tuesday 22.5.2012
DESCRIPTION
Tuesday 22.5.2012. Tuesday. 6:30 injection beam after collimator problems sorted out 7:17 dump by interlock BPMs: pilot being excited by the injection cleaning Switched off injection cleaning for the third injection for the next fill. 8:48 – 4: 24 stable beams fill# 2651 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/1.jpg)
2012-05-238:30 meeting EBH 11
Tuesday 22.5.2012
![Page 2: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/2.jpg)
2012-05-238:30 meeting EBH 2
![Page 3: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/3.jpg)
2012-05-238:30 meeting EBH 3
6:30 injection beam after collimator problems sorted out 7:17 dump by interlock BPMs: pilot being excited by the
injection cleaning Switched off injection cleaning for the third injection for the next fill.
8:48 – 4: 24 stable beams fill# 2651 5.8 1033 cm-2s-1 peak Luminosity 1.43 1011 average bunch intensity at injection – rather big
variations Delivered 205 pb-1
average to Atlas and CMS in 19:35 hours
Tuesday
![Page 4: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/4.jpg)
2012-05-238:30 meeting EBH 4
![Page 5: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/5.jpg)
2012-05-238:30 meeting EBH 5
15:18 the B1 bunches #1, #2 and #4 all of a sudden experienced a sharp loss (collisions in IP8 only)
![Page 6: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/6.jpg)
2012-05-238:30 meeting EBH 6
Bunch intensities and losses after 15 h collisions
![Page 7: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/7.jpg)
2012-05-238:30 meeting EBH 7
4:24 beam dumped by operator 6:00 re-injecting lengthened by issues with the SPS bunch length 8:00 filling again
Wednesday Morning
![Page 8: Tuesday 22.5.2012](https://reader030.vdocuments.net/reader030/viewer/2022032606/56812cd3550346895d918d9f/html5/thumbnails/8.jpg)
2012-05-238:30 meeting EBH 8
The request for abort gap cleaning was changed from 5e9 to 1e10 for beam 1 only.
BSRT and especially the AGM: closing of application should not affect operation
Take Soft Start data immediately after a beam dump at full energy when the MKIs are close to or above the MKI temperature interlock threshold
Take measurements (manual at the time being) head-tail monitor – investigate automatic triggering, possibly on BBQ amplitude
Vacuum will need an access to repair a pumping group in S45 (not urgent)
Varia