water & environment nsu - sunjin.co.kr · sewerage 10. river engineering 11. storm water pump...
Embed Size (px)
TRANSCRIPT

NIHON SUIDOSUNJINWWATEER && ENVVIROONMEENT
NSUNIHON SUIDO CONSULTANTS SUNJIN UNITED
N I H O N S U I D O C o n s u l t a n t s S U N J I N U n i t e d
COMPANY PROFILE & PROJECT BOOK

CONTENTS
About United01. About NSU (Nihon Suido Consultants & SUNJIN United)
02. United Service Area
03. Synergy Advantage
04. Organization
05. Manpower
06. License
07. Global Networks
��
������������
Portfolio08. Water Supply
09. Sewerage
10. River Engineering
1 1 . Storm Water Pump Station
1 2 . Major Project Lists
�������

01
02
ABOUT NSU SUNJINKOREA
Nihon Suido ConsultantsJAPAN
NSU Message
The collaboration between Nihon Suido Consultants Co., Ltd. a Japanese company with world-class technology and experience in waterworks & sewerage field and Sunjin Engineering & Architecture, a Korean company with experience and know-how in the field of water treatment plant, intake facilities, transmission-distribution pipe, advanced treatment process, sewerage treatment plant, rainwater pump station and reservoir creates a synergy effect to provide high-quality service for customer satisfaction.
Nihon Suido Consultants Sunjin United
Company Name
President
Head Office
Establishment
Employees
Type of Business
Website
Tel.
SUNJIN Engineering & Architecture co., Ltd.
Yoo, Sang Chun
Korea (Seoul)
1975. 6
1,272
Civil & Architecture Engineering Service,
Design & Supervision
www.sunjin.co.kr
+82-2-6333-3339
Nihon Suido Consultants co., Ltd.
Yoshikazu NOMURA
Japan (Tokyo)
1959
Water Supply System for Municipal & Industrial Purposes
Sewerage & Drainage System with Water Reuse & Recycle System
Human Waste Disposal
Water Pollution Control & Process Development
www.nissuicon.co.jp
+81-3-5323-6200
Company Profile
2
NIHON SUIDO CONSULTANTS SUNJIN UNITED
About United
One stop service by integrated engineering management throughout the entire process in waterworks & sewerage.
Research and Feasibility Study → Basic Design → Detailed Design → System engineering → Supervision → CM → Management / Training / Education
Provide high quality service so that the quality of life will be improved, and offer cultural space for local people on its surface space through underground sewerage treatment plant.
NSU Agreement

Water SupplyWater Supply System improvement Master PlanWater Treatment Facility, Water IntakeTransmission and Distribution FacilityRiverside Filtration System Development
Water & SewerageSewerage Master PlanSewer line Improvement Master PlanWastewater Treatment FacilityDrainage Pumping-Station & FacilityUnderground Sewage Treatment Plant
Water RecycleTreatment Water Recycle Facility
Water PurificationWater Pollution Control & Process Development
O&M (Operation & Maintenance)System Engineering
River EngineeringComprehensive Development Plan of River AreaMaintenance and Improvement Project Plan of RiverMaintenance and Improvement Project of Environmental River
Water ResourceDevelopment of Dam and CanalForming of Ecology Water ParkComprehensive Reduction plan of Damage from Storm and FloodInfluence Assessment on Advance Disaster
EnvironmentEnvironmental Impact Assessment(EIA)Preliminary Environment ReviewPost-EIA(Environmental Impact Assessment)Design for Non-Point Pollution Treatment FacilitiesDesign for Waste Incinerator and Landfill FacilitiesDesign for Food Waste Composting Facility
LandscapePark & Open Space PlanningWater Front plan of Utilization Water SpaceRecreation & Tourism IndustryUrban Beau
Electrical DesignGeneration, Transmission and Distribution of ElectrictityElectrical Facilities for ConstructionElectrical Design in PlantRenewable Energy
Mechanical FacilitiesMechanical Engineering
Mechanical Design in Plant
Architecture EngineeringPublic and commercial facilities Cultural exhibition facilitiesEducational and research facilities Residential facilitiesSports facilitiesMedical facilities
Urban PlanningLand Use PlanningNational Land Use Planning & Regional Land Use PlanningMetropolitan City PlanningDistrict Unit PlanningUrban Development & Complex Design
02
04
UNITED SERVICE AREA
About United
Nihon Suido Consultants Sunjin United

Making facilities underground, we can arrange the facilities underground and can assign surface space to sports facilities space, waterfront and etc for people around area, with an emphasis on eco-friendly resource such as renewable energy and recycling treated water.
“ Collaboration between Nihon Suido in Japan Consultants and Sunjin in Korea will provide customer satisfaction in waterworks & sewage services through the synergy effect.”
Technology
NSU SYNERGY EFFECT
Value
Manpower Reference
EPC (Engineering - Procurement - CM)
FS (Feasibility Study), Design, Supervision, PM, CM
Experts and Engineers
Interface and One-stop services
Economical Design & Services
System Engineering
Operation & Maintenance
Water treatment plant, domestic and overseas
Sewage treatment plant, Rainwater pump station, etc
Nihon Suido Consultants Co.,Ltd.
03
06
SYNERGY
Nihon Suido Consultants Sunjin United
ADVANTAGE
About United

���132
257
23
57
126
�����
��
���
���
���
��
��
���
����
Personnel
Waterworks
Mechanical/Electrical EngineeringEnvironment
Total
Landscape Engineers
Architecture Engineers
Urban(& Transportation) Planning Engineers
Road & Railway Engineers
PCM & Supervision Engineers
System Engineers
Administration and Economists
N S UWater Supply Dept.
Transmission and Distribution Facility
Water Supply System
Water Treatment Plant
Wastewater Treatment Plant
Water Resource
Environmental Assessment
Project Construction Management
Administration
Environment Plant
Supervision
Finance
Sewer line Improvement
Sewage Works Dept.
Water Resource Dept.
Environment Engineering Dept.
PCM & Supervision Dept.
Management Dept.
Mechanical/Electrical Engineering Dept.
River Engineering
Operation & Maintenance Dept.
Architecture & Landscape Dept.
Road & Railway Dept.
Urban(& Transportation) Planning Dept.
04 05ORGANIZATION MANPOWER
About United About United
Water Supply Engineers
Wastewater Engineers
River Engineers
Water Resource Engineers
Supervision
08 Nihon Suido Consultants Sunjin United

Overseas Offices
Project Experiences
Dubai, UAE
Abu Dhabi, UAE
Albania
Bandladesh
Bolivia
Bosnia Herzegovina
Brazil
Cambodia
Canada
China
Colombia
Cuba
Denmark
Dominican Republic
Ecuador
Egypt
El Salvador
Ethiopia
France
Germany
Guam
Honduras
India
Iran
Jamaica
Japan
Jordan
Kazakhstan
Kenya
Kuwait
Kyrgyzstan
Laos
Libya
Madagascar
Mauritius
Mexico
Morroco
Myanmar
Nepal
Nicaragua
Nigeria
Norway
Oman
Pakistan
Palestine
Philippines
Qatar
Romania
Russia
S. Korea
Saipan l.
Saudi Arabia
Seychells
Singapore
South Africa
Sudan
Syria
Taiwan
Thailand
Trinidad &Tobago
Tunisia
U.S.A
UAE
UK
Vietnam
Yemen
Jordan
Libya
Vietnam
Indonesia
Laos
Sri Lanka
06 07LICENSE GLOBAL
About United
10 Nihon Suido Consultants Sunjin United
Waterworks & Sewerage, EnvironmentEngineering worksEngineering & Construction of waste water facilitiesEngineering & Construction work of general waste treatment facilitiesWater Supply SewageRiver EngineeringWater Resources DevelopmentWater Pollution Environment Water Pollution Control Water pollution prevention facilities serviceWastes TreatmentNature Environmental Management Soil EnvironmentMunicipal & Residential environment maintenance serviceEnvironmental effects assessment serviceOperation & Maintenance
Mechanical/Electrical EngineeringGeneral planning and supervision of electric power facilitiesEnergy Management Building Electrical Facilities Generation Transmission and Distribution Electric Application
Architecture & LandscapeArchitecture design & Construction supervision serviceConstruction & Architecture procedures service in accordance with related laws and regulationsLandscape design & assessment service
Urban PlanningNational Land Planning / Land Development / Urban planningSurveying service / Energy usage planning service
PM, CM, SupervisionConstruction Management ProfessionalGeneral/Project supervision and construction servicesFire-fighting facilities design & construction supervision serviceLease & Sale of real estate and other real estate related service, real estate development
Road & RailwayGeological servey / Tunnel / Steel Structure & Concrete / Soil & FoundationTraffic impact assessment serviceRoad & Railway design / Railway Track & Vehicles MaintenanceProduction and design GIS map
Etc.Quality management system certificate (ISO 9001)Environmental management system certificate (ISO 14001)Information Security Management System Requirements(ISO 27001)Software consultancy development and supply
ihon Suido Consultants &
UNJIN
NITED
NSU
NETWORKS

08Portfolio
12 Nihon Suido Consultants Sunjin United
WATER SUPPLY
The Project for Rehabilitation of Water Supply Facilities in Savannakhet Area, Laos
Laos
Rehabilitation project of existing water treatment plant,
distribution reservoir, pipeline
Basic design, detailed design, and construction supervision
Client_ JICA, Government of Laos
2000-2003
Basic Design on Rehabilitation of China-Japan Friendly Purification Plant Facilities in Chang Chun, China
China
Rehabilitation of existing WTP
(300,000㎥/day) facilities Basic design
Client_ JICA
2001 - 2002
Nadi-Lautoka Water Supply Scheme, Fiji (Augmentation Works)
Fiji
Treatment plant: 23,000㎥/day, 4,000㎥/day,
9,000㎥/day Reservoir, pipeline
Detailed design and construction supervision
Client_ Government of Fiji (JBIC loan)
1999 - 2003
Preliminary and Detailed Design for Advanced Water Treatment Plant of Yeongdeungpo Water Center(#3), Korea
Korea
Activate Carbon Chamber: 225,000㎥/day,
Relay Pumping Station : 300,000㎥/day
Client_ The office of Waterworks
Seoul Metro Gov’t
2008

1 4
Portfolio_ 08 WATER SUPPLY
14 Nihon Suido Consultants Sunjin United
The Meru Water Supply Project, Kenya
Kenya
Rehabilitation and Improvement of raw
water main, existing treatment plant,
transmission/ distribution pipeline
Advisory service on operation and
maintenance Basic design, detailed design,
and construction supervision
Client_ JICA, JBIC loanGovernment of Kenya
1999-2004
Nhon Trach Water Supply Project Dong Nai Province, Vietnam
Vietnam
Industrial and domestic water supply;
WTP: 105,000㎥/day, Intake, pumping station, transmission
and distribution pipeline, elevated tank, power system
Detailed design and construction supervision
Client_ JBIC loan
2000-to date
Master Plan for Reduction of Water Pollution of Sava River, Croatra
Croatia
Preparation of Master Plan on water Pollution
reduction and Feasibility Study for wastewater
management in selected 5 cities Master plan
and feasibility study
Client_ JICA
2000-2001
Preliminary & Detailed Design for Construction of Advanced Water Treatment Facilities of Amsa-dong Arisu Water Center, KoreaKorea
WTP : Q=1,110,000㎥/day
Client_ Office of Waterworks, Seoul Metropolitan Government
2008
Chun Industrial Water Supply Project, China
China
Treatment Plant:
250,000㎥/day, Raw Water Pipe: D1,600mm
x L26.9km, Transmission
Pipe:D1,400mm x L10km, Distribution
Pipe:D400-1,200mm x L136km
Feasibility study, detailed design,
construction supervision, and follow-up study
Client_ Government of China (JBIC two step loan)
1994-1996

Portfolio_ 08 WATER SUPPLY
Beijing No.9 Waterworks Extension Project(Phase 3),
China
Bangkok Water SupplyImprovement Project (1~7th), Thailand
Jakarta Water Supply Implementation Project (Buaran- II), Indonesia
China
Expansion of Beijing No. 9 WTP (additional
500,000㎥/day)
Advisory service for detailed design and
construction supervision
Client_ Government of China(JBIC loan)
1997-2000
Thailand
Expansion of water supply facilities; Treatment
Plant:400,000㎥/day x 2 nos.,
Transmission pipe: D1,500-3,200mm x L21.2km,
Reservoir: 40,000㎥, as well as UFW reduction program
Detailed design(1999-2000), Construction supervision and
UFW reduction pilot project(2001-2005)
Expansion of water supply facilities from 2,800,000㎥/day
to 3,200,000㎥/day
Construction supervision
Client_ Government of Thailand(JBIC loan, OECF loan)
1995-1999
Indonesia
(OECF loan)
Construction of Buaran-II water treatment plant
producing 259,200㎥/day of potable water to
distribute it to eastern part of Jakarta city
Detailed design
Client_Government of Indonesia
1987-1988
Detailed Design and Supervision Service for Advanced Water Treatment Plant of Gwangam Arisu Water Center, Korea
Korea
WTP : Q=250,000㎥/day
Client_ Office of Waterworks, Seoul Metropolitan Government
Capacity Development Project for Non-Revenue Water Reduction
in Jordan
Jordan
Master planning and feasibility study of the wastewater
management for the Guatemala Metropolitan area
Master plan and feasibility study
Client_ JICA
1995-1996
16 Nihon Suido Consultants Sunjin United

The Project for Rehabilitation ofWater Supply Facilities in Seven Districts,
Dominica
The Project for Improvement of Water Supply System for the City of Huaquillas and Arenillas, Ecuador
The Rural Water Supply Project in Sulawesi Island, Indonesia
Indonesia
Rural water supply system for 19 core areas of subdistricts: Intake, Pipe, Reservoir
Basic design, detailed design, and construction supervision (2000-2004) Small and Medium Sized Towns Water Supply,
Sulawesi, Indonesia Study for five towns in Sulawesi in frame work of PELITA III (the Third 5 year Development Plan 1979-1984)
Feasibility studies and preliminary design
Clinet_ JICA, Government of Indonesia
1980
Dominica
Rehabilitation of 7 water treatment plants, reservoirs, and
pipelines Basic design, detailed design, & construction
supervision
Clinet_ JICA, Government of Dominican Republic
2001-2004
Ecuador
Construction of intake, pipelines, water
treatment plant, and distribution reservoir
Basic design, detailed design,
and construction supervision
Clinet_ JICA, Government of Ecuador
2004-2006
18 Nihon Suido Consultants Sunjin United
Portfolio_ 08 WATER SUPPLY
Utilization of Additional Production Capacity on Ujung Pandang Water Supply Development Project, Indonesia
Astana City Water Supply and Sewerage Project, Kazakhstan
Indonesia
Construction of distribution network system; Pipe D150-
1,000mm x L4.02km,
Distribution main, Service main Feasibility study, detailed
design, and construction supervision (1999)
Improvement of water supply facilities; Treatment Plant: 86,400㎥/day,
Pipe: D150-1,100mm x L79km PumpConstruction supervision
Client_ Government of Indonesia (JBIC loan)
1995-2000
Kazakhstan
Construction of 210,000㎥/day intake, 100,000㎥/day
treatment plant, 5.6 km distribution pipelines, replacement
of 100 km existing pipelines. Construction of rehabilitation
of the 136,000㎥/day sewage and sludge treatment facility,
rehabilitation of 17 pump stations, replacement of 20.6 km
of sewers, and replacement of 5,300 manhole covers.
Construction supervision
Client_ Government of Kazakhstan (JBIC Loan)
2004-2008
India
Master plan for augmentation of water supply and sanitation
in Goa State. The target year of the master plan is 2020;
& a feasibility study for priority project Master plan up to
2020, feasibility studies and preliminary design
Client_ JICA
2005-2006
India Study on Augmentation of Water Supply and Sanitation for the
Goa State, India

Preliminary & Detailed Design forImprovement Works of Seonam Sewage Treatment Plant, Korea
Preliminary Design for Improvement Works and Advanced Treatment Process(T/K), Seonam Sewage Treatment Plant, Korea
Korea
STP Capacity : Q=2,000,000㎥/day
Clinet_ Seoul Metro Gov’t
2003
Korea
STP Modernization Works : Q=360,000㎥/day,
Advanced Treatment Process Improvement :
Q=1,150,000㎥/day
Clinet_ Daewoo E&C Co., LTD.
2008
1 420 Nihon Suido Consultants Sunjin United
09Portfolio
SEWERAGE Master Plan for Rehabilitation & Expansion of Existing WTP, Santiago
Detailed Design of Kandy City Wastewater Plant, Sri Lanka
Santiago
Preparation of Master Plan for rehabilitation
and expansion of existing wastewater
treatment plant and pipelines
Master plan and feasibility study
Clinet_ JICA
2000-2002
Sri Lanka
Construction of collection system, sewerage
treatment plant, branch sewer pipe Detailed
design and tender assistance
Clinet_ Government of Sri Lanka (JBIC loan)
2008 - to date
Singapore The Covering of Existing Treatment Units and Extension works at Kranji Sewage Treatment works, Singapore
Singapore
Covering of existing treatment units (76,000㎥/day)
Extension works of 76,000㎥/day sewage
treatment plant Basic design, detailed design
& construction supervision
Clinet_ Government of Singapore
1992-1994
B1F Basement O&M Space
B2F Basement Treatment Space

Design for Sewage Facilites of Andong Imha Dam, Korea
Feasibility Study and Master Plan for Advanced Treatment Process of 4 Sewage Treatment Plants, Korea
Detailed Design for BTO of Geomdan Sewage Treatment Plant, Korea
Preliminary and Detailed Design for Ganam-myeon Sewage Treatment Plant, Yeoju-gun, Korea
Master Plan & Bidding Document for Advanced Treatment Process of Jeonju Sewage Treatment Plant, Korea
Korea
Total Capacity of 4 STP in Seoul City : Q=5,810,000㎥/day
Clinet_ Seoul
2001
Korea
STP Capacity : Q=120,000㎥/day,
Sewerage Pipe : L=30,477m
Clinet_ Hanwha Engineering & Construction Corp.
2000
Korea
STP Capacity : Q=4,000㎥/day, Sewerage Pipe : Φ300
~Φ500mm, L=20.6km
Clinet_ Yeoju-gun
Korea
STP Capacity : Q=303,000㎥/day
Clinet_ Jeonju-si
Korea
3 STP, Community STP : New 30, Retrofitting 17,
Sewerage Pipe : Φ80~Φ350mm, L=163.0km, 98 Pump Sta.
Clinet_ Hanwha Engineering & Construction Corp.
2005
Portfolio_ 09 SEWERAGE
22 Nihon Suido Consultants Sunjin United

Southern Binh Duong Province Water Environment Improvement Project, Vietnam
The Development Study on the Improvement of Sewerage and Drainage System for the Havana Bay, Cuba
Cuba
The estimated population within the
Havana Bay basin is about 800,000 in 2000.
The objectives of the Study includes; to
formulate a master plan for improving
sewerage and drainage system for the Havana
Bay, & to conduct a feasibility study for the
priority project(s). feasibility study
Clinet_ JICA
2002-2003
Vietnam
Construction of Sewerage treatment plant (17,650㎥/day),
Pumping stations, and Trunk sewer and branch sewer
Detailed design and construction supervision
Clinet_ Southern Binh Duong Province,Vietnam (JBIC loan)
2008 - to date
Portfolio_ 09 SEWERAGE
24 Nihon Suido Consultants Sunjin United
Bidding Document of T/K Project for Water Treatment Plant of Seoho River, Suwon City, Korea
Preliminary Design of T/K Project for Yeongjong Water Restoration Center, Yeongjong Sky City, Incheon Free Economic Zone, Korea
Preliminary & Detailed Design for Sojeong-myeon Sewage Treatment Plant & Community Sewer System Management, Yeongi-gun, Korea
Korea
STP Capacity : Q=47,000㎥/day
Clinet_ DAEWOO Engineering & Construction Co., Ltd.
Korea
STP : Q=24,000㎥/day
Treated Sewage Facility : Q=18,000㎥/day
Clinet_ DaeLim Industrial Co., LTD.
Korea
PhaseⅠ : STP Q=468㎥/day, PhaseⅡ : STP
Q=1,070㎥/day
Clinet_ Yeongi-gun

Preliminary & Detailed Design for Waste Water Treatment Plant of Geomdan Industrial Estate, Korea
Korea
STP : Q=9,000㎥/day, Interceptor : L=227.7m
Clinet_ Hyosung Ebara Engineering Co., LTD.
Preliminary & Detailed Design for Tongil-Dongsan Sewage Treatment Plant,
Paju, Korea
Korea
Extension of STP : Q=6,000㎥/day
Clinet_ Cheil Engineering Co., LTD. Detailed Design for Advanced Treatment Process and Extention of
Gwangyeong Sewage Treatment Plant, Gwangyang, Korea
Korea
Target Year : 2025
Project Area : 428.4ha
Target Population : 21,562
Clinet_ Hae Dong Construction Co., LTD.
2008
Detailed Design for Advanced Treatment Process(T/K) of Gajwa Sewage Treatment Plant, Korea
Korea
STP Capacity : Q=350,000㎥/day
Clinet_ Posco Construction Corp.
2007
Feasibility Study on the Wastewater Treatment along the Danube River Downstream Reach, Romania
Romania
Feasibility Study on wastewater management in
seven cities Feasibility study
Clinet_ JICA
1999-2000
26 Nihon Suido Consultants Sunjin United
Portfolio_ 09 SEWERAGE

Transmigrate and Underground Project of Sinanha Sewage Treatment Plant in Yeondae
City, China
Underground Project of Tujaman Sewage Treatment Plant in Yeondae City, China
China
STP Capacity : Q=120,000㎥/day
Project site area: 130,000㎡ Treated Water Reuse
2011
China
STP Capacity : Q=500,000㎥/day
- Construction & Architecture : 500,000㎥/day
- Mechanic, Electric, Instrument : 400,000㎥/day
- Treated Water Reuse: 100,000㎥/day
2011
Portfolio_ 09 SEWERAGE
28 Nihon Suido Consultants Sunjin United
Dubai Waterfront Project Proposal Design (STP/PP), Dubai UAE
Doha South Sewage Treatment Works Project, Qatar
Proposal Design for Dubai International City STP, Dubai UAE
T/K Project for Advanced Treatment Process of Sewage Treatment Plant, Suwon, Korea
Dubai UAE
STP : Q=114,000㎥/day, L=2.0km
Clinet_ GS E&C Co., LTD.
2008
Korea
STP Capacity : Q=220,000㎥/day
Clinet_ Samsung Engineering Corp.
2005
Qatar
STP : Q=80,400㎥/day
Clinet_ Daewoo E&C Co., LTD.
2008
Dubai UAE
STP : Q=44,000㎥/day
Project Area : 67,584㎡
Clinet_ Samsung Engineering Co., LTD.
2008
����������������� ��
������� ��
������������������
���������������������������������������������������
����������������������������������������
������� ��

Detailed Design of Natural River for Hakeui Stream, Korea
Basic Design for Revival of Nakdong River(23rd Section, T/K), Korea
Detailed Design of Restoration for Gwangju Stream, Korea
Basic Design for Han River Restoration(6th Section), Korea
Detailed Design of Natural River of Sungnae Stream, Korea Korea
Natural Stream Detail Design, Sungnae Stream : 3.2km, Gami Stream : 0.4km
Clinet_ Songpa-gu
2006
Korea
Natural River Detail Design, Length : 3.97km
Clinet_ Anyang-si
2002
Kora
Design for Soil & Foundation of Nakdong River Gangjeong Weir
Clinet_ Daelim Industrial Company
2009
Korea
Design, Length : 4.530km
Clinet_ Gwangju-si
2002
Korea
- Water supply and Measure of the flood response
- Composition of Hydrophilic environment and promote
Activation of regional development
Place : Yeoju Yeojueup Sangri ~ Jomdongmyeon
Samhapri Construction range : 17.5km
(Hydrological Equipment, Small hydropower plants,
Pumping Station, Drainage Station)
Clinet_ SK E&C
2009
10
30 Nihon Suido Consultants Sunjin United
RIVER ENGINEERING
Portfolio

Detailed Design for Improvement Works of Sinjeong3 Stormwater Pump Sta., Korea
Preliminary and Detailed Design for Extention of Yangpyeong Pump Sta., Korea
Korea
Total Pumping Capacity : 560㎥/min
Clinet_ Yangcheon-gu
2002
Korea
Extention of P/S (Q=397㎥/min,Q=450㎥/min)
Clinet_ Yeongdeungpo-gu
2007
Yangpyeong pump sta. Dorim pump sta.
11Portfolio
32 Nihon Suido Consultants Sunjin United
STORM WATER PUMP STATION
Preliminary andDetailed Design for Extention of
Daechi Pump Sta., Korea
Korea
Extention of P/S (Q=362㎥/min)
Clinet_ Gangnam-gu
2007
Preliminary & Detailed Design (Extension 1 Area) for Improvement in Facility Capacity of Stormwater Pump Sta., Korea
Korea
Total Detention Reservoir : 420,600㎥
Clinet_ Seoul
2008

12
34 Nihon Suido Consultants Sunjin United
Major Project Lists
MAJOR PROJECT LISTS
Preliminary Design for Industrial Waterworks of Gunjang Industrial
Complex
Pipe Line L=37.1km
Korea Water Resources Corp.
Detailed Design for Interceptor, Seoho River
Interceptor : L=1.6km
Suwon-si
Survey and Master Plan for Sewer System of Jungnang River
Project Area : 5,666.39ha, Pipe Line : Φ250~Φ1500mm, L=31,300m,
Culvert : L=2,660m
Seoul
Preliminary Design for Punggi-eup Sewage Treatment Plant
STP Capacity : Q=10,000㎥/day, Interceptor : Φ500~Φ1350mm,
L=20.75km
Ministry of Environment
Preliminary Design for Paengseong Sewage Treatment Plant,
Pyeongtaek
STP Capacity : Q=7,000㎥/day, Interceptor : Φ800~Φ1100mm,
L=3,990m
Ministry of Environment
Preliminary & Detailed Design for Mt. Wau Distribution Reservoir
Distribution Reservoir : V=60,000㎥
The Office of Waterworks Seoul
Detailed Design for Extension of Dongducheon Sewage Treatment
Plant
STP Capacity : Q=21,000㎥/day, Interceptor : L=19.85km
Dongducheon-si
Preliminary & Detailed Design for Waterworks of Jucheon-myeon &
Jinan-eup, Jinan-gun
Distribution Reservoir : 640㎥, Pipe Line : 15km
Jinan-gun
Preliminary Design for Jeonui Sewage Treatment Plant, Yeongi-gun
1st stage : 2,000㎥/day, 2nd stage : 1,000㎥/day,
Pipe Line : Φ300~500mm, L=4.0km
Ministry of Environment
Detailed Design for Interceptor of Woncheon River
Interceptor : Φ350~▣1.8×1.8, L=16.096km, Pump Sta : 1EA
Suwon-si
Preliminary & Detailed Design for Waterworks of Sillim-myeon
WTP Capacity : Q=1,000㎥/day, Transmission Pipe : L=13.8km
Wonju-si
Survey & Preliminary Design for Sewer System, Anyang River
Project Area : 2,624.79ha, Pipe Line : L=449.914km
Seoul
Master Plan for Sewer System, Seoul
Project Area : 605.9㎢, Design Population : 12 Million Persons,
STP Capacity : Q=7,555,000㎥/day, Interceptor : L=383km
Seoul
Detailed Design for Paengseong Sewage Treatment Plant
STP Capacity : Q=7,000㎥/day, Main Process : Oxidation Ditch,
Interceptor : L=2.7km
Pyungtaek-si
Preliminary and Detailed Design for Interceptor Facilities
Pipe line : Φ200~Φ500mm, L=12.9km
Dongducheon-si
Preliminary Design for Jeonui Sewage Treatment Plant and Master
Plan for Sewer System, Yeongi-gun
STP Capacity : Q=2,000㎥/day, Interceptor : Φ300~Φ500mm,
L=4.36km, Sewerage Pipe : L=2,100km
Yeongi-gun
Preliminary and Detailed Design for Pump Sta. and Sewer System of
Jisan-dong
Interceptor : Φ300~Φ800mm, L=4.62km,
Pump Sta. : Q=22,700㎥/day
Gumi-si
Survey & Preliminary Design for Sewer System of Deungchon
Project Area : 748.5ha, Survey of Sewer : L=153.33km
Seoul
Master Plan for Sewer System of Yongsu River, Banpo-myeon
STP Capacity : Q=11,000㎥/day, Pipe Line : L=80.3km,
Interceptor : L=10.14km
Gongju-si
Survey and Detailed Design for Industrial Waterworks, Daejeon
L=0.5km / Distribution Reservoir : V=21,100㎥,
Distribution Pipe Line : Φ900~Φ1200mm,
L=6.0km, Raw Water Pipe Line : Φ1,100mm, L=0.5km
Daejeon City Waterworks Authority
Master Plan for Sewer System, IncheonProject Area : 456.1㎢, Design Population : 2,967,000,STP Capacity : Q=2,941,000㎥/day,Sewerage Pipe : L=3,571km, Interception : L=95.4kmIncheon-si
Preliminary and Detailed Design for Interceptor of Hwangguji-RiverInterceptor : Φ500mm~▣3.0×2.5, L=17.5kmSuwon-si
T/K Project for Heunghae Sewage Treatment PlantSTP Capacity : Q=25,000㎥/dayHanwha Engineering & Construction Corp.
Preliminary Design for BTO of Geomdan Sewage Treatment PlantSTP Capacity : Q=120,000㎥/day, Sewerage Pipe : L=30,477mHanwha Engineering & Construction Corp.
Detailed Design for Distribution Pipe of Mt. Acha Water Distribution Reservoir, Etc.Transmission & Distribution Pipe Line : Φ500~Φ900mm, L=17,402mThe Office of Waterworks Seoul City
Preliminary and Detailed Design for Ganam-myeon Sewage Treatment Plant, Yeoju-gunSTP Capacity : Q=4,000㎥/day, Sewerage Pipe : Φ300~Φ500mm, L=20.6kmYeoju-gun
Detailed Design for Geumsa & Sanbuk Sewerage Treatment Plant, Yeoju-gunSTP Capacity : Q=1,000㎥/day,Sewerage Pipe : Φ80~Φ300, L=8.9kmYeoju-gun
Master Plan for Sewer System, IcheonDrainage Area : 46,393ha, Project Area: 6,851ha,Sewerage Pipe : L=186.11km, Interceptor : L=155.1km,STP Extension : 4 Points(Q=1,400~3,300㎥/day)Icheon-si
Preliminary & Detailed Design for Bogwang Storm Water Pump Sta.Suction Well : V=2,300㎥, Pump Sta : Q=606㎥/minYongsan-gu
Detailed Design for Separate Sewer SystemSewerage Pipe : Φ100~Φ400mm, L=68.34kmCheonan-si
Feasibility Study and Master Plan for Advanced Treatment Process
of 4 Sewage Treatment Plants
Total Capacity of 4 STP in Seoul City : Q=5,810,000㎥/day
Seoul
Feasibility Study for Sewer System, Suwon
Survey Area : 3,158ha
Suwon-si
Preliminary and Detailed Design for Waterworks of Seokbo
WTP Capacity : Q=1,000㎥/day, Conveying Pipe : L=760m,
Distribution Pipe : L=28,229m, Service Pipe : L=2,669m
Yeongyang-gun
Preliminary & Detailed Design for Dongryang Sewage Treatment
Plant, Chungju
STP Capacity : Q=400㎥/day, Sewerage Pipe : 13.7km
Chungju-si
Prevention Program of Flood Damage, Garibong Sta. Area
Ronovation & Sewerage Pipe : L=1,076.4m
Geumcheon-gu
Master Plan & Bidding Document for Advanced Treatment Process
of Jeonju Sewage Treatment Plant
STP Capacity : Q=303,000㎥/day
Jeonju-si
Detailed Design for Banghwa Stormwater Pump Sta.
Detention Reservoir : 8,200㎥, Total Pumping Capacity : 670㎥/min
Gangseo-gu
Preliminary Design for Incheongyo Pump Sta.
Sewerage Pipe : L=9,747m, Renovation Pipe : L=3,219m,
Pump Capacity : Φ700×42㎥/min×55kw×2EA
Incheon-si
1995
2000
1999
2001
2002
1998
1996
1997

36 Nihon Suido Consultants Sunjin United
Major Project Lists
Preliminary Design for Pumping Station as the Analysis of 2001
Flooding in Gangnam-gu
Detention Reservoir : 99,450㎥
Seoul
Detailed Design for Improvement Works of Sinjeong3 Stormwater
Pump Sta.
Total Pumping Capacity : 560㎥/min
Yangcheon-gu
Preliminary and Detailed Design for Advanced Treatment Process of
Seobu Sewage Treatment Plant, Seogwipo
STP Capacity : Q=15,000㎥/day, Facility : BNR (B3 Process), Filtration
Seogwipo-si
Detailed Design for Retrofitting of Advanced Treatment System,
Jochiwon Sewage Treatment Plant
STP Capacity : Q=20,000㎥/dau, Facility : BNR, Filtration, isinfection
Yeongi-gun
Preliminary & Detailed Design for Jeongsan Sewage Treatment Plant
STP Capacity : Q=800㎥/day, Sewerage Pipe : L=9,010m
Cheongyang-gun
Preliminary & Detailed Design for Improvement Works of Seonam
Sewage Treatment Plant
STP Capacity : Q=2,000,000㎥/day
Seoul
Master Plan for Sewer System, Yeongi-gun
2 STP, 5 Sewerage P/S, 10 Community STP (8 New, 2 Extension),
Interceptor : L=20,440m
Yeongi-gun
Feasibility Study & Master Plan for Reuse Program of Storm Water
WTP Capacity : Q=3,500㎥/day, Pipe Line : L=4.22km
Sudokwon Landfill Site Management Corp.
Feasibility Study & Master Plan for Improvement Works of Sewer
System, Ganghwa-gun
Project Area : 3,170㎢, Sewerage pipe : L=42.040km,
Pipe Renovation : L=9,889m
Environmental Management Corp.
Master Plan for Sewage System, Incheon
Project Area = 30,592ha, Indoor Modeling Study
Incheon-si
T/K Project for Advanced Treatment Process of Sewage Treatment
Plant, Suwon
STP Capacity : Q=220,000㎥/day
Samsung Engineering Corp.
T/K Project for Sewage Facilites for the Upper of Soyanggang Dam
4 STP, Community STP : New 28, Retrofitting 68, 11 WTP,
Sewerage Pipe : Φ80~Φ400mm, L=143.2km, 100 Pump Sta.
Bumyang Construction Corp.
Design for Sewage Facilites of Andong Imha Dam
3 STP, Community STP : New 30, Retrofitting 17,
Sewerage Pipe : Φ80~Φ350mm, L=163.0km, 98 Pump Sta.
Hanwha Engineering & Construction Corp.
Preliminary & Detailed Design for Sewer System, Yeongi-gun
Drainage Area : 762.08ha, Project Area: 179.18ha, Sewerage Pipe :
Φ200~Φ 500mm, L=33.34km, Pipe Renovation : Φ300mm~▣1.2
×1.2m, L=12.33km,
Sewage Pump Sta. 1 point
Yeongi-gun
Detailed Design for Filtration & Disinfection Facilities of Gyeongju
Sewage Treatment Plant
STP : Q=110,000/day, Filtration Facility : Φ1,500mm×H3,000mm×
15(Fibered sand Filtration), Disinfection Facility : 500A×1.5m×3(UV
Disinfection)
Gyeongju-si
Detailed Design for Filtration & Disinfection Facilities of Gyeongju
Sewage Treatment Plant
STP : Q=110,000/day, Filtration Facility : Φ1,500mm×H3,000mm×
15(Fibered sand Filtration), Disinfection Facility : 500A×1.5m×3(UV
Disinfection)
Gyeongju-si
Preliminary & Detailed Design for Community Water Supply Facilites
Preliminary & Detailed Design for Sorae & Nonhyeon Sewage
Treatment Plant
Design for Sewer System of Songbang River & Waste Water
Treatment Plant of Jeongsan Agricultural & Industrial Complex
Cheongyang-gun
Bidding Document & Master Plan for Sewer System of Han River
Project Area : 5,430ha, Sewerage Pipe : L=210.91km, Pipe
Renovation : L=16.17km
nvironmental Management Corp.
Basic Design for Retrofitting of Advanced Treatment Process, Gajwa
Sewage Treatment Plant
STP Capacity : Q=90,000㎥/day
Posco Construction Corp.
Survey & Preliminary Design for Sewer System, Ganghwa-eup,
Ganghwa-gun
Project Area : 358.1ha, Sewerage Pipe : L=47.11km,
Pipe Renovation : L=4.12km, 6 Pump Sta.
Posco Engineering & Construction Corp.
Preliminary Design for BTL Project of Sewer System, Gimhae-si
Project Area : 30.07㎢, Sewerage Pipe : Φ80~Φ900mm,
L=92.42km, Pipe Renovation : L=9.25km, 16 Sewage Pump Sta.
SK Engineering & Construction Corp.
Detailed Design for Sewer Renovation
Preliminary Design for Extension of Myeonmok Stormwater Pump
Sta. Jungnang-gu
Preliminary & Detailed Design for Sewer System of Doksan-1Dong
Sewerage Pipe : Φ250~Φ300mm, L=2.27km,
Drainage pipe : Φ300~Φ800mm, L=1.906km
Geumcheon-gu
Bidding Document & Master Plan for Seoho River Sewage Treatment
Plant Suwon-si
Basic Design T/K Project for Seongnam Pangyo Water Restoration
Center
STP Capacity : Q=47,000㎥/day, Pump Sta. Q=35,000㎥/day
Sambu Construction Corp.
Master Plan & EIA for BTL Project of Sewer System, Seoguipo
Project Area : 12.23ha, Sewerage Pipe : L=101.6km,
Pipe Renovation : L=10.4km, 41 Pump Sta.
Environmental Management Corp.
Preliminary Design for BTL Project of Sewer System, Geumsan-gun
Sewerage Pipe : L=62.02km,
Pipe Renovation : L=3.97km, 3 Pump Sta.
Sungwon Corp.
Preliminary Design for T/K Project of Sewer Pipe, Suwon City
Project Area : 9.84㎢, Sewerage Pipe : L=1.7km,
Pipe Renovation : L=48.15km
Taeyoung Construction Corp.
Preliminary Design of BTL Project for Sewer System, Wanju-gun
Ultra Construction & Engineering Co. Ltd
Examination for the Construction Proposal of Gangdong & Gulhwa
Sewage Treatment Plant, Ulsan
Korea Development Institute
Preliminary Design for BTL Project of Sewer Facilities Extension,
Incheon
Hanwha Engineering & Construction Corp.
Preliminary Design for BTL Project of Sewer System, Jeju City
Project Area : 0.214㎢, Sewerage Pipe : Φ200mm~▣0.5×0.5m,
L=52.46km, Pipe Renovation : L=32.29km, 2 Sewage Pump Sta.
SK Engineering & Construction Corp.
Detailed Design for Sewer System of Han River
Daewoo Engineering Construction Co. Ltd
Detailed Design for Sewer System of Ganghwa
Project Area : 358.1ha, Sewerage Pipe : 48,644m,
Renovation Pipe : 2,532m
Posco Construction Corp.
EIA & Feasibility Study and BTL Project for Sewer System of Wonju
& Boryeong City and Seocheon-Gun
Project Area : 347.4ha, Swerage Pipe : 52,910m,
Renovation Pipe : 11,742m
Environmental Management Corp.
Detailed Design for Advanced Treatment Process(T/K) of Gajwa
Sewage Treatment Plant
STP Capacity : Q=350,000㎥/day
Posco Construction Corp.
Making a White Paper for Sewer System of the Area Which are
Supplied Water from Han River
Environmental Management Corp.
2002 2004
2005
2006
2003
2007

38 Nihon Suido Consultants Sunjin United
Major Project Lists
Master Plan for Water Supply & Water Demand Management,
Yoengi-gun
Project Area : 174.58㎢, Target year : 2025
Yoengi-gun
CCTV Survey & Watertight Test
CCTV Survey : L=32.7km, Watertight Test : 590 Pts.
Public Procurement Service
Bidding Document & Master Plan for Sewage Treatment Plant of
Bupil, Ichon
STP Capacity : Q=5,000㎥/day, Q=600㎥/day, Q=400㎥/day,
Target Year : 2011
Environmental Management Corp.
Feasibility Study for Water Supply and Sewage of Subic Bay,
Philippines
WTP Capacity : Q=50,000㎥/day, Water Pipe : L=26km,
Target Year : 2020
Environmental Management Corp.
Bidding Document of T/K Project for Water Treatment Plant of Seoho
River, Suwon City
STP Capacity : Q=47,000㎥/day
DAEWOO Engineering & Construction Co., Ltd.
Preliminary & Detailed Design for Interceptor of Wolmi, Incheon
Pump sta. : Q=12,000㎥/day, Intercepting Sewer Network : L=3.5km
Incheon-si
Detailed Design of BTL Project for Sewer System, Gimhae
Project Area : 30㎢, Sewer Network : L=92.42km,
Renovation : L=12.45km
SK Engineering & Construction Co., Ltd.
Detailed Design for Public Information Facilities of Songdo Waste
Water Reclamation and Reusing Plant
MF/RO Facility : Q=100㎥/day, Audio-Visual Room,
Streamlet : L=125m
IFEZA
Design of BTL Project for Sewer System, Boryeong
Project Area : 987ha, Sewrage Pipe : 52.3km, Renovation : 12.3km
Korea Developmet Corp. Co.,Ltd
Detaild Design of BTL Project for Sewer System of Geumsan-gun
Prject Area : 360.79ha, Sewer Network : L=62km
SUNGWON Corp.
Preliminary & Detailed Design of Sewage Treatment Plant &
Community Sewage Facility of Sojeong, Yeongi-gun
STP Capacity : Q=800㎥/day, Sewer Network : 41.8km
Public Procurement Service
Preliminary and Detailed Design for Extention of Daechi Pump Sta.
Extention of P/S (Q=362㎥/min)
Gangnam-gu
Preliminary and Detailed Design for Extention of Yangpyeong Pump
Sta.
Extention of P/S (Q=397㎥/min,Q=450㎥/min)
Yeongdeungpo-gu
Technical Consulting Services of Lake Water Purification and
Building an Artificial Lake for the Giang Vo and Me Tri Development
Project in Hanoi, Vietnam
Lake Purification System (Giang Vo Q=5,000㎥/day,
Me Tri Q=10,000 ㎥/day)
Geumho Industrial Co., Ltd
Preliminary and Detailed Design for Extention of Daechi Pump
Station (Technical Service)
Expansion Capacity of Pumping Stations (Q=3,120㎥/min)
Gangnam-gu
Detailed Design for Sewer System in Deungchon 1 Cathment
Project Area : 1.67㎢, Sewer Network : 28.26㎞
Gangseo-gu
Preliminary and Detailed Design for Advanced Water Treatment Plant
of Yeogdeungpo Water Center(#3)
Activate Carbon Chamber: 225,000㎥/day,
Relay Pumping Station : 300,000㎥/day
The office of Waterworks Seoul Metro Gov’t
Master Plan for Sewerage System, Ongjin-gun
Project Area : 164.28㎢, Target Year : 2025
Environmental Management Corp.
Master Plan for Sewerage System(Technical Support Serviece),
Ongjin-gun
Project Area : 164.28 ㎢, Target Year : 2025
Wetech
Detailed Design for Sewer System in Jong-Am Cathment, Seoul
D300mm∼□1.8×2.0m, L=8.34㎞ Sewer Network : L=8.34 km
Seongbuk-gu
Preliminary and Detailed Design Agricltural Village Sewerage
System, Cheongyang-gun
Small Scale Sewerage System(7 Areaes), Target Year : 2010
Cheongyang-gun
Master Plan, Environmental Impact Assessment, and Feasibility
Study of BTL Project for Sewer System
Project Area : Jinju-si (463.5ha), Jinan-gun (193.5ha),
Sewer Network : Jinju-si (57.2km), Jinan-gun (32.2km)
Environmental Management Corp.
Preliminary and Detailed Design for Domestic Water Development in
Agriculture Area and Rehabilitation of Small Scale Water Supply
System, Hwasung
Water Reservior(V=2,000㎥), Distribution System, Rehabilitation of
Small-Scale Water Supply Facilities (28 areaes)
Cheongyang-gun
Al Dhakhira Sewage Treatment Project
STP, Sanitary Pump Station, Sewer Network : Rising Main(70.54km),
Gravity(4,26km)
Daewoo E&C
Preliminary & Detailed Design for Rural Water Supply Development
Project in Agriculture Area, Walha-Bongsan
Distribution Reservoir : V=600㎥/day, Transmission & Distribution
Pipe : L=9.315km, Water Pipe : L=9.899km
Yeongi-gun
Preliminary and Detailed Design for Domestic Water Development in
Agriculture Area and Rehabilitation of Small Scale Water Supply System
Distribution Reservoir : V=2,000㎥/day, Distribution Pipe : L=69.7km
Korea Engineering Consultants Corp.
Preliminary & Detailed Design for Construction of Advanced Water
Treatment Facilities of Amsa-dong Arisu Water Center
WTP : Q=1,110,000㎥/day
Office of Waterworks, Seoul Metropolitan Government
Preliminary & Detailed Design for Sojeong-myeon Sewage
Treatment
Plant & Community Sewer System Management, Yeongi-gun
PhaseⅠ : STP Q=468㎥/day, PhaseⅡ : STP Q=1,070㎥/day
Yeongi-gun
Dubai Waterfront Project Proposal Design (STP/PP)
STP : Q=114,000㎥/day, L=2.0km
GS E&C Co., LTD.
Preliminary Design of T/K Project for Youngjong Water Restoration
Center, Youngjong Sky City
STP : Q=24,000㎥/day, Treated Sewage Facility : Q=18,000㎥/day
DaeLim Industrial Co., LTD.
Detailed Design and Supervision Service for Advanced Water
Treatment Plant of Gwangam Arisu Water Center
WTP : Q=250,000ton/day
Office of Waterworks, Seoul Metropolitan Government
Feasibility Study and Conceptual Planning for Multi-Functional
Tunnel of Seoul
Multifunctional Tunnel : L=17.6km, Road : L=10.6km,
Storage Tank : L=8.2km, ø=12.75m
Seoul
Preliminary Design of T/K Project for Yeongjong Water Restoration
Center, Youngjong Sky City, Incheon Free Economic Zone
STP : Q=24,000㎥/day, Treated Sewage Facility : Q=18,000㎥/day
DaeLim Industrial Co., LTD.
Detailed Design for Sewer System in Jong-am Catchment
Pipe Renovation : L=9,186m, Circular Pipe Renovation : L=2,525m,
Sewer Pipe : L=1,109m
Seongbuk-gu
Detailed Design for Geomdan Sewerage Treatment Plant
STP : Q=40,000㎥/day, Project Area : 449.98ha,
Target Population : 122,796
Hanwha Engineering&Construction Co., LTD.
Master Plan and Bidding Document for Stream-Improvement and
Effluent Reuse, Iksan
STP : Q=20,000㎥/day, Project Area : 1,470㎡
Environmental Management Corp.
Modification of Water Supply Master Plan and Establishment of
Water Demand Management, Cheongyang-gun
Facility : Q=33,000㎥/day, Water Pipe : L=121km
Yeongi-gun
Preliminary & Detailed Design for Cheongyang Sewer System
Management(PhaseⅢ) and Community Sewer System Improvement
STP : Q=770㎥/day, Sewer Pipe : L=28.445km
Cheongyang-gun
Preliminary & Detailed Design for Myeongseong-ri Sewerage
Treatment Facilities Construction
Facility : Q=150㎥/day, Sewer Pipe : L=11.0km
Yangpyeong Environment Affairs Agency
2007
2008
2009

40 Nihon Suido Consultants Sunjin United
Major Project Lists
Preliminary & Detailed Design for Sewer System, Jangnim Service Area
Sewer Pipe : L=16.89km, Manhole : 503EA, House-inlet : 1,532EA
Busan-si
Detailed Design for Removing Box Construction, Yeoksam-dong 662
Pipe Line Survey : L=0.33km
Gangnam-gu
Master Plan of Pilot Project for Integrated Operating System of Rural
Water Supply in Jeollanam-do Province
STP : Q=491,550㎥/day, Population Plan : 678,236,
Target Population : 446,289
Environmental Management Corp.
Detailed Design for Sewerage System, Cheongyang-gun
STP : Q=50㎥/day, Sewerage Pipe : L=1.094km
Cheongyang-gun
Preliminary & Detailed Design for Cheongyang Sewer System
Management(PhaseⅢ) and Community Sewer System Improvement
STP : Q=770㎥/day, Sewer Pipe : L=28.445km
Sahmyook Engineering Co., LTD.
Detailed Design for Sewer System in Dorim Catchment 1
Total Pipe Line : L=57km (Pipe Renovation : L=5.294km,
Sewer Pipe : L=1.999km, Change Pipe : L=84.946km)
Yeongdeungpo-gu
Preliminary & Detailed Design for Tongil-Dongsan Sewage
Treatment Plant, Paju
Extension of STP : Q=6,000㎥/day
Hyosung Ebara Engineering Co., LTD.
Proposal Design for Dubai International City STP
STP : Q=44,000㎥/day, Project Area : 67,584㎡
Samsung Engineering Co., LTD.
Preliminary & Detailed Design for Tongil-Dongsan Sewage
Treatment Plant, Paju
Extension of STP : Q=6,000㎥/day
Cheil Engineering Co., LTD.
Preliminary and Detailed Design for Namyang and Bibong Domestic
Water Supply Development in Agriculture Area
Transmission Pipe : L=100km, ø=200~50mm
Cheongyang-gun
Preliminary & Detailed Design for Stormwater Storage Tank
Construction of Nokbeon-dong Athletic Park
Project Area : 1,250㎡, V=6,875㎥(4,875㎥)
Eunpyeong-gu
Preliminary & Detailed Design for Stormwater Reduction Facillities in
Mugungwha Park
Storage Tank : V=2,530㎥
Gangseo-gu
Preliminary & Detailed Design for Treated Sewage Effluent Facilities
of Gulpo Sewage Treatment Plant
STP : Q=75,000㎥/day, Pipe Line : L=1.08km
Incheon-si
Preliminary Design for Improvement Works and Advanced Treatment
Process(T/K), Seonam Sewage Treatment Plant
STP Modernization Works : Q=360,000㎥/day,
Advanced Treatment Process Improvement : Q=1,150,000㎥/day
Daewoo E&C Co., LTD.
Preliminary & Detailed Design (Extension 1 Area) for Improvement in
Facility Capacity of Stormwater Pump Sta.
Total Detention Reservoir : 420,600㎥
Seoul
Detailed Design for Advanced Treatment Process and Extention of
Gwangyeong Sewage Treatment Plant, Gwangyang
Target Year : 2025, Project Area : 428.4ha, Target Population : 21,562
Hae Dong Construction Co., LTD.
Preliminary Design for Bupil, Sogo and Songgye Public Sewage
Project, Icheon
Project Area : 776.11ha, Target Population : 21,307
Facility : Q=6,000㎥/day
Sungjee Construction
Master Plan for Sewerage System, Boryeong
Project Area : 569.01㎢, Target year : 2025
Boryeong-si
Master Plan, EIA and Feasibility Study of BTL Project for Sewer
System, Chuncheon
Project Area : 605.38ha, Sewer Pipe : L=84.946km,
Pipe Renovation : L=18.674km
Environmental Management Corp.
Doha South Sewage Treatment Works Project
STP : Q=80,400ton/day
Daewoo E&C Co., LTD.
Preliminary & Detailed Design for Treated Sewage Effluent Facilities
of Gulpo Sewage Treatment Plant
STP : Q=75,000㎥/day, Sewer Pipe : L=1.08km
Sejong Engineering Co., LTD.
Preliminary & Detailed Design for Bodeok and Yucheon 2-ri
Community Sewage Facilities, Yeongi-gun
Bodeok : STP Q=151㎥/day, Sewer Pipe L=4,641m
Yucheon : STP Q=200㎥/day, Sewer Pipe L=4,098m
Yeongi-gun
Preliminary & Detailed Design for Improvement & Extention of
Cheongyang Sewage Treatment Plant
Improvement of STP : Q=3,200㎥/day,
Extension of STP : Q=1,800㎥/day
Cheongyang-gun
CCTV Survey and Water Tightness of Sewer Pipe in Cheongtong
Service Area
CCTV Sewer Pipe Survey : L=26,801m,
Water Tightness Survey : ø=200, 573 Points
Public Procurement Service
Detailed Design for Tongil-Dongsan Sewage Treatment Plant,
Paju City
Extension of STP : Q=6,000㎥/day
Preliminary & Detailed Design for Extention and Advanced Treatment
Facilities Installation of Gwangyang Sewage Treatment Plant
Target Year : 2025, Project Area : 428.4ha,
Target Population : 21,562
Hae Dong Construction Co., LTD.
Preliminary & Detailed Design for Community Sewage Facilities of
Bodeok, Yucheon 2-ri, Yeongi-gun
Bodeok : STP Q=151㎥/day, Sewer Pipe L=4.64km,
Yucheon : STP Q=200㎥/day, Sewer Pipe L=4.01km
Yeongi-gun
Modification of Water Supply Master Plan and Establishment of
Water Demand Management, Cheongyang-gun
Facility : Q=3,650㎥/day, Water Pipe : L=84.6km
Cheongyang-gun
Examination for Construction Proposal of Reusing Sewage of
Dalseong Industrial Complex Waste Water Treatment Plant
Storage Tank : W6.95 X L24.7 X H6.0 X 2EA
Korea Development Institute
Master Plant for Sewer System, Boryeong
Project Area : 569.01㎢, Target Year : 2025
Kyongdong Engineering Co., LTD.
Preliminary & Detailed Design for Extension and Improvement of
Cheongyang Sewage Treatment Plant
Improvement of STP : Q=3,200㎥/day,
Extension of STP : Q=1,800㎥/day
Cheongyang-gun
Master Plan(Revise) for Water Supply System & Water Demand
Management, Cheongyang-gun
Facility : Q=3,650㎥/day, Water Pipe : L=84.6km
Cheongyang-gun
Basic & Detailed Design for Development Works of Water in Rural
Area, Namyang & Bibong Area
Transmission Pipe : L=100km, ø=200~50mm
Korea Engineering Consultants Corp.
Oman New Darsait STP Project
Proposal Design for Project of Oman New Darsait STP
STP : Q=45,000㎥/day
GS E&C Co., LTD.
Master Plan for Livestock Manure Management, Gwangju City
Target Year : 2019, Proposal for Reuse Method of Livestock Manure
Gwangju City, Gyeonggi-do
Preliminary & Detailed Design for Waste Water Treatment Plant of
Geomdan Industrial Estate
STP : Q=9,000㎥/day, Interceptor : L=227.7m
Hyosung Ebara Engineering Co., LTD.
Basic & Detailed Design for rain water retaining facility project in
Nokbeon sports park
Retaining facility : V=6,875㎥, Area : 1,250㎡
Eun-pyoung District
Detailed Design for rain water retaining facility in Mugunghwa park
Retaining facility : V=2,530㎥, Area : 506㎡
Gang-seo District
Preliminary & Detailed Design for Biological Reactor Cover of Suwon
Sewage Treatment Plant
Cover : W6.75 X L40.5 X H1.2 X 32EA,
Vacreator : 450(㎥/min) X 2EA
Suwon Environment Affairs Agency
Environment Management Master Plan in the Kingdom of Cambodia
Plan for Environment Facility in 3 Cieies
(Phnom Penh, Siem Reap, Preah Sihanouk)
Cambodia Government
Master Plan for Sewer System, Yangpyeong-gun
Project Area : 877.81km2, Target Year : 2025
Yangpyeong-gun
Preliminary & Detailed Design for Development Works of Water in
Rural Area, Yeolha & Bongsan Area
Bongsan : V=600㎥/day, Transmission Pipe : L=9,315m
D=75~350mm, Water pipe : L=9,879m D=16~75mm
Yeonggi-gun
2009
2010