designengineers.com 319. 841. 1944 davenport schools ... · 7/22/2019 3:36:56 pm bim...

of 18 /18
FRANK L SMART INTERMEDIATE 1934 W 5th St, Davenport, IA 52802 JEFFERSON ELEMENTARY SCHOOL 1027 N Marquette St, Davenport, IA 52804 Dwight Clopton Schumm My license renewal date is December 31, 2019. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Date Pages or sheets covered by this seal: Iowa Registration No. 13694 M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S 8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404 designengineers.com 319. 841. 1944 CONSULTANTS OWNER PROJECT NAME SHEET TITLE A 1 PROJECT NUMBER: DRAWN: CHECKED: ISSUE DATE AND DESCRIPTION B C D E A B C D E 2 3 4 5 6 1 2 3 4 5 6 7/22/2019 3:39:58 PM BIM 360://Davenport Schools Network Rewire Phase 3 2019 19035/MEP - DCSD Smart Network Rewire 2019 19035_R18 .rvt Davenport Schools Network Rewire Phase 3 2019 COVER SHEET G000 19035 NJO AMS 07 - 22 - 2019 CD SET DAVENPORT, IA Davenport Schools Network Rewire Phase 3 2019 PROJECT NO.: 19035 DAVENPORT COMMUNITY SCHOOLS CD SET Sheet Index Sheet Number Sheet Name GENERAL G000 COVER SHEET ARCHITECTURAL A101 ARCHITECTURAL ENLARGE VIEW - SMART INTERMEDIATE TELECOM TD100 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LOWER LEVEL TD101 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LEVELS ONE AND TWO TD110 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL ONE TD111 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL TWO TD112 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL THREE T100 TELECOM PLAN - JEFFERSON ELEMENTARY– LOWER LEVEL T101 TELECOM PLAN - JEFFERSON ELEMENTARY– LEVELS ONE AND TWO T110 TELECOM PLAN – SMART INTERMEDIATE – LEVEL ONE T111 TELECOM PLAN – SMART INTERMEDIATE – LEVEL TWO T112 TELECOM PLAN – SMART INTERMEDIATE – LEVEL THREE T400 TELECOM ENLARGE VIEWS – JEFFERSON ELEMENTARY T401 TELECOM ENLARGE VIEWS – SMART INTERMEDIATE T500 TELECOM SCHMEATICS AND DETAILS T501 TELECOM SCHMEATICS AND DETAILS T502 TELECOM SCHMEATICS AND DETAILS T503 TELECOM SCHEDULES AND DETAILS G000, A101, TD100, TD101, TD110, TD111, TD112, T100, T101, T110, NOT TO SCALE 2 SITE MAP - SMART INTERMEDIATE T111, T112, T400, T401, T500, T501, T502, T503 NOT TO SCALE 1 SITE MAP - JEFFERSON ELEMENTARY SCHOOL

Author: others

Post on 11-Oct-2020

0 views

Category:

Documents


0 download

Embed Size (px)

TRANSCRIPT

  • FRANK L SMART INTERMEDIATE1934 W 5th St, Davenport, IA 52802

    JEFFERSON ELEMENTARY SCHOOL1027 N Marquette St, Davenport, IA 52804

    Dwight Clopton Schumm

    My license renewal date is December 31, 2019.

    I hereby certify that this engineering document was

    prepared by me or under my direct personal supervision

    and that I am a duly licensed Professional Engineer

    under the laws of the State of Iowa.

    Date

    Pages or sheets covered by this seal:

    Iowa Registration No. 13694

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    9:5

    8 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    COVER SHEET

    G000

    19035

    NJO

    AMS

    07-22-2019 CD SET

    DAVENPORT, IA

    Davenport Schools Network Rewire Phase 3 2019

    PROJECT NO.: 19035

    DAVENPORT COMMUNITY SCHOOLS

    CD SET

    Sheet IndexSheet

    Number Sheet Name

    GENERAL

    G000 COVER SHEET

    ARCHITECTURAL

    A101 ARCHITECTURAL ENLARGE VIEW - SMART INTERMEDIATE

    TELECOM

    TD100 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LOWER LEVEL

    TD101 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LEVELS ONE AND TWO

    TD110 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL ONE

    TD111 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL TWO

    TD112 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL THREE

    T100 TELECOM PLAN - JEFFERSON ELEMENTARY– LOWER LEVEL

    T101 TELECOM PLAN - JEFFERSON ELEMENTARY– LEVELS ONE AND TWO

    T110 TELECOM PLAN – SMART INTERMEDIATE – LEVEL ONE

    T111 TELECOM PLAN – SMART INTERMEDIATE – LEVEL TWO

    T112 TELECOM PLAN – SMART INTERMEDIATE – LEVEL THREE

    T400 TELECOM ENLARGE VIEWS – JEFFERSON ELEMENTARY

    T401 TELECOM ENLARGE VIEWS – SMART INTERMEDIATE

    T500 TELECOM SCHMEATICS AND DETAILS

    T501 TELECOM SCHMEATICS AND DETAILS

    T502 TELECOM SCHMEATICS AND DETAILS

    T503 TELECOM SCHEDULES AND DETAILS

    G000, A101, TD100, TD101, TD110, TD111, TD112, T100, T101, T110,

    NOT TO SCALE2 SITE MAP - SMART INTERMEDIATE

    T111, T112, T400, T401, T500, T501, T502, T503

    NOT TO SCALE1 SITE MAP - JEFFERSON ELEMENTARY SCHOOL

  • RM

    220

    1' -

    0"

    7' -

    4"

    6' - 4"

    A-1

    A-2

    A-1

    ARCHITECTURAL NOTES:

    A-1 8' tall metal partition, refer to specification 05 5000.A-2 3' sliding door with hardware, refer to specification 05 5000.

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    9:5

    4 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    ARCHITECTURALENLARGE VIEW -SMARTINTERMEDIATE

    A101

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/2" = 1'-0"1 SMART INTERMEDIATE ARCHITECTURAL PLAN - ROOM 220

  • JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    J J J J J J J J J JJJJJJJJJJJ

    JJ

    JJ

    JJ

    JJ

    JJ

    3

    2

    12

    EXISTING 2-4"C

    EXISTING 4" J-HOOKS

    1-2"C

    1-2"C BUILDING FIBER AND COPPER SERVICE ENTRANCE, TD-1

    CRAWLSPACEENTRANCE

    ELEVATED WALLOPENING INTOCRAWLSPACE

    CRAWL SPACE

    TD-1

    ABANDON EXISTING PATHWAY

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    6:5

    6 P

    MB

    IM 3

    60://D

    aven

    port

    Schoo

    ls N

    etw

    ork

    Rew

    ire P

    ha

    se 3

    20

    19 1

    903

    5/M

    EP

    - D

    CS

    D J

    effe

    rso

    n N

    etw

    ork

    Rew

    ire 2

    019

    190

    35_

    R18.r

    vt

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMDEMOLITIONPLAN -JEFFERSONELEMENTARY –LOWER LEVEL

    TD100

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 JEFFERSON DEMOLITION PLAN - LOWER LEVEL

    N

    REFER TO SHEET T503 FORTELECOM DEMOLITION

    NOTES

    REFER TO SHEET T503 FORELECTRICAL DEMOLITION

    NOTES

    TO REMAIN

    TO BE REMOVED / REVISED

    DEMOLITION KEY

  • I

    AP

    IIAP

    API

    AP

    C

    C

    AP

    C

    I

    AP

    APAP

    I

    I

    I

    I

    IIAP

    I

    I

    IAPAPC

    II

    I

    AP

    AP

    IIIC C

    II I I IC

    AP

    AP

    I

    AP

    I

    AP

    IAP

    I

    I I

    AP

    I I AP I

    IIIIIII CC

    C

    I

    II API

    I

    AP

    I

    I AP

    I

    I I I I I

    AP

    AP

    Room

    1

    Room

    2

    Room

    3

    Room

    4

    PRINCIPAL

    NURSE

    Room

    5

    Room

    6

    OFFICEIMC

    7

    Room

    8

    Room

    9

    Room

    10

    GIRLS

    MECH/MEZZ

    CAFE

    STAGE

    17

    AUD

    GYM

    BOYS

    Room

    11

    Room

    12

    Room

    13

    Room

    43

    Room

    44

    MEZZ MEZZ

    A

    B

    C

    D

    ABANDON EXISTING PATHWAY TO TELECOM ROOM ON LOWER LEVEL

    1 1 1

    1

    121

    2

    1

    12

    2

    2

    1

    1

    111

    1

    11

    1

    1

    11

    1

    1

    1

    1

    21

    2

    12

    2

    1

    2

    2

    1

    2

    1

    1

    1

    21

    1111

    1

    1

    1 1 1 1 1 1 1 1

    1

    211

    2 3 3 3

    2

    22

    3

    EXISTING TO BE REUSED1-4"C & 2-2"C UP TO MDF

    EXISTING TO BE REUSED 2-4"C DOWN TO CRAWLSPACE

    1

    22

    2

    2

    31

    1

    2

    1

    W

    2

    1

    1

    1

    1

    1

    1

    3

    1

    1

    1

    2

    1

    1 1

    1 1 2 1

    1

    1

    4

    1

    3

    W 2

    2

    1

    1W

    2

    1

    3

    1

    1

    2

    1

    1

    1

    2

    W

    WWW

    2

    1

    2

    1W

    2

    1

    W

    W

    Room

    14

    Room

    15

    Room

    16

    Room

    17Room

    18

    Room

    30

    Room

    29

    Room

    28

    BOYS

    Room

    41Room

    34

    Room

    39

    Room

    38Room

    37

    Room

    36Room

    32

    Room

    31

    Room

    27

    Room

    26

    Room

    25

    Room

    22

    Room

    23

    Room

    24

    Room

    21Room

    20Room

    19

    Room

    35

    LEVEL 3

    EXISTING TO BE REUSED1-4"C & 2-2"C DOWN TO ROOM 4 CLOSET

    2

    2

    2

    Room

    33

    2-4"C

    MDF ROOM19A T400

    1

    EXISTING PANEL 2D, E-1, E-2

    Room

    33.B

    Room

    33.C

    Room

    33.A

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    7:0

    2 P

    MB

    IM 3

    60://D

    aven

    port

    Schoo

    ls N

    etw

    ork

    Rew

    ire P

    ha

    se 3

    20

    19 1

    903

    5/M

    EP

    - D

    CS

    D J

    effe

    rso

    n N

    etw

    ork

    Rew

    ire 2

    019

    190

    35_

    R18.r

    vt

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMDEMOLITIONPLAN -JEFFERSONELEMENTARY –LEVELS ONEAND TWO

    TD101

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 JEFFERSON DEMOLITION PLAN - LEVEL ONE

    1/16" = 1'-0"2 JEFFERSON DEMOLITION PLAN - LEVEL TWO

    N

    REFER TO SHEET T503 FORTELECOM DEMOLITION

    NOTES

    REFER TO SHEET T503 FORELECTRICAL DEMOLITION

    NOTES

    TO REMAIN

    TO BE REMOVED / REVISED

    DEMOLITION KEY

  • C

    CC

    AP

    AP

    I

    I

    I

    I

    AP

    AP

    I

    II

    C

    I

    I

    C

    C

    AP

    C

    C

    II

    AP

    I

    I

    AP

    C

    C

    C

    I

    I AP

    C

    C

    I

    C

    AP

    C

    C

    C

    C

    AP

    C

    AP

    I I

    AP

    I

    I

    I

    C

    I

    C

    1

    1

    1

    W

    W

    1

    W

    1

    W1

    W

    W

    W

    11

    W

    W1

    W

    W

    2

    1

    1

    1

    W

    3 2

    2

    W

    2

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3W

    1

    1

    1

    1

    2

    IN BASEMENT

    7

    TRANECONTROLS

    EXISTINGPANEL BOILER

    GYM

    128

    STAGE

    129

    STORAGE

    130

    ROOM

    116

    ROOM

    115A

    STORAGE

    118A

    WEIGHT ROOM

    118B

    ROOM

    115B

    ROOM

    114

    WORK ROOM

    CONF. ROOM

    MEDIA CENTER

    34

    BOYS

    113

    ROOM

    112ROOM

    111

    ROOM

    110

    ROOM

    109

    STOR.

    ROOM

    108

    STORAGE

    ROOM

    107

    GIRLS

    106

    ROOM

    105

    FAN ROOM

    28

    ROOM

    35

    ROOM

    104

    BOILER RM

    001

    BOYS LOCKER ROOMSTOR.

    BOYS LOCKER ROOM

    BOYS LOCKER ROOM

    GIRLS LOCKER ROOM

    ROOM

    126

    ELEV.ROOM

    127

    STORAGE

    STORAGE

    BOYS

    122

    GIRLS

    123

    CAFETERIA

    101

    KITCHEN

    102

    STORAGE

    BOYS

    125

    GIRLS

    124

    STOR.

    EXISTING MDFFIBER/COPPERDMARC, TD-1,TD-3, TD-4

    TD-2

    TD-2

    TD-2

    TD-2

    TD-2

    TD-2

    TD-2

    TD-2TD-2

    TD-2

    TD-2

    TD-1TD-3 TD-4

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:1

    7 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL ONE

    TD110

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL ONE

    N

    TO REMAIN

    TO BE REMOVED / REVISED

    DEMOLITION KEY

    REFER TO SHEET T503 FORTELECOM DEMOLITION

    NOTES

    REFER TO SHEET T503 FORELECTRICAL DEMOLITION

    NOTES

  • II

    I

    I

    C

    I

    AP

    C

    C

    AP

    C

    C

    I

    I AP

    III

    C

    C

    APCC

    C

    AP

    AP

    C

    I

    C

    AP

    API

    C

    I AP C

    AP

    I

    AP

    I

    AP

    I

    I

    I

    II

    AP

    AP

    I

    I

    I

    I

    I

    I

    I

    ?

    ?

    ROOM

    209

    ROOM

    210

    ROOM

    211

    ROOM

    221

    WOMEN

    219

    UPPER GYM

    225

    NURSE

    241

    ADMIN. & GUIDANCE

    240

    STOR. FILE RM.

    CONF. 'A'

    SUPPORT STAFF

    PRINCIPAL CONF. 'B'

    ASST. PRINC.

    GUID.

    GUID.

    STAFF WRK RMSTORAGE

    B

    A

    W

    3

    1

    W

    W

    1

    1

    1

    W

    1

    2

    2112

    2

    W

    1

    WW1

    W1

    2

    1

    1

    3

    1

    W

    1

    1

    11

    1

    1

    1

    3

    1

    222

    4

    1

    2

    2

    2 1

    IN CASEWORK

    IN CASEWORK

    2

    2

    2 4

    2

    1

    2

    2

    233

    1

    1

    2

    3 3

    3

    1

    W

    1

    1

    1

    2

    1

    1

    1

    1

    111

    1

    MECHANICAL

    MEZZANINE

    230

    MECH. ROOM

    231

    ROOM

    216

    ROOM

    215

    ROOM

    218

    ROOM

    217

    ROOM

    208

    ROOM

    207

    GIRLS

    206

    ROOM

    205

    CUST.

    ROOM

    204

    BOYS

    222

    GIRLS

    223

    OFFICE STOR

    ROOM

    224

    ROOM

    200

    ROOM

    201

    ROOM

    203

    ROOM

    202A

    ROOM

    202B

    ROOM

    202C

    ROOM

    202D

    ROOM

    214

    ROOM

    212

    STOR.

    STOR.

    T401

    1

    T401

    3RM220

    EXISTING PANEL 2M1, E-3, E-4, E-5, E-6

    TD-4

    TD-2

    TD-2TD-2

    TD-2

    TD-2

    TD-2

    TD-4

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:2

    1 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL TWO

    TD111

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL TWO

    N

    TO REMAIN

    TO BE REMOVED / REVISED

    DEMOLITION KEY

    REFER TO SHEET T503 FORTELECOM DEMOLITION

    NOTES

    REFER TO SHEET T503 FORELECTRICAL DEMOLITION

    NOTES

  • I

    I

    I

    II

    CC

    C

    C

    I

    AP

    C

    AP

    AP

    I

    I

    I

    AP

    C

    AP

    I

    C

    AP AP

    C

    C

    C

    AP

    I

    C

    C

    C

    I

    I

    AP

    AP

    I

    I

    I

    I

    I

    I

    I

    I

    W

    1

    1W

    1

    W

    2

    2

    11

    W

    11

    W

    1

    W

    1

    W

    1 W

    W

    1

    31

    3

    1

    1W

    164

    W1

    1

    W

    1

    W

    1

    1

    W1

    1

    W

    1

    1

    2 1

    W1

    1

    1 3

    W

    ROOM

    317

    ROOM

    316

    ROOM

    315

    ROOM

    314

    BOYS

    313

    ROOM

    312ROOM

    311ROOM

    310

    ROOM

    308

    STOR.

    STOR.

    309

    ROOM

    307

    GIRLS

    306

    ROOM

    305

    ROOM

    321

    ROOM

    304

    GIRLS

    322

    STOR.

    ROOM

    303

    ROOM

    302

    ROOM

    301

    ROOM

    300A

    ROOM

    300

    CUST.

    325

    ELEV.

    ROOM

    318

    ROOM

    319A

    ROOM

    319B

    ROOM

    319C

    ROOM

    324A

    ROOM

    324B

    BOYS

    323

    2

    ROOM

    319320A

    320B

    ROOM

    324A

    ROOM

    324B

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:2

    4 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL THREE

    TD112

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL THREE

    N

    TO REMAIN

    TO BE REMOVED / REVISED

    DEMOLITION KEY

    REFER TO SHEET T503 FORTELECOM DEMOLITION

    NOTES

    REFER TO SHEET T503 FORELECTRICAL DEMOLITION

    NOTES

  • I

    I I

    I

    I

    AP

    J

    J

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    J J J J J J J J J J J JJJJJJJJJJJJJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    JJ

    J J JJJJ

    STORAGE

    BOILER ROOM

    CAFE OFFICE

    ELEC.

    EXISTING 2-4"C

    EXISTING 4" J-HOOKS

    1-2"C

    1-2"C

    CRAWLSPACEENTRANCE

    ELEVATED WALLOPENING INTOCRAWLSPACE

    CRAWL SPACE

    CUSTODIAL

    EXISTING FIBER ANDCOPPER ENTRANCE

    1"C

    1"C

    1 1/2"C

    ABANDON EXISTING PATHWAY

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    6:5

    0 P

    MB

    IM 3

    60://D

    aven

    port

    Schoo

    ls N

    etw

    ork

    Rew

    ire P

    ha

    se 3

    20

    19 1

    903

    5/M

    EP

    - D

    CS

    D J

    effe

    rso

    n N

    etw

    ork

    Rew

    ire 2

    019

    190

    35_

    R18.r

    vt

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOM PLAN -JEFFERSONELEMENTARY–LOWER LEVEL

    T100

    19035

    NJO

    AMS

    07-22-2019 CD SET

    N

    1/16" = 1'-0"1 JEFFERSON FLOOR PLAN - LOWER LEVEL

    EXISTING

    NEW / REVISED

    NEW WORK KEY

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

    ALL CABLING ON THIS SHEET ISSERVED FROM MDF RM. 19A

  • AP

    AP

    AP

    C

    C

    C

    AP

    APC

    AP

    AP

    C C C

    AP

    AP

    AP

    I

    AP

    APAP

    I

    I

    I

    AP

    AP

    I

    I

    I

    II

    I

    III II I I I

    AP

    I

    AP

    AP

    I

    I

    I

    I

    I

    I I

    I

    I

    II

    AP

    AP

    APAP

    AP I I

    I

    I

    I

    I

    I

    I I

    I

    AP

    APAP

    AP

    CC

    C

    AP

    AP

    AP

    I

    IIIII I I I I I

    AP

    AP

    APAP

    AP

    APAP AP

    AP

    AP

    AP

    AP

    AP

    AP

    II

    I

    I

    II

    I

    I

    I

    I

    I

    I

    I

    I I

    I

    I

    I

    I

    I I

    I

    I

    I

    II I

    I

    I

    I

    II I I

    I

    III

    I

    Room

    4PRINCIPAL

    OFFICE

    CAFE

    AUD

    GYM

    IMC

    7

    Room

    10

    Room

    9

    IMC

    7

    Room

    6

    Room

    5NURSE

    GIRLS

    Room

    3

    Room

    2

    MEZZ

    Room

    1

    Room

    13

    Room

    12Room

    11

    BOYS

    Room

    43

    MECH/MEZZ

    STAGE

    17

    Room

    44

    AC

    2

    2

    2

    2

    2

    2AC

    AC

    ABANDON EXISTING PATHWAY

    ROOM 4A

    T-2

    LEVEL 3

    MDF ROOM19A

    Room

    25

    Room

    26

    Room

    27

    GIRLS

    Room

    31

    Room

    32

    Room

    36

    Room

    38

    Room

    37

    Room

    33

    Room

    39

    Room

    35

    Room

    34

    Room

    41

    Room

    28

    BOYS

    Room

    29

    Room

    30

    Room

    14

    Room

    15

    Room

    16

    Room

    17

    Room

    18

    Room

    19

    Room

    20

    Room

    21

    Room

    22

    Room

    23

    Room

    24

    EXISTING TO BE REUSED1-4"C & 2-2"C DOWN TO ROOM 4 CLOSET

    2-4"C

    2

    2

    2

    2

    Room33.C

    Room33.B

    Room33.A

    T400

    2

    EXISTING PANEL 2D, E-1, E-2

    Room32.A

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    6:5

    5 P

    MB

    IM 3

    60://D

    aven

    port

    Schoo

    ls N

    etw

    ork

    Rew

    ire P

    ha

    se 3

    20

    19 1

    903

    5/M

    EP

    - D

    CS

    D J

    effe

    rso

    n N

    etw

    ork

    Rew

    ire 2

    019

    190

    35_

    R18.r

    vt

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOM PLAN -JEFFERSONELEMENTARY–LEVELS ONEAND TWO

    T101

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 JEFFERSON FLOOR PLAN - LEVEL ONE

    1/16" = 1'-0"2 JEFFERSON FLOOR PLAN - LEVEL TWOEXISTING

    NEW / REVISED

    NEW WORK KEY

    N

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

    ALL CABLING ON THIS SHEET ISSERVED FROM MDF RM. 19A

  • C

    CC

    AP

    AP

    AP

    C

    C

    C

    AP

    C

    C

    AP

    AP

    C

    C

    C

    AP

    C

    C

    C

    AP

    C

    C

    C

    C

    AP

    C

    AP

    C

    C

    AP

    I

    I

    I

    I

    II

    I

    I

    II

    I

    I

    I

    I

    I

    I I

    AP

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I I I I

    I

    I

    I

    I

    III

    I

    II

    I

    AP AP APAPI

    AP

    AP

    AP

    AP

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    SS

    SS

    S

    AP

    T-1

    T-1

    EXISTING MDFFIBER/COPPERDMARC

    CAFETERIA

    101

    STAGE

    129

    GYM

    128

    GIRLS

    124

    BOYS

    125

    STORAGE

    ROOM

    127

    ELEV.

    ROOM

    126

    STORAGEGIRLS

    123

    BOYS

    122

    CUST.

    KITCHEN

    102

    STORAGE

    STOR.

    GIRLS LOCKER ROOM WEIGHT ROOM

    118B

    STORAGE

    118A

    ROOM

    117 ROOM

    116

    ROOM

    115A

    ROOM

    115B

    BOYS LOCKER ROOM

    BOILER RM

    001

    ROOM

    104

    ROOM

    105 FAN ROOM

    002

    ROOM

    121

    MEDIA CENTER

    120

    WORK ROOM

    CONF. ROOM

    ROOM

    114

    ROOM

    112

    STORAGE

    ROOM

    111

    ROOM

    110

    STOR.

    ROOM

    109

    ROOM

    108STORAGE

    ROOM

    107

    CL.

    GIRLS

    106

    T-1

    T-1

    2-4"C1-TO L22-TO L3

    2-4"C

    4"C

    TRANECONTROL

    2-4"C UP TO MDF

    2-4"C

    2

    W

    MDF 220IDF 202B

    MDF 220IDF 202B

    3

    T-2

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:0

    1 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOM PLAN– SMARTINTERMEDIATE –LEVEL ONE

    T110

    19035

    NJO

    AMS

    07-22-2019 CD SET

    N

    1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL ONE

    EXISTING

    NEW / REVISED

    NEW WORK KEY

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

  • C

    C

    C

    C

    C

    AP

    C

    C

    CC

    C

    C

    C

    AP

    C

    C

    AP

    AP

    II

    I

    I

    I

    I

    I

    III

    I

    AP

    I

    AP

    I

    I

    AP

    I

    I

    II

    I

    I

    I

    I

    I

    AP

    AP

    AP

    AP

    AP

    AP

    AP AP

    API

    I

    AP

    AP

    AP

    AP

    AP

    AP

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    II

    I

    I

    I

    I

    I

    I

    I

    I

    II

    I

    I

    I

    II

    I

    I

    I

    I

    I

    S

    I

    I

    W

    ROOM

    205

    GIRLS

    206 CL.

    ROOM

    207ROOM

    208

    ROOM

    209 ROOM

    210

    ROOM

    211

    ROOM

    212

    BOYS

    213

    ROOM

    214

    ROOM

    215

    ROOM

    216

    ROOM

    204

    ROOM

    200

    ROOM

    201

    ROOM

    202A

    ROOM

    203

    ROOM

    202B

    ROOM

    202C

    ROOM

    202D

    OFFICE STOR

    ROOM

    224

    STORAGE

    GIRLS

    223

    BOYS

    222

    CUST.

    CUST.

    ROOM

    221

    ROOM

    217

    ROOM

    218

    WOMEN

    219

    UPPER GYM

    225

    NURSE

    241

    ADMIN. & GUIDANCE

    240

    STOR.FILE RM.

    CONF. 'A' SUPPORT STAFF

    PRINCIPAL

    CONF. 'B'

    ASST. PRINC.

    GUID.

    GUID.

    STAFF WRK RM

    STOR.

    STOR.

    MECHANICAL

    MEZZANINE

    230

    MECH. ROOM

    231

    ELEV.

    MECH RM

    STORAGE

    T401

    4

    T401

    2

    RM

    220

    EXISTING PANEL 2M1, E-3, E-4, E-5, E-6

    2-4"C

    2-4"C

    2

    2

    AC AC

    2 2

    MDF 220IDF 202B

    MDF 220IDF 202B

    2-4"C DOWN

    4"C UP

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:0

    4 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOM PLAN– SMARTINTERMEDIATE –LEVEL TWO

    T111

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL TWO

    EXISTING

    NEW / REVISED

    NEW WORK KEY

    N

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

  • CC

    C

    CC

    C

    AP

    C

    C

    C

    C

    C

    C

    C

    AP

    AP

    I

    I

    I

    II

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    AP

    AP

    AP

    AP

    AP

    AP

    AP

    APAP AP AP AP

    AP

    AP

    AP

    II

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I

    I I I I I

    I

    I

    I

    I

    II

    I

    AP

    ROOM

    302

    ROOM

    301

    ROOM

    300

    ROOM

    300A

    ROOM

    303

    ROOM

    304

    ROOM

    305

    GIRLS

    306

    ROOM

    307ROOM

    308

    STOR.

    309

    ROOM

    310

    ROOM

    311

    ROOM

    312

    BOYS

    313

    ROOM

    314

    ROOM

    315

    ROOM

    316

    ROOM

    317

    ROOM

    318

    ROOM

    319A

    ROOM

    319B

    ROOM

    319C

    ROOM

    321

    GIRLS

    322

    BOYS

    323

    ROOM

    324B

    ROOM

    324A

    CUST.

    325

    STOR.

    CUST.

    STOR.

    CL.

    ELEV.

    SKYLIGHT

    2 2

    4

    320B

    ROOM

    320

    320A

    ROOM

    324B

    ROOM

    324A

    4"C

    MDF 220IDF 202B

    MDF 220IDF 202B

    4"C DOWNTO MDF

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:0

    7 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOM PLAN– SMARTINTERMEDIATE –LEVEL THREE

    T112

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL THREE

    EXISTING

    NEW / REVISED

    NEW WORK KEY

    N

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

  • EXISTING TO REMAINSERVER CABINET

    HCM

    1

    +84"

    EXISTING TO REMAINSERVER CABINET

    EXISTING TO REMAIN DR-1WITH VMS AND SECURITYCAMERA PATCH PANEL

    VCM

    2

    VCM

    2

    T-2NEMA 5-30,3#10, E-1E-1

    E-2

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:3

    6:5

    6 P

    MB

    IM 3

    60://D

    aven

    port

    Schoo

    ls N

    etw

    ork

    Rew

    ire P

    ha

    se 3

    20

    19 1

    903

    5/M

    EP

    - D

    CS

    D J

    effe

    rso

    n N

    etw

    ork

    Rew

    ire 2

    019

    190

    35_

    R18.r

    vt

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMENLARGE VIEWS– JEFFERSONELEMENTARY

    T400

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/4" = 1'-0"1 ENLARGED ROOM 19A - DEMOLITION 1/4" = 1'-0"2 ENLARGED ROOM 19A - TELECOM

    RECEPTACLE KEY

    TR - INDICATES TAMPER RESISTANT (SAFETY TYPE) RECEPTACLEGFI - INDICATES GROUND FAULT INTERRUPTER RECEPTACLETVSS - INDICATES TRANSIENT VOLT SURGE SUPPRESSOR RECEPTACLEIG - INDICATES ISOLATED GROUND RECEPTACLEWP - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ FLIPCOVERWPD - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ CORD AND PLUG COVER# - NUMBER INDICATES PANEL CIRCUIT NUMBER+##" - DIMENSION INDICATES HEIGHT TO CENTER OF RECEPTACLE ABOVE FINISH FLOOR (+18" IF NOT SHOWN)USB - INDICATES USB TYPE RECEPTACLE

    EXISTING

    TO BE REMOVED /REVISED

    DEMO/NEW WORK KEY

    NEW / REVISED

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

    N

  • I I

    ROOM

    202B

    EXISTING TO REMAIN DR-1MOVE TO NEW LOCATION

    TD-5

    ROOM

    202B

    HCM

    1

    +90"

    HCM

    1

    +90" 2-4"C

    ROOM

    202B

    E-4

    E-3NEMA 5-30, 3#10, E-3

    VCM

    2

    VCM

    2

    EXISTING TO REMAIN DR-1MOVE OUT FROM NORTH WALL 2'.

    HCM

    1+144"-168"

    HCM

    1

    +144"-168"

    HCM

    1

    +90"

    VCM

    3

    NEW CAGEWALL

    E-6

    NEMA 5-30, 3#10, E-5E-5

    VCM

    2

    VCM

    2

    NEW CAGEWALL

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:0

    9 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMENLARGE VIEWS– SMARTINTERMEDIATE

    T401

    19035

    NJO

    AMS

    07-22-2019 CD SET

    1/4" = 1'-0"1 ENLARGED ROOM 202B - DEMOLITION 1/4" = 1'-0"2 ENLARGED ROOM 202B - TELECOM

    1/4" = 1'-0"3 ENLARGED ROOM 220 - DEMOLITION 1/4" = 1'-0"4 ENLARGED ROOM 220 - TELECOM

    RECEPTACLE KEY

    TR - INDICATES TAMPER RESISTANT (SAFETY TYPE) RECEPTACLEGFI - INDICATES GROUND FAULT INTERRUPTER RECEPTACLETVSS - INDICATES TRANSIENT VOLT SURGE SUPPRESSOR RECEPTACLEIG - INDICATES ISOLATED GROUND RECEPTACLEWP - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ FLIPCOVERWPD - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ CORD AND PLUG COVER# - NUMBER INDICATES PANEL CIRCUIT NUMBER+##" - DIMENSION INDICATES HEIGHT TO CENTER OF RECEPTACLE ABOVE FINISH FLOOR (+18" IF NOT SHOWN)USB - INDICATES USB TYPE RECEPTACLE

    EXISTING

    TO BE REMOVED /REVISED

    DEMO/NEW WORK KEY

    NEW / REVISED

    REFER TO SHEET T503 FORTELECOM NOTES

    REFER TO SHEET T503 FORELECTRICAL NOTES

    N

  • AP

    HCM-2PP-1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2

    PDU-1

    AMP #1

    VMS

    PDU-1

    FH-1

    UPS-2

    RGB

    HCM-2PP-1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2

    PDU-1

    FH-2

    RGB

    UPS-2UPS-1

    RGB

    MC1

    PDU-1

    AMP #2

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    HCM-2PP-1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2

    PDU-1

    FH-1

    UPS-2

    RGB

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    HCM-2PP-1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2

    PDU-1

    FH-2

    RGB

    UPS-2

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    NETWORK EQUIPMENT

    PD

    U-2

    PD

    U-2

    AMP #3

    ZR1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2PP-1

    HCM-2

    PAIR 3

    8BR

    PAIR 1

    6GN

    7W-BR

    5W-BL

    4BL

    PAIR 4PAIR 2

    1W-G

    20

    1W-0

    JACK POSITIONS

    EIGHT POSITION MODULAR JACK PIN/PAIR ASSIGNMENT,

    T568B

    T17700-30B

    T568B

    NOTE:1. LOCATE WITHIN PLENUM SPACE ABOVE AN ACCESSIBLE

    CEILING AT COORDINATED LOCATIONS FOR FUTURE ACCESS. FURNISH METAL UNISTRUT SUPPORT SYSTEMS AS NEEDED TO MAINTAIN AN EASILY ACCESSIBLE ELEVATION.

    PROPERLY SUPPORTUTP CABLE

    SURFACE MOUNTED HOUSING ONSTRUCTURE ABOVE ACCESSIBLECEILING, SEE PLANS FOR NUMBEROF DATA PORTS

    ~5' MIN. SLACK COIL FOR UTP CABLE NEAR THE SURFACE MOUNTED HOUSING

    DATA SCHEMATIC DETAIL -ABOVE CEILING SURFACE

    MOUNTED HOUSING DETAIL

    T17700-71a

    ~Ø12"

    T270526.1

    TMGB TELECOMMUNICATION MAINGROUNDING BUSBAR DETAIL

    20.00"

    ∅0.31" (48 PLCS)∅0.44" (12 PLCS)

    INSULATION MOUNTING HOLES

    ∅0.4

    4" (x3)

    6.75"

    5.8"

    1.0"

    1.12" (x3)1.12" 1.06" 1.12"

    0.62

    "

    1.5"

    0.62

    "

    PANDUIT PART #GB4B0624TPI-1

    0.25

    "

    T270526.2

    TGB TELECOMMUNICATIONSGROUNDING BUSBAR DETAIL

    PANDUIT PART #GB2B0312TPI-1

    20.00"

    ∅0.4

    4" (x3)

    6.75"

    5.8"

    1.0"

    0.25

    "

    RGB RACK-MOUNTEDGROUNDING BUSBAR DETAIL

    T270526.3

    19"

    CPI PART# 10610-019

    1"

    SPLICEHARDWARE

    3/16"

    ###-X, X

    1 2

    3 4

    ###-X, X

    DATA JACK

    DATA JACKOR BLANK

    DATA JACK

    DATA JACKOR BLANK

    OUTLET LOCATION LABEL. SEE OUTLET FACEPLATE LABELING DETAIL

    100-1, 2 100-3, 4 100-5

    100-10, 11 100-8, 9 100-6, 7

    100-12

    START

    CLOCKWISE TO LEFT OF DOOR

    W

    2 2

    2 2

    EXAMPLE ROOM100

    100-14, 15 2

    100-13

    NOTES:

    1. INSTALL LABEL IN WINDOW AT TOP OF FACEPLATE TO INDICATE OUTLET LOCATION NUMBER. USE MANUFACTURE'S WHITE PAPER LABELS. LABELS SHALL BE PRINTED WITH A LETTERING DEVICE. HAND LABELING IS NOT ACCEPTABLE. REFER TO THE SPECIFICATIONS.

    2. PROVIDE LABELING AT DISTRIBUTION FRAME TO INDICATE JACK NUMBER AND FIELD DESIGNATIONS. USE MANUFACTURE'S LABELS. LABELS SHALL BE PRINTED WITH LETTERING DEVICE. HAND LABELING IS NOT ACCEPTABLE. REFER TO THE SPECIFICATIONS.

    100-01, 02

    1 2

    3 4

    100-03, 04

    DATA JACK

    DATA JACK

    DATA JACK

    DATA JACK

    OUTLET LOCATION LABEL. SEE OUTLET FACEPLATE LABELING DETAIL

    1 2 3 4 5 6 7 8 9 10 11 12

    2

    DATA #'SOR BLANK

    VCM-2VCM-2DR-1 DR-1 DR-2VCM-1DR-1VCM-2 VCM-1

    DR-3

    MDF RACK ELEVATION IDF 2 POST RACK ELEVATION IDF FLOOR CABINET ELEVATION IDF WALL CABINET ELEVATION

    NOTES:1. ALL ELEVATIONS ARE TYPICAL TO HELP COORDINATE INSTALLATION LAYOUTS. CONTRACTORS SHALL NOT USE THE ELEVATIONS FOR MATERIAL AND OR EQUIPMENT TAKEOFFS.2. WHERE MULTIPLE LEVELS OF A BUILDING ARE SERVED FROM A SINGLE MDF/IDF, SEPERATE THE HORIZONTAL CABLES IN THE RACK OR CABINET BY LEVELS. SEE SPEC.3. HORIZONTAL CABLE SHALL BE SEPERATED AND TERMINATED IN ISOLATED PATCH PANELS BY TECHNOLOGY. SECURITY CAMERA CABLES, WIRELESS CABLES AND STANDARD WIRED DATA CABLES SHALL BE IN SEPERATE PATCH PANELS.

    A. INSTALL THE HORIZONTAL CABLES MOVING FROM TOP TO BOTTOM BY LEVEL THEN BY TECHNOLOGY STARTING WITH CAMERAS, THEN WIRELESS THEN STANDARD DATA.

    LEVEL 1

    LEVEL 2

    4-2"C TO 18" BELOW SLEEVES OR HORIZ. PATHWAY

    LEGRAND WIREMOLD 2300 SERIES RACEWAY SYSTEM

    2338A, 2337A

    2344, 2347,2348

    411, 811, 2311, 2311DFO

    417, 817, 2317, 2317DFO415, 815, 2315406, 806, 2306

    810A2, 2310A, 2310DFO418, 818, 2318, 2318DFO

    417, 817, 2317

    NOTES:1. CONTRACTOR IS RESPONSIBLE TO PROVIDE AND INSTALL ALL

    MANUFACTURED COMPONENTS THAT APPLY TO AND COMPLETE THE 2300 RACEWAY SYSTEM INSTALLATION, WHETHER SHOWN OR NOT.

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:1

    2 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMSCHMEATICSAND DETAILS

    T500

    19035

    NJO

    AMS

    07-22-2019 CD SETNOT TO SCALE1TELECOM FACEPLATE AND PATCH PANEL STANDARDLABELING DIAGRAM

    NOT TO SCALE2 DATA RACK ELEVATION DETAIL

  • PAGING SYSTEM SCHEDULEPLAN MARK DESCRIPTION FURNISHED BY INSTALLED BY REMARKS NOTES

    P1 14 AWG 2 Conductor Solid Bare Copper Plenum Rated Shielded Cable TC TC Belden Per Spec.

    P2 Category 6A Patch Cord TC TC Belden Orange Per Spec. Anx. PN: B6120FL-1000 1

    P3 Category 6, Shielded, White TC TC Anixter Part # CMP-00423COM-C6-S-01

    BLANK ROW

    AMP Bosch Paviro Amplifier 2 x500W TC TC PN: PVA-2P500

    EOL Bosch Paviro End of Line Slave Module TC TC PN: PVA-1WEOL 2

    MC1 Bosch Paviro Matrix Controller TC TC PN: PVA:4CR12

    MCS Bosch Paviro Matrix Call Station TC TC PN: PVA-15CST

    S1 Bosch Ceiling Loudspeaker TC TC PN: LBC3951/11-US

    S2 Bosch Wall Mount Cabinet Loudspeaker TC TC PN: LB1-UW06-FL1

    S3 Bosch Horn Loudspeaker TC TC PN: LBC3481/12-US

    Contractor Shall Check Specifications For Possible Further Details

    KEY:

    EC: Electrical Contractor

    TC: Telecommunication Contractor

    OP: Owner Provided

    ETR: Existing to Remain

    NOTES:

    1 Contractor Shall determine when 3' and or 10' are required.

    2 Contractor Shall provide per EOL device all materials noted in the EOL Detail for a complete installation protecting the EOL from the plenum environment.

    CST BUS 1

    AMP IN A2

    AMP IN A1

    SPEAKER OUT B12

    SPEAKER OUT B11

    SPEAKER OUT B10

    SPEAKER OUT B9

    SPEAKER OUT B8

    SPEAKER OUT B7

    SPEAKER OUT A6

    SPEAKER OUT A5

    SPEAKER OUT A4

    SPEAKER OUT A3

    SPEAKER OUT A2

    SPEAKER OUT A1

    LINE OUT 1-4 RJ45 LINE IN 1-4 RJ45

    CAN BUS CAN BUS

    AMP OUT 1 70V

    AMP OUT 2 70V

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    LOUDSPEAKERS:EACH TAPPED AT 6W

    CALLSTATION

    BOSCH

    MATRIX CONTROLLER AT (MDF)PN: PVA-4CR12

    BOSCH PAVIRO AMP #1 AT (MDF)PN: PVA-2P500

    BOSCH PAVIRO CALL STATIONPN: PVA-15CST

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    EOL

    NOTES: EOL= END OF LINE SLAVE MODULE. PN: PVA-1WEOL EVERY EOL SHALL BE CONNECTED TO GROUND.

    CONTRACTOR: SEE EOL DETAIL FOR OTHER MATERIALS THATMAKE UP THE COMPLETE INSTALLED DEVICE.

    P2

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P1

    P3

    PAGING END OF LINE SLAVE MODULE CIRCUIT DIAGRAM

    FILTER DC/DCSPEAKER +

    SPEAKER -

    SHIELD / WIRE / GROUNDCONTROL

    ADDRESS

    SEND/RECIEVE

    SS

    RG CG

    +

    -

    RG

    CG

    = MINIMUM RESISTANCE BETWEEN SPEAKER LINE AND GROUND/EARTH

    = MAXIMUM CAPACITY BETWEEN SPEAKER LINE AND GROUND

    PAGING END OF LINE SLAVE MODULE COMPONETS

    NEMA 1 JUNCTION BOXANX PN: 43769

    5" PIECE 35 MM DIN RAILSQUARE D PN: 9080MH339

    COMES IN 33" (CUT TO 5")

    PLASTIC 35MM DIN RAIL MOUNT ADAPTERMcMASTER -CARR PN# 8961K32

    BOSCH PAVIRO END-OF-LINESLAVE MODULEPN: PVA-1WEOL

    COMES WITH (2) SCREWS

    THAT WORK WITH DIN MOUNT ADAPTER

    PART:A

    PART:B

    PART:C

    PART:D

    A

    C

    D

    E

    NON-METALLIC STRAIN RELIEF CABLE GLAND 1/2" FROM SKINTOPANX PN: S2112

    PART:E

    B

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:1

    3 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMSCHMEATICSAND DETAILS

    T501

    19035

    NJO

    AMS

    07-22-2019 CD SET

    NOT TO SCALE1 PAGING SCHEMATIC DIAGRAM

  • C

    OWNERPROVIDEDNETWORK

    EQUIPMENT

    PP-1

    AP

    IGB

    TMGB

    DR

    HCM

    RGB

    TMGB

    DR

    HCM

    RGB

    ELECTRICALENTRANCE

    FACILITY

    FH-3ISP FH

    FH-1FH-2

    IGB

    TMGB

    DR

    HCM

    RGB

    ELECTRICALENTRANCE

    FACILITY

    FH-3ISP FH

    FH-1

    TYPICAL MDF/IDF

    D4

    D3

    D2

    D5

    TYPICAL ADMIN, CLASSROOM OR CORRIDOR

    N

    G

    ELEC.

    LEVEL 2 RM. 220 (MDF)RM. 202B (IDF-1)

    IC

    LEVEL 1

    TYP.

    TYP.

    TYP.

    EK

    EK

    EK

    TYP.

    TYP.

    TYP.

    EK

    EK

    EK

    FAN ROOM 02

    LEVEL 2 RM. 220 (MDF)

    F1

    RM. 202B (IDF-1)

    F1

    LEVEL 1

    INCOMING FIBER SERVICE

    LOWER LEVEL ELEC

    LEVEL 1

    LEVEL 2

    CRAWL SPACE

    RM. 4A

    RM. 19A (MDF)

    IC

    N

    G

    TYP.

    TYP.

    TYP.

    EK

    EK

    EK

    LOWER LEVEL CUSTODIAL (A)

    LEVEL 1

    LEVEL 2

    CRAWL SPACE

    RM. 4A

    RM. 19A (MDF)

    F1

    INCOMING FIBER SERVICE

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:1

    4 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMSCHMEATICSAND DETAILS

    T502

    19035

    NJO

    AMS

    07-22-2019 CD SET

    NOT TO SCALE1STRUCTURED CABLING TYPCIAL WIRING SCHEMATICDIAGRAM

    NOT TO SCALE2 SMART BONDING AND GROUNDING SCHEMATIC

    NOT TO SCALE3 SMART FIBER BACKBONE SCHEMATIC DIAGRAM

    NOT TO SCALE4 JEFFERSON BONDING AND GROUNDING SCHEMATIC

    NOT TO SCALE5 JEFFERSON FIBER BACKBONE SCHEMATIC DIAGRAM

  • TELECOMMUNICATIONS SCHEDULE

    PLAN MARK DESCRIPTION FURNISHED BY INSTALLED BY REMARKS NOTES

    D2 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Orange Anx. PN: CMP-00423BNT-6A-08 1,8

    D3 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Black Anx. PN: CMP-00423BNT-6A-02 2

    D4 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Yellow Anx. PN: CMP-00423BNT-6A-05 3

    D5 Category 6A Snagless Slim Patch Chord TC TC Q-Series Per. Spec 4

    EK 6 AWG Grounding Conductor TC TC Per Spec.

    F1 Corning Plenum 12 Strand OS2 Interlocked Armor Fiber TC TC Anx. PN: 370-407-ARMORMIC-12

    IC Insulated, Copper, No.3/0 AWG EC EC Per Spec.

    TBB Insulated, Copper, No.3/0 AWG TC TC Per Spec.

    V1 Belden Multi-Conductor, Category 3, 25 pair, U/UTP, CMP, Plenum Cable TC TC Anx. PN: CMP-02524NDX-3

    BLANK ROW

    AP Wireless Access Point OP TC 7

    DR-1 Two Post Equipment Rack TC TC Per Spec.

    FH-1 Corning CCH-02U Closet Connector Housing TC TC Anx. PN: 180627

    FH-2 Corning CCH-01U Closet Connector Housing TC TC Anx. PN: 180626 5

    FH-3 Cornning WCH-02P TC TC Anx. PN: 180452

    HCM-1 Horizontal Cable Management 12" x 2" Wire Basket Tray TC TC Per Spec.

    HCM-2 19" Horizontal, Rack Mount, Cable Manager, 1RU TC TC Per Spec.

    HCM-3 19" Horizontal, Rack Mount, Cable Manager, 2RU TC TC Per Spec.

    IDC-1 25 Pair S110 Cross-Connect Block W/ Legs TC TC Siemon Company Anx. PN: 260449

    PDU-1 Horizontal Power Distribution Unit TC TC Per Spec.

    PDU-2 Vertical Power Distribution Unit TC TC Per Spec.

    PP-1 24 Port Patch Panel, Flat Unloaded TC TC Belden Anx. PN: 371725 6

    RGB Rack Grounding Busbar, Rack Mounted TC TC Per Spec.

    TGB Telecommunication Grounding Busbar TC TC Per Spec.

    TMGB Telecommunication Main Grounding Busbar TC TC Per Spec.

    UPS-1 Uninterruptable Power Supply 3000va TC TC Per Spec.

    UPS-2 Uninterruptable Power Supply 2500va TC TC Per Spec.

    VCM-1 Vertical Cable Management, Single Sided, Black TC TC Per Spec.

    VCM-2 Vertical Cable Management, Double Sided, Black TC TC Per Spec.

    Contractor Shall Check Specifications For Possible Further Details

    KEY:

    EC: Electrical Contractor

    TC: Telecommunication Contractor

    OP: Owner Provided

    ETR: Existing to Remain

    NOTES:

    1 Surveillance Camera Information Jacks

    2 Wireless Access Point Information Jacks

    3 Standard Data/VoIP Information Jacks. PC and Phone will utilize one (1) data port.

    4 Contractor shall provide and install two (2) patch cables per information jack location. One (1) 3' and one (1) 10' in the appropriate color per system.

    5 Contactor shall provide and install for each FH for Termination of OS2 fiber. Corning OS2 pigtail splice cassette 12F LC duplex. Anx. PN: 474222

    6 Contractor shall provide and install dedicated PP-1's per systems. Surveillance Cameras, Wireless Access Points and Standard Data/VoIP.

    7 Contractor shall provide and install patch cables per note 4 for AP's and verify with owner that the AP's are online.

    8 Typically all existing security camera cables will remain. The contractor is responsible to work with the owner to ensure all security cameras are connected and online at the end of the project. If any cameras are notfunctioning per the owner. The contractor shall channel test the cable to verify the cable okay.

    GENERAL TELECOMMUNICATIONS NOTES:

    1. The Electrical Contractor shall study all Telecom plans including reading all Telecom general and

    specific notes for instructions that will affect or pertain to the Electrical Contractor.

    2. Electrical Contractor shall provide and install all telecom conduits to accessible ceiling space (they

    shall not be terminated above hard lids or in exposed areas). Unless instructed otherwise, stub all

    telecom conduits to the accessible ceiling space in the same room as the opening.

    3. The Electrical Contractor shall not daisy chain any voice/data cabling or AV cabling conduits when

    routing from boxes to accessible ceiling spaces, etc.

    4. The Electrical Contractor shall provide and install bushings on all telecom conduits at the time of

    conduit installation.

    5. Coordinate routing of raceway and equipment to maintain access to filters, motors, electrical

    equipment, and controls. In no case shall raceway, cabling bundles, or equipment pass directly over

    electrical panels or disconnects or restrict access to any electrical equipment including junction boxes.

    6. Conduit minimum sizes shall be per the electrical raceway specifications unless noted otherwise.

    7. Contractor shall verify all quantities.

    8. Contractor shall fasten all equipment to structure, so everything is completely solid.

    9. Contractor shall use hook and loop fasteners on cabling exclusively, no tie wraps. Exception: tie wraps

    may be used loosely for dressing cables during installation but shall be removed and replaced with

    hook and loop fasteners before job is complete.

    10. The maximum distance between all J hooks shall be four feet. All J hooks shall be sized to have at

    least 50% capacity available for future growth. Contractor shall not fasten cabling to piping, ductwork,

    conduits, or anything other than Contractor installed J hooks or cable tray supported from structure.

    Contractor shall not lay cable over piping, ductwork, conduits, ceiling grid/tiles, and any other building

    structure element or building support system device. Use low voltage pathway only.

    11. All telecom cabling in finished spaces is to be routed concealed in walls, unless specifically noted

    otherwise. All exposed cabling and cabling behind inaccessible construction (such as in walls and

    above drywall ceilings) shall be routed in conduit which is provided and installed by the Electrical

    Contractor. All wall penetrations shall be sleeved with conduit.

    12. The Contractor shall not pull any telecom cabling through conduits that do not have the required

    bushings installed. Cabling pulled through conduits with no bushings that receive cable jacket damage

    shall be replaced by the contractor at no charge to the Owner.

    13. The Contractor shall furnish and install fire stopping in all telecom conduits including those with cabling

    in them and those telecom sleeves or conduits without cabling in them to meet wall ratings.

    14. The telecom structured cabling shall not have paint or paint overspray on the cabling jacket which may

    degrade the performance of the cabling and void the warranty. Cabling which has paint on it shall be

    replaced at the Contractor's expense (it cannot be cleaned mechanically or with solvents, it shall be

    replaced).

    15. The Contractor shall utilize the existing horizontal primary pathways which are primarily 4" J-Hooks

    and wire basket tray. Where the primary pathway does not meet the specified requirements called out

    for J-hook pathways or the primary pathway J-hook or cable tray does not extend to necessary

    locations, the Contractor shall add the needed matching materials required to bring the pathway up to

    spec.

    16. The Contractor shall utilize the existing horizontal and vertical secondary pathways for the placement

    and replacement of the communications cabling. The contractor shall furnish and provide all support

    mechanisms and fire stopping as directed in the plans and specifications.

    17. Contractor shall install all wall mounted speakers, junction boxes, and wire mold, etc., devices as close

    to ceiling structure as possible allowing room for placement of equipment.

    GENERAL TELECOM DEMOLITION NOTES:

    1. Unless noted otherwise all items to be removed and disposed of by Contractor. See demolition key.

    The Owner may elect to salvage select electrical system components. Coordinate with Owner prior to

    disposal of equipment. Equipment the District elects to keep shall be transported by Contractor to

    District Warehouse located at 1008 West Kimberly Road, Davenport, Iowa. Allow time for scheduling

    drop off time with Owners representatives.

    2. Where communications equipment, and/or wiring devices are noted to be removed, demo wire back to

    source or nearest active equipment. The Contractor shall leave 5' of cable securely supported until

    Owner or Design Professional permits removal.

    3. Where conduits penetrate CMU or cast-in-place concrete, cut conduit flush with wall or floor. Patch all

    wall and floor penetrations to match existing surface. Under no circumstances shall abandoned

    conduit, wire, or electrical equipment remain at the completion of construction.

    4. Telecom demolition drawings are based on field observation and existing documentation where

    available. Extensive efforts have been made to accurately portray existing conditions. Demolition

    drawings are intended to convey the general scope of demolition. Miscellaneous abandoned boxes

    and conduit may not be indicated. All electrical and communications systems, raceways and supports

    in walls and ceilings scheduled to be removed are to be demolished. Contractor field verification is

    required.

    5. Coordinate any service outages affecting areas outside the remodel area with Owner at least 24 hours

    prior to outage. Where required by the Owner, any work requiring power or network interruption shall

    be scheduled outside of normal working hours.

    6. Maintain integrity of existing circuit wiring and active devices serving areas outside the remodel area.

    If specific items/devices are taken out of service temporarily to complete new work, return to service as

    soon as possible.

    7. The building will remain occupied and in use for the duration of construction. Refer to the

    specifications as well as phasing plans for additional information regarding working access within and

    adjacent to occupied areas and specific phasing requirements.

    8. Where ceiling systems are removed, Contractor shall permanently support low voltage cabling systems

    currently supported by ceiling system with j-hooks on building structure.

    9. For all flush devices to be removed in remaining walls, cover abandoned opening with new cover plate,

    unless noted otherwise. The existing wall mounted speakers and intercom call buttons shall be left in

    place and cables to these devices shall be cut at conduit or wiremold path entrances and demolished.

    10. The Contractor shall not demolish or affect the following devices and shall restore these systems if

    they are affected. The Coaxial CATV system, the Altronix boxes and their cabling, Primex Clock

    devices and cabling, and all other devices which are not scheduled for demolition.

    GENERAL ELECTRICAL NOTES:

    1. Below is a list of common requirements outlined in the Project Manual. Refer to the

    Project Manual and standard details for more detailed information for these items

    and for all other materials and construction methods required.

    a. Minimum wire size to be #12 for power.

    b. Wall boxes installed flush in common wall shall not be back-to-back or

    throughwall type.

    c. All conduits, junction boxes, wiring, equipment, etc. to be properly labeled.

    d. Provide green ground conductor throughout entire electrical system.

    e. All circuits shall have dedicated neutrals to meet NEC without having handle

    ties. Shared neutrals are not allowed.

    2. Penetrations for all conduits passing through fire and smoke rated walls and floors

    shall be provided with firestopping to maintain the fire rating. Use other 3M (or

    equal) UL-Listed details as applicable for specific installations.

    3. Where conduit or sleeves pass through floors, roofs, walls and partitions that are not

    fire or smoke rated, penetrations shall be sealed with grout or caulk.

    4. Drawings are in part diagrammatic, intended to convey the scope of work, and to

    indicate the general locations of equipment and some feeders. Contractor shall field

    verify all dimensions and layout his own work according to the following guidelines:

    a. Coordinate device locations and heights with Architectural elevations and

    details prior to rough in. Fixtures and devices to be centered around

    architectural construction. Verify exact box rough-in locations with

    Architect prior to installation of conduit and wire. Architect reserves the

    right to have the Contractor adjust box locations at this time.

    b. Contractor shall be responsible for determining the exact locations for

    equipment and rough-ins and the exact routing of feeders prior to

    construction so as to best fit the layout of the work. Space above ceilings

    is limited; coordinate final layout with all trades.

    c. Where offsets in feeders are required to coordinate the work of other trades

    or to maintain required ceiling heights, they shall be provided at no

    additional cost to the Owner.

    d. Coordinate location of equipment and routing of feeders to maintain access

    to heat pumps, motors, electrical equipment, and controls.

    e. Contractor shall install equipment per clearances listed in NEC.

    5. All elements of the construction shall be performed by workmen skilled in the

    particular craft involved, and regularly employed in that particular craft. All work

    shall be performed in a neat, workmanlike manner in keeping with the highest

    standards of the craft.

    6. Electrical, communications and fire alarm systems shall not be supported by

    mechanical ductwork, mechanical piping, sprinkler or ceiling system support wires.

    Where coordinated with other trades, common support structures may be utilized.

    7. Circuit numbers shown have been chosen to aid in design and to provide clarity of

    scope of work. Adjust as necessary based on field conditions.

    8. Where conduits and cable tray cross building expansion joints, provide suitable

    expansion fittings. Unless fitting is listed for bonding, provide external bonding

    jumper.

    ***REMODEL****

    9. Electrical Contractor shall cut and patch walls and floors as required for installation

    of new systems.

    a. All openings in concrete or masonry construction shall be core drilled or saw

    cut. Coordinate with existing structure and General Contractor as required

    to maintain structural integrity and minimize size of openings. Do not

    modify structural building components without coordinating modifications

    with the Architect.

    10. Electrical Contractor shall remove and reinstall acoustical ceiling tile (ACT) as

    required to complete electrical work as indicated on the plans. Any tile damaged

    during construction shall be replaced at the contractor's expense.

    11. Provide updated typewritten circuit directories at all existing panelboards with new or

    modified circuits.

    12. The building will remain occupied and in use for the duration of construction.

    Contractor shall maintain all circuits in occupied areas. Any work requiring power

    interruption to occupied areas shall be scheduled with the Owner. After-hours work

    may be required.

    SPLICE CONNECTION FROMEXISTING TO NEW

    CONDUIT CONTINUATION

    CONDUIT TURNING DOWN

    ANY WIRING DEVICE WITH THIS SYMBOLINDICATES SURFACE MOUNTED OUTLET BOX

    MOTION DETECTOR

    CONDUIT STUB

    PUSH BUTTON

    M

    INTERCOM DEVICE - WALL MOUNTED

    TELECOMMUNICATIONS SYMBOLS

    INDICATES ADDITIONAL DETAIL PER THE FOLLOWING:

    INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

    INFORMATION JACK FOR VOICE OR DATA USE,MATCH RECEPTACLE HEIGHT UNLESS OTHERWISE NOTED

    I

    V VOLUME CONTROL - WALL MOUNTED

    #

    XYZ

    ACCESS CONTROL READER - WALL MOUNTEDA

    CONDUIT TURNING UP

    INDICATES WALL PHONE PLATE AT+48" UNLESS OTHERWISE NOTED

    XX

    ##

    *** TELECOM ***

    LADDER RACK

    WIRE BASKET

    CAMERA - CEILING MOUNTED

    EQUIPMENT DESIGNATIONPER EQUIPMENT SCHEDULE

    # -

    XYZ -

    -AC

    -W

    -W+

    C CAMERA - WALL MOUNTED

    INTERCOM DEVICEI

    (NOTE: ALL SYMBOLS SHOWN MAY NOT BE REQUIRED FOR THIS PROJECT)

    INDICATES 8" ABOVE COUNTERTOP OR 4"ABOVE BACKSPLASH

    MOTION DETECTOR - WALL MOUNTEDM

    SECURITY DEVICE - WALL MOUNTEDS

    SECURITY DEVICES

    JUNCTION BOX - IN FLOOR BOX OR CEILING

    PULL BOX

    J

    J

    JUNCTION BOX - WALL MOUNTED

    ELECTRONIC DISPLAY - CEILING MOUNTED

    ELECTRONIC DISPLAY - WALL MOUNTED

    (NOTE: ALL STANDARD HEIGHT DEVICES 18" AFF TO CENTER OF BOX UNLESS NOTED OTHERWISE)

    INDICATES WALL PHONE PLATE AT +48" UNLESS OTHERWISE NOTED, PLUS ONE JACK AT STANDARD OUTLET HEIGHT.

    INDICATES LENS AIMED DOWNINDICATES LENS AIMED OUT

    --

    INDICATES LENS AIMED DOWNINDICATES LENS AIMED OUT

    --

    C

    INFORMATION JACK FOR WIRELESS ACCESS POINT (WAP) - CEILING MOUNTED

    INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

    INFORMATION JACK FOR VOICE OR DATA USE - CEILING MOUNTED

    # -#

    #INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

    # -

    EMERGENCY COMMUNICATION DEVICE - WALL MOUNTED,PROVIDE INFORMATION JACK FOR VOICE OR DATA

    E

    EMERGENCY COMMUNICATION DEVICE,PROVIDE INFORMATION JACK FOR VOICE OR DATA

    E

    INDICATES NUMBER OF INFORMATION JACKS.THE NUMBER ONE IS IMPLIED.

    # -

    INDICATES NUMBER OF INFORMATION JACKS.THE NUMBER ONE IS IMPLIED.

    # -

    ACD ACCESS CONTROL DOOR

    # INDICATES TYPE, SEE ACCESS CONTROL DOOR SCHEDULE

    # -

    # INDICATES PLAN MARK, SEE ACCESS CONTROL DOOR SCHEDULE

    # -

    #

    #

    INDICATES PLAN MARK, SEE VIDEO SURVEILLANCE SCHEDULE

    # -

    INDICATES PLAN MARK, SEE VIDEO SURVEILLANCE SCHEDULE

    # -

    SPECIAL CABINET AS NOTED - SURFACE MOUNTED

    *** EQUIPMENT ***

    SPECIAL CABINET AS NOTED - RECESSED MOUNTED

    (NOTE: ALL SYMBOLS SHOWN MAY NOT BE REQUIRED FOR THIS PROJECT)

    ELECTRICAL SYMBOLS

    EXISTING SURFACE BRANCH CIRCUIT PANELBOARD OR AS NOTED

    OUTLET BOX WITH SPECIAL DEVICE AS NOTED

    *** WIRING DEVICES ***

    DOUBLE DUPLEX RECEPTACLE

    ANY WIRING DEVICE WITH THIS SYMBOLINDICATES SURFACE MOUNTED OUTLET BOX

    M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

    8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

    designengineers.com 319. 841. 1944

    CONSULTANTS

    OWNER

    PROJECT NAME

    SHEET TITLE

    A

    1

    PROJECT NUMBER:

    DRAWN:

    CHECKED:

    ISSUE DATE AND DESCRIPTION

    B

    C

    D

    E

    A

    B

    C

    D

    E

    2 3 4 5 6

    1 2 3 4 5 6

    7/2

    2/2

    019

    3:4

    0:1

    6 P

    MB

    IM 3

    60

    ://D

    ave

    nport

    Scho

    ols

    Netw

    ork

    Re

    wire

    Ph

    ase

    3 2

    019

    190

    35/M

    EP

    - D

    CS

    D S

    ma

    rt N

    etw

    ork

    Rew

    ire

    20

    19 1

    903

    5_R

    18 .rv

    t

    Davenport SchoolsNetwork RewirePhase 3 2019

    TELECOMSCHEDULESAND DETAILS

    T503

    19035

    NJO

    AMS

    07-22-2019 CD SET

    KEYED NOTES

    T-1 Contractor provide Wiremold 4000 two-gang overlapping cover duplex receptacle G4047BX coverplates for demo locations.

    T-2 Contractor install new cable for data and wireless services to this data rack.

    TD-1 After all services have been cut over to new cable and IP phones are installed. Remove existing wallfield equipment, termination hardware and phone switch. Leave only copper and fiber DMARCequipment and connectivity. Turn over all electronic equipment, racks, newer standard modular patchpanels, modular jacks and patch cables to owner.

    TD-2 Contractor to verify if camera cable is routed to the existing MDF or to Rm.202B IDF-1. If the cameracable is routed to the old MDF then re-route existing or install new cable to Rm.202B IDF-1

    TD-3 Contractor to coordinate with the owner relocating the video management server from its currentlocation to the rack in the new MDF .

    TD-4 Contractor to remove all existing multi-mode fiber backbone and innerduct after services have beenmoved over to the new single mode fiber.

    TD-5 Contractor coordinate service outages and relocate the existing data rack to the new location noted onthe enlarged details.

    KEYED NOTES

    E-1 Provide new 30A/1P breaker in existing GE panel 2D located just outside MDF room 19A. Replaceexisting spare single pole breaker. Return removed spare breaker to owner. New breaker AIC ratingshall match existing panel AIC ratings. New breaker is to serve new special receptacle in MDF room19A.

    E-2 Utilize two existing spare 20A/1P breakers from existing panel 2D for new double duplex located inMDF room 19A.

    E-3 Provide new Seimens type BL 30A/1P 10,000AIC breaker in existing Seimens panel 2M1. Replaceexisting 20A/1P spare in panel space 21 for new breaker. Return removed spare breaker to owner.New breaker is to serve new special receptacle in room 202B.

    E-4 Utilize two existing spare 20A/1P breakers 23 and 25 from existing panel 2M1 for new double duplexlocated in room 202B.

    E-5 Provide new Seimens type BL 30A/1P 10,000AIC breaker in existing Seimens panel 2M1. Replaceexisting 20A/1P spare in panel space 27 for new breaker. Return removed spare breaker to owner.New breaker is to serve new special receptacle in room 220. Prior to commencement of construction,contractor to field verify location of existing panel NB that serves existing room 220. The location ofpanel NB was unable to be discovered during design.

    E-6 Utilize two existing spare 20A/1P breakers 29 and 31 from existing panel 2M1 for new double duplexlocated in room 220. Prior to commencement of construction, contractor to field verify location ofexisting panel NB that serves existing room 220. The location of panel NB was unable to bediscovered during design.

    G000 - COVER SHEETA101 - ARCHITECTURAL ENLARGE VIEW - SMART INTERMEDIATETD100 - TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LOWER LEVELTD101 - TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LEVELS ONE AND TWOTD110 - TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL ONETD111 - TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL TWOTD112 - TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL THREET100 - TELECOM PLAN - JEFFERSON ELEMENTARY– LOWER LEVELT101 - TELECOM PLAN - JEFFERSON ELEMENTARY– LEVELS ONE AND TWOT110 - TELECOM PLAN – SMART INTERMEDIATE – LEVEL ONET111 - TELECOM PLAN – SMART INTERMEDIATE – LEVEL TWOT112 - TELECOM PLAN – SMART INTERMEDIATE – LEVEL THREET400 - TELECOM ENLARGE VIEWS – JEFFERSON ELEMENTARYT401 - TELECOM ENLARGE VIEWS – SMART INTERMEDIATET500 - TELECOM SCHMEATICS AND DETAILST501 - TELECOM SCHMEATICS AND DETAILST502 - TELECOM SCHMEATICS AND DETAILST503 - TELECOM SCHEDULES AND DETAILS