Welcome & objectives
SIT-28 continues the theme of increased focus on physical outputs in support of CEOS implementation priorities
SIT team providing reinforced support and feedback for VCs and WGs SIT-27 side meeting was productive and follow-up telcon
series
SIT-28 side meeting progressed topics for discussion at SIT
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
3
Agenda
VC & WG Contributions to the 2015 GEOSS (1h10m) Individual brief reports
VC Membership, composition & sustainability (40m)
VC/WG Selected Topic (30m) – Deliverables & Blue Planet CEOS Deliverables for GEOSS Data Discovery and Access (1h15m)
HMA-CWIC Standardising data access for VC holdings
LSI Terms of Reference (20m) Wrap
VC & WG Accomplishments for the 2015 GEOSS
CEOS SIT-28 MeetingHampton, Virginia, USA11th March 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
5
2015 accomplishments
10-year implementation plan for the GEOSS ends in 2015
Critical for GEO to show tangible benefits for member governments – and CEOS has a leading role
CSS study of VCs focused on their capacity and intentions to provide outputs – SIT dialogue with VCs/WGs in 2012 & 2013 has continued this discussionThe VCs and WGs are the delivery teams of CEOS
Delivery plans have been updated – this session takes a look at the combined output
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
ACC 2015 accomplishments
1. Multi Sensor Volcanic Eruption Alert System• Enhanced support to Aviation Control Service (SACS) web service providing
SO2 and volcanic ash warning service based on multi-sensor measurements2. Geostationary AQ Constellation Coordination Activities
• Establish cross-agency membership on relevant science teams• Agree on an open data policy for AQ-relevant data and support establishment of
common cal/val standards for common pre-launch instrument characterization. Conduct workshop during 2013
• Organize a workshop on AQ model intercomparison to optimize use by air quality forecasters and managers
• Undertake best efforts to overlap planned GEO AQ missions (e.g., Sentinel 4, TEMPO, and GEMS) by at least 1 year to provide simultaneous continuous observations of the Northern Hemisphere through a full annual cycle
3. Total Ozone ECV support• Establish validation protocol and common database• Combined US/European total ozone ECV data set generation
4. Greenhouse Gas Constellation• GHG measurement coordination, validation protocols, potential for combined
ECV data sets5. Limb scattering ozone profile measurement coordination
• In collaboration with SPARC/WMO/IOC activities
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
LSI 2015 accomplishments
1. LSI Explorer (Cross-Catalog, Data Discovery, Data Delivery System)1. INPE2. CSA/CCRS3. NASA4. NOAA5. USGS6. JAXA7. China Data Centers8. ESA9. South Africa
2. Terrestrial ECVs discoverable and downloadable3. SAR Collections Data Delivery Flow Incorporated
1. Addressing Public-Private Partnerships4. LSI Web Site
1. Expanded and Updated Agency Holdings2. All Links Point to MIM3. SAR Missions fully represented
5. Support Extended to all GEO Initiatives Endorsed by CEOS1. Terrestrial Collection Focus
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
OCR 2015 accomplishments
1. Implementation of INSITU-OCR• Establishment of a Task Force on Calibration – standing WG under IOCCG that could interface with
CEOS WGCV (2013 deliverable to facilitate INSITU-OCR Implementation)• Finalization of IOCCG Report 14 – Calibration of Satellite Ocean-Colour Sensors• Finalization of IOCCG Report 15 – Remote Sensing in Polar Seas (related)• IOCCG agencies and members define commitments for implementation of INSITU-OCR
o Deliverable: quantifying requirements for, identifying and (plans for) supporting three long-term cal/val sites that run across satellite missions by 2015
2. Ocean Color ECV support• Focus on basin to global scale ECV/CDR time series for climate related studies which require long
records• IOCCG ECV WG goal is to give a complete report of initial objectives at the IOCCG in 2014 (TOR and
written report for description of goals) o Development of roadmap for first assessment – topic for second meeting – May 2013o Recommend comparison/evaluation metricso Record and evaluate differences among existing OCR ECV products and recommend how differences
can be resolved. o Establish criteria to be satisfied by OCR ECV products and recommend actions needed to ensure the
quality and consistency required by GCOS. o Respond to CEOS requests for review of OCR ECVs. o Establish contact with the SST-VC.o Evaluate agency efforts to develop/help develop and archive ECVs
3. Operational Oceanography (VC Coordination) Paper• Under discussion at IOCCG currently
NB: OCR-VC membership rotation• Current co-leads are Paula Bontempi (NASA), Peter Regner (ESA), Prakash Chauhan (ISRO)• Dr. Chauhan (ISRO) has requested to rotate off• Bontempi will stay in lead role for another year, Regner (ESA) will stay on board, and IOCCG is
considering the addition of Paul DiGiacomo (NOAA) as co-lead (NOAA approved)
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
OST 2015 accomplishments
1. Ensure launch of Jason-3 in March 2015 latest, so as to preserve continuity of the reference measurement
2. Timely program approval of Jason-CS in Europe and in the US to ensure long-term availability of the reference measurement
3. Fulfil the user requirements of two, preferably three additional missions through provision and dissemination of SARAL, Cryosat 2 and HY2A altimetry products (and also assimilation into the multi mission DUACS product)
4. Maintain focus on new technology as in SWOT and ensure its continuity with the Jason-series by including a Jason-class nadir altimeter in the SWOT payload (currently baseline).
All of the above are needed to sustain the delivery of a service to our users, and this
requires a number of transverse activities such as: • An adequate training program,• Addressing the role of the Ocean Surface Topography Science Team in the CEOS
OST Constellation,• Considering the contribution of OST Constellation to the concept of Operational
Oceanography services coordination by CEOS.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
OSVW 2015 accomplishments
• OSCAT Follow-On: OceanSat-3 launched planned for 2016 (program not yet approved)• ASCAT Follow-On: Planned for launch on EPS-SG 2nd satellite (Sat-B) in 2022
• By 2015 instrument design expected to be ready.
• In 2013 ASCAT-B becomes the primary operational mission and ASCAT-A remains in operations as a hot stand-by. Tandem operations beyond 2014 are under discussion and will be assessed in the course of 2013. In this context:
• Absolute calibration of ASCAT-B and cross-calibration with ASCAT-A• Potential revisit of phasing of METOP-A/METOP-B options
• Consistently reprocessed ASCAT-A mission dataset• Consistently processed OSCAT mission dataset
• Define standard calibration/validation methodology in coordination with IOVWST • In coordination with IOWVST, define approach/plan to harmonize multi-mission wind
data records
• Consolidate/formalize the periodically given course on the use of scatterometer winds for marine forecasting.
• To identify and start addressing additional scatterometer wind training needs within the scientific community in a more general oceanography applications context, drawing from the expertise available in the IOVWST group
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
11
PC 2015 accomplishments
o PC Data Portal with links to CEOS Water Portal− Completion of First Phase “link only” interface – March − Planning/study for and implementaton of Second Phase
“query/results/order based” interface – April 2013 to December 2014o Precipitation ECV support – Response to GCOS Action A-8 - Ensure
continuity of satellite precipitation products− Deliverables #1, #2, #3, #4, #5 (see next slide for details)
o Deployment of GPM phase constellation satellites and maintaining continuity with TRMM
o Advocacy of post-GPM phase PC− Potential Microwave Imager (MI) shortfall in post-GPM era − Light and solid precipitation measurements at high latitudes− GPM FO
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
12
Response to GCOS Action A8 - Ensure continuity of satellite precipitation products
Deliverables1. Sustainment and enhancement of constellation of satellites carrying
microwave radiometers (both imagers and sounders) and moderate inclination satellite carrying microwave imager and precipitation radar.
2. Well characterized and stable Level 1B calibrated, geolocated brightness temperature (Tb) products from each PC radiometer.
3. Inter-calibrated brightness temperature (Tc) products by applying the GPM core observatory reference standard.
4. Precipitation retrievals using physically based a-priori database constructed from combined radiometer/radar measurement.
5. Global monthly PDF of precipitation intensity based on the above.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
13
SST-VC 2015 accomplishments
1.Continue to interface GHRSST activities with CEOS and enhance cooperation with CEOS Ocean VC’s
2.Increase CEOS SST-VC membership (Targets: KARI, NRSCC, NSMC/CMA, ISRO, CONAE, Roskosmos, SANSA)
SST-VC: Space Segment• Address gap in dual-view TIR imaging since loss of ENVISAT AATSR (AVHRR & IASI)• Launch of Sentinel-3A in 2015 providing continuity of dual-view IR measurements.• Commission METOPB AVHRR and NPP• Inclusions of ISRO OCEANSAT3, KARI COMS, NOAA NPP, JAXA GCOM-W,
EUMETSAT METOP&MTG within the SST-VC• Prepare White Paper on SST Constellation definition (needs, structure, system)
SST-VC: Ground Segment/Information systems• Data availability and access: Maintain and evolve the user/producer community providing
international exchange and application of NRT EO SST data within the GHRSST framework
• Bring GCOM-W, COMS and VIIRS SST data into the GHRSST framework• CEOS-GEO Action IN-03-C1_1: Translate and bring on-line EO-SST data holdings within
the CEOS WGISS Integrated Catalogue (CWIC)• Improve multi-sensor L4 analyses and ensemble products of EO SST for operational and
climate applications• Develop and implement metrics for SST services, products and users.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
SST-VC 2015 accomplishments
• SST-VC: Products and services• Coordinate user requirements and feedback for SST Products and Services• Improve SST product validation and coordination of validation teams• Climate monitoring and research (CEOS-GEO Actions CL-01-C1_1& CL-01-C1_2)
Development of SST CDR as CEOS Response to the Satellite Supplement of the 2010 GCOS IP via ESA CCI and GHRSST activities
• CEOS-GEO Action IN-02-C1_3: Implement QA4EO principles into GHRSST SST data sets in the most appropriate manner
• Ocean Supersites Development: pilot using the High Resolution Diagnostic data set (HR-DDS) via the ESA Felyx project (http://hrdds.ifremer.fr/) for SST, Ocean Colour, Wind/Wave (CEOS-GEO Action DI-01-C2_2 )
• SST-VC: Notes• Capacity building: Develop training activities for satellite SST practitioners.• Improve user feedback to CEOS Agencies via better integration of existing
GHRSST activities within CEOS.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
WGCapD 2015 accomplishments
Deliverables for the following GEO WP, ID-02-C2 component, as identified in CEOS actions
1. Integrate GEONetCab project website with the GEO web portal and WGCapD websiteo Output: Integrate information about Capacity Building resources for the Earth
Observation domain.
2. Development of an International Online Certificate Program in Remote Sensing, to be organized by CEOS Space Agencieso Output: First pilot course to be held from Feb 18 to June 10, to Anglophone
countries in Africa. More courses shall be developed, also focusing of French Africa and Latin America.
3. Develop and carryout an inventory of capacity building activities focused on space-derived data. o Outputs: Perform a global assessment which will serve to better focus capacity
building efforts as well as highlight new areas where organizations can better cooperate to achieve their goals. The final product will be an interactive map hosted on the CEOS website.
4. Execute a Digital Elevation Models workshop with high resolution DEM data.o Outputs: Expand these workshops to Nepal as well if the data is released for
those regions.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
16
WGClimate 2015 accomplishments
From WGClimate ToR:
•Define and implement a consistent Climate Monitoring Architecture for space-based observations.
•Review and assess, on behalf of CEOS, the generation of Fundamental Climate Data Records (FCDRs) and derived Essential Climate Variable (ECV) climate products supported by Member space agencies,
WGClimate: Space Segment• Once initial rendition of Physical Architecture is complete, concrete recommendations on climate observation priorities
for space segment will be provided. • Undertaken in collaboration with CGMS, expected within 2015.
WGClimate: Ground Segment/Information systems• Essential Climate Variable Inventory. • First version and analysis available by Q1 2014.
WGClimate: Products and services• Consensus system metrics for assessing ECV maturity end 2014. • In depth ECV/TCDR assessment procedure and pilots Q2 2014. • Both undertaken with SST and OCR VCs (and their associated scientific bodies - GHRSST, IOCCG) and in
collaboration with WCRP-DAC.
Note: the joint activity on the climate monitoring architecture with CGMS has been extremely productive and beneficial. If this is to continue in the future then some joint oversight mechanism would be necessary and effective
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
WGISS 2015 accomplishments
Contributions to GEOSS Data Discovery and Access
1.IDN: Directory Service and Collection Metadata• More than 14,000 (as of Feb. 26th) data collections from
CEOS agencies can be discovered from GEO Portal.2.CWIC : Catalog service and Data Access
1. More than 1,700 (as of Feb. 26th) data collections from CEOS agencies can be discovered and accessed from GEO Portal.
•FedEO : Catalog service and Data Access• Several data collections from CEOS agencies will be
discoverable from GEOSS.•Portal systems
• LSI Portal, ACC Portal and CEOS Water Portal
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
WGCV 2015 accomplishments
GEO Workplan component IN-02: Earth Data Sets•IN-02-C1: Advances in Life-cycle Data Management
Develop a GEO strategy for data quality assurance through developing a CEOS Quality Assurance Framework for Earth Observation (QA4EO) and implementing processes and structure for CEOS data and information.
• Output: QA4EO Implementation Pilots and Showcases for key GEO data/information/SBA efforts; Fit for purpose documentation related to system, data and product capability and accuracy; Quality parameter measurement and process guidelines for each quality definition; Support to LTDP and data management efforts, Incorporation of information in the process and definitions; Incorporation of data and information QA flags; Update of QA4EO website
Enabling Data and Information Interoperability and Harmonization in CEOS and GEO by developing an architecture and constituent elements needed for implementation of an operational system
•Output: Full list of CEOS test sites; Establish operational collection of calibration data over these sites by agencies; Prototype pre-operational satellite to satellite (optical domain) bias correction; Establish methodologies to aid interoperability
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
19
2015 accomplishments – space segment
Space SegmentACC * Geostationary AQ Constellation Coordination (Sentinel-4, TEMPO, GEMS)
* Greenhouse Gas Constellation* Limb scattering ozone profile measurement coordination
LSI -
OCR -
OST * Ensure launch of Jason-3 in March 2015 latest, so as to preserve continuity of the reference measurement* Timely program approval of Jason-CS in Europe and in the US to ensure long-term availability of the reference measurement* Maintain focus on new technology as in SWOT and ensure its continuity with the Jason-series by including a Jason-class nadir altimeter in the SWOT payload
OSVW * In 2013 ASCAT-B becomes the primary operational mission and ASCAT-A remains in operations as a hot stand-by. Tandem operations beyond 2014 under discussion. Planning: absolute calibration of ASCAT-B and cross-calibration with ASCAT-A; potential revisit of phasing of METOP-A/METOP-B options.(* OSCAT F/O (Oceansat-3) and ASCAT F/O (EPS-SG) mission advocacy and coordination).
PC * GPM Constellation phase satellites - continuity for TRMM
SST * Sentinel-3 launch and advocacy (ESA) * Commissioning of METOB-B AVHRR/IASI (EUMETSAT)* Development of an SST- constellation requirements paper (work in progress) *Addressing the Gap in dual-view SST measurements since the loss of ENVISAT AATSR (ESA)* Inclusion of HY-2B into the Constellation (SOA)(Advocacy of: NPP/VIIRS (NOAA); COMS (KARI); continuity of passive microwave measurements (GCOM-W, JAXA); MTG (EUMETSAT); GCOM-C (JAXA); Oceansat-3 (ISRO))
WGCapD -
WGISS -
WGClimate (Once initial rendition of Physical Architecture is complete, first concrete recommendations on climate observation priorities for space segment will be provided. Undertaken in collaboration with CGMS, expected within 2015.)
WGCV -
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
20
2015 accomplishments – gnd segment/infosys
Gnd Segment/Info SystemsACC -
LSI * LSI Explorer (Cross-Catalog, Data Discovery, Data Delivery System)* LSI Web Site
OCR -
OST -
OSVW -
PC * PC Data Portal
SST * GHRSST framework for data discovery and access inc NRT data* Development of Sentinel-3 Mission Performance Centre and Ground Segment* Implementation of CWIC for SST holdings * Development of Global AVHRR HRPT rescue activity* Common format for SST products (implemented already for all GHRSST data streams and as part of the Sentinel-3 G/S from conception)(Cooperation with International validation teams (e.g Sentinel-3), Coordination of in situ SST radiometer validation activities with ISSI and WGCV (radiometer inter-comparison))
WGCapD * WGCapD web/GEONetCab/GEO portal - capacity building resources
WGISS * CEOS IDN: 14,000+ data collections – also via GEO Portal* CWIC: 1,700+ data collections – also via GEO Portal* FedEO: CEOS agency data collections discoverable via GEOSS* Portal systems: LSI, ACC & CEOS Water
WGClimate * Essential Climate Variable Inventory. First version and analysis available by Q1 2014.
WGCV -
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
21
2015 accomplishments – products & services
Products/ServicesACC * Multi Sensor Volcanic Eruption Alert System
* Total Ozone ECV supportLSI * Terrestrial ECVs
OCR * Ocean Colour ECV support: basin to global scale ECV/CDR. IOCCG ECV WG will prepare report on objectives by 2014OST * Provision and dissemination of SARAL, Cryosat 2 and HY2A altimetry products (and also assimilation into the multi mission DUACS product)
* Training programmes
OSVW * Consistently reprocessed ASCAT-A mission dataset* Consistently processed OSCAT mission dataset* Standard calibration/validation methodology in coordination with IOVWST* Course on the use of scatterometer winds for marine forecasting – based on needs assessment
PC * Precipitation ECV support
SST * Improved SST products (L2, L3 and L4) * Improved Multi-Product Ensemble SST L4 diagnostic system (GMPE)* Metrics for SST services, products and users * Development of SST CDR via ESA CCI and GHRSST* Improved CDR from MSG SEVIRI * Improved use of GSICS* Inclusion of QA4EO guidelines in GHRSST data sets (Formal link to WGCV) * Implementation and operation of Diagnostic Data Set (e.g., via the ESA Felyx project) to pilot Ocean SuperSite development.(Advocacy for Ocean SuperSites with Agency cooperation; Coordinate user requirements and feedback for SST Products and ServicesAdvocate for better access to CEOS Member data sets)
WGCapD * International Online Certificate Program in Remote Sensing* Inventory of capacity building activities focused on space-derived data* Digital Elevation Models workshops with high resolution DEM data
WGISS -WGClimate * Consensus system metrics for assessing ECV maturity end 2014.
* In depth Data assessment procedure and pilots Q2 2014.(Both undertaken with SST and OCR VCs (and their associated scientific bodies - GHRSST, IOCCG) and in collaboration with WCRP-DAC)
WGCV * GEO strategy for data quality assurance through a CEOS Quality Assurance Framework for Earth Observation (QA4EO)* QA4EO Implementation Pilots and Showcases for key GEO data/information/SBA efforts* Fit for purpose documentation related to system, data and product capability and accuracy* Quality parameter measurement and process guidelines for each quality definition* CEOS Test Sites for operational system of Data and Information Interoperability and Harmonization in CEOS and GEO* Operational collection of calibration data over these sites by agencies* Prototype pre-operational satellite to satellite (optical domain) bias correction
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
22
Space segment
Significant variation, even internally, in defining and communicating what the VCs and WGs aim to achieve
VCs mainly deliver space segment coordination outcomes and products/services
“The Virtual Constellations are seen as one of the biggest assets of CEOS, and the primary mechanism for the coordination of space assets”
Isolating, defining, standardising the value added of the VCs for the space segment would help communication & management?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
23
Ground segment, products & services
WGs mainly deliver portals/info systems & products/services Major outputs like IDN and ECV inventory
SIT Vice Chair proposal seeks to standardise on the access to products and services relevant to VCs
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
24
Communicating CEOS accomplishments
In light of the consolidated responses, do individual VC/WGs wish to change their statement of accomplishments? Should we more generally seek to sharpen scope of VC/WG accomplishments and seek to standardise and improve consistency?
Clearer deliverables would aid communication and management?Better integration of the VC/WGs with the annual CEOS work plan
Not much guidance from the Constellations Process Paper (late 2008)Implementation Plans and schedules are requestedTime for an update?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
25
Adequacy of the 2015 accomplishments for the GEOSS
Perspective from CEOS rep to post-2015 GEO WG Discussion
Perspective from GEO Secretariat Discussion
VC Membership, Composition & Sustainability
G. Dyke/SIT Chair Team, C. Donlon and K. Casey/SST-VC, M. Dowell/WGClimateCEOS SIT-28 MeetingHampton , Virginia, USA11-12 March 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Overview
• Update on VC membership status and gaps• Status of VC engagement with respective science
teams• Motives, perceived benefits and risks• Discussion
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Key Questions for Discussion
• What are the motivations for some VCs to engage related science teams?
• Are there lessons for other VCs & do we need a more systematic approach to engagement?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
VC Membership Status
• Approximate VC Membership• PC: ~20
• LSI: ~20
• ACC: ~15 CEOS, ~100 more generally (academia, etc.)
• SST: ~10 (all members also GHRSST members)
• OSVW: ~20
• OST: ?
• OCR: ?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Changes in Gaps Since SIT-27
• PC:• No change (CMA, ROSHYDROMET)
• LSI:• Link to WGClimate established through John Dwyer
• Links to SDCG being clarified
• ACC:• Fuxiang Huang at CMA/NSMC indicated he will attend
• No progress with Russia
• SST• Added CSIRO/BoM and WGCV
• Still seeking ISRO, CONAE, NRSCC, NSMC/CMA,
Roskosmos, KARI, SANSA
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
• OSVW:• No change (SOA, CMA, ROSHYDROMET, ROSKOSMOS)
• No response to CEOS leadership letter last year to China
• EUMETSAT progress with SOA bi-laterally
• OST: SIT-27 Status• CNSA/China (OSTST participation, HY-2A, HY-
2B, SARAL/AltiKa)
• ESA (OSTST participation)
• OCR: SIT-27 Status• Instrument Science Teams – various CEOS agencies
Changes in Gaps Since SIT-27
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
VCs and Science Teams
VC Science Team(s)
VC-ST Interface Formal Coordination Status
SST GHRSST All SST-VC members are in GHRSST.
GHRSST established SST-VC.
OSVW
IOVWST Paul Chang/NOAA Dialog initiated at 2012 IOVWST meeting in Utrecht.
OCR IOCCGCEOS Associate
Mark Dowell/JRCPaula Bontempi/NASA
OCR-VC members frequently presented at IOCCG. Coordination potential on ECV generation in support of GCOS
OST OST-ST Pascal Bonnefond/FranceJoshua Willis NASA JPL
OST-ST is part of the formal 4-party agreement covering up to Jason-3. OST-ST has expressed some desire to expand beyond current 4 parties.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
VCs and Science Teams
VC Science Team(s) VC-ST Interface
Formal Coordination Status
PC NASA and JAXA PMM-STs, M-T IST, CGMS-IPWG, GEWEX
NASA, JAXA, U. of Nagoya, CNES, LEGOS-OMP/CNRS, UCAR, CSU
STs have participated PC-VC since its inception in 2007, contributing to the PC-VC IP, work plans and reporting, and CEOS GCOS IP response. PC-VC workshops held on the sidelines of the NASA PMM ST meetings to facilitate participation.
ACC SPARC, IOC, mission science teams, GCOS, European Carbonsat MAG
Ongoing collaborative efforts with SPARC, IOC and others
LSI Land cover mission STs, land-derived ECV groups, GOFC-GOLD
Informal Formative
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Motivation
• OCR was well aligned; SST was aligned by design; OST & OSVW, are looking to better align with key science teams• PC also has links
• ACC and LSI more diffuse
• What is the motivation for this engagement?
• Is this indicative of a bigger issue with the current geometry for all VCs?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
36
Benefits
There are multiple benefits to links between CEOS VCs/WGs and domain specific international science working groups
• They provide the scientific underpinning to CEOS agency activities in the international context
• They can provide independent oversight on activities where this is required
• They provide a international consolidation of “scientific user requirements” for CEOS agency datasets and products
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
37
Benefits
CEOS has implicitly taken advantage of these relationships through a variety of mechanisms
• Existing links with VCs WGs
• The international Science Working Groups being existing CEOS associate members
Do we need to define a systematic approach to addressing the relationship between CEOS and these organizations?
NB: there is no pre-judged opinion on this
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
38
Mapping Existing Relationships
CEOS Entity ISWG Link
OCR-VC IOCCG Associate member
WGClimate WCRP activities Associate member
SST-VC GHRSST Catalyst for VC
OST-VC OSTST ?
OSVW-VC OSVWST?
PC-VC Precip. STs Formative and on going contributions to the VC
ACC-VC …
LSI-VC …
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Points from Monday’s Discussion
• If we’re looking for the VCs to focus on delivery/expanded contributions, more capacity and expertise is needed, and in some cases the science teams may have this
• CEOS agency resources support science teams (not exclusively, but substantially) and agencies could try and ensure these activities are connected to the VCs to a greater extent
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Discussion
• What are the motivations for some VCs to engage related science teams?
• Are these motivations common across VCs?
• Do these commonalities warrant a systematic approach to addressing the relationship between CEOS and these organizations?
VC-WG selected topic
2015 Accomplishments& Blue Planet
CEOS SIT-28 MeetingHampton, Virginia, USA12th March 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
42
Accomplishments
Consistent and concise description of CEOS contribution to the 2015 GEOSS and the scope of the contribution from each VC and WG
The ‘deliverables that got left behind’: OCR IN-SITU ACC QA4EO Others….?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
43
Blue Planet
CEO Update on GEO Blue Planet Task Component lead(s)? Op Oceans coordination activity
The Sprint to Summit?
GEO Blue Planet Task
Kerry Ann SawyerCEOS Executive OfficerCEOS SIT-28 MeetingHampton, Virginia, USA12 March 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
46
SB-01 – Oceans and Society or “the Blue Planet Task”
New Task in the GEO 2012-2015 Work PlanRelated GEOSS Strategic Targets
Climate, Ecosystems, Agriculture, Biodiversity
Components:C1 – Global Ocean Information Coordination and Access• Lead (CEOS) – M. Dowell (need to provide new CEOS Lead as
Mark has been asked to lead on behalf of EU/EC)
C2 – Operational Systems for Monitoring of Marine and Coastal Ecosystems
• Lead (CEOS) – P. Regner (ESA) (need to provide new CEOS Lead as Peter has asked to removed)
C3 – A Global Operational Ocean Forecasting Network
C4 – Applications of Earth Observations and Information to Sustainable Fishery and Aquaculture Management
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
47
Oceans and Society Blue Planet Symposium 2013
19-21 November 2012 – Ilhabella, BrazilMain Outcomes/Actions:
Continue developing the SB-01 Task and establish further synergies between the various Task Components
Develop a White Paper to elaborate contributions of various programs and elements of Blue Planet
CEOS Presentation to Symposium highlighted: Initiatives at the international level to coordinate satellite observations of
the ocean that are relevant to the Blue Planet Task of GEO Examples (not meant to be exhaustive) include:
CEOS Working Group on Climate – ocean Essential Climate Variables CEOS Virtual Constellations – all main ocean observations! CEOS Carbon Task Force – ocean aspects covered in Strategy report
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
48
Oceans and Society - Blue Planet at GEO-IX Plenary
Albert Fischer, UNESCO/IOC, presented
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
49
Oceans and Society - Blue Planet at GEO-IX Plenary
GHRSST
Added Value of Blue Planet:•Provides new platforms to demonstrate importance of sustained in situ and satellite observations of marine and freshwater environments, and the value of integrating these with models
•Brings together a wide and diverse community of governmental and academic researchers and provides new platforms for integration of multiple streams of data into products that provide the real value to users
•Includes a dynamic, focused program in capacity building, complemented by a vigorous, global network of former scholars from developing countries.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
50
CEOS 2013 Work Plan
Expected Outcomes for 2013 – CEOS Support to Key Stakeholder Initiatives6.5 – Determination of the level and scope of engagement of the four ocean-related Virtual Constellations in the GEO Blue Planet Task
Ocean VCs and WGClimate “will participate in a CEOS Oceans Summit to address key activities where CEOS entities can make significant contributions to the newly developed Blue Planet Task.”
“Additionally, CEOS will consider how best to capitalize on the existence of the four ocean-related Virtual Constellations by reviewing and investigating the feasibility of creating an overarching entity for operational oceanography.”
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
51
CEOS Intervention in Support of Blue Planet Task
CEOS is very pleased with the development of the Blue Planet Task in the 2012-2015
Work Plan. We are well-positioned to support the identified priority actions. CEOS
leads two of the four Components in the Task. In 2013, CEOS will consider how best
to engage the four ocean-related Virtual Constellations: Ocean Colour Radiometry,
Ocean Surface Topography, Ocean Surface Vector Wind, and Sea Surface
Temperature, to seek if this Task can receive further support. CEOS is engaged in the
analysis of contributions to outputs for monitoring the marine ECVs and the role of the
oceans in the carbon cycle and how best to define a strategy for the next generation of
CEOS Agency satellite missions to monitor that process. The CEOS Carbon Task
Force is also assessing the three major domains, including oceans, and their
interrelationships, and this was addressed earlier this week at the Oceans and Society
Blue Planet Symposium, in which I was pleased to participate.
CEOS Deliverables for GEOSS Data Discovery and Access
Heritage, recent efforts, possible solutions using HMA-CWIC & discussion
Name Satoko Horiyama MIURAOrganization WGISS Chair/JAXACEOS SIT-28 MeetingHampton , Virginia, USADate March12, 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Contents
1. Goal
2. Future Steps towards the Goal
3. Recommendations (just introduction)
4. Heritage
5. Recent Efforts
6. Background of Recommendations
7. Response to the Plenary Action
8. Recommendations (before discussion)
9. Discussion
10.Recommendations (reflecting discussion results, ask for endorsement)
11. Way Forward53
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Goal
All of the “OPEN” CEOS Agencies’ data can be discovered and accessed from external clients (e.g. CEOS and GEO Portals)
• It should be independent of the technical implementation/standards and without any discrimination.
54
Overall, 70% of CEOS mission data is accessible (OPEN). This includes all missions launched since 2000.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Future Steps towards the Goal
1. To improve data discovery through GEO portal
2. To improve data access through GEO Portal
Several recommendations were prepared to implement the above steps (shown in the following slides).
After discussion, SIT participants will be asked to endorse those.
55
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Recommendations (introduction)
Recommendations to improve CEOS agencies’ “OPEN” data discovery and access
1. [Datasets Registration] CEOS agencies are strongly urged to register their datasets to IDN. Target date = The next Plenary Meeting
2. [IDN Data Maintenance] In order to keep datasets accurate and timely, each agency should check their records in IDN periodically.
3. [Navigation for users] CEOS agencies should take the appropriate measures for easily leading users to products after data discovery.
56
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Heritage
1. CEOS agencies have several useful systems/tools such as:• CWIC • FedEO (based on HMA-science)• IDN• Each Agency’s systems/tools
2. At the last plenary meeting (Nov., 2012), there was intense discussion on CEOS agencies’ data discovery and access.• ACTION : “WGISS to engage related agencies and to lead an
investigation into the opportunities and obstacles for the
interoperability of HMA and CWIC, providing a report and
recommendations to SIT-28.”
57
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Recent Efforts
1. Strategic Discussion
a. Two telecons among WGISS, SIT chair team and SIT Vice Chair telecon in December and February(1) Covered broader perspective on how to improve CEOS
agencies’ data discovery and access
b. One Telecon with CEOS members in February
2. Technical Discussiona. Four telecons among HMA team, CWIC team and
WGISS telecon in January and February
3. E-mail exchange
58
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Background for Recommendations
• In order to be “discoverable” through GEO Portal, datasets need to be registered to IDN in advance. This is a necessary 1st step.
• The IDN team is happy to support you on how to start the registration. Please contact to
“[email protected]”, if you need any help.
Recommendation 1: Datasets RegistrationCEOS agencies are strongly urged to register their datasets to IDN.
59
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Background for Recommendations
• As of February 26th, more than 14,000 datasets from CEOS agencies were registered. But,
a. For a significant part of them, the information returned in the query results is either wrong or inaccurate (e.g. obsolete information).
b. The IDN team currently runs a link checker program on the catalog on weekly basis and when broken links are discovered the IDN team contacts the record owners. But sometimes record owners themselves are obsolete!
Recommendation 2 : IDN Data MaintenanceIn order to keep datasets accurate and timely, each
agency should check their records in IDN periodically.
60
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Background for Recommendations
1. If datasets are registered to IDN, they are discoverable from the GEO Portal.
2. But “discoverable” does not necessarily equal to “efficiently accessible”.a. Even if a hyperlink appears, it may lead to the top
page of another system. Users have to search the dataset again. (= accessible but not “efficiently” accessible)
b. Or no hyperlink appears due to some reason. (= not accessible)
Recommendation 3 : Navigation for usersCEOS agencies should take the appropriate measures for easily leading users to products after data discovery.
61
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
62
CEOS Data Policy Study Results
387 Mission-Instrument Combinations Open (no registration) = 42% Open (simple registration) = 22% Open (advanced approval) = 6% Restricted = 14% No Access or Unknown = 16%
Comments Overall, 70% of CEOS mission data
is accessible (OPEN). This includesall missions launched since 2000.
First release of results available onthe CEOS website under SEO. A prototype CEOS Data Policy Portal has also been released.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Response to the Plenary Action
1. FedEO (based on HMA-science) team and CWIC team agreed to specify and implement one common external interface, “CEOS OpenSearch”.• Details need to be discussed by the team from FedEO
and CWIC, but here are tentative milestones.(1) Specify the standard using current implementations of the
specifications: After SIT-28 ~ Sep., 2014
(2) FedEO and CWIC teams implement the CEOS OpenSearch standard for external client access: ~Feb., 2015
2. CEOS and other Community Portals will need to implement only one access standard to search and access data from CWIC & FedEO.
63
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
EO-DAIL
FEDEO Clearinghouse
NASA ECHOGateway
ESA Missions
OGC 06-131 EOP EP (HMA)
Legend:
EUMETSAT
European Missions
DMC
VITO
MDA
Spot Image
DLR
Disasters Charter
CNES
NASA ECHO
NASA
CEOS portals
GEO PortalESA/ESRIN
Note: All HMA interfaces (green) already available and connected to FedEO. Others coming.
IDN
USGSLSI
CWIC Missions
INPENASANOAACLASSGHRSST
JAXA CCRS ISROAOE (China)Beijing-1NSMC/FengYunCRESDA
CWIC
HMA – CWIC Interoperability
OGC 09-084 OpenSearch
OGC CSW64
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Recommendations (before discussion)
Recommendations to improve CEOS agencies’ “OPEN” data discovery and access
1. [Datasets Registration] CEOS agencies are strongly urged to register their datasets to IDN. Target date = The next Plenary Meeting
2. [IDN Data Maintenance] In order to keep datasets accurate and timely, each agency should check their records in IDN periodically.
3. [Navigation for users] CEOS agencies should take the appropriate measures for easily leading users to products after data discovery.
65
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
DISCUSSION
Modification of Recommendations (as needed)
66
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Recommendations (ask for approval)
Recommendations to improve CEOS agencies’ “OPEN” data discovery and access
1. [Datasets Registration] CEOS agencies are strongly urged to register their datasets to IDN. Target date = The next Plenary Meeting
2. [IDN Data Maintenance] In order to keep datasets accurate and timely, each agency should check their records in IDN periodically.
3. [Navigation for users] CEOS agencies should take the appropriate measures for easily leading users to products after data discovery.
67
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Way Forward
1. Side meeting on March 15th (after SIT-28) • Technical issues and more details will be discussed.
2. WGISS-35 Meeting (May 6-10)• Detailed discussion on WGISS contributions.
3. GEO IIB and Work Plan Symposium (June 3-7)• According to the results from the meeting on March 15 th,
CEOS will report/present their contributions.
4. CEOS Plenary (November)• Report the 2013 activities results and 2014 plan,
including preparation for to “Sprint to Summit”.
5. GEO Plenary/Summit (January 2014?)• Sprint to Summit, Exhibition?
68
Strategic
Technical
Strategic
Technical
Strategic
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
Acronyms
• CWIC: CEOS WGISS Integrated Catalog• IDN: International Directory Network• HMA: Heterogeneous Missions Accessibility
69
Consistent access to VC data
Steven Hosford, Pedro GonçalvesCNESCEOS SIT-28 MeetingHampton, Virginia, USA12/03/2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
71
Summary
• CEOS and GEOSS context
• Virtual Constellations Study
• Objectives and Schedule
• Next Steps
• Conclusions
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
72
CEOS Context
Current situation• CEOS agencies are major contributors and one of the driving forces in
the implementation of the GEOSS since its inception• Many space data collections have been registered in the GEOSS
Component and Services Registry (IDN copied into CSR)• CEOS “strongly encourages” agencies to register and maintain up-to-
date the CEOS catalogue of data collections the International Directory Network (IDN)
However, download access to space data through GEOSS remains difficult
• CEOS assumes the role of coordinator of the space component of GEOSS, but should it consider a different approach to facilitate access through GEOSS to space data?
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
73
GEOSS Context
• Enhance decision making in nine Societal Benefit Areas (SBAs):Disasters, Health, Energy, Climate, Agriculture, Ecosystems, Biodiversity, Water, Weather
• GEOSS Data Collection of Open Resources for Everyone
• Critical to advancing data sharing • Following common data sharing principles
• Full and Open Exchange of Data• Data and Products at Minimum Time delay and Minimum Cost• Free of Charge or Cost of Reproduction
• CEOS Virtual Constellations conduct activities that respond to SBA requirements
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
74
VC data access study objectives
• Identify and evaluate access to datasets belonging to each VC• Which satellite/sensor combinations belong to each VC?• What is the status of the data collections they generate?• compliancy with the GEOSS data access characterizations
(e.g. DataCORE) – link to SEO Data policy study• discoverability from the GEOSS Common Infra or CEOS
level infrastructure
• Provide guidance on improving discovery and online access to space data collection
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
75
Potential impact of using VCs
• Improve search capabilities beyond free-text
• Mimic mainstream search engines with ordering/relevance of search results:• Geospatial and temporal domain • Usage patterns • Applications and linkages of collections
CEOS Virtual Constellations have great potential• in establishing link between data collections and application
domains• improve links between collections (find one, suggest another)• interoperability for cross-search / relation (link a product with data
and space-time equivalent product, link products with auxiliary data)• introducing domain “intelligence” into search and access
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
76
Next Steps
• Establish contact with each VC • Validate primary data collections listing• Validate specific requirements (NRT, processing level)• Define priority data collections
• Evaluate and test • Data discovery and online access methods (machine to
machine discovery and access)• Define data flows scenarios (discover collection to
access products)• Demonstrate workflow scenarios (access and process
data)
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
77
Conclusions
• Data download access to space data remains challenging,especially for the non specialist users targeted by GEO
• CEOS currently “strongly encourages” agencies to maintain up-to-date data collection information in IDN (and feeds this through to GEO's Components and Services Registry)
• Building on this, using CEOS VCs could greatly facilitate a structured approach to improving data discovery and download access
• Coordinating with WGISS and SEO the study reported here will assess data discovery and access to VC data collections and provide feedback and guidance on possible next steps
• Results will be reported to WGISS-35 (May, 2013)
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
78
Thanks for your feedback / thoughts on these proposals
Steven Hosford <[email protected]>Pedro Gonçalves <[email protected]>
Land Surface Imaging VC:Terms of Reference
Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGSCEOS SIT-28 MeetingHampton , Virginia, USAMarch 12, 2013
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
80
Current LSITerms of Reference
Background: The CEOS Land Surface Imaging Virtual Constellation (LSI VC) was established through a Declaration of Intent signed by seven CEOS agencies in 2007.
Purpose: The LSI VC primary role is to promote the effective and comprehensive collection, distribution, and application of Earth Observation (EO) data of the global land surface, especially to meet societal needs of the global population, such as those addressed by the Group on Earth Observations (GEO) societal benefit areas (SBAs).
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
81
Current LSITerms of Reference 1/2
Scope: The remit of LSI VC is to coordinate and focus land EO contributions from CEOS agencies supporting CEOS priorities. This includes considering space-based Remote Sensing from optical (visible and infrared including thermal) and microwave instruments. The CEOS Priority Actions are main drivers for the group with the current LSI VC focus on:
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
82
Current LSITerms of Reference 2/2
• Improved coordination support of Space Agency terrestrial activities related to climate initiatives
• Direct support to key GEO initiatives that CEOS has endorsed including the Forest Carbon Tracking, the Global Forest Observations Initiative, the Joint Experiments on Crop Assessment and Monitoring and, as appropriate, the GEO Global Agricultural Monitoring
• Investigating ways LSI can integrate or utilize the outputs from CEOS Quality Assurance for Earth Observation (QA4EO) efforts
• Developing tools and sponsoring forums for CEOS terrestrial mission planning.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
83
Current SDCGTerms of Reference
Background: The CEOS GFOI Space Data Coordination Group (SDCG) was established by the 25th CEOS Plenary (November 2011).
Purpose: The SDCG serves to implement The CEOS Strategy for Space Data Coverage and Continuity in Support of the GEO Global Forest Observations Initiative (GFOI) and Forest Carbon Tracking (FCT) Task.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
84
Current SDCG Terms of Reference 1/2
Scope: The remit of SDCG activities is defined by the scope of the CEOS Data Strategy document. Points to note:
•The SDCG seeks to support coordinated acquisition of all relevant Earth observing missions in support of GFOI and FCT needs emphasis is on coordination of CEOS agency missions, but an effective interface will be developed to engage and communicate needs to commercial operators
•The SDCG will limit its coordination to acquisition planning, at least initially; the broader scheme of data processing and distribution will be directed by the GFOI implementation, and the SDCG may have a role therein in due course
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
85
Current SDCG Terms of Reference 2/2
• The SDCG is not intended to be an open-ended arrangement for support of GFOI operations; it is anticipated that as the institutional arrangements and capacity for GFOI and its Project Office develop, the SDCG functions will transition into these structures.
• Noting the need for data coordination processes in support of other emerging CEOS priorities, the SDCG is being established with a view to being able to broaden its scope in future.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
86
LSI Terms of ReferenceWay Forward
Scope: The remit of LSI VC is to coordinate the
distribution of terrestrial data including terrestrial
Essential Climate Variables (ECVs), from CEOS
agencies supporting CEOS priorities. This includes
considering space-based remote sensing from optical
(visible and infrared including thermal) and microwave
instruments. The CEOS Priority Actions are main
drivers for the group with the current LSI VC focus on:
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
87
LSI Terms of ReferenceWay Forward
Deliverables: The LSI VC will provide the following services and activities: •Provide distribution services from the LSI portal for CEOS agency terrestrial data.•Facilitate the distribution of terrestrial ECVs as recommended by the WGClimate. •Strive to address the cross-cutting issues that are common and fundamental to all data coordination responses from CEOS (information extraction, cross calibration, inter-operability, long-term data records, availability and dissemination, data quality, metadata) in cooperation with the other CEOS Working Groups.•Provide end users updated information on current CEOS data coverages, gaps and potential discontinuity in data availability.•Investigate a land data coordination role with CEOS agencies utilizing Public-Private Partnership arrangements with the goal to facilítate data access and usage for CEOS sponsored activities.
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
• Request SIT review and endorse new LSI Terms of Reference
LSI Terms of ReferenceWay Forward
SIT-28 MeetingHampton, Virginia, USA11-15 March 2013
89
Wrap - recall
VC & WG Deliverables for the 2015 GEOSS (1h10m) Individual brief reports
VC Membership, composition & sustainability (40m)
VC/WG Selected Topic (30m) – Deliverables & Blue Planet CEOS Deliverables for GEOSS Data Discovery and Access (1h15m)
HMA-CWIC Standardising data access for VC holdings
LSI Terms of Reference (20m) Wrap