park and Garfield Elementary. Supported by Energize Our Neighborhoods. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Manitou Ave, Howard St / Garfield St
52 53 Garfield Sidewalk, Manitou to Broadway Sidewalk to Manitou Park and Garfield Elementary. Supported by Energize Our Neighborhoods. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Garfield St, Manitou Ave / Broadway Ave
53 54 Grand St Pedestrian Enhancements Fix hazardous sidewalks, construct ADA compliant pedestrian ramps, and fill sidewalk gaps where appropriate.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Grand St Pedestrian Enhancements
54 55 Miller St Pedestrian Enhancements Fix hazardous sidewalks, construct ADA compliant pedestrian ramps, and fill sidewalk gaps where appropriate.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Miller St Pedestrian Enhancements
55 56 Ash St Pedestrian Enhancements Fix hazardous sidewalks, construct ADA compliant pedestrian ramps, and fill sidewalk gaps where appropriate.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Ash St Pedestrian Enhancements
56 57 Bergeson Bikeway, Federal Way to Holcomb Include a raised bike lane from Federal Way to Apple. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Bergeson St Bikeway, Federal Way / Holcomb Rd
57 58 Wildwood Sidewalk, Fairview to Ustick Fill in sidewalk gaps on mid-mile street. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Wildwood St, Fairview Ave / Ustick Rd
58 59 Canonero, Sumpter, Lizaso Bikeway Low stress bikeway connecting to new Cloverdale Overpass with enhanced signals at Overland and at Victory (includes Camas segment at north end, B-2, B-3 in Southwest Ped/Bike Plan.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP update.
Cloverdale-Five Mile Bikeway, Columbia Rd / Camas St
59 60 Bannock Bikeway, Bruce to Coston Low-stress Bikeway and crossing improvements (per East Boise Bike/Ped Plan Project B-9, C-10, C-15, C-16).2022 2022 2024
Project to be built in 2024. Bannock St Maintenance and Bikeway, Broadway Ave / Greenbelt - Bikeway
60 61 Glenwood Multiuse Path, Goddard to Chinden Replace sidewalk on west side of Glenwood with a 10 ft sidewalk/multiuse path to connect bicyclists on the West Bench and Capitol High School with the grocery store and the pathway on Glenwood north of Chinden, and then the Greenbelt.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Glenwood St, Goddard Rd / Chinden Blvd
61 62 Sunset Ave Bikeway, 36th St to Hill Rd Improve Sunset Ave as a bikeway including enhanced crossings, shared lane markings, wayfinding, and traffic calming in accordance with the North Boise Neighborhood Plan. Concept design will further refine project scope.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates. Not a part of the regional low-stress bike network.
Sunset Ave, 36th St / Hill Rd - Bikeway
62 63 Pleasanton Bikeway, Whitewater Park Blvd to 21st with connection to Bannock St
Wayfinding signage and arterial crossings. Install an enhanced bike/ pedestrian crossings. The east end of the Pleasanton Bikeway will connect to the Bannock Street Bikeway at/near 21st Street.
2022-2023 2023 2024
Project to be built in 2024. Pleasanton Ave Bikeway, Greenbelt / 23rd St
63 64 Reutzel Sidewalk Gap, Riva Ridge to Summerset Fill 450 ft gap sidewalk on north side. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Reutzel Dr, Riva Ridge Way / Summerset Way
64 65 Sunset Ave Sidewalk, 28th St to 20th St Construct sidewalk on Sunset Ave from 28th St to 20th St in accordance with the North Boise Neighborhood Plan.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Sunset Ave, 28th St / 20th St - Bikeway
65 66 Fort St and 8th St, leading pedestrian interval signal
Add a leading pedestrian interval for the north side crossing in accordance with the North Boise Neighborhood Plan.
Not Programmed
Not Programmed
Not Programmed
ACHD Traffic Engineering to investigate pedestrian/vehicle conflicts to determine need.
Fort St and 8th St Pedestrian Crossing
66 67 Sunset Ave Sidewalk, 32nd St to 28th St Construct sidewalk on Sunset Ave from 32nd St to 28th St in accordance with the North Boise Neighborhood Plan.
Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Sunset Ave, 32nd St / 28th St - Bikeway
67 68 Highlander Pedestrian/Bicycle Gap Fill a 250 ft gap on Highlander east of Five Mile with a multiuse paved path. Not Programmed
Not Programmed
Not Programmed
To be evaluated and prioritized for possible inclusion into future IFYWP updates.
Highlander Rd, EO Five Mile Rd
Design YR ROW YRConstruction
YR
2020 Priority Ranking
2019 Priority Ranking Agency Project Name Agency Project Description
Current IFYWP Programming Status
ACHD Response ACHD Implementation Project Name68 69 Broadway Ave and Boise Ave Intersections
Modifications for Pedestrians and BicyclistsImprove intersection for bikes and pedestrians in accordance with the Southeast Boise Neighborhood Plan. Includes accessible pedestrian signal. 2019 2019 2020
Project to be built in 2020. Broadway Ave and Boise Ave
69 N/A Two Digital Speed Readers on Warm Springs Ave Install two digital speed reader displays on Warm Springs Ave at Maynard Gulch and Teresa Dr to increase safety where wildlife are frequently crossing.
On Hold Capitol Blvd Bicycle Connection, Rose Hill St / Royal Blvd
Improve bike and pedestrian connection. Not Programmed
Not Programmed
Not Programmed
Project On Hold (per City). Capitol Blvd Bikeway, Vista Ave / Greenbelt
On Hold Orchard Protected Bike Lane, Fairview to Chinden Increase protection of bicyclists traveling from the West Bench to Garden City and the Greenbelt. Not Programmed
Not Programmed
Not Programmed
Project On Hold (per City). Orchard Rd, Fairview Ave / Chinden Blvd
1 1 Taft Elementary Area Pedestrian Improvements Complete review of the Taft Elementary attendance area walking routes to determine where sidewalks areneeded.
Not Programmed
Not Programmed
Not Programmed
ACHD to consider as part of future budgets. Taft Elementary Area Pedestrian Improvements
2 2 NEPA Study for the Gowen Rd, Lake Hazel Rd, and Orchard St Complete a NEPA study for roads in the area to qualify for federal funding. 2019-2020 2021-2022 2023
Project to be built in 2023. Orchard St Realignment, Gowen Rd / I-84 On-Ramp
3 3 Central Bench Bike/Ped Plan UpdateN/A
Not Programmed
Not Programmed
Not Programmed
Scheduled for completion in 2022 as part of ACHD's Neighborhood Plan cycle.
Central Bench Bike/Ped Plan Update
4 4 Barber Valley Bike/Ped PlanN/A
Not Programmed
Not Programmed
Not Programmed
Scheduled for completion in 2022 as part of ACHD's Neighborhood Plan cycle.
Barber Valley Bike/Ped Plan
5 N/A Concept Study/Plan for 6-Legged Intersection at Boise Ave, Highland & Vermont
From 2014-19 there were seven crashes at this intersection. Each crash report identifies the harmful eventas angle . Possible strategies include: improving visibility, smaller corner radius, and marked pedestriancrossing, adding raised medians
Other/Studies
PDS - Comprehensive Planning Division
Gowen Rd
Eckert Rd
Federal Way
Hwy 21
Lake Forest Dr
Parkcenter Blvd
Grand Forest Dr
Amity Rd
Boise Ave
Surprise Way
Bergeson St
War
mSp
ring s
A ve
Holco
mb R
d
Yamhill Rd
Inter con Way
0 0.5 1Miles
2020 City of Boise Requests for ACHD's IFWYP FY2021-2025[
Legend
Com m u n ity Activity Cen ter
Neighborhood Activity Center
Region al Activity Center
Activity Center BufferSchoolsVacant Lan d (> 1 Acre)
Existing Bike & Pedestrian FacilitiesBike Lan eShared Bike RouteNeighborhood Bike RouteHighw ay Bike RouteMulti-Use PathMissin g Sid ew alks
Warm Sprin gs Ave Sid ew alk, Glacier Dr to Glaicer Dr1
Barber Valley Planning Area
Boise City Priorities: Road, Intersection, Study or Other• Eckert Road Brid ge• Barber Valley Bike/Ped Plan
1
Plan n in g Area Boun d ary
Boise City Priorities: Community ProgramsBike FacilityProtected Bike FacilityBike & Ped estrian Facility In tersection
Road Recon structionPed estrian Facility
3/4/2020
0 0.7 1.4Miles [
Legend
Com m unity Activity Ce nte r
Ne ig hborhood Activity Ce nte r
Re g iona l Activity Ce nte r
Activity Ce nte r Buffe rSchoolsV a ca nt La nd (> 1 Acre )
Existing Bike & Pedestrian FacilitiesBike La neSha re d Bike RouteNe ig hborhood Bike RouteHig hwa y Bike RouteM ulti-Use Pa thM issing Sid e wa lks
Central Bench Planning Area
Boise City Priorities: Road, Intersection, Study or Other• Ce ntra l Be nch Bike /Pe d Pla n Up d a te
Ove rla nd Rd a nd Phillippi St Pe d e stria n/Bicycle Sig na l
V ista Ave a nd Ne z Pe rce Pe d e stria n/Bicycle Sig na l
Koote na i St Tra ffic Ca lm ing , Orcha rd to V ista Ave
Shoshone St Bike wa y, Ca na l St to Ca pitol Blvd
Ca ssia Stre e t Bike wa y, Allum ba ug h to Colum bus
Phillippi St Sid e wa lk, Ta rg e e St to Ove rla nd Rd
Ne z Pe rce St Sid e wa lk, V ista Ave to Colum bus St
Phillippi St Sid e wa lk & Bike La ne s, Ove rla nd Rd to Fra nklin
Colum bus St Bike wa y, Ca na l St to Koote na i St
Phillippi St Sid e wa lk, M a la d St to Ta rg e e St
Ga rd e n St & Fra nklin Pe d /Bike Sig na l
Ga rd e n St Sid e wa lk & Bike wa y Pha se 1: Fra nklin Rd / Be the l St
Libe rty St Sid e wa lk & Bike wa y, De nton to Doug la s
Ga rd e n St Sid e wa lk & Bike wa y Pha se 2: Be the l to Em e ra ld
1213
1
10
23456789
Pla nning Are a Bound a ry
11a11b
12
4
3
5
8
6
11a
9
7
10
12
11b
13
PDS - Comprehensive Planning Division3/4/2020 2020 City of Boise Requests for ACHD's IFWYP FY2021-2025
Boise City Priorities: Community ProgramsBike Fa cilityProte cte d Bike Fa cilityBike & Pe d e stria n Fa cility Inte rse ction
Roa d Re constructionPe d e stria n Fa cility
Boise Ave
15th S
t
Front St
27th
St
Americana Blvd
36th St
9th St
Fairview Ave
4th St
Vista
Ave
Federal Way
16th S
t
23rd
St
Broa
dway
Ave
Fort St
Chinden Blvd
Capitol
Blvd
Rose Hill St
8th St
5th St6th
St
2nd St
3rd St
Jefferson St
Shoreline Dr
River St
Latah
St
Beacon St
University Dr
Union St
11th S
t
Roos
evelt
St
Myrtle St
12th S
t
13th St
10th S
t
1st St
14th S
t
State St
Main St
Idaho St
Hays St
Bannock St
White wa te r Park Blvd
Linco
ln Av
e
Emerald St
Park Blvd
0 0.3 0.6Miles [
6
Legend
Com m unity Activity Ce nte r
Ne ig h b orh ood Activity Ce nte r
Re g iona l Activity Ce nte r
Activity Ce nte r Buffe rSchoolsVa ca nt La nd (> 1 Acre )
Existing Bike & Pedestrian FacilitiesBike La neSh a re d Bike RouteNe ig h b orh ood Bike RouteHig h w a y Bike RouteM ulti-Use Pa thM issing Side w a lks
Downtown Planning Area
Boise City Priorities: Road, Intersection, Study or Other• 5th a nd 6th Stre e t, conve rt to tw o-w a y• Fort St / Ha ys St / 5th St Inte rse ction• Dow ntow n Boise Bicycle Pla n
11th St Bike w a y, Rive r St to He ron
Ha ys St a nd 11th St Pe de stria n/Bike Crossing
Fort St a nd 11th St Pe de stria n/Bike Crossing
8th St Contra flow Prote cte d Bike La ne , Ba nnock to Union
Fra nklin St Bike w a y, 18th St to 6th St
Ba nnock Bike w a ys, White w a te r Pa rk Blvd to 15th St
Gra nd St Pe de stria n Enh a nce m e nts
M ille r St Pe de stria n Enh a nce m e nts
Ash St Pe de stria n Enh a nce m e nts
Ple a sa nton Bike w a y, Wh ite w a te r Pa rk Blvd to 15th
Fort St a nd 8th St, le a ding pe de stria n inte rva l sig na l
2b2a1
456789
3
Pla nning Are a Bounda ry
10
2b2a
1
4
3
7
5
10
8
9
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/5/2020
Boise City Priorities: Community ProgramsBike Fa cilityProte cte d Bike Fa cilityBike & Pe de stria n Fa cility Inte rse ction
Roa d Re constructionPe de stria n Fa cility
Completed Projects• Je ffe rson St. Bike w a y, 2nd to 16th, 2019• Fa irvie w Ave a nd M a in St, Wh ite w a te r Pa rk Blvd / 16th St, a dd on stre e t p a rking , 2019
Jefferson St
Harri
son B
lvd
Hill Rd
8th S
t
Main St
13th
StSunset Ave
16th S
t
9th St
15th
StBo
gus B
asin Rd
Highland View Dr
Union St
Irene St
14th S
t
Fort St
State StHays St
Curling Dr
Braeme re Rd
Cartwri ght Rd
0 0.35 0.7Miles [
Legend
Community Activity Center
Neighborhood Activity Center
Regional Activity Center
Activity Center Buffer
Schools
Vacant Land (> 1 Acre)
Existing Bike & Pedestrian FacilitiesBike Lane
Shared Bike Route
Neighborhood Bike Route
Highway Bike Route
Multi-Use Path
Missing Sidewalks
Boise Hills Dr Sidewalk, 7th St to Mesa Grande Ln
Highlands View Traffic Calming & Pedestrian Facilities
Clubview Dr Chicane
Hill Rd & Lancaster Enhanced Pedestrian Crossing
1
2
Foothills Planning Area
31
2
3
4
4 Planning Area Boundary
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/4/2020
Boise City Priorities: Community ProgramsBike Facility
Protected Bike FacilityBike & Pedestrian Facility Intersection
Road Reconstruction
Pedestrian Facility
15thStFairview Ave
Taft St
27th
St
Americana Blvd
Latah
St
Harri
son B
lvd
Orch
ard St Warm Springs Ave
Curti
s Rd
Walnut
St
9th St
Collis
ter D
r
Vista
Ave
36th
St
Hill Rd
Whitewater ParkB lvd
Kootenai S t
Northview St
State St
16th S
t
Overland Rd
ParkcenterBl vd
13th
St
28th
St
Sunset Ave
Fort St
Philli
ppi S
t
Chinden Blvd
Capitol
Blvd
Rose Hill St
8th St
5th St
23rd
St
6th St
Boise Ave
Catalpa Dr
Broa
dway
Ave
3rd St
Ri ve r Ru n Dr
Franklin Rd
Veterans Memorial Pkwy
32nd
St
Front St
Jefferson St
Mallard Dr
River St
Park Blvd
Adams St
Unive rsity Dr
Highland View Dr
Bogu
s Basi
n Rd
14th S
t
Irene St
11th S
t
C assia St
Roos
evelt
St
Beacon St
Nez Perce St
Myrtle St
10th S
t
Emerald StFranklin St
Main StIdaho St
Hays StBannock St
44th St
Reserve St
Cartwright Rd
Divis
ion Av
e
Federal Way
Braemere Rd
Irving St
Liber
ty St
Ustick Rd
0 0.8 1.6Miles [
Legend
Com m unity Ac tivity Center
Neig hb orhood Ac tivity Center
Reg ional Ac tivity Center
Ac tivity Center BufferSc hoolsVac ant Land (> 1 Ac re)
Existing Bike & Pedestrian FacilitiesBike LaneShared Bike RouteNeig hb orhood Bike RouteHig hway Bike RouteMulti-Use P athMissing Sidewalks
Flum e Enhanc ed Bic yc le Crossing at Bannoc k
Coston St Sidewalk, Bannoc k St to Franklin St
Harrison Blvd & Irene St P edestrian Crossing
Warm Spring s Ave & Old P enitentiary P ed/Bike Crossing
13th St Traffic Calm ing , Fort St to Hill Rd
13th St Sidewalk, Heron St to Hill Rd
Bannoc k Bikeway, Bruc e to Coston
Sunset Ave Bikeway, 36th St to Hill Rd
Sunset Ave Sidewalk, 28th St to 20th St
Sunset Ave Sidewalk, 32nd St to 28th St
1
10
23456789
North/East Ends Planning Area
Boise City Priorities: Road, Intersection, Study or Other• State St Transit Lanes, 36th St to 27th St• State St Transit Lanes, Collister Dr to 36th St• 32nd St Extension, Moore St to Whitewater P ark Blvd• Taft Elem entary Area P edestrian Im provem ents
12
3
4
5
6
7
8910
P lanning Area Boundary
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/4/2020
Boise City Priorities: Community ProgramsBike Fac ilityP rotec ted Bike Fac ilityBike & P edestrian Fac ility Intersec tion
Road Rec onstruc tionP edestrian Fac ility
Taft St
Mitch
ell St
Ken t
L n
Hill RdMapleGroveR d
36th
St
Gary
Ln
Garre
tt St
State St
Ellens F e rryDr
Coffe
y St
Riverside Dr
Marigold St
Boga
rt Ln
Five M
ile R
d
Caswell St
50thSt
Catalpa Dr
Julli
onWa
y
Chinden Blvd
McMillan Rd
Gi l lisDr
Arne
y Ln
Collis
ter D
r
JohnsLanding Way
Mountain View Dr
Dunc
an Ln
Hil l Road Pkwy
Glen
wood
St
Castle Dr
Hors
esho
e Ben
d Rd
Alworth St
Gillis Rd
Seaman Gulch Rd
Utahna Rd
Hwy 5
5
Pierce Park Ln
Joplin Rd
Goddard Rd0 0.6 1.2
Miles [
Legend
Co mmun ity Activity Cen ter
Neighbo rho o d Activity Cen ter
Regio n a l Activity Cen ter
Activity Cen ter BufferScho o lsVa ca n t La n d (> 1 Acre)
Existing Bike & Pedestrian FacilitiesBike La n eSha red Bike Ro uteNeighbo rho o d Bike Ro uteHighwa y Bike Ro uteMulti-Use Pa thMissin g Sidewa lks
Northwest Planning Area
No rthwest Bikewa y, Ho rsesho eben d Rd to 36th St a t Ta ft
Co llister Rd Pedestria n & Bicycle Impro vemen ts, Sta te St to Hill Rd
Ho rsesho e Ben d Rd Bikewa y, Hill Rd to Sta te St with wa yfin din g to Green belt a n d En ha n ced Cro ssin g a t Uta hn a
Road, Intersection, Study or Other
1
2
3
• Sta te St Tra n sit La n es, Glen wo o d St to Pierce Pa rk Ln • Sta te St a n d Pierce Pa rk Ln In tersectio n Widen in g• Sta te St Tra n sit La n es, Pierce Pa rk Ln t Co llister Dr• Sta te St a n d Glen wo o d St In tersectio n Impro vemen ts
Pla n n in g Area Bo un da ry
1
2
3
Boise City Priorities: Community ProgramsBike Fa cilityPro tected Bike Fa cilityBike & Pedestria n Fa cility In tersectio n
Ro a d Reco n structio nPedestria n Fa cility
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/4/2020
N:\Workspaces\PDS\CompPlan\Projects\Transportation\IFYWP\2020\Southeast_IFWPPrioritiesBoise_3-2020.mxd
Broa
dway
Ave
Kootenai St Vista
Ave
Colum
bus S
t
Nez Perce StOverland Rd
Gowen Rd
Boise Ave
Eckert RdFederal Way
Hwy 21
Columbia Rd
Targee St
Lake Forest Dr
Geke
ler Ln
LawA
ve
Airport Way
Anne
tt St
R iver RunDr
Bergeson St
Victory Rd
Linden St
Rose Hill StParkcenterBlvdMa
llard Dr
Grand F orestDr
Amity Rd
Owyh
ee St
Wright St
Surpri se Wa y
Beacon St
Warm Springs Ave
Elder St
Eisenman Rd
Divis
ion Av
e
ProductionAve
Cherry Ln
Yamhill Rd
Apple
St
Technology Way0 1 2
Miles [
Legend
Com m unity Ac tivity Center
Neig h borh ood Ac tivity Center
R eg ional Ac tivity Center
Ac tivity Center BufferSc h oolsVac ant Land (> 1 Ac re)
Existing Bike & Pedestrian FacilitiesBike LaneSh ared Bike R outeNeig h borh ood Bike R outeHig h way Bike R outeMulti-Use PathMissing Sid ewalks
3
4
5
6
7
89
Southeast Planning Area
Boise City Priorities: Road, Intersection, Study or Other• Broad way Ave/Avenue B and Id ah o St/ Warm Spring s Ave Intersec tion Mod ific ation
11
1
2
Broad way Ave Ped estrian & Bic yc le Im provem ents, R ic h m ond or Lind en to Fed eral Way
Colum bia Villag e Bikeway, Mim osa to Hwy 21 at Tec h nolo g y Way
Holc om b R d Sid ewalk & Bike Lanes, Mim osa Way to Am ity R d
Lind en Bikeway, Broad way to Boise Ave
Fed eral Way Multi-Use Path way, Gowen R d to Mic ron Entranc e
Manitou Bikeway & Boise Ave & Manitou Enh anc ed Crossing
Am ity R d Multiuse Path , Fed eral Way to Holc om b R d
Manitou Sid ewalk & Bikeway, Howard to Garfield
Garfield Sid ewalk, Manitou to Broad way
Berg eson St Bikeway, Fed eral Way to Holc om b R d
Broad way Ave and Boise Ave Intersec tions Mod ific ationsfor Ped estrians and Bic yc lists
1
10
2
345
6
789
Planning Area Bound ary
10
11
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/4/2020
Boise City Priorities: Community ProgramsBike Fac ilityProtec ted Bike Fac ilityBike & Ped estrian Fac ility Intersec tion
R oad R ec onstruc tionPed estrian Fac ility
Philli
ppi S
t
Mitch
ell St
Cole
Rd
Maple
Gro
ve R
d
Gow enRd
Victory Rd
Five M
ile R
d
Curti
s Rd
Clov
erdale
Rd
Eagle
Rd
Amity Rd
Overland Rd
Orch
ard St
Cassia St
Kootenai St
Columbia Rd
Targee St
Valle
yHei g
htsDr
Satur
nWay
Lake Hazel Rd
Reutzel Dr
Riva
Ridge
Wa y
Pepperm int Dr
Chapin Ave
Sea
Bree
zeW
ayLa Grange St
S pectrum St
Trestlewood St
Valle
y St
Bienapfl Dr
Desert Ave
S eneca Dr
Wright St
Highlander Rd
0 0.85 1.7Miles [
Legend
Com m unity Activity Ce nte r
N e ig hborhood Activity Ce nte r
Re g iona l Activity Ce nte r
Activity Ce nte r Buffe rSchoolsVa ca nt La nd (> 1 Acre )
Existing Bike & Pedestrian FacilitiesBike La neSha re d Bike RouteN e ig hborhood Bike RouteHig hwa y Bike RouteMulti-Use Pa thMissing Sid e wa lks
Southwest Planning Area
Bicycle Enha nce Crossing a t Five Mile & Sa nd pip e r/Ma rting a le
K Ba r T Bike wa y, Clove rd a le to Ma ple Grove
Bike wa y Conne ction on Five Mile Rd , K Ba r T Dr to Ove rla nd
Victory Te m pora ry Multiuse Pa th, Clove rd a le to Five Mile Mitche ll Sid e wa lk, Am ity to Victory
Ca none ro, Sum pte r, Liza so Bike wa y
Re utze l Sid e wa lk Ga p, Riva Rid g e to Sum m e rse t
Hig hla nd e r Pe d e stria n/Bicyle Ga p
Boise City Priorities: Road, Intersection, Study or Other• Five Mile , Ove rla nd Rd to Fra nklin Rd (Five Mile I-84 Ove rp a ss) Im prove m e nts• Ma ple Grove Rd W id e ning & Im prove m e nts, Victory Rd to Ove rla nd Rd• Ma ple Grove Rd W id e ning & Im prove m e nts, Am ity Rd to Victory Rd
Pla nning Are a Bound a ry
2
1
3
6
4
5
7
8
8
1234567
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/5/2020
Boise City Priorities: Community ProgramsBike Fa cilityProte cte d Bike Fa cilityBike & Pe d e stria n Fa cility Inte rse ction
Roa d Re constructionPe d e stria n Fa cility
Completed Projects• Cole Rd a nd Victory Rd Inte rse ction, 2019-2020• Clove rd a le Ove rp a ss, 2019
State St
Ustick Rd
Curti
s Rd
Franklin RdBarrister Dr
Taft St
Pine Ave
Hill Rd
Orch
ard St
Maple
Gro
ve R
dBo
gart
Ln
Eagle
Rd
36th
St
Fairview Ave
Whitewa terPark B lvd
Ro se Hill St
Mitch
ell St Northview St
Gary
Ln
Five M
ile R
d
Garre
tt St
EllensFer r y Dr
Coffe
y St
Riversi deDr
Marigold St
Cassia St
Philli
ppi S
t
Chinden Blvd
Pierce Pa rk Ln
McMillan RdSh
amro
ck Av
e
Catalpa Dr
Jullio
nWa y
Milw
auke
eSt
Clov
erdale
Rd
Edna St
Cole
Rd
Goddard Rd
Cory Ln
Gil l isDr
Arne
y Ln
50th St
Latah
St
Adams St
Granger Ave
Roos
evelt
St
Collis
ter D
r
Sunset Ave
Emerald St
Gle n
wood
St
Castle Dr
Exe cutive Dr
44th St
Al worth St
Hic k
oryA
ve
Irving St
Liber
ty St
Gillis Rd
Utahna Rd
MountainV iew Dr
Joplin Rd
0 1 2Miles [
Legend
Community Activity Center
Neighborhood Activity Center
Regional Activity Center
Activity Center Buffer
Schools
Vacant Land (> 1 Acre)
Existing Bike & Pedestrian FacilitiesBike Lane
Shared Bike Route
Neighborhood Bike Route
Highway Bike Route
Multi-Use Path
Missing Sidewalks
West Bench Planning Area
Allumbaugh St Sidewalk, Fairview Ave to Northview St
Northview-Ustick Bikeway, Shamrock to Milwaukee
Fairview Ave Hill Cycle Track, Orchard to Garden Street
Chinden-McMillan Bikeway (Phase 1), Bennington Wayto Mitchell St
De Meyer St Sidewalk, Cloverdale Rd to Lena Ave;and Lena Ave Sidewalk, De Meyer St to Arlen St
Wildwood Sidewalk, Fairview to Ustick
Glenwood Multiuse Path, Goddard to Chinden
4
5
6
7
3
4 5
6
72
1
Planning Area Boundary
13
2
PDS - Comprehensive Planning Division2020 City of Boise Requests for ACHD's IFWYP FY2021-2025 3/4/2020
Boise City Priorities: Community ProgramsBike Facility
Protected Bike FacilityBike & Pedestrian Facility Intersection
Road Reconstruction
Pedestrian Facility
Attachment 1
INTEGRATED FIVE-YEAR WORK PLAN FY2021-2025 UPDATE KEY DATES AND DEADLINES
DECEMBER - MARCH 20
ACHD staff meet with partner agencies. ACHD staff will brief agency staff on the IFYWP process, status of projects in the current IFYWP, prioritization methodologies, existing technical data, the status of projects, and other IFYWP-related issues.
MARCH 12
Public Open House #1
MARCH 20
Partner agency requests due to ACHD.
APRIL 8
ACHD Commission work session on prioritization review
MAY 6
ACHD Commission work session on early issues.
JULY 15
ACHD work session on Initial Draft IFYWP – Initial Draft IFYWP will be transmitted to partner agencies afterward.
JULY 14 – AUGUST 14
Initial Draft Public and Agency comment period, including a public open house on the IFYWP and Budget.
AUGUST 14
Partner agency comments on Initial Draft IFYWP due to ACHD.
SEPTEMBER 2
ACHD Commission work session on Partner Agency Comments.
SEPTEMBER 23
Proposed IFYWP Adoption Hearing.