Page 1: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

WMS IMPLEMENTATIONWMS IMPLEMENTATION

Tales of the Unexpected

Page 2: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

COMPANY PROFILECOMPANY PROFILE

h Established 1870

h Privately ownedh The largest Independent Multi-Modal Freight

Forwarder in the UKh Warehouse storage, pick, pack, rework and

distribution

h Annual turnover in excess of £125 million

h Over 750 employees

h State of the art strategically placed hub operations

h 20 branch locations throughout the UK

Page 3: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

Page 4: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

Group Turnover 5 Yr TrendGroup Turnover 5 Yr Trend

Year

2004-05

2003-04

2002-03

2001-02

2000-01

£125m

£119m

£106m

£ 95m

£ 90m

Page 5: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

DartfordDartford

The 7 acre site comprises 6,600 sqm of warehousing with 15.5m high bay racking with capacity for 11,000 pallet spaces. Additionally there is 6,800sqm multi-tiered mezzanine plus 2400 square metres office accommodation on 3 floors, all protected by 24 hours manned security and cctv surveillance throughout.•44 end-loading doors with powered dock levelers.•Pallet truck conveyor train system.•Truck and swap body collection and delivery fleet.•HM Customs ICD,ERTS,Bonded warehouse and REDS.

Page 6: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

COLESHILLCOLESHILL

The 7.5 acre (3 Ha) site includes:

• Phase I purpose built multi-user warehouse with 5,850 m2 floor space plus 3000 pallet locations. In addition 3000 m2 of mezzanine floor space and a 3 storey office block totalling another 1,500 m2

• Phase II warehouse with a further 6500 m2 with 12.5metres clear eaves height and storage capacity for 10,000 pallet loads plus another 5000 m2 of mezzanine floor space for order sorting

• 24 hour manned security and CCTV surveillance throughout

Page 7: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

BRISTOLBRISTOL

The building of Phase II will create a single 6 acre site including:

• Phase I purpose built transit facility with a total of 5,000 m2 of floor space including over 2,000 m2 of mezzanine floor. 14 dock levelling doors and 1 pier for side loading plus office space for over 40 operators.

• Phase II distribution centre will have 21 loading doors and will hold around 11,000 standard pallets in high-bay racking, plus 4 mezzanine floors giving a total floor area of over 12,000 m2.

• 24 hour security and CCTV surveillance throughout

Page 8: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

Operational ProcessOperational Process

Page 9: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

End-to-end supply chain and total outsourced solutions.• Point of Origin warehousing• Inbound Transport Road Distribution Full Load

• Container Pallet• Airfreight Parcel

• Warehousing• Receipt Pack• Putaway Label• Storage Pallet QC

• Carton Stickering• Break-pack Sortation• Tote Overwrap

• Pick Pallet Re-work• Carton Re-Box• Break-pack Re-Palletise

• Returns Management Warranty repairs• Kimball Bonded warehousing• Kitting/sub-assembly Asset Securitisation• Serial number tracking

• Web Portal E- Fulfilment• Accounts and Admin services

• Credit control• Invoicing• Order processing B2B and B2C

Page 10: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

KPI MeasuresKPI MeasuresSubject Area Measure(s) Target

Receipt and Quality Control

Items checked sorted and available for issue within 12 hours of receipt

99%

Stock Accuracy Book to physical stock accuracy. 99.7%

Pick Accuracy Percentage of items picked in accordance with customer requirements

99.5%

Delivery – Correct Day and including Correct Time where specified

Percentage of total deliveries made in full.

99% Own service.98% Carrier.

Collection of Returns Collections arranged and products returned to site within 72 hours of notification of requirement

98%

Processing of Returns

Returned items to be processed and ready for subsequent action within 24 hours of receipt

99%

Loss or Damage Percentage of total units lost or damaged.

0.0075%

Page 11: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

REFERENCESREFERENCES

River Island

Paul Smith

Arcadia Group Limited

Page 12: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The ProcessThe Process

h Committee made up of all interested parties –20

h Establish what the business users want

h Determine goals and objectives

h Set functionality specification

h Look at in-house proposal

h Send out tender and spec

h Search through tender responses

h Evaluate cost and functionality score sheet

h Shortlist

Page 13: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The ProcessThe Process

h Invite shortlisted parties in for outline demonstration.

h Final shortlist based on observed capability and meeting users requirements

h Set scenario test 1 hour before 2nd demo

h Final discussions with 2 preferred providers

h Appointment of Red Prairie

h From 20 strong committee determine Project implementation team and leader

h Set implementation goals and objectives

Page 14: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The ProcessThe Process

h Determine functionality Spec and two test clients which would test functionality

h Use process mapping tools to determine levels of customisation

h Train Users etc

h Set system up

h Test – Test – Test functionality, rules, set up and test clients under scenarios

h Agree outcomes and ‘sign off’ project

h Go Live

Page 15: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The SystemThe System

Red Prairie

Page 16: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

INFORMATION MANAGEMENTINFORMATION MANAGEMENT

RED PRAIRIE

DeliverablesClient Set-up Speedy

and Flexible

The leading supplier of Logistics Software

Real Time Stock

Control

Integrated Activity Based

Costing

End to End Supply Chain

visibility

Greater control of

clients business process

Page 17: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

INFORMATION MANAGEMENTINFORMATION MANAGEMENT

RED PRAIRIE Improvements

Increased Productivity leading

to improved competitiveness

Web access

for clients

Greater

Structure to our

processes

Page 18: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

INFORMATION MANAGEMENTINFORMATION MANAGEMENT

RED PRAIRIE

Picking

Kimballing

Controls Added Value

Process

Kit building

Asset Management

Page 19: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

INFORMATION MANAGEMENTINFORMATION MANAGEMENT

RED PRAIRIE

Logistics in Birmingham,

Dartford, Heathrow and Bristol .

Freight Forward

Warehouse during

Summer 2007

ImplementationGo Live

March

Page 20: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

INFORMATION MANAGEMENTINFORMATION MANAGEMENT

RED PRAIRIE

Picking

Kimballing

Controls Added Value

Process

Kit building

Logistics in Birmingham,

Dartford, Heathrow and Bristol .

Freight Forward

Warehouse during

Summer 2007

ImplementationGo Live

March

Asset Management

Improvements

Increased Productivity leading

to improved competitiveness

Web access for

clients

Greater

Structure to our

processes

Why Red Prairie?

Client Set-up Speedy

and Flexible

The leading supplier of Logistics Software

Real Time Stock

Control

Integrated Activity Based

Costing

End to End Supply Chain

visibility

Greater control of

clients business process

Page 21: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The SystemThe System

The Red Prairie WMS and Process Control

SKU set up and alternative SKU association. EAN128 swing ticket etcPack Configuration. The ability to handle multiple box set ups and different sources for product Client with multiple stock owners – WDT with Sonneti etc

Infinite lines to the pre advice receipt can be added easily.

Infinite Lines to the Order Build, Multiple orders can be packed together in one consignmentInfinite capability for electronic interface

Web access by client real time to Order Management and Inventory control

RDT used for 99.97% pick Accuracy

QC and lock status control

Inventory is TAG ID’d for entire transaction history

Lot No. and Batch traceability

Page 22: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The ChallengesThe Challenges

h Large Committee too unwieldy

h Appointed ‘Champions’ don’t necessarily make the grade

h Individuals see what they want in the system and not what is real

h Systemising bad practices

h System needs to be available immediately after training or better still before

h The expected easy parts of the system were overly complicated and happily vice-versa

Page 23: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The ChallengesThe Challenges

h Replicate the live environment

h Go live clients changed at both sites

h Composition of the implementation task force changed

h People get carried away with capability and it then becomes all things to all men

h Once we had the system we started selling the system and not the process

h Setting the system up

Page 24: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

Opportunities CreatedOpportunities Created

h Self sufficiency

h Super-users at each operational site

h New unexpected benefits – Freight Forwarding Business

h Speed of set up

h New ‘Champions’ appear from the most unlikely places.

h Harmonised working practices

h Communication between sites

h Billing of complex processes

Page 25: WMS IMPLEMENTATION - Aricia · WMS IMPLEMENTATION Tales of the Unexpected. Pioneers in service since 1870. COMPANY PROFILE hEstablished 1870 hPrivately owned ... hTo have a sophisticated

Pioneers in service since 1870.

The Objectives The Objectives –– AchievedAchieved

h To have a sophisticated and flexible WMS

h To have the opportunity to manipulate data easily

h To expand the logistics business by having a more competitive offering

h To be able to set up and configure a client within I day (except EDI)

h To have a system accessible from all locations

h To increase productivity by 20%

h To be compatible with all bar coding systems/RFID

h To make the logistics sites and business self sufficient re WMS requirements