Page 1: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre
Page 2: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre
Page 3: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

~ 1fR UlfUT ~ : fft-9, ~ ~:&1~~}lI'1<:1~, cpcqlRlIl mro, ~ ~- 110016National Load Despatch Centre: 8-9, Qutab Institutional Area, Katwaria Sarai, New Delhi - 110016website: www.nldc.in, www.nldcindia.in,Tel.: 011-26536832, 011-26524522, Fax: 011-26524525, 011-26536901- .

Ref: POSOCO/NLDC/System Operation/Outage Planning/

To,

Member Secretary

NRPC/WRPC/SRPC/ERPC/NERPC

Dated: 28th February 2013

Subject: Draft Procedure for Transmission Elements Outage Planning

Sir,

Outage Coordination has been one of the important functions of Regional Power Committees (RPCs),

Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre (NLDC) and it

constitutes the first stage of operational planning. Proper coordination of transmission element

outage is important for network reliability and security. The importance of outage coordination has

also been emphasised in the recommendations of the "Enquiry Committee on Grid Disturbance in

Northern Region on so" July 2012 and in Northern, Eastern and North Eastern Region on 31st July

2012" and the same is quoted below:

"9.6 Coordinated outage planning of transmission elements Outage planning of inter-State and inter-

regional transmission elements should be carried out in a coordinated manner at RPC fora (say

Operation Co-ordination sub-committee of RPCs) in accordance with regulation 5 of Central

Electricity Authority (Grid Standards) Regulation, 2010 and Section 5.7.1 of Indian Electricity Grid

Code. In case need for emergency maintenance arises in between two meeting of Operation Co-

ordination sub-committee, NLDC and RLDCsshould allow such maintenance after carefully looking at

prevailing system conditions under intimation to RPCSecretariat. "

Further it has been also been advised by Member (GO&D) vide letter dated oz" September 2012 to

carry out outage planning of inter-state and inter regional elements in coordination with RPCs.

In view of the above and based on the experience so far, a draft procedure for transmission

elements outage planning has been prepared and enclosed with this letter. It is proposed that the

procedure may be discussed in the forthcoming OCC meeting of each region. The procedure would

be finalised after suitably incorporating the comments received during these meetings.

With Regards,

Yours Sincerely

0\~ pV.K. Agrawal

ED,NLDC

POSOCO

Copy to:

Member (GO&D), CEA

Director(Operations), POWERGRID

CEO POSOCO

EDSRLDC

GM NRLDC, WRLDC, ERLDC,NERLDC

~ ~ ~ CfilllT('1ll: ~·9. ~ ~!{T"f(ij"" ~, Cficc:llf"{lll mP1, ~ ~-110016Registered & Corporate Office: 8-9, Qutab Institutional Area. Katwaria Sarai, New Delhi - 110016

Page 4: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Procedure for Transmission Elements

Outage Planning

March 2013

The procedure aims to streamline the process of outage coordination between SLDCs, RLDCs, NLDC, RPCs and Indenting Agencies

Page 5: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

1. Introduction

Reliable operation of the All India grid is important from the view point of

Quality Of Service (QoS) to the customers and other stakeholders. Proper co-

ordination of transmission outages in the system is one of the key aspects to

ensuring reliability. Outages in the transmission network could either be on

account of planned maintenance activities or construction related activities or

any emergency conditions arising in the field. Proper coordination of

transmission element outage is important mainly due to the following factors:

i. Reliability of operation of the All India grid

ii. Certainty to the electricity markets.

iii. Proper crew resource mobilization at the work sites to ensure that

outage time is minimized.

iv. Proper coordination of works by different entities to ensure that

outage time is optimised.

Outage Coordination has been one of the important functions of Regional

Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and

National Load Despatch Centre (NLDC) and is the first stage of operational

planning. As per Indian Electricity Grid Code (IEGC), the responsibility to

undertake planning of outage of transmission system has been assigned to

RPCs. The outages of the inter-state transmission lines and intra state elements

which are important for the region are being coordinated by RLDCs. In the

cases where the outages may have an impact across two or more regions,

coordination is in consultation with NLDC. The relevant clauses of IEGC in this

regard are quoted below:

“2.4.2 The following functions which go to facilitate the stability and smooth operation of the systems are identified for the RPC:

………… (e) To undertake planning of outage of transmission system on annual /

monthly basis.”

“2.3 Role of RLDC

Page 6: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

2.3.1.1The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region” “2.2 Role of NLDC …….. (f) Coordination with Regional Power Committees for regional outage schedule in the national perspective to ensure optimal utilization of power resources.” 2. Objective

At present, planned outages are being discussed in respective Operation

Coordination Committee (OCC) meeting of RPCs and availed based on the

actual grid conditions and/or any changes requested by transmission system

owner or transmission element outage indenting agency. The approval of

planned as well as emergency outages in the transmission network level in real

time is being coordinated by RLDCs and NLDC based on system conditions. The

procedure aims to streamline the process of outage coordination between

SLDCs, RLDCs, NLDC, RPCs, owners of transmission assets and transmission

element outage Indenting Agencies. As outage planning is an important part of

operational planning, multi-layered checks would help in ensuring reliability of

the power system. These checks need to be at the following levels:

Due diligence between the agencies involved in the transmission asset

maintenance through bilateral discussion.

Study sub-committee of RPCs.

Operation Co-ordination sub-Committee of RPCs

Off-line simulations and planning at RLDCs/NLDC level

Real time check at RLDCs/NLDC level

3. Scope

The procedure is applicable to RPCs, RLDCs, NLDC, SLDCs, STUs, load serving

entities and indenting agency. It would be applicable once the annual outage

Page 7: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

plan is finalized by 31st December of each year for the next financial year by

the RPCs as per the IEGC.

4. Procedure for discussing outages in OCC meeting.

4.1. Indenting Agency: The agency which gives the requisition for outage

of any transmission element shall be called Indenting Agency. Any of

the following may request for outage of any transmission elements:

4.1.1. Transmission Licensees / State Transmission Utilities

4.1.2. Generating Companies

4.2. Indenting Agency shall submit the proposed shutdown for the next

calendar month latest by 3rd day of the current month to the RPC

Secretariat as per Format IA / Format IB.

4.3. In case of shutdown of inter-regional lines and intra-regional lines

affecting the transfer capability of any inter regional corridor, the

Indenting agency shall submit the shutdown proposal in both the

concerned RPCs. To facilitate this broad list of such lines is indicated

at Annexure II which will be reviewed and updated by NLDC from

time to time. The indenting agency may do an internal screening of

its outage plan centrally to avoid multiple outages in the same

corridor simultaneously. Bilateral discussion between the agencies

involved may also be done to minimize outage duration before

submitting the outage plan to RPCs.

4.4. RPC Secretariat shall compile all the received proposals and put up

the same on its website by 5th day of the month as per Format IIA /

Format IIB.

4.5. System Study sub-committee of RPCs shall study the impact of these

outages and based on its recommendations, RPC shall discuss

proposed outages in the OCC meeting and prepare a list of approved

transmission outages with the precautions to be taken. RPCs would

attempt to schedule all their OCC meetings between 10th to 15th day

of the month so that sufficient time is available both to the Study

Committee before the OCC meetings as well as for RLDCs/NLDC

Page 8: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

(mainly to take care of further changes in the network topology

and/or in load generation) after the OCC meeting.

4.6. While approving the shutdowns it shall be ensured that outages in

the same corridor shall not be approved simultaneously. It also need

to be ensured that all other concerned entities should also complete

their work during the shutdown period so as multiple shutdown of

same element for work by multiple agencies are avoided. The

multiple outages of the transmission element for the same work

during the year may also be avoided.

4.7. RPC shall send the list of approved transmission outages to

SLDCs/RLDCs/NLDC within 3 days of the OCC meeting and preferably

latest by 18th of the month as per Format IIIA / Format IIIB. The same

shall also be displayed on RPC websites.

4.8. Any shutdown proposal which requires approval of two RPCs shall be

considered approved only if it is approved in both the RPCs.

4.9. After the receipt of Format IIIA / Format IIIB from each RPC, NLDC in

consultation with RLDCs may prepare a tentative readjusted

timings/dates of transmission element outages for next month

considering the principles set out in this procedure.

5. Approving Load Despatch Centre and Consenting Load Despatch Centre

5.1. Approving Load Despatch Centre: The Load Despatch Centre

responsible for approving any transmission outage shall be called

Approving Load Despatch Centre.

5.2. Consenting Load Despatch Centre: The agency whose consent is

required by Approving Load Despatch Centre for approving any

outage shall be called Consenting Load Despatch Centre .Once the

RPCs approve the monthly outage plan, the responsibility of approval

of outages shall be as under:

Page 9: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Sl.No Type of Outage Consenting Load Despatch Centre

Approving Load Despatch Centre

1 765 kV or above Lines Concerned RLDCs

NLDC

2 Inter-Regional Lines Concerned RLDCs

NLDC

3 HVDCs Concerned RLDCs

NLDC

4 International Interconnections

Concerned RLDC NLDC

5 Intra-Regional Lines affecting transfer capability of any inter regional corridor.

Concerned RLDCs

NLDC

6 Intra-Regional Lines which does not affect transfer capability of any inter regional corridor and included in the list of important elements of RLDCs (excluding lines covered under sl no.1,3,4 and 5)

SLDCs RLDCs

7 All other lines (excluding sl no. 1,2,3,4,5,6)

SLDC SLDC

6. Procedure for approval of outage on D-3 basis

6.1. Planned Outages which have been approved in the OCC meeting of a

region shall be considered for approval by RLDCs/NLDC on D-3 basis.

If an outage is to be availed on say 10th of the month, the indenting

agency would forward such requests to the concerned RLDC on 7th of

the month by 1000 hours. This practice is necessary to realize the

seriousness and readiness of the agency which indented the outage

request in the first place as it is observed that many outages are not

Page 10: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

availed as per the monthly schedule. In case the request for

transmission element outage is not received within the timeline

prescribed above, it will be assumed that the indenting agency is not

availing the outage.

6.2. Request for outages which are approved by OCC must be sent by the

owner of the transmission asset at least 3 days in advance to

respective RLDC by 1000 hours as per Format IV.

6.3. In case the owner is not availing the OCC approved outage, the same

shall be intimated to the respective RLDC at least 3 days in advance.

6.4. Planned Outages which are approved in OCC meeting shall only be

considered for approval on D-3 basis.

6.5. Approval of Outage where Approving Authority is NLDC

6.5.1. RLDCs shall forward the request for shutdown along with their

consent and observation as per Format V to NLDC/other concerned

RLDCs with clear observations regarding possible constraints /

contingency plan and consent including study results by 1000 hours

of D-2 day. Other concerned RLDCs would forward their

observations/consent/reservations by 1600 hours of D-2.

6.5.2. NLDC shall approve the outage along with the clear

precautions/measures to be observed during the shutdown and

inform all concerned RLDCs.

6.5.3. The proposed outages shall be reviewed on day ahead basis

depending upon the system conditions and the outages shall be

approved/refused latest by 1200 Hrs of D-1 day. A suggestive format

for approval of outage is enclosed as Format VI.

Page 11: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

6.5.4. In case the outage is approved precautions/measures to be

observed during the shutdown shall be stated. In case of refusal,

clear reasons shall be stated by the RLDCs/NLDC.

6.5.5. Outages impacting the transfer capability of more than one

corridor shall not be allowed simultaneously.

Sl No Activity Day Time

1 Request of shutdown from Indenting agency to concerned RLDC.

D-3 1000 hrs

2 Forwarding request of shutdown requiring NLDC approval from RLDC to other concerned RLDCs and NLDC (along with the recommendations and study result)

D-2 1000 hrs

3 Comments of other RLDCs or NLDC

D-2 1800 hrs

4 Approval or Rejection of Request

D-1 1200 hrs

6.6. Approval of Outage where Approving Authority is RLDC

6.6.1. In case the indenting agency is a state entity, the request for

transmission element outage shall be submitted to respective state

load despatch centre (SLDC). SLDC shall forward the request for

shutdown along with their consent and observation as per Format V

to RLDC.

6.6.2. In all other cases, the request for transmission element outage

shall be submitted to respective RLDC.

6.6.3. RLDC shall study the impact of proposed outages and approve /

refuse the outage latest by 1200 Hrs of D-1 day. A copy of the

Page 12: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

approval / refusal shall also be sent to NLDC (for 400 kV and above

lines). A suggestive format for approval / refusal of outage is

enclosed as Format VI.

6.6.4. In case the outage is approved precautions/measures to be

observed during the shutdown shall be stated. In case of refusal,

clear reasons shall be stated by the SLDCs/RLDC

6.6.5. Outages in the same corridor shall not be approved

simultaneously shall be rescheduled accordingly.

6.7. Approval of Outage where Approving Authority is SLDC

6.7.1. SLDC shall study the impact of proposed outages on the system

and approve the outage latest by 1200 Hrs of D-1 day. The format VI

as suggested above can be used for approval / refusal of outage.

6.7.2. Outages in the same corridor shall not be approved

simultaneously and shall be rescheduled accordingly.

6.8. In case of any system constraint or any other reason, approving

authority may decline the proposed outage by giving the reasons for

the same and tentative dates for the shutdown.

6.9. In case, any approved outage is not availed in real time, the same

may not be allowed again in that month. In such a scenario,

indenting agency shall be required to submit a fresh proposal in the

next OCC meeting.

6.10. A list of all approved outages for the next day must be available in

the RLDCs/NLDC control room by 1900 hours with a copy of the

study results and special precautions, if any. This would be studied

by the night shift engineers so that the outage can be facilitated the

next day morning.

Page 13: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

7. Approval of Emergency Outages

7.1. All outages which are not approved in the OCC meeting but having

impact on human and equipment safety and/or to meet any other

emergency requirement or special conditions shall be considered

under Emergency Outage category.

7.2. The request for emergency outage shall be submitted along with the

details like nature of emergency, impacts due to emergency

situation, reasons and associated facts for not considering in the

outage planning process.

7.3. Emergency outages shall be allowed subject to system conditions

and its severity. In this case, if required, planned outage may be

deferred, if possible.

7.4. Emergency outages shall be allowed immediately or within the short

possible time, based on the severity of the emergency and system

condition on instance to instance basis.

8. Availing Outages in real time

8.1. The agencies involved shall ensure availing of outages as per the

approved schedule time.

8.2. On the day of outage, the outage availing agency shall seek the code

for availing outage from respective RLDC(s) /NLDC (wherever

applicable). The agencies involved shall endeavour to avail the

outage with in 15mintues of availing the code but not later than 30

minutes. In case, due to any contingency, the outage could not be

availed within 30 minutes, a fresh code needs to be obtained by all

concerned agencies stating the reason there of Record of scheduled

and actual time of outage and restoration shall be maintained at

RLDCs/NLDC.

8.3. RLDCs shall prepare a monthly statement of scheduled and actual

time of outage and restoration and forward the same to RPC latest

Page 14: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

by 05th day of the next month with a copy to NLDC. The format is

enclosed as Format VIIA / Format VIIB.

8.4. SLDCs shall prepare a monthly statement of scheduled and actual

time of outage and restoration and forward the same to RPC latest

by 05th day of the next month with a copy to concerned RLDC. The

Format VIIA / Format VIIB as suggested above can be used for

sending the report to RPCs.

8.5. RLDCs/NLDC shall develop a separate web based portal for

information exchange subsequently, which would dispense with the

need for emails.

8.6. As any deviation in the outage from the schedule can affect other

planned outages as well as affect reliability and electricity markets,

indenting agency must strictly adhere to the shutdown timings.

9. Normalisation of Outages

9.1. All effort shall be made by the Indenting agency to normalise the

shut down within approved time period so that the transmission

element is normalised within the approved time period.

9.2. On completion of the outage work, the outage availing agency shall

seek the code for normalisation of elements from respective RLDC(s).

The agencies involved shall endeavour to normalise the outage with

in 15mintues of availing the code but not later than 30minutes. In

case, due to any contingency, the normalisation could not be done

with in 30minutes, a fresh code needs to be obtained by all

concerned agencies stating the reason thereof.

9.3. In case of extension of a shutdown, the Indenting agency would

furnish the reasons of extension, and expected normalisation time to

concerned RLDC/SLDC at least one hour before the scheduled

normalisation time.

9.4. Under such circumstances SLDCs/RLDCs/NLDC shall review the

impact of such delay on the shutdown already approved

Page 15: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

transmission system and would reserve the right to review for

according/cancellation of the shutdown.

9.5. In case of repeated delay in normalisation of outages by any agency,

the same shall be reported by SLDCs/RLDCs/NLDC to RPCs.

10. Request for charging new elements

10.1. Owner of the transmission asset shall submit the request for

probable charging new elements for the next calendar month latest

by 3rd day of the current month to the RPC Secretariat.

10.2. System Study sub-committee of RPCs shall study the impact of

charging of new elements and based on its recommendations, RPC

shall discuss the requests for charging new elements in the OCC

meeting and prepare a list of new elements to be charged during the

next calendar month along with the precautions to be taken. RPC

shall send the list of new elements to be charged within 3 days of the

OCC meeting and latest by 18th of the month. The same shall also be

displayed on RPC websites.

10.3. The owner of the new transmission element shall inform the

concerned SLDC / RLDC / NLDC about the charging of the element

atleast 3 days in advance.

10.4. SLDCs / RLDCs / NLDC shall study the charging of all 400 kV and

above new elements and prepare charging instructions which shall

be forwarded to the asset owner along with the study results with a

copy to NLDC.

Page 16: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

List of Annexures

Sl No. Format /

Annexure No

Title From

(Agency)

To

(Agency)

1 Annexure I Flow Chart of Transmission Outage Planning

2 Annexure II Important Elements of NLDC

Page 17: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

List of Formats

1 Format IA Request For Transmission

Element Outage

Indenting

Agency

RPC

2 Format IB Request For Bus, Bay, ICTs,

Reactor, FACTS, FSCs, SVCs

etc Outage

Indenting

Agency

RPC

3 Format IIA List of monthly proposed

shutdowns of Transmission

Lines

RPC Website

4 Format IIB List of monthly proposed

shutdowns of Bus, Bay,

ICTs, Reactor, FACTS, FSCs,

SVCs etc

RPC Website

5 Format IIIA List of monthly approved

shutdowns of Transmission

Lines

RPC NLDC/RLDC/SLDC

6 Format IIIB List of monthly approved

shutdowns of Bus, Bay,

ICTs, Reactor, FACTS, FSCs,

SVCs etc

RPC NLDC/RLDC/SLDC

7 Format IV Request for Transmission

Element Outage

Indenting

Agency

RLDC/SLDC

8 Format V Request for Transmission Element Outage

RLDC NLDC

9 Format VI Approval of Outage RLDC / NLDC

Indenting Agency/RLDC

10 Format VIIA Monthly Shutdown Report

For Transmission Lines

SLDC/RLDC RPC

11 Format VIIB Monthly Shutdown Report

For For Bus, Bay, ICTs,

Reactor, FACTS, FSCs, SVCs

etc

SLDC/RLDC RPC

Page 18: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre
Page 19: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

LINK Voltage Level Inter Regional Lines OWNER No. of Circuit

HVDC Link Vindhyachal Back to Back (500 MW) PG -

Agra-Gwalior I ( 765kV operated at 400kV) PG Single Circuit

Agra-Gwalior II ( 765kV operated at 400kV) PG Single Circuit

Kankroli-Zerda PG Single Circuit

Bhinmal-Zerda PG Single Circuit

Kota-Badod RAJ-MP Single Circuit

Morak-Badod RAJ-MP Single Circuit

Auraiya-Mehgaon MP-MP Single Circuit

Auraiya-Malanpur MP-MP Single Circuit

Neemuch-Udaipur MP-RAJ Single Circuit

Seopar Kalan-Sawai Madhopur MP-RAJ Single Circuit

Ranapratap Sagar-Gandhi Sagar RAJ-MP Double Circuit

Rihand-Morwa UP-MP Single Circuit

Rajghat-Lalitpur MP-UP Single Circuit

HVDC Link Bhadravati Back to Back (2x500 MW) PG -

Chikkodi- Kolhaphur KAR-MAH Double Circuit

Ambewadi-Ponda KAR-GOA Single Circuit

Ambewadi-Xeldem KAR-GOA Single Circuit

Rourkela-Raigarh PG Circuit III & I

Raigarh-Sterlite PG Circuit II & IV

Ranchi-Sipat PG Double Circuit

Budhipadar-Raigarh OD-CH Single Circuit

Budhipadar-Korba(East) OD-CH Circuit II

Budhipadar-Korba(East) PG Circuit III

Sasaram Back to Back (500 MW) PG

Sasaram-Saranath (400KV) PG Single Circuit

Sasaram-Allahabad (400KV) PG Single Circuit

765KV Gaya-Sasaram-Fatehpur PG Single Circuit

Muzaffarpur-Gorakhpur PG Double Circuit

Patna-Balia PG Four Circuits

Biharshariff-Balia PG Double Circuit

Sasaram-Balia PG Single Circuit

220KV Pusauli-Sahupuri BR-UP Single Circuit

Sone nagar-Rihand BR-UP Single Circuit

Garwah-Rihand BR-UP Single Circuit

Karmanasa-Sahupuri BR-UP Single Circuit

Karmanasa-Chandauli BR-UP Single Circuit

400 KV Jeypore-Gazuwaka Back to Back PG Double Circuit

HVDC Link Talcher-Kolar Bipole PG -

400KV Binaguri-Bongaigaon PG Double Circuit

220KV Birpara-Salakati PG Double Circuit

NR-Nepal 132 KV Tanakpur-Mahendernagar UK-NEP Single Circuit

132 KV Salakati - Geylegphug PG Single Circuit

132 KV Rangia -Matonga AS-BHU Single Circuit

400KV Binaguri -Tala-I & II ( India portion) PG Double Circuit

400KV Binaguri -Tala- IV ( India portion) PG Single Circuit

400KV Binaguri -Malbase - III ( India portion) PG Single Circuit

220KV Birpara - Chukha - I & II ( India portion) PG Double Circuit

220KV Birpara - Malbase ( India portion) PG Single Circuit

220kVWR-SR

ER-BHUTAN

220KV

ER-NER

400KV

132KV

NER-BHUTAN

ER-SR

TRANS NATIONAL LINK

HVDC Link

ER-NR

INTER REGIONAL LINK

Annexure II

WR-NR 220KV

132KV

400KV

IMPORTANT GRID ELEMENTS

Page 20: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

REGION Voltage Level Inter Connection OWNER No. of Circuit

NR +/- 500KV HVDC RIHAND-DADRI BIPOLE PG -

NR +/- 500KV HVDC BALIA-BHIWADI BIPOLE PG -

WR/NR +/- 500KV HVDC MUNDRA-MOHINDERGARH- BIPOLE * APL -

WR +/- 500KV HVDC CHANDRAPUR-PADGE BIPOLE MSETCL -

765KV ANPARA C-UNNAO UPPCL SINGLE

765KV BALIA-LUCKNOW PG SINGLE

765 KV FATEHPUR-AGRA PG SINGLE

765KV MOGA-BHIWANI(PG) PG SINGLE

765KV JHATIKARA-BHIWANI PG SINGLE

765KV SIPAT-BILASPUR 1 PG SINGLE

765KV SIPAT-BILASPUR 2 PG SINGLE

765KV SEONI-BILASPUR 1 PG SINGLE

765KV SEONI-BILASPUR 2 PG SINGLE

765KV SEONI-WARDHA 1 PG SINGLE

765KV SEONI-WARDHA 2 PG SINGLE

765KV BINA-SATNA 1 PG SINGLE

765KV BINA-SATNA 2 PG SINGLE

765KV SEONI-BINA PG SINGLE

* A dedicated transmission system set up by M/s Adani Power Ltd.

HVDC AND 765KV LINES ( EXCLUDING INTER REGIONAL LINKS)IMPORTANT GRID ELEMENTS

NR

WR

Page 21: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

1 KANKROLI RAPP - C- I & II 400 WR-NR

2 SINGRAULI STPS HVDC VINDHYACHAL 400 WR-NR

3 SINGRAULI STPS ANPARA 400 WR-NR

4 Bhiwani PG Mohindergarh D/C 400 WR-NR

1 Bina Gwalior I & II 400 WR-NR

2 Bina Shujalpur I & II 400 WR-NR

3 Raipur Bhadravati I 400 WR-SR, W3

4 Raipur Bhadravati II & III 400 WR-SR,W3

5 Bhadravati Bhilai 400 WR-SR,W3

6 Bhilai Koradi 400 W3

7 Seoni Bhilai 400 W3

8 Korba Vindhyachal 400 W3

9 Korba Mahan 400 W3

10 Soja Zerda 400 WR-NR

11 Ranchodpura Zerda 400 WR-NR

12 Mundra Sami 400 WR-NR

13 Raipur Wardha I & II 400 W3

14 Wardha Akola I & II 400 W3

1 RAMAGUNDAM BHADRAVATI I & II 400 WR-SR

2 RAMAGUNDAM N'SAGAR I & II 400 WR-SR

3 JEYPORE GAZUWAKA I & II 400 ER-SR

4 Vijayawada Nellore I & II 400 ER-SR

1 PURNEA MUZAFFARPUR 400 ER-NER &ER-NR

2 BIHARSHARIFF SASARAM - I & II 400 ER-NR

3 BIHARSHARIFF SASARAM - III 400 ER-NR

4 MALDA PURNEA I & II 400 ER-NER &ER-NR

5 Kahalgaon Banka I &II 400 ER-NER &ER-NR

6 Banka Biharshariff I & II 400 ER-NER &ER-NR

7 Kahalgaon Biharshariff I & II 400 ER-NER &ER-NR

8 TALCHER GMR 400 ER-SR

9 GMR MERAMUNDALI I & II 400 ER-SR

10 TALCHER ROURKELA I & II 400 ER-SR

11 KHARAGPUR KOLAGHAT 400 ER-SR

12 KOLAGHAT BARIPADA 400 ER-SR

13 FARAKKA MALDA 400 ER-NER &ER-NR

14 MAITHON KAHALGAON I & II 400 ER-NR

15 JEYPORE INDRAVATI 400 ER-SR

16 JEYPORE BOLANGIR 400 ER-SR

17 BOLANGIR MERAMUNDALI 400 ER-SR

18 Kahalgaon Barh I & II 400 ER-NR

19 Sterlite ROURKELA (LILO) II & IV 400 W3-ER

19 Rengali Keonjhar 400 ER-SR

20 Keonjhar Baripada 400 ER-SR

1 Balipara Bongaigaon I & II 400 ER-NER

2 Bongaigaon TPS (BTPS) Salakati I & II 220 ER-NER

3 Agia Sarusajai I & II 220 ER-NER

4 Balipara Samaguri 220 ER-NER

TTC / ATC impact

NORTH EASTERN REGIONSL NO FROM TO VOLTAGE

KV

SOUTHERN REGION

SL NO FROM TO VOLTAGE KV TTC / ATC impact

TTC / ATC impact

EASTERN REGIONTO VOLTAGE

KVSL NO FROM

IMPORTANT GRID ELEMENTS

NORTHERN REGIONSL NO FROM TO VOLTAGE

KV TTC / ATC impact

IMPORTANT LINES HAVING IMPACT ON TTC/ATC

WESTERN REGIONTTC / ATC impactSL NO FROM TO VOLTAGE

KV

Page 22: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Annexure I

Flow Chart: Transmission Elements Outage Planning

Inputs Activity Timelines

START

Preparation of Annual

Outage Plan by RPCs

Preparation of list of

proposed outages for next

calendar month by RPCs

Monthly review of

outage plan for next

calendar month

Finalization of outages for

next calendar month in the

OCC meeting

RPC shall display the annual

outage plan on their website by

31st December each year for the

next financial year

5th day of a month

In the OCC meeting

Latest by 15th of every

month for the next

month

Latest by last day of every

month

RPC to send list of

approved outages to

SLDCs/RLDCs/NLDC

Within 3 days of the OCC

meeting and preferably

latest by 18th of the

month

Recommendations of

Study Sub Committee

of RPCs to the OCC

Moderation of Outages

by NLDC in consultation

with RLDCs

Future Outage

plan of all

entities

Outage requests from

indenting agency to

RPCs by 3rd day of

current month

Submission to

RPC by 31st Oct

every year

Page 23: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Requisition for outage by

requesting agency to

RLDC/SLDC

Approval /

Refusal of

outage by

NLDC

Approval /

Refusal of outage

by RLDC/SLDC

NLDC

RLDC to forward

outage request

to NLDC along

with comments

Approving

Authority

RLDC to study the

impact of Outage on

IR Corridor

RLDC / SLDC

Latest by 1200 Hrs of D-1

day

Latest by 1000 Hrs of D-3

day where D is the day of

outage

Latest by 1000 Hrs of D-2

day

Monthly statement of

approved shutdowns by

RLDCs/SLDCs to RPCs

Latest by 5th day of next

month for the previous

month

STOP

Execution and

Normalisation of Outage As per approved timings and

Subject to real time

conditions. In case the

shutdown is required to be

postponed, revised dates

would be suggested

SLDC to study the

impact of Outage and

gives its comments

Comments

from other

RLDCs NO YES

Page 24: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time Remarks

Format I(A): Request For Transmission Element Outage by Indenting agency to RPC

Line Details Proposed Date and TimeFor the MonthIndenting Agency

Page 25: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time RemarksName of the Element

Line Details Proposed Date and Time

Format I(B): Request For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc Outage by Indenting agency to RPC

Indenting Agency

Page 26: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time Remarks

Line Details Proposed Date and Time

Format II(A): List of Received Proposals for Transmission Element Outage from Different Agencies

Name of the RPC For the Month

Page 27: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time RemarksName of the Element

Format II(B): List of Received Proposals for Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc Outage from Different Agencies

Name of the RPCLine Details Proposed Date and Time

Page 28: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Issue Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

Control Area/ Corridor impacted Remarks

Format III(A): List of OCC approved shutdowns of  Transmission Lines

Line Details Approved Date and TimeProposed Date and TimeName of the RPC

Page 29: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Issue Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

Control Area/ Corridor impacted Remarks

Format III(B): List of OCC approved shutdowns of  Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc

Approved Date and TimeName of the RPC

Name of the Element

Line Details Approved Date and Time

Page 30: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format IV: Request for Transmission Element Outage by

Indenting Agency to RLDC/SLDC

Name of the Requesting Agency: Address of the Requesting Agency:

Name of the element :

Voltage Level : Owner : OCC Approved (Yes/No) : OCC Reference No. : Duration of Outage : From Date- To Date- From Time- To Time- Daily/Continuous : Reason for Outage : Approving Authority :

( ) Signature

Place: Date: Time:

Page 31: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format V: Request for Transmission Element Outage by

RLDC to NLDC Name of the Requesting Agency: Name of the element :

Voltage Level (kV) : 765/400/220/230/132 Owner : OCC Approved : Yes/No OCC Reference No. : Duration of Outage : From Date- To Date- From Time- To Time- Type : Daily / Continous Reason for Outage : Consent : Yes / No Study Conducted : Yes / No Results of Study Attached: Yes / No Revision in TTC Required: Yes/No If Yes,

Conditions:

( )

Signature Place: Date: Time:

Sl.No. Corridor Original TTC Revised TTC Limiting Constraint

Page 32: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format VI: Approval /Refusal of Outage by

NLDC/RLDCs/SLDCs

___________Load Despatch Centre

<Address>

<Tel No.> <Fax No.>

Approval / Refusal for Shutdown

Approval / Refusal No: Date: Time:

From: To:

Sl No

Element Start End S/D Type*

Reason

Date Time Date Time

* C: Continuous Basis, D: Daily Basis

Remarks

<Precautions/measures to be observed during the shutdown> / <Reasons for

Refusal>

Signature

Copy to:

1.

2.

3.

Page 33: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Sl.No.Reuesting Agency

Approving Authority

Approval Number

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Planned / Emergency

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time Revision in TTC Remarks

Format VII(A): Monthly Shutdown Report For Transmission Lines by RLDCs/SLDCs

Approval Details Line Details Outage Details Scheduled  Date and Time Actual Date and TimeDate and Time requested 

by Indenting Agency

Name of the RLDC/SLDC For the Month Issue Date

OCC Approved              Date and Time

Page 34: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Sl.No.Reuesting Agency

Approving Authority

Approval Number

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Planned / Emergency

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time Revision in TTC Remarks

Format VII(B): Monthly Shutdown Report For For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc by SLDCs/RLDCsName of the RLDC/SLDC For the Month Issue Date

Actual Date and TimeOCC Approved              Date and Time

Name of the element

Approval Details Line Details Outage Details Scheduled Date and TimeDate and Time requested by 

Indenting Agency

Page 35: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

~ 1fR UlfUT ~ : fft-9, ~ ~:&1~~}lI'1<:1~, cpcqlRlIl mro, ~ ~- 110016National Load Despatch Centre: 8-9, Qutab Institutional Area, Katwaria Sarai, New Delhi - 110016website: www.nldc.in, www.nldcindia.in,Tel.: 011-26536832, 011-26524522, Fax: 011-26524525, 011-26536901- .

Ref: POSOCO/NLDC/System Operation/Outage Planning/

To,

Member Secretary

NRPC/WRPC/SRPC/ERPC/NERPC

Dated: 28th February 2013

Subject: Draft Procedure for Transmission Elements Outage Planning

Sir,

Outage Coordination has been one of the important functions of Regional Power Committees (RPCs),

Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre (NLDC) and it

constitutes the first stage of operational planning. Proper coordination of transmission element

outage is important for network reliability and security. The importance of outage coordination has

also been emphasised in the recommendations of the "Enquiry Committee on Grid Disturbance in

Northern Region on so" July 2012 and in Northern, Eastern and North Eastern Region on 31st July

2012" and the same is quoted below:

"9.6 Coordinated outage planning of transmission elements Outage planning of inter-State and inter-

regional transmission elements should be carried out in a coordinated manner at RPC fora (say

Operation Co-ordination sub-committee of RPCs) in accordance with regulation 5 of Central

Electricity Authority (Grid Standards) Regulation, 2010 and Section 5.7.1 of Indian Electricity Grid

Code. In case need for emergency maintenance arises in between two meeting of Operation Co-

ordination sub-committee, NLDC and RLDCsshould allow such maintenance after carefully looking at

prevailing system conditions under intimation to RPCSecretariat. "

Further it has been also been advised by Member (GO&D) vide letter dated oz" September 2012 to

carry out outage planning of inter-state and inter regional elements in coordination with RPCs.

In view of the above and based on the experience so far, a draft procedure for transmission

elements outage planning has been prepared and enclosed with this letter. It is proposed that the

procedure may be discussed in the forthcoming OCC meeting of each region. The procedure would

be finalised after suitably incorporating the comments received during these meetings.

With Regards,

Yours Sincerely

0\~ pV.K. Agrawal

ED,NLDC

POSOCO

Copy to:

Member (GO&D), CEA

Director(Operations), POWERGRID

CEO POSOCO

EDSRLDC

GM NRLDC, WRLDC, ERLDC,NERLDC

~ ~ ~ CfilllT('1ll: ~·9. ~ ~!{T"f(ij"" ~, Cficc:llf"{lll mP1, ~ ~-110016Registered & Corporate Office: 8-9, Qutab Institutional Area. Katwaria Sarai, New Delhi - 110016

Page 36: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

 

 

 

 

 

 

 

 

Procedure for Transmission Elements Outage Planning 

 

 

 

 

 

 

 

March 2013 

 

 The procedure aims to streamline the process of outage coordination between RLDCs, NLDC, RPCs and Indenting Agencies  

Page 37: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

1. Introduction 

Reliable  operation  of  the  All  India  grid  is  important  from  the  view  point  of Quality Of Service  (QoS) to the customers and other stakeholders. Proper co‐ordination of transmission outages  in the system  is one of the key aspects to ensuring  reliability. Outages  in  the  transmission  network  could  either  be  on account of planned maintenance activities or construction related activities or any  emergency  conditions  arising  in  the  field.  Proper  coordination  of transmission element outage is important mainly due to the following factors: 

i. Reliability of operation of the All India grid 

ii. Certainty to the electricity markets. 

iii. Proper  crew  resource mobilization at  the work  sites  to ensure  that outage time is minimized. 

iv.  Proper  coordination  of  works  by  different  entities  to  ensure  that outage time is optimised.  

  

Outage  Coordination  has  been  one  of  the  important  functions  of  Regional Power  Committees  (RPCs),  Regional  Load  Despatch  Centres  (RLDCs)  and National  Load  Despatch  Centre  (NLDC)  and  is  the  first  stage  of  operational planning.  As  per  Indian  Electricity  Grid  Code  (IEGC),  the  responsibility  to undertake  planning  of  outage  of  transmission  system  has  been  assigned  to RPCs. The outages of the inter‐state transmission lines and intra state elements which  are  important  for  the  region  are  being  coordinated  by  RLDCs.  In  the cases where  the  outages may  have  an  impact  across  two  or more  regions, coordination is in consultation with NLDC.  The relevant clauses of IEGC in this regard are quoted below: 

“2.4.2 The following functions which go to facilitate the stability and smooth operation of the systems are identified for the RPC: 

………… (e) To undertake planning of outage of transmission system on annual / monthly basis.” 

“2.3 Role of RLDC 

Page 38: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

 2.3.1.1The  Regional  Load Despatch  Centre  shall  be  the  apex  body  to  ensure integrated operation of the power system in the concerned region”  “2.2  Role of NLDC  ……..  (f)  Coordination  with  Regional  Power  Committees  for  regional  outage schedule  in  the  national  perspective  to  ensure  optimal  utilization  of  power resources.”  2. Objective 

At  present,  planned  outages  are  being  discussed  in  respective  Operation Coordination  Committee  (OCC) meeting  of  RPCs  and  availed  based  on  the actual grid  conditions and/or any  changes  requested by  transmission  system owner  or  transmission  element  outage  indenting  agency.  The  approval  of planned as well as emergency outages in the transmission network level in real time is being coordinated by RLDCs and NLDC based on system conditions. The procedure  aims  to  streamline  the  process  of  outage  coordination  between RLDCs, NLDC, RPCs, owners of  transmission assets and  transmission element outage  Indenting  Agencies.  As  outage  planning  is  an  important  part  of operational planning, multi‐layered checks would help in ensuring reliability of the power system. These checks need to be at the following levels: 

• Due diligence between  the agencies  involved  in  the  transmission asset maintenance through bilateral discussion. 

• Study sub‐committee of RPCs. 

• Operation Co‐ordination sub‐Committee of RPCs 

• Off‐line simulations and planning at RLDCs/NLDC level 

• Real time check at RLDCs/NLDC level 

3. Scope 

The procedure is applicable to RPCs, RLDCs, NLDC, SLDCs, STUs, load serving entities and indenting agency. It would be applicable once the annual outage 

Page 39: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

plan is finalized by 31st December of each year for the next financial year by the RPCs as per the IEGC. 

4. Procedure for discussing outages in OCC meeting. 

4.1. Indenting Agency:  The agency which gives the requisition for outage of any transmission element shall be called Indenting Agency. Any of the following may request for outage of any transmission elements: 

4.1.1. Transmission Licensees / State Transmission Utilities 

4.1.2. Generating Companies 

4.2. Indenting Agency shall submit  the proposed shutdown  for  the next calendar month  latest by 3rd day of  the  current month  to  the RPC Secretariat as per Format IA / Format IB. 

4.3. In  case  of  shutdown  of  inter‐regional  lines  and  intra‐regional  lines affecting  the  transfer  capability  of  any  inter  regional  corridor,  the Indenting  agency  shall  submit  the  shutdown  proposal  in  both  the concerned RPCs. To facilitate this broad list of such lines is indicated at Annexure  II which will be  reviewed  and  updated  by NLDC  from time to time. The  indenting agency may do an  internal screening of its  outage  plan  centrally  to  avoid  multiple  outages  in  the  same corridor  simultaneously.  Bilateral  discussion  between  the  agencies involved  may  also  be  done  to  minimize  outage  duration  before submitting the outage plan to RPCs. 

4.4. RPC Secretariat shall compile all  the  received proposals and put up the same on  its website by 5th day of the month as per Format IIA / Format IIB. 

4.5. System Study sub‐committee of RPCs shall study the impact of these outages  and  based  on  its  recommendations,  RPC  shall  discuss proposed outages in the OCC meeting and prepare a list of approved transmission outages with the precautions to be taken. RPCs would attempt to schedule all their OCC meetings between 10th to 15th day of  the month  so  that  sufficient  time  is available both  to  the  Study Committee  before  the  OCC  meetings  as  well  as  for  RLDCs/NLDC 

Page 40: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

(mainly  to  take  care  of  further  changes  in  the  network  topology and/or in load generation) after the OCC meeting. 

4.6. While approving  the  shutdowns  it  shall be ensured  that outages  in the same corridor shall not be approved simultaneously. It also need to be ensured that all other concerned entities should also complete their work during  the shutdown period so as multiple  shutdown of same  element  for  work  by  multiple  agencies  are  avoided.  The multiple  outages  of  the  transmission  element  for  the  same  work during the year may also be avoided.  

 

4.7. RPC  shall  send  the  list  of  approved  transmission  outages  to SLDCs/RLDCs/NLDC within 3 days of the OCC meeting and preferably latest by 18th of the month as per Format IIIA / Format IIIB. The same shall also be displayed on RPC websites. 

4.8. Any shutdown proposal which requires approval of two RPCs shall be considered approved only if it is approved in both the RPCs. 

4.9. After the receipt of Format IIIA / Format IIIB from each RPC, NLDC in consultation  with  RLDCs  may  prepare  a  tentative  readjusted timings/dates  of  transmission  element  outages  for  next  month considering the principles set out in this procedure. 

 

5. Approving Load Despatch Centre  and Consenting Load Despatch Centre 

5.1. Approving  Load  Despatch  Centre:  The  Load  Despatch  Centre responsible  for  approving  any  transmission  outage  shall  be  called Approving Load Despatch Centre. 

5.2. Consenting  Load  Despatch  Centre:  The  agency  whose  consent  is required  by  Approving  Load  Despatch  Centre  for  approving  any outage  shall be  called Consenting  Load Despatch Centre  .Once  the RPCs approve the monthly outage plan, the responsibility of approval of outages shall be as under: 

Page 41: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

Sl.No  Type of Outage  Consenting Load Despatch Centre 

Approving Load Despatch Centre 

1  765 kV or above Lines Concerned RLDCs 

NLDC 

2  Inter‐Regional Lines  Concerned RLDCs 

NLDC 

3  HVDCs  Concerned RLDCs 

NLDC 

4  International Interconnections  

Concerned RLDC NLDC 

5  Intra‐Regional  Lines affecting  transfer capability  of  any  inter regional corridor. 

Concerned RLDCs 

NLDC 

6  Intra‐Regional  Lines which  does  not  affect transfer  capability  of  any inter  regional  corridor and  included  in the  list of important  elements  of RLDCs    (excluding  lines covered under sl no.1,3,4 and 5) 

SLDCs RLDCs 

7  All  other  lines  (excluding sl no. 1,2,3,4,5,6) 

SLDC SLDC 

 

6. Procedure for approval of outage on D‐3 basis  

 

6.1. Planned Outages which have been approved in the OCC meeting of a region shall be considered for approval by RLDCs/NLDC on D‐3 basis. If an outage is to be availed on say 10th of the month, the  indenting agency would forward such requests to the concerned RLDC on 7th of the month by 1000 hours.  This practice  is necessary  to  realize  the seriousness and readiness of the agency which  indented the outage request in the first place as it is observed that many outages are not 

Page 42: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

availed  as  per  the  monthly  schedule.  In  case  the  request  for transmission  element  outage  is  not  received  within  the  timeline prescribed above, it will be assumed that the indenting agency is not availing the outage. 

6.2. Request for outages which are approved by OCC must be sent by the owner  of  the  transmission  asset  at  least  3  days  in  advance  to respective RLDC by 1000 hours as per Format IV.  

6.3. In case the owner is not availing the OCC approved outage, the same shall be intimated to the respective RLDC at least 3 days in advance. 

6.4. Planned Outages which are approved  in OCC meeting  shall only be considered for approval on D‐3 basis. 

 

 

6.5. Approval of Outage where Approving Authority is NLDC 

6.5.1. RLDCs  shall  forward  the  request  for  shutdown  along with  their consent and observation as per Format V to NLDC/other concerned RLDCs  with  clear  observations  regarding  possible  constraints  / contingency plan and consent including study results by 1000 hours of  D‐2  day.  Other  concerned  RLDCs  would  forward  their observations/consent/reservations by 1600 hours of D‐2. 

 

6.5.2. NLDC  shall  approve  the  outage  along  with  the  clear precautions/measures  to  be  observed  during  the  shutdown  and inform all concerned RLDCs.  

 

6.5.3. The  proposed  outages  shall  be  reviewed  on  day  ahead  basis depending  upon  the  system  conditions  and  the  outages  shall  be approved/refused latest by 1200 Hrs of D‐1 day. A suggestive format for approval of outage is enclosed as Format VI.  

Page 43: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

 

6.5.4. In  case  the  outage  is  approved  precautions/measures  to  be observed  during  the  shutdown  shall  be  stated.  In  case  of  refusal, clear reasons shall be stated by the RLDCs/NLDC. 

6.5.5. Outages  impacting  the  transfer  capability  of  more  than  one corridor shall not be allowed simultaneously. 

 

Sl No  Activity  Day Time 1  Request of shutdown from 

Indenting agency to concerned RLDC. 

D‐3 1000 hrs 

2  Forwarding request of shutdown requiring NLDC approval from RLDC to other concerned RLDCs and NLDC (along with the recommendations and study result) 

D‐2 1000 hrs 

3  Comments of other RLDCs or NLDC 

D‐2 1800 hrs 

4  Approval or Rejection of Request 

D‐1 1200 hrs 

 

6.6. Approval of Outage where Approving Authority is RLDC 

6.6.1. In  case  the  indenting  agency  is  a  state  entity,  the  request  for transmission element outage shall be submitted to respective state load  despatch  centre  (SLDC).  SLDC  shall  forward  the  request  for shutdown along with their consent and observation as per Format V to RLDC.  

6.6.2. In  all  other  cases,  the  request  for  transmission  element  outage shall be submitted to respective RLDC. 

6.6.3. RLDC  shall  study  the  impact of proposed outages and approve  / refuse  the  outage  latest  by  1200  Hrs  of  D‐1  day.  A  copy  of  the 

Page 44: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

approval / refusal shall also be sent to NLDC (for 400 kV and above lines).  A  suggestive  format  for  approval  /  refusal  of  outage  is enclosed as Format VI.  

6.6.4. In  case  the  outage  is  approved  precautions/measures  to  be observed  during  the  shutdown  shall  be  stated.  In  case  of  refusal, clear reasons shall be stated by the SLDCs/RLDC 

6.6.5. Outages  in  the  same  corridor  shall  not  be  approved simultaneously shall be rescheduled accordingly. 

 

6.7. Approval of Outage where Approving Authority is SLDC 

6.7.1. SLDC  shall  study  the  impact of proposed outages on  the  system and approve the outage latest by 1200 Hrs of D‐1 day. The format VI as suggested above can be used for approval / refusal of outage. 

6.7.2. Outages  in  the  same  corridor  shall  not  be  approved simultaneously and shall be rescheduled accordingly. 

6.8. In  case  of  any  system  constraint  or  any  other  reason,  approving authority may decline the proposed outage by giving the reasons for the same and tentative dates for the shutdown. 

6.9. In  case, any approved outage  is not availed  in  real  time,  the  same may  not  be  allowed  again  in  that  month.  In  such  a  scenario, indenting agency shall be required to submit a fresh proposal in the next OCC meeting. 

6.10. A  list of all approved outages  for  the next day must be available  in the  RLDCs/NLDC  control  room  by  1900  hours  with  a  copy  of  the study  results and special precautions,  if any. This would be  studied by the night shift engineers so that the outage can be facilitated the next day morning. 

 

 

Page 45: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

7. Approval of Emergency Outages 

7.1. All outages which are not approved  in  the OCC meeting but having impact on human and equipment  safety and/or  to meet any other emergency  requirement  or  special  conditions  shall  be  considered under Emergency Outage category. 

7.2. The request for emergency outage shall be submitted along with the details  like  nature  of  emergency,  impacts  due  to  emergency situation,  reasons  and  associated  facts  for  not  considering  in  the outage planning process.  

7.3. Emergency  outages  shall  be  allowed  subject  to  system  conditions and  its  severity.  In  this  case,  if  required,  planned  outage may  be deferred, if possible. 

7.4. Emergency outages shall be allowed immediately or within the short possible  time, based on  the  severity of  the emergency and  system condition on instance to instance basis. 

 

8. Availing Outages in real time 

8.1. The  agencies  involved  shall  ensure  availing  of  outages  as  per  the approved schedule time. 

8.2. On the day of outage, the outage availing agency shall seek the code for  availing  outage  from  respective  RLDC(s)  /NLDC  (wherever applicable).  The  agencies  involved  shall  endeavour  to  avail  the outage with  in 15mintues of availing the code but not  later than 30 minutes.  In  case, due  to any  contingency,  the outage  could not be availed within 30 minutes, a fresh code needs to be obtained by all concerned agencies stating the reason there of Record of scheduled and  actual  time  of  outage  and  restoration  shall  be maintained  at RLDCs/NLDC. 

8.3. RLDCs  shall  prepare  a monthly  statement  of  scheduled  and  actual time of outage and restoration and  forward the same to RPC  latest 

Page 46: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

by 05th day of  the next month with a  copy  to NLDC. The  format  is enclosed as Format VIIA / Format VIIB. 

8.4. SLDCs  shall  prepare  a monthly  statement  of  scheduled  and  actual time of outage and restoration and  forward the same to RPC  latest by 05th day of  the next month with a copy  to concerned RLDC. The Format  VIIA  /  Format  VIIB  as  suggested  above  can  be  used  for sending the report to RPCs. 

8.5. RLDCs/NLDC  shall  develop  a  separate  web  based  portal  for information exchange subsequently, which would dispense with the need for emails. 

8.6. As any deviation  in  the outage  from  the  schedule  can affect other planned outages as well as affect  reliability and electricity markets, indenting agency must strictly adhere to the shutdown timings. 

 

9. Normalisation of Outages 

9.1. All  effort  shall  be made  by  the  Indenting  agency  to  normalise  the shut  down  within  approved  time  period  so  that  the  transmission element is normalised within the approved time period.   

9.2. On completion of the outage work, the outage availing agency shall seek the code for normalisation of elements from respective RLDC(s). The agencies involved shall endeavour to normalise the outage with in 15mintues of availing  the  code but not  later  than 30minutes.  In case, due  to any contingency,  the normalisation could not be done with  in  30minutes,  a  fresh  code  needs  to  be  obtained  by  all concerned agencies stating the reason thereof.   

9.3. In  case  of  extension  of  a  shutdown,  the  Indenting  agency  would furnish the reasons of extension, and expected normalisation time to concerned  RLDC/SLDC  at  least  one  hour  before  the  scheduled normalisation time.  

9.4. Under  such  circumstances  SLDCs/RLDCs/NLDC  shall  review  the impact  of  such  delay  on  the  shutdown  already  approved 

Page 47: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

transmission  system  and  would  reserve  the  right  to  review  for according/cancellation of the shutdown. 

9.5. In case of repeated delay in normalisation of outages by any agency, the same shall be reported by SLDCs/RLDCs/NLDC to RPCs. 

 

10. Request for charging new elements 

10.1. Owner  of  the  transmission  asset  shall  submit  the  request  for probable charging new elements for the next calendar month  latest by 3rd day of the current month to the RPC Secretariat. 

10.2. System  Study  sub‐committee  of  RPCs  shall  study  the  impact  of charging of new elements and based on  its  recommendations, RPC shall  discuss  the  requests  for  charging  new  elements  in  the  OCC meeting and prepare a list of new elements to be charged during the next  calendar month  along with  the  precautions  to  be  taken.  RPC shall send the list of new elements to be charged within 3 days of the OCC meeting and latest by 18th of the month. The same shall also be displayed on RPC websites. 

10.3. The  owner  of  the  new  transmission  element  shall  inform  the concerned SLDC  / RLDC  / NLDC about  the  charging of  the element atleast 3 days in advance. 

10.4. SLDCs  /  RLDCs  /  NLDC  shall  study  the  charging  of  all  400  kV  and above new elements and prepare  charging  instructions which  shall be forwarded to the asset owner along with the study results with a copy to NLDC. 

Page 48: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

List of Annexures 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sl No.  Format / Annexure No 

Title  From

(Agency) 

To 

(Agency) 

1  Annexure I  Flow Chart of Transmission Outage Planning 

 

2  Annexure II  Important Elements of NLDC 

   

Page 49: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

List of Formats 

1  Format IA  Request For Transmission Element Outage 

IndentingAgency 

RPC 

2  Format IB  Request For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc Outage 

Indenting Agency 

RPC 

3  Format IIA  List of monthly proposed shutdowns of Transmission Lines 

RPC Website 

4  Format IIB  List of monthly proposed shutdowns of  Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc 

RPC Website 

5  Format IIIA  List of monthly approved shutdowns of Transmission Lines 

RPC NLDC/RLDC/SLDC

6  Format IIIB  List of monthly approved shutdowns of  Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc 

RPC NLDC/RLDC/SLDC

7  Format IV  Request for Transmission Element Outage 

Indenting Agency 

RLDC/SLDC 

8  Format V  Request for Transmission Element Outage 

RLDC  NLDC 

9  Format VI  Approval of Outage  RLDC / NLDC 

Indenting Agency/RLDC 

10  Format VIIA  Monthly Shutdown Report For Transmission Lines 

SLDC/RLDC RPC 

11  Format VIIB  Monthly Shutdown Report For For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc 

SLDC/RLDC RPC 

Page 50: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

 

 

 

 

 

Page 51: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

LINK Voltage Level Inter Regional Lines OWNER No. of Circuit

HVDC Link Vindhyachal Back to Back (500 MW) PG -

Agra-Gwalior I ( 765kV operated at 400kV) PG Single Circuit

Agra-Gwalior II ( 765kV operated at 400kV) PG Single Circuit

Kankroli-Zerda PG Single Circuit

Bhinmal-Zerda PG Single Circuit

Kota-Badod RAJ-MP Single Circuit

Morak-Badod RAJ-MP Single Circuit

Auraiya-Mehgaon MP-MP Single Circuit

Auraiya-Malanpur MP-MP Single Circuit

Neemuch-Udaipur MP-RAJ Single Circuit

Seopar Kalan-Sawai Madhopur MP-RAJ Single Circuit

Ranapratap Sagar-Gandhi Sagar RAJ-MP Double Circuit

Rihand-Morwa UP-MP Single Circuit

Rajghat-Lalitpur MP-UP Single Circuit

HVDC Link Bhadravati Back to Back (2x500 MW) PG -

Chikkodi- Kolhaphur KAR-MAH Double Circuit

Ambewadi-Ponda KAR-GOA Single Circuit

Ambewadi-Xeldem KAR-GOA Single Circuit

Rourkela-Raigarh PG Circuit III & I

Raigarh-Sterlite PG Circuit II & IV

Ranchi-Sipat PG Double Circuit

Budhipadar-Raigarh OD-CH Single Circuit

Budhipadar-Korba(East) OD-CH Circuit II

Budhipadar-Korba(East) PG Circuit III

Sasaram Back to Back (500 MW) PG

Sasaram-Saranath (400KV) PG Single Circuit

Sasaram-Allahabad (400KV) PG Single Circuit

765KV Gaya-Sasaram-Fatehpur PG Single Circuit

Muzaffarpur-Gorakhpur PG Double Circuit

Patna-Balia PG Four Circuits

Biharshariff-Balia PG Double Circuit

Sasaram-Balia PG Single Circuit

220KV Pusauli-Sahupuri BR-UP Single Circuit

Sone nagar-Rihand BR-UP Single Circuit

Garwah-Rihand BR-UP Single Circuit

Karmanasa-Sahupuri BR-UP Single Circuit

Karmanasa-Chandauli BR-UP Single Circuit

400 KV Jeypore-Gazuwaka Back to Back PG Double Circuit

HVDC Link Talcher-Kolar Bipole PG -

400KV Binaguri-Bongaigaon PG Double Circuit

220KV Birpara-Salakati PG Double Circuit

NR-Nepal 132 KV Tanakpur-Mahendernagar UK-NEP Single Circuit

132 KV Salakati - Geylegphug PG Single Circuit

132 KV Rangia -Matonga AS-BHU Single Circuit

400KV Binaguri -Tala-I & II ( India portion) PG Double Circuit

400KV Binaguri -Tala- IV ( India portion) PG Single Circuit

400KV Binaguri -Malbase - III ( India portion) PG Single Circuit

220KV Birpara - Chukha - I & II ( India portion) PG Double Circuit

220KV Birpara - Malbase ( India portion) PG Single Circuit

220kVWR-SR

ER-BHUTAN

220KV

ER-NER

400KV

132KV

NER-BHUTAN

ER-SR

TRANS NATIONAL LINK

HVDC Link

ER-NR

INTER REGIONAL LINK

Annexure II

WR-NR 220KV

132KV

400KV

IMPORTANT GRID ELEMENTS

Page 52: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

REGION Voltage Level Inter Connection OWNER No. of Circuit

NR +/- 500KV HVDC RIHAND-DADRI BIPOLE PG -

NR +/- 500KV HVDC BALIA-BHIWADI BIPOLE PG -

WR/NR +/- 500KV HVDC MUNDRA-MOHINDERGARH- BIPOLE * APL -

WR +/- 500KV HVDC CHANDRAPUR-PADGE BIPOLE MSETCL -

765KV ANPARA C-UNNAO UPPCL SINGLE

765KV BALIA-LUCKNOW PG SINGLE

765 KV FATEHPUR-AGRA PG SINGLE

765KV MOGA-BHIWANI(PG) PG SINGLE

765KV JHATIKARA-BHIWANI PG SINGLE

765KV SIPAT-BILASPUR 1 PG SINGLE

765KV SIPAT-BILASPUR 2 PG SINGLE

765KV SEONI-BILASPUR 1 PG SINGLE

765KV SEONI-BILASPUR 2 PG SINGLE

765KV SEONI-WARDHA 1 PG SINGLE

765KV SEONI-WARDHA 2 PG SINGLE

765KV BINA-SATNA 1 PG SINGLE

765KV BINA-SATNA 2 PG SINGLE

765KV SEONI-BINA PG SINGLE

* A dedicated transmission system set up by M/s Adani Power Ltd.

HVDC AND 765KV LINES ( EXCLUDING INTER REGIONAL LINKS)IMPORTANT GRID ELEMENTS

NR

WR

Page 53: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

1 KANKROLI RAPP - C- I & II 400 WR-NR

2 SINGRAULI STPS HVDC VINDHYACHAL 400 WR-NR

3 SINGRAULI STPS ANPARA 400 WR-NR

4 Bhiwani PG Mohindergarh D/C 400 WR-NR

1 Bina Gwalior I & II 400 WR-NR

2 Bina Shujalpur I & II 400 WR-NR

3 Raipur Bhadravati I 400 WR-SR, W3

4 Raipur Bhadravati II & III 400 WR-SR,W3

5 Bhadravati Bhilai 400 WR-SR,W3

6 Bhilai Koradi 400 W3

7 Seoni Bhilai 400 W3

8 Korba Vindhyachal 400 W3

9 Korba Mahan 400 W3

10 Soja Zerda 400 WR-NR

11 Ranchodpura Zerda 400 WR-NR

12 Mundra Sami 400 WR-NR

13 Raipur Wardha I & II 400 W3

14 Wardha Akola I & II 400 W3

1 RAMAGUNDAM BHADRAVATI I & II 400 WR-SR

2 RAMAGUNDAM N'SAGAR I & II 400 WR-SR

3 JEYPORE GAZUWAKA I & II 400 ER-SR

4 Vijayawada Nellore I & II 400 ER-SR

1 PURNEA MUZAFFARPUR 400 ER-NER &ER-NR

2 BIHARSHARIFF SASARAM - I & II 400 ER-NR

3 BIHARSHARIFF SASARAM - III 400 ER-NR

4 MALDA PURNEA I & II 400 ER-NER &ER-NR

5 Kahalgaon Banka I &II 400 ER-NER &ER-NR

6 Banka Biharshariff I & II 400 ER-NER &ER-NR

7 Kahalgaon Biharshariff I & II 400 ER-NER &ER-NR

8 TALCHER GMR 400 ER-SR

9 GMR MERAMUNDALI I & II 400 ER-SR

10 TALCHER ROURKELA I & II 400 ER-SR

11 KHARAGPUR KOLAGHAT 400 ER-SR

12 KOLAGHAT BARIPADA 400 ER-SR

13 FARAKKA MALDA 400 ER-NER &ER-NR

14 MAITHON KAHALGAON I & II 400 ER-NR

15 JEYPORE INDRAVATI 400 ER-SR

16 JEYPORE BOLANGIR 400 ER-SR

17 BOLANGIR MERAMUNDALI 400 ER-SR

18 Kahalgaon Barh I & II 400 ER-NR

19 Sterlite ROURKELA (LILO) II & IV 400 W3-ER

19 Rengali Keonjhar 400 ER-SR

20 Keonjhar Baripada 400 ER-SR

1 Balipara Bongaigaon I & II 400 ER-NER

2 Bongaigaon TPS (BTPS) Salakati I & II 220 ER-NER

3 Agia Sarusajai I & II 220 ER-NER

4 Balipara Samaguri 220 ER-NER

TTC / ATC impact

NORTH EASTERN REGIONSL NO FROM TO VOLTAGE

KV

SOUTHERN REGION

SL NO FROM TO VOLTAGE KV TTC / ATC impact

TTC / ATC impact

EASTERN REGIONTO VOLTAGE

KVSL NO FROM

IMPORTANT GRID ELEMENTS

NORTHERN REGIONSL NO FROM TO VOLTAGE

KV TTC / ATC impact

IMPORTANT LINES HAVING IMPACT ON TTC/ATC

WESTERN REGIONTTC / ATC impactSL NO FROM TO VOLTAGE

KV

Page 54: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Annexure I

Flow Chart: Transmission Elements Outage Planning

Inputs Activity Timelines

START

Preparation of Annual

Outage Plan by RPCs

Preparation of list of

proposed outages for next

calendar month by RPCs

Monthly review of

outage plan for next

calendar month

Finalization of outages for

next calendar month in the

OCC meeting

RPC shall display the annual

outage plan on their website by

31st December each year for the

next financial year

5th day of a month

In the OCC meeting

Latest by 15th of every

month for the next

month

Latest by last day of every

month

RPC to send list of

approved outages to

SLDCs/RLDCs/NLDC

Within 3 days of the OCC

meeting and preferably

latest by 18th of the

month

Recommendations of

Study Sub Committee

of RPCs to the OCC

Moderation of Outages

by NLDC in consultation

with RLDCs

Future Outage

plan of all

entities

Outage requests from

indenting agency to

RPCs by 3rd day of

current month

Submission to

RPC by 31st Oct

every year

Page 55: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Requisition for outage by

requesting agency to

RLDC/SLDC

Approval /

Refusal of

outage by

NLDC

Approval /

Refusal of outage

by RLDC/SLDC

NLDC

RLDC to forward

outage request

to NLDC along

with comments

Approving

Authority

RLDC to study the

impact of Outage on

IR Corridor

RLDC / SLDC

Latest by 1200 Hrs of D-1

day

Latest by 1000 Hrs of D-3

day where D is the day of

outage

Latest by 1000 Hrs of D-2

day

Monthly statement of

approved shutdowns by

RLDCs/SLDCs to RPCs

Latest by 5th day of next

month for the previous

month

STOP

Execution and

Normalisation of Outage As per approved timings and

Subject to real time

conditions. In case the

shutdown is required to be

postponed, revised dates

would be suggested

SLDC to study the

impact of Outage and

gives its comments

Comments

from other

RLDCs NO YES

Page 56: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time Remarks

Format I(A): Request For Transmission Element Outage by Indenting agency to RPC

Line Details Proposed Date and TimeFor the MonthIndenting Agency

Page 57: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time RemarksName of the Element

Line Details Proposed Date and Time

Format I(B): Request For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc Outage by Indenting agency to RPC

Indenting Agency

Page 58: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time Remarks

Line Details Proposed Date and Time

Format II(A): List of Received Proposals for Transmission Element Outage from Different Agencies

Name of the RPC For the Month

Page 59: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time RemarksName of the Element

Format II(B): List of Received Proposals for Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc Outage from Different Agencies

Name of the RPCLine Details Proposed Date and Time

Page 60: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Issue Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

Control Area/ Corridor impacted Remarks

Format III(A): List of OCC approved shutdowns of  Transmission Lines

Line Details Approved Date and TimeProposed Date and TimeName of the RPC

Page 61: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

For the Month Issue Date

Sl.No.

Name of the Requesting Agency

Voltage Level (kV) Owner Ckt ID

Inter Regional / Intra Regional

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

Control Area/ Corridor impacted Remarks

Format III(B): List of OCC approved shutdowns of  Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc

Approved Date and TimeName of the RPC

Name of the Element

Line Details Approved Date and Time

Page 62: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format IV: Request for Transmission Element Outage by

Indenting Agency to RLDC/SLDC

Name of the Requesting Agency: Address of the Requesting Agency:

Name of the element :

Voltage Level : Owner : OCC Approved (Yes/No) : OCC Reference No. : Duration of Outage : From Date- To Date- From Time- To Time- Daily/Continuous : Reason for Outage : Approving Authority :

( ) Signature

Place: Date: Time:

Page 63: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format V: Request for Transmission Element Outage by

RLDC to NLDC Name of the Requesting Agency: Name of the element :

Voltage Level (kV) : 765/400/220/230/132 Owner : OCC Approved : Yes/No OCC Reference No. : Duration of Outage : From Date- To Date- From Time- To Time- Type : Daily / Continous Reason for Outage : Consent : Yes / No Study Conducted : Yes / No Results of Study Attached: Yes / No Revision in TTC Required: Yes/No If Yes,

Conditions:

( )

Signature Place: Date: Time:

Sl.No. Corridor Original TTC Revised TTC Limiting Constraint

Page 64: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Format VI: Approval /Refusal of Outage by

NLDC/RLDCs/SLDCs

___________Load Despatch Centre

<Address>

<Tel No.> <Fax No.>

Approval / Refusal for Shutdown

Approval / Refusal No: Date: Time:

From: To:

Sl No

Element Start End S/D Type*

Reason

Date Time Date Time

* C: Continuous Basis, D: Daily Basis

Remarks

<Precautions/measures to be observed during the shutdown> / <Reasons for

Refusal>

Signature

Copy to:

1.

2.

3.

Page 65: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Sl.No.Reuesting Agency

Approving Authority

Approval Number

Voltage Level (kV)

From Substation

To Substation Owner Ckt ID

Inter Regional / Intra Regional

Planned / Emergency

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time Revision in TTC Remarks

Format VII(A): Monthly Shutdown Report For Transmission Lines by RLDCs/SLDCs

Approval Details Line Details Outage Details Scheduled  Date and Time Actual Date and TimeDate and Time requested 

by Indenting Agency

Name of the RLDC/SLDC For the Month Issue Date

OCC Approved              Date and Time

Page 66: To, - Kar · Outage Coordination has been one of the important functions of Regional Power Committees (RPCs), Regional Load Despatch Centres (RLDCs) and National Load Despatch Centre

Sl.No.Reuesting Agency

Approving Authority

Approval Number

Voltage Level (kV) Owner

Inter Regional / Intra Regional

Planned / Emergency

Daily/ Continous Reason

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time

From Date

From Time

To Date

To Time Revision in TTC Remarks

Format VII(B): Monthly Shutdown Report For For Bus, Bay, ICTs, Reactor, FACTS, FSCs, SVCs etc by SLDCs/RLDCsName of the RLDC/SLDC For the Month Issue Date

Actual Date and TimeOCC Approved              Date and Time

Name of the element

Approval Details Line Details Outage Details Scheduled Date and TimeDate and Time requested by 

Indenting Agency