Hertfordshire Waste Procurement Programme – Progress Report
Peter Davidson
Programme Director
9 September 2009
www.hertsdirect.org
Current waste performance
• 555,000 tonnes municipal waste per annum
• 44% recycled or composted (household waste)
• 50% to landfill, mostly outside Hertfordshire
• 6% to Edmonton EfW
• Costs over £50m per annum to collect and dispose
• 25% of all Hertfordshire’s Waste
www.hertsdirect.org
The drivers for change
• Landfill space running out – 1 left in County
• Landfill Tax significantly increasing costs - £8 per tonne per year
• Landfill Allowances + Trading Scheme sets maximum levels
• Set against a background of increasing recycling – 50% by 2012
www.hertsdirect.org
The response
• JMWMS 2007 – launched November 2007
• Feasibility study started November 2007
• Expression of Interest March 2008
• Outline Business Case October 2008
• £115 million of PFI credits allocated March 2009
• Solution needed by 2015
www.hertsdirect.org
The reference case for PFI Credits
• 270,000 tonnes
• Energy from Waste + Combined Heat and Power
• County Council owned site at New Barnfield, South Hatfield
• 2 transfer stations
• 75,000 tonnes “potentially untreatable” waste
www.hertsdirect.org
What is required from the market
• A solution to treat up to 270,000 + 75,000 tonnes of residual waste at 2039/40
• All of residual waste arisings
• Technology neutral - solution will need to be long term, proven, flexible and reliable
• CC owned site not mandatory
• Recovery of energy – heat and/or electricity
www.hertsdirect.org
Progress to date
• OJEU Notice published 9 April 2009
• Pre-Qualification Questionnaire
• Bidders Day – 30+ Companies attended
• 13 Applicants – large companies + consortia
• International interest with a range of experience
• 6 Applicants short-listed + Invited to Submit Outline Solution (s)
www.hertsdirect.org
Short-listed companies
• Covanta
• E.ON Energy from Waste AG (EEW)
• MVV Umwelt GmbH
• Shanks PFI Investments Ltd / Wheelabrator Technologies Inc
• SITA UK Limited consortium
• Veolia ES Aurora
www.hertsdirect.org
Competitive Dialogue timetable
• Prescribed process – Public Contracts Regulations 2006
• Outline Solutions (ISOS) June – October 2009
• Detailed Solutions (ISDS) November 2009 – October 2010
• Final Tenders (CFT) October – December 2010
• Selection of Preferred Bidder April 2011
• Contract and Financial Close August 2011
• Town Planning May 2012
• Operational Plant April 2015
www.hertsdirect.org
Supporting work
• Preparing New Barnfield as the reference site
• CHP Feasibility Study
• Securing transfer arrangements
• Working with Hertfordshire Waste Partnership
• Managing communications
• Interim Waste Contract – less landfill, greater use of alternative treatments
www.hertsdirect.org
Key messages
• County Council requires a cost-effective solution for the management of residual municipal waste
• Procurement process is very prescribed
• Dealing with commercially sensitive information
• The Reference Case is a benchmark for evaluation
• The market will provide the solution
• The position may not become clear until Preferred Bidder appointed