The following is a record of what was done during the last working week and a forecast of the Next week.....
Initial Points
Projects and Deadlines
Design
Installation Panel Build
Mater Dei Hospital PPM
Business Development
As of Monday 6th Feb Kimberly Gijsbers (Dutch Nationality) will be joining ESI. Kimberly will be assisting TBr and KJa in Sales Department. She is going to stay with us till 16th June 2017.
Note that I will be on long leave from 13th Feb to 24th Feb (both days
included)
Some Points Before Starting
Also note that Shridar will be on long leave from 17 Feb 2017 to 20th
March
Projects and Deadlines
16_051_Baxter_AHU
Project put to sleep – well done to all!! Some minor snags but on in all done-
Dennis to address the snags pending- there are also some issues regarding un stable velocity readings which Trevor is taking care of
16_041_RSM_Security
We have done some good progress here – well done to all pulling the ropes!!!
We need to close off here – the sooner the better
16_025_DeLaRue_OFX
Design will be ready this week , materials have been delivered and training by overseas specialists was delivered last week- thanks to CFH/TBR/MPA on organising the required logistics
14_069_OTM Additions
Q019 AS410 – We are proceeding with works here in conjunction with Gruppo Sett in Italy- our high level target is to change over in May/June 2017
Q021_TF4- Panel is on site and installed- we need to power up and start connecting and powering up MOVs- we have made some target dates which we need to keep
16_007_LeMeridien
We have started working on phase 1 panels – phase 1 which has to be completed by Feb 2017-
We have so far done 2 panels – we need to do 5 by end of Feb 2017- so we are a little behind here
Projects and Deadlines
16_023_GGY
We have some snags pending (Savant with Android TV, integration with Acs, under floor heating functionality) - we also have to transfer the old GGY system to the new platform
15_011- Sliema apartments
We have done most terminations and panel build is completed too. We are trying to finalise the installation and then testing and commissioning would be next... The completion date here is for March 2017
15_023_FM panels
We have a new 2 panels for FM environmental (D5M-110) ... The delivery date is not know – design is completed
We have also received a new order for D20 ASRD400 - DU_P D/A- it is to be completed by first week of March 2017- this will be done by a new sub contracted panel builder
16_058_Methode
Another fast tack project Jace Based AHU control system here –Panel design is completed
Panel build to start on Monday/Tuesday - use required overtime to complete- Installation to commence with cable pulling by Sub contractors – for this project , in my absence, I will need Dennis/Clifton and Claudio to take over and ensure we deliver on time
14_083_Interconti
We have commissioned the system with snags - we will return to site when snags are done by others-
we also have to deliver the pool panel
Projects and Deadlines
12_043_LSP
We have an important and urgent snag to be rectified ASAP – treating the rust on enclosures
There are some points on the tenant billing application which we are tackling
13_031_CCA
We have a number of snags here , which are to be put to bed once and for all!!
The snags are centred around the AC controls and the NUOO CCTV system
12_027- Parliament
We have finalised the documentation and eventually need to integrate ProWatch.
15_038_new_HA_Ovt and 15_026_Apap
Residence
These two home automation projects are now urgent- we need to complete all installation
We also need to start working of the software development- they are urgent and we have to perform
14_08_Siggiewi School-
We have made a commitment to do training1. Training/ Data gathering and back up / Preventative maintenance on hardware /Transfer of server to SHE set up at MITA/Reactive maintenance/emergency call outs/Fine tuning / re commissioning of louvers
Projects and Deadlines
12_025_SCM PH2
The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION- SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this
13_070- SCM Lagoona Plant room
We need to conclude all pending installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue
13_075_Bosch_ProWatch_Genetec_Interface
The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission
01 02 03 04
DesignFor the Past week we have been working on the following
Completed RSM Security Panel DrawingsRSM Security DAC Drawings
Methode – released MCC-SMT for Panel BuildingMethode- populated ‘Notes for Programmers’ on Points list with SAA
FM Env D20-ASRD – concluded Panel Draughting for CFH review
Design
OTM – Q020 - Netherlocks – started Panel Design TF3_NVC_004_ESI (complete by 10/2)
01 02 03 04
DesignAnd next week… we will work on
OTM – Q020 - Netherlocks – release Panel Design TF3_NVC_004_ESI to Silvio review & feedback (complete & submit by 10/2)
FM Env – D20-ASRD – conclude CFH feedback, print labels for Panel Build
Preparation design works for new project
Design
This is what the Installation team have been working on last week
Modification on Dali at RSM
Energized the new 5DP02 extension panel at OTM
RSM Security Terminated all intruder and DAC panels
Installation
Continued with works at Mosta workshop
Maintenance works at offices
….. And this is what is planned for next week
Start commissioning at RSM
Restart with works at OVT
Installation
OTM Terminate outgoers on 5DP02OTM 5DP02 IO testingOTM Terminations on JB 20
Next week we will • 16_058_Methode- Gas Down – Full speed ahead please• FM Env D20-ASRD – This will be built by a sub contractor as
soon as we get the parts
Panel Build
Panel Build
Week 06PPMYearly Field devices checks, IR images & coordinated tests Feb-- D11-CC2, D12-CC1, F02-CC1, F05-CC1, F05-CC4, F05-CC5
Quarterly panel checks Feb -- D00-CC1, D01-CC1, DP1-CC1, D02-CC1, DP2-CC1, D04-CC1, DP3-CC1, D04-CC2, D04-CC3, DO5-CC1, D05-CC2, D06-CC1, DP4-CC1, D06-CC2, D06-CC3D07-CC1, D07-CC2, D08-CC1, DP5-CC1, D08-CC2, D08-CC3, D09-CC1, D09-CC2, D10-CC1, D10-CC2, D10-CC3, DP6-CC1, D11-CC1, D11-CC2,D12-CC1Weekly update of antivirus on all BMS stationsTwo yearly S7-300 CPU V2 Replacement Battery D08-CC1, D08-CC2, D09-CC2, D11-CC1, D11-CC2, D10-CC1, D10-CC2, P04-CC1, CF1-CC1
Mater Dei Maintenance
ReactiveHandling of reactive work orders OthersParticipating in weekly fire drillsTraining of new team memberWO- 116184572 (Q131)To supply and replace existing control gear for F2-CHW1-P2 with a new simocode and sirus soft starter
Mater Dei Maintenance
Sterling Chemicals Line 2 PLC system
lighting control systems in Qatar
Quote for Fire alarm
Building automation in a private clinic
And…. We may still have a chance to win a VERY large BMS jobThese are the quotes the business development
team have been working on
Business Development
Some Last Thoughts
I need to bring up a point and remind you all – we need to be cordial, mannered, professional and respectful to clients- I know that most of the times we are that and it is a trait which differentiates our company from others....
But
I need to remind you and insist that we are all cordial, mannered, professional and respectful to each other
I await all your feedback on all the ESI discussions – without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment
Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for
I urge you all to follow this blog and keep up to
date with what is happening at ESI
Lets all work to get the work done on time, on
budget and to the required quality
We need to communicate, pull the rope in the
same direction to make our projects a success
and profitable
Some Last Thoughts
I wish you all a good and productive
week