us lhc accelerator research program jim strait for the bnl-fnal-lbnl lhc accelerator collaboration...

27
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley US LHC Accelerator Research Program

Upload: edmund-bond

Post on 13-Dec-2015

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

US LHC Accelerator Research Program

Jim StraitFor the BNL-FNAL-LBNL LHC Accelerator Collaboration

DOE Meeting

18 April 2003

brookhaven - fermilab - berkeleyUS LHC Accelerator Research Program

Page 2: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 2

Outline

Program Goals, Overview, and Organization

R&D to Maximize the HEP Output of LHC

Fundamental Accelerator R&D

R&D for LHC Upgrades

Coordination with CERN

Page 3: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 3

Goals of the US LARP

Advance High Energy Physics• Help bring the LHC on and up to design performance quickly.

• Improve LHC performance by advances in understanding and instrumentation.

• Use LHC as a tool to gain deeper knowledge of accelerator science and technology.

• Extend LHC as a frontier HEP instrument with a timely luminosity upgrade.

Advance U.S. Accelerator Science and Technology• Keep skills sharp by helping commission the LHC.

• Conduct forefront AP research and development.

• Advance U.S. capabilities to improve the performance of our own machines.

• Prepare U.S. accelerator scientists to design the next generation of hadron colliders.

• Develop advanced components necessary for the next generation of hadron colliders.

Page 4: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 4

Summary of Planned Program

• Help commission the hardware delivered by the LHC Accelerator Project and later by the LARP

• Help commission the LHC with initial beam.

• Use the LHC to perform experiments and test calculations and theories of fundamental accelerator science.

• Develop and build new instruments that will improve the operation of the LHC and help us perform accelerator physics experiments.

• Perform accelerator physics studies and advanced magnet R&D that will result in the IR designs and prototype IR magnets for a timely LHC luminosity upgrade.

Page 5: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 5

Initial Organizational and Reporting Structure

Page 6: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 6

Page 7: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 7

Page 8: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 8

Page 9: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 9

strong tools for

Page 10: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 10

R& D to maximize the HEP output of the LHCInitial Instrumentation Suite

1) Tune, Chromaticity, & Coupling Feedback• Tune, chromaticity and coupling feedback instruments are crucial for efficiency

with intense beams … At LHC but also RHIC and Tevatron.• Such tools are already being developed at CERN and at BNL … Collaboration

meeting on this topic, Fermilab, May 9, 2003.

2) Real- Time Luminosity Measurements• Fast luminosity measurements help keep the beams in exact collision.

• Two potential technologies: ArN2 ionization chamber and CdTe.

• Beam test at Fermilab this year, jointly with CERN, to allow direct comparison.

3) Longitudinal Beam Density Monitor• Based on the non-linear mixing of synch. radiation with light from a pulsed laser. • These measurements are essential, with 350 MJ of stored energy in the beams.• We plan to begin R&D on this to start in FY2005.

Page 11: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 11

Page 12: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 12

Page 13: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 13

Page 14: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 14

Accelerator Systems Cost Estimate

P R E L I M I N A R Y

Page 15: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 15

High Priority of R&D for LHC Upgrades Recognized by HEPAP*

HEPAP has set its highest priority on R&D for a luminosity upgrade:

The science of extending exploration of the energy frontier with the LHC accelerator and detector luminosity upgrades is absolutely central. The R&D phase for these will need to start soon if the upgrades are to be finished by the present target date of 2014.

HEPAP has set lower priority on energy upgrade:

It is possible that the physics found in the next decade at the LHC will be such that it will demand such an upgrade, but at this point we don’t know enough yet either about the science or about the specifics of the facility that might be proposed. It will require an extensive R&D phase.

______________________________________________________

* High-Energy Physics Facilities of the DOE Office of Science Twenty-Year Road Map, HEPAP report to the Director of the Office of Science, 17 March 2003.

Page 16: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 16

Schedule for Upgrades

Page 17: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 17

New IRs are a Key Element of a Luminosity Upgrade

Page 18: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 18

Accelerator Physics for Luminosity Upgrade

Accelerator Physics for luminosity upgrades is the earliest AP activity.• It informs the type of upgrade that can take place.• It is necessary to guide the magnet R&D program, which must be

launched soon and must be launched on the right path. • Close cooperation with CERN required.

Currently planned work:• Interaction region optics.• Energy deposition.• Beam-beam calculations.• Interaction region field error compensation.• Beam loss scenarios.• Effects of and requirements for other machine upgrades.

Page 19: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 19

Magnet R&D for Luminosity Upgrade

• Magnet R&D will eventually become the largest part of LARP.

• Plan to pursue R&D on both quadrupoles and dipoles:– Quads with the largest possible aperture

with Gop > 200 T/m. (FNAL + LBNL)

– Large-aperture dipoles for the extreme radiation environment of a dipole-first IR. (BNL + LBNL)

• Deliverables will be successful R&D, leading to accelerator-ready magnet design(s).

• Fabrication of production magnets is outside the scope of LARP and will be considered a\s a separate proposal.

Page 20: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 20

Interactions with other Magnet R&D Programs

The LARP cannot deliver accelerator-ready designs for all of the new IR magnets by itself.• The LARP R&D program will be built upon and well coordinated with

the on-going vigorous U.S. base program in high-field magnet development.

– DOE funded program to develop Nb3Sn superconductor.

– High-field dipole programs at BNL, FNAL and LBNL.• We will work in close collaboration with non-U.S. programs.

– Expect vigorous R&D program to start at CERN in a few years.– ESGARD proposals

Networking activities

“Next European Dipole” => collaboration with US on dipole-first IR?

– Participation by KEK?

Page 21: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 21

Magnet R&D Program Elements

1) The development of magnet requirements and conceptual designs.• This will be the main activity for the next ~1½ years.• Done with close cooperation between accelerator physicists and

magnet scientists and in close collaboration with CERN.• This work continues at a lower level throughout the R&D program

as understanding of LHC beam requirements and magnet technology limits increase.

2) Technology development.• Addresses key technological issues for the new IR magnets

raised by the conceptual design studies.• Will be a major activity in the early years (~2004-2006).• Continues as support activity throughout the model magnet

program.

Page 22: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 22

Magnet R&D Program Elements

3) Model magnet programs for large-aperture, high-field quads & dipoles.• First models in 2006, limited by slow start of funding.• ~2 models per year of each quadrupole and dipole through 2010.• As soon as practical, build 4 m model of one type.• Additional models may be necessary after decision is made on

new IR design, expected 2009-10.• Expect considerable cross-fertilization between dipole and

quadrupole programs, between LARP and base program, and between U.S. and European programs.

4) The construction of one or more accelerator-quality prototypes.• Follows the decision on the final IR design in 2009-10.• Current funding guidance limits us to (at most!) one type (D or Q).• The goal is clear: To have a fully developed and proven,

accelerator ready design, ready for production by 2012.

Page 23: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 23

Magnet R&D Program Cost Estimate

P R E L I M I N A R Y

Page 24: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 24

Cost Estimate Summary

P R E L I M I N A R Y

Page 25: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 25

Coordination with CERN

Many formal and informal meetings with CERN over the past 1 year to develop the LARP proposal.

US-CERN Committee combines leaders of the LHC at CERN with leaders of the LARP at the US Labs, and provides for formal coordination of the US effort with the CERN LHC program.

The US-CERN Committee, at its first meeting on 10 April, approved our program plans, as documented in a letter from Lyn Evans.

Page 26: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 26

Summary

Program elements:• Hardware commissioning (FY 2005-2007).• Beam commissioning (FY 2006 – 2009)• Advanced beam instrumentation R&D• Use LHC as a tool for accelerator physics research.• Accelerator physics studies for luminosity upgrade.• Magnet R&D for luminosity upgrade.

• Further effort required to fit the program within the funding guidance

. . . or more funding is required.

Page 27: US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley

DOE - 18 Apr 03 US LHC Accelerator Research Program - J. Strait 27

Summary

• The LHC is very complex and will be difficult to commission and bring to its full capabilities. The U.S. labs can play an important role in speeding startup and optimizing LHC performance, thereby maximizing the physics return on our large national investment.

Adequate and consistent support must be provided to make this happen.

• The LHC will be the frontier high energy accelerator, offering forefront opportunities for advanced accelerator physics and technology research and development.

We need adequate and consistent support to be able to exploit this unique opportunity.