designengineers.com 319. 841. 1944 davenport schools ... · 7/22/2019 3:36:56 pm bim...

18
FRANK L SMART INTERMEDIATE 1934 W 5th St, Davenport, IA 52802 JEFFERSON ELEMENTARY SCHOOL 1027 N Marquette St, Davenport, IA 52804 Dwight Clopton Schumm My license renewal date is December 31, 2019. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Date Pages or sheets covered by this seal: Iowa Registration No. 13694 M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S 8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404 designengineers.com 319. 841. 1944 CONSULTANTS OWNER PROJECT NAME SHEET TITLE A 1 PROJECT NUMBER: DRAWN: CHECKED: ISSUE DATE AND DESCRIPTION B C D E A B C D E 2 3 4 5 6 1 2 3 4 5 6 7/22/2019 3:39:58 PM BIM 360://Davenport Schools Network Rewire Phase 3 2019 19035/MEP - DCSD Smart Network Rewire 2019 19035_R18 .rvt Davenport Schools Network Rewire Phase 3 2019 COVER SHEET G000 19035 NJO AMS 07 - 22 - 2019 CD SET DAVENPORT, IA Davenport Schools Network Rewire Phase 3 2019 PROJECT NO.: 19035 DAVENPORT COMMUNITY SCHOOLS CD SET Sheet Index Sheet Number Sheet Name GENERAL G000 COVER SHEET ARCHITECTURAL A101 ARCHITECTURAL ENLARGE VIEW - SMART INTERMEDIATE TELECOM TD100 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LOWER LEVEL TD101 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LEVELS ONE AND TWO TD110 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL ONE TD111 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL TWO TD112 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL THREE T100 TELECOM PLAN - JEFFERSON ELEMENTARY– LOWER LEVEL T101 TELECOM PLAN - JEFFERSON ELEMENTARY– LEVELS ONE AND TWO T110 TELECOM PLAN – SMART INTERMEDIATE – LEVEL ONE T111 TELECOM PLAN – SMART INTERMEDIATE – LEVEL TWO T112 TELECOM PLAN – SMART INTERMEDIATE – LEVEL THREE T400 TELECOM ENLARGE VIEWS – JEFFERSON ELEMENTARY T401 TELECOM ENLARGE VIEWS – SMART INTERMEDIATE T500 TELECOM SCHMEATICS AND DETAILS T501 TELECOM SCHMEATICS AND DETAILS T502 TELECOM SCHMEATICS AND DETAILS T503 TELECOM SCHEDULES AND DETAILS G000, A101, TD100, TD101, TD110, TD111, TD112, T100, T101, T110, NOT TO SCALE 2 SITE MAP - SMART INTERMEDIATE T111, T112, T400, T401, T500, T501, T502, T503 NOT TO SCALE 1 SITE MAP - JEFFERSON ELEMENTARY SCHOOL

Upload: others

Post on 11-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

FRANK L SMART INTERMEDIATE1934 W 5th St, Davenport, IA 52802

JEFFERSON ELEMENTARY SCHOOL1027 N Marquette St, Davenport, IA 52804

Dwight Clopton Schumm

My license renewal date is December 31, 2019.

I hereby certify that this engineering document was

prepared by me or under my direct personal supervision

and that I am a duly licensed Professional Engineer

under the laws of the State of Iowa.

Date

Pages or sheets covered by this seal:

Iowa Registration No. 13694

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

9:5

8 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

COVER SHEET

G000

19035

NJO

AMS

07-22-2019 CD SET

DAVENPORT, IA

Davenport Schools Network Rewire Phase 3 2019

PROJECT NO.: 19035

DAVENPORT COMMUNITY SCHOOLS

CD SET

Sheet IndexSheet

Number Sheet Name

GENERAL

G000 COVER SHEET

ARCHITECTURAL

A101 ARCHITECTURAL ENLARGE VIEW - SMART INTERMEDIATE

TELECOM

TD100 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LOWER LEVEL

TD101 TELECOM DEMOLITION PLAN - JEFFERSON ELEMENTARY – LEVELS ONE AND TWO

TD110 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL ONE

TD111 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL TWO

TD112 TELECOM DEMOLITION PLAN - SMART INTERMDIATE – LEVEL THREE

T100 TELECOM PLAN - JEFFERSON ELEMENTARY– LOWER LEVEL

T101 TELECOM PLAN - JEFFERSON ELEMENTARY– LEVELS ONE AND TWO

T110 TELECOM PLAN – SMART INTERMEDIATE – LEVEL ONE

T111 TELECOM PLAN – SMART INTERMEDIATE – LEVEL TWO

T112 TELECOM PLAN – SMART INTERMEDIATE – LEVEL THREE

T400 TELECOM ENLARGE VIEWS – JEFFERSON ELEMENTARY

T401 TELECOM ENLARGE VIEWS – SMART INTERMEDIATE

T500 TELECOM SCHMEATICS AND DETAILS

T501 TELECOM SCHMEATICS AND DETAILS

T502 TELECOM SCHMEATICS AND DETAILS

T503 TELECOM SCHEDULES AND DETAILS

G000, A101, TD100, TD101, TD110, TD111, TD112, T100, T101, T110,

NOT TO SCALE2 SITE MAP - SMART INTERMEDIATE

T111, T112, T400, T401, T500, T501, T502, T503

NOT TO SCALE1 SITE MAP - JEFFERSON ELEMENTARY SCHOOL

Page 2: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

RM

220

1' -

0"

7' -

4"

6' - 4"

A-1

A-2

A-1

ARCHITECTURAL NOTES:

A-1 8' tall metal partition, refer to specification 05 5000.A-2 3' sliding door with hardware, refer to specification 05 5000.

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

9:5

4 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

ARCHITECTURALENLARGE VIEW -SMARTINTERMEDIATE

A101

19035

NJO

AMS

07-22-2019 CD SET

1/2" = 1'-0"1 SMART INTERMEDIATE ARCHITECTURAL PLAN - ROOM 220

Page 3: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

J J J J J J J J J JJJJJJJJJJJ

JJ

JJ

JJ

JJ

JJ

3

2

12

EXISTING 2-4"C

EXISTING 4" J-HOOKS

1-2"C

1-2"C BUILDING FIBER AND COPPER SERVICE ENTRANCE, TD-1

CRAWLSPACEENTRANCE

ELEVATED WALLOPENING INTOCRAWLSPACE

CRAWL SPACE

TD-1

ABANDON EXISTING PATHWAY

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

6:5

6 P

MB

IM 3

60://D

aven

port

Schoo

ls N

etw

ork

Rew

ire P

ha

se 3

20

19 1

903

5/M

EP

- D

CS

D J

effe

rso

n N

etw

ork

Rew

ire 2

019

190

35_

R18.r

vt

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMDEMOLITIONPLAN -JEFFERSONELEMENTARY –LOWER LEVEL

TD100

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 JEFFERSON DEMOLITION PLAN - LOWER LEVEL

N

REFER TO SHEET T503 FORTELECOM DEMOLITION

NOTES

REFER TO SHEET T503 FORELECTRICAL DEMOLITION

NOTES

TO REMAIN

TO BE REMOVED / REVISED

DEMOLITION KEY

Page 4: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

I

AP

IIAP

API

AP

C

C

AP

C

I

AP

APAP

I

I

I

I

IIAP

I

I

IAPAPC

II

I

AP

AP

IIIC C

II I I IC

AP

AP

I

AP

I

AP

IAP

I

I I

AP

I I AP I

IIIIIII CC

C

I

II API

I

AP

I

I AP

I

I I I I I

AP

AP

Room

1

Room

2

Room

3

Room

4

PRINCIPAL

NURSE

Room

5

Room

6

OFFICEIMC

7

Room

8

Room

9

Room

10

GIRLS

MECH/MEZZ

CAFE

STAGE

17

AUD

GYM

BOYS

Room

11

Room

12

Room

13

Room

43

Room

44

MEZZ MEZZ

A

B

C

D

ABANDON EXISTING PATHWAY TO TELECOM ROOM ON LOWER LEVEL

1 1 1

1

121

2

1

12

2

2

1

1

111

1

11

1

1

11

1

1

1

1

21

2

12

2

1

2

2

1

2

1

1

1

21

1111

1

1

1 1 1 1 1 1 1 1

1

211

2 3 3 3

2

22

3

EXISTING TO BE REUSED1-4"C & 2-2"C UP TO MDF

EXISTING TO BE REUSED 2-4"C DOWN TO CRAWLSPACE

1

22

2

2

31

1

2

1

W

2

1

1

1

1

1

1

3

1

1

1

2

1

1 1

1 1 2 1

1

1

4

1

3

W 2

2

1

1W

2

1

3

1

1

2

1

1

1

2

W

WWW

2

1

2

1W

2

1

W

W

Room

14

Room

15

Room

16

Room

17Room

18

Room

30

Room

29

Room

28

BOYS

Room

41Room

34

Room

39

Room

38Room

37

Room

36Room

32

Room

31

Room

27

Room

26

Room

25

Room

22

Room

23

Room

24

Room

21Room

20Room

19

Room

35

LEVEL 3

EXISTING TO BE REUSED1-4"C & 2-2"C DOWN TO ROOM 4 CLOSET

2

2

2

Room

33

2-4"C

MDF ROOM19A T400

1

EXISTING PANEL 2D, E-1, E-2

Room

33.B

Room

33.C

Room

33.A

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

7:0

2 P

MB

IM 3

60://D

aven

port

Schoo

ls N

etw

ork

Rew

ire P

ha

se 3

20

19 1

903

5/M

EP

- D

CS

D J

effe

rso

n N

etw

ork

Rew

ire 2

019

190

35_

R18.r

vt

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMDEMOLITIONPLAN -JEFFERSONELEMENTARY –LEVELS ONEAND TWO

TD101

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 JEFFERSON DEMOLITION PLAN - LEVEL ONE

1/16" = 1'-0"2 JEFFERSON DEMOLITION PLAN - LEVEL TWO

N

REFER TO SHEET T503 FORTELECOM DEMOLITION

NOTES

REFER TO SHEET T503 FORELECTRICAL DEMOLITION

NOTES

TO REMAIN

TO BE REMOVED / REVISED

DEMOLITION KEY

Page 5: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

C

CC

AP

AP

I

I

I

I

AP

AP

I

II

C

I

I

C

C

AP

C

C

II

AP

I

I

AP

C

C

C

I

I AP

C

C

I

C

AP

C

C

C

C

AP

C

AP

I I

AP

I

I

I

C

I

C

1

1

1

W

W

1

W

1

W1

W

W

W

11

W

W1

W

W

2

1

1

1

W

3 2

2

W

2

3

3

3

3

3

3

3

3

3

3

3

3

3

3W

1

1

1

1

2

IN BASEMENT

7

TRANECONTROLS

EXISTINGPANEL BOILER

GYM

128

STAGE

129

STORAGE

130

ROOM

116

ROOM

115A

STORAGE

118A

WEIGHT ROOM

118B

ROOM

115B

ROOM

114

WORK ROOM

CONF. ROOM

MEDIA CENTER

34

BOYS

113

ROOM

112ROOM

111

ROOM

110

ROOM

109

STOR.

ROOM

108

STORAGE

ROOM

107

GIRLS

106

ROOM

105

FAN ROOM

28

ROOM

35

ROOM

104

BOILER RM

001

BOYS LOCKER ROOMSTOR.

BOYS LOCKER ROOM

BOYS LOCKER ROOM

GIRLS LOCKER ROOM

ROOM

126

ELEV.ROOM

127

STORAGE

STORAGE

BOYS

122

GIRLS

123

CAFETERIA

101

KITCHEN

102

STORAGE

BOYS

125

GIRLS

124

STOR.

EXISTING MDFFIBER/COPPERDMARC, TD-1,TD-3, TD-4

TD-2

TD-2

TD-2

TD-2

TD-2

TD-2

TD-2

TD-2TD-2

TD-2

TD-2

TD-1TD-3 TD-4

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:1

7 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL ONE

TD110

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL ONE

N

TO REMAIN

TO BE REMOVED / REVISED

DEMOLITION KEY

REFER TO SHEET T503 FORTELECOM DEMOLITION

NOTES

REFER TO SHEET T503 FORELECTRICAL DEMOLITION

NOTES

Page 6: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

II

I

I

C

I

AP

C

C

AP

C

C

I

I AP

III

C

C

APCC

C

AP

AP

C

I

C

AP

API

C

I AP

C

AP

I

AP

I

AP

I

I

I

II

AP

AP

I

I

I

I

I

I

I

?

?

ROOM

209

ROOM

210

ROOM

211

ROOM

221

WOMEN

219

UPPER GYM

225

NURSE

241

ADMIN. & GUIDANCE

240

STOR. FILE RM.

CONF. 'A'

SUPPORT STAFF

PRINCIPAL CONF. 'B'

ASST. PRINC.

GUID.

GUID.

STAFF WRK RMSTORAGE

B

A

W

3

1

W

W

1

1

1

W

1

2

2112

2

W

1

WW1

W1

2

1

1

3

1

W

1

1

11

1

1

1

3

1

222

4

1

2

2

2 1

IN CASEWORK

IN CASEWORK

2

2

2 4

2

1

2

2

233

1

1

2

3 3

3

1

W

1

1

1

2

1

1

1

1

111

1

MECHANICAL

MEZZANINE

230

MECH. ROOM

231

ROOM

216

ROOM

215

ROOM

218

ROOM

217

ROOM

208

ROOM

207

GIRLS

206

ROOM

205

CUST.

ROOM

204

BOYS

222

GIRLS

223

OFFICE STOR

ROOM

224

ROOM

200

ROOM

201

ROOM

203

ROOM

202A

ROOM

202B

ROOM

202C

ROOM

202D

ROOM

214

ROOM

212

STOR.

STOR.

T401

1

T401

3RM

220

EXISTING PANEL 2M1, E-3, E-4, E-5, E-6

TD-4

TD-2

TD-2TD-2

TD-2

TD-2

TD-2

TD-4

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:2

1 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL TWO

TD111

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL TWO

N

TO REMAIN

TO BE REMOVED / REVISED

DEMOLITION KEY

REFER TO SHEET T503 FORTELECOM DEMOLITION

NOTES

REFER TO SHEET T503 FORELECTRICAL DEMOLITION

NOTES

Page 7: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

I

I

I

II

CC

C

C

I

AP

C

AP

AP

I

I

I

AP

C

AP

I

C

AP AP

C

C

C

AP

I

C

C

C

I

I

AP

AP

I

I

I

I

I

I

I

I

W

1

1W

1

W

2

2

11

W

11

W

1

W

1

W

1 W

W

1

31

3

1

1W

164

W1

1

W

1

W

1

1

W1

1

W

1

1

2 1

W1

1

1 3

W

ROOM

317

ROOM

316

ROOM

315

ROOM

314

BOYS

313

ROOM

312ROOM

311ROOM

310

ROOM

308

STOR.

STOR.

309

ROOM

307

GIRLS

306

ROOM

305

ROOM

321

ROOM

304

GIRLS

322

STOR.

ROOM

303

ROOM

302

ROOM

301

ROOM

300A

ROOM

300

CUST.

325

ELEV.

ROOM

318

ROOM

319A

ROOM

319B

ROOM

319C

ROOM

324A

ROOM

324B

BOYS

323

2

ROOM

319320A

320B

ROOM

324A

ROOM

324B

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:2

4 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMDEMOLITIONPLAN - SMARTINTERMDIATE –LEVEL THREE

TD112

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 SMART TELECOM DEMOLITION PLAN - LEVEL THREE

N

TO REMAIN

TO BE REMOVED / REVISED

DEMOLITION KEY

REFER TO SHEET T503 FORTELECOM DEMOLITION

NOTES

REFER TO SHEET T503 FORELECTRICAL DEMOLITION

NOTES

Page 8: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

I

I I

I

I

AP

J

J

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

J J J J J J J J J J J JJJJJJJJJJJJJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

JJ

J J JJJJ

STORAGE

BOILER ROOM

CAFE OFFICE

ELEC.

EXISTING 2-4"C

EXISTING 4" J-HOOKS

1-2"C

1-2"C

CRAWLSPACEENTRANCE

ELEVATED WALLOPENING INTOCRAWLSPACE

CRAWL SPACE

CUSTODIAL

EXISTING FIBER ANDCOPPER ENTRANCE

1"C

1"C

1 1/2"C

ABANDON EXISTING PATHWAY

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

6:5

0 P

MB

IM 3

60://D

aven

port

Schoo

ls N

etw

ork

Rew

ire P

ha

se 3

20

19 1

903

5/M

EP

- D

CS

D J

effe

rso

n N

etw

ork

Rew

ire 2

019

190

35_

R18.r

vt

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOM PLAN -JEFFERSONELEMENTARY–LOWER LEVEL

T100

19035

NJO

AMS

07-22-2019 CD SET

N

1/16" = 1'-0"1 JEFFERSON FLOOR PLAN - LOWER LEVEL

EXISTING

NEW / REVISED

NEW WORK KEY

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

ALL CABLING ON THIS SHEET ISSERVED FROM MDF RM. 19A

Page 9: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

AP

AP

AP

C

C

C

AP

APC

AP

AP

C C C

AP

AP

AP

I

AP

APAP

I

I

I

AP

AP

I

I

I

II

I

III II I I I

AP

I

AP

AP

I

I

I

I

I

I I

I

I

II

AP

AP

APAP

AP I I

I

I

I

I

I

I I

I

AP

APAP

AP

CC

C

AP

AP

AP

I

IIIII I I I I I

AP

AP

APAP

AP

APAP AP

AP

AP

AP

AP

AP

AP

II

I

I

II

I

I

I

I

I

I

I

I I

I

I

I

I

I I

I

I

I

II I

I

I

I

II I I

I

III

I

Room

4PRINCIPAL

OFFICE

CAFE

AUD

GYM

IMC

7

Room

10

Room

9

IMC

7

Room

6

Room

5NURSE

GIRLS

Room

3

Room

2

MEZZ

Room

1

Room

13

Room

12Room

11

BOYS

Room

43

MECH/MEZZ

STAGE

17

Room

44

AC

2

2

2

2

2

2AC

AC

ABANDON EXISTING PATHWAY

ROOM 4A

T-2

LEVEL 3

MDF ROOM19A

Room

25

Room

26

Room

27

GIRLS

Room

31

Room

32

Room

36

Room

38

Room

37

Room

33

Room

39

Room

35

Room

34

Room

41

Room

28

BOYS

Room

29

Room

30

Room

14

Room

15

Room

16

Room

17

Room

18

Room

19

Room

20

Room

21

Room

22

Room

23

Room

24

EXISTING TO BE REUSED1-4"C & 2-2"C DOWN TO ROOM 4 CLOSET

2-4"C

2

2

2

2

Room33.C

Room33.B

Room33.A

T400

2

EXISTING PANEL 2D, E-1, E-2

Room32.A

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

6:5

5 P

MB

IM 3

60://D

aven

port

Schoo

ls N

etw

ork

Rew

ire P

ha

se 3

20

19 1

903

5/M

EP

- D

CS

D J

effe

rso

n N

etw

ork

Rew

ire 2

019

190

35_

R18.r

vt

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOM PLAN -JEFFERSONELEMENTARY–LEVELS ONEAND TWO

T101

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 JEFFERSON FLOOR PLAN - LEVEL ONE

1/16" = 1'-0"2 JEFFERSON FLOOR PLAN - LEVEL TWOEXISTING

NEW / REVISED

NEW WORK KEY

N

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

ALL CABLING ON THIS SHEET ISSERVED FROM MDF RM. 19A

Page 10: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

C

CC

AP

AP

AP

C

C

C

AP

C

C

AP

AP

C

C

C

AP

C

C

C

AP

C

C

C

C

AP

C

AP

C

C

AP

I

I

I

I

II

I

I

II

I

I

I

I

I

I I

AP

I

I

I

I

I

I

I

I

I

I

I I I I

I

I

I

I

III

I

II

I

AP AP APAPI

AP

AP

AP

AP

I

I

I

I

I

I

I

I

I

I

SS

SS

S

AP

T-1

T-1

EXISTING MDFFIBER/COPPERDMARC

CAFETERIA

101

STAGE

129

GYM

128

GIRLS

124

BOYS

125

STORAGE

ROOM

127

ELEV.

ROOM

126

STORAGEGIRLS

123

BOYS

122

CUST.

KITCHEN

102

STORAGE

STOR.

GIRLS LOCKER ROOM WEIGHT ROOM

118B

STORAGE

118A

ROOM

117 ROOM

116

ROOM

115A

ROOM

115B

BOYS LOCKER ROOM

BOILER RM

001

ROOM

104

ROOM

105 FAN ROOM

002

ROOM

121

MEDIA CENTER

120

WORK ROOM

CONF. ROOM

ROOM

114

ROOM

112

STORAGE

ROOM

111

ROOM

110

STOR.

ROOM

109

ROOM

108STORAGE

ROOM

107

CL.

GIRLS

106

T-1

T-1

2-4"C1-TO L22-TO L3

2-4"C

4"C

TRANECONTROL

2-4"C UP TO MDF

2-4"C

2

W

MDF 220IDF 202B

MDF 220IDF 202B

3

T-2

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:0

1 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOM PLAN– SMARTINTERMEDIATE –LEVEL ONE

T110

19035

NJO

AMS

07-22-2019 CD SET

N

1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL ONE

EXISTING

NEW / REVISED

NEW WORK KEY

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

Page 11: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

C

C

C

C

C

AP

C

C

CC

C

C

C

AP

C

C

AP

AP

II

I

I

I

I

I

III

I

AP

I

AP

I

I

AP

I

I

II

I

I

I

I

I

AP

AP

AP

AP

AP

AP

AP AP

API

I

AP

AP

AP

AP

AP

AP

I

I

I

I

I

I

I

I

I

I

II

I

I

I

I

I

I

I

I

II

I

I

I

II

I

I

I

I

I

S

I

I

W

ROOM

205

GIRLS

206 CL.

ROOM

207ROOM

208

ROOM

209 ROOM

210

ROOM

211

ROOM

212

BOYS

213

ROOM

214

ROOM

215

ROOM

216

ROOM

204

ROOM

200

ROOM

201

ROOM

202A

ROOM

203

ROOM

202B

ROOM

202C

ROOM

202D

OFFICE STOR

ROOM

224

STORAGE

GIRLS

223

BOYS

222

CUST.

CUST.

ROOM

221

ROOM

217

ROOM

218

WOMEN

219

UPPER GYM

225

NURSE

241

ADMIN. & GUIDANCE

240

STOR.FILE RM.

CONF. 'A' SUPPORT STAFF

PRINCIPAL

CONF. 'B'

ASST. PRINC.

GUID.

GUID.

STAFF WRK RM

STOR.

STOR.

MECHANICAL

MEZZANINE

230

MECH. ROOM

231

ELEV.

MECH RM

STORAGE

T401

4

T401

2

RM

220

EXISTING PANEL 2M1, E-3, E-4, E-5, E-6

2-4"C

2-4"C

2

2

AC AC

2 2

MDF 220IDF 202B

MDF 220IDF 202B

2-4"C DOWN

4"C UP

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:0

4 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOM PLAN– SMARTINTERMEDIATE –LEVEL TWO

T111

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL TWO

EXISTING

NEW / REVISED

NEW WORK KEY

N

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

Page 12: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

CC

C

CC

C

AP

C

C

C

C

C

C

C

AP

AP

I

I

I

II

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

AP

AP

AP

AP

AP

AP

AP

APAP AP AP AP

AP

AP

AP

II

I

I

I

I

I

I

I

I

I

I

I I I I I

I

I

I

I

II

I

AP

ROOM

302

ROOM

301

ROOM

300

ROOM

300A

ROOM

303

ROOM

304

ROOM

305

GIRLS

306

ROOM

307ROOM

308

STOR.

309

ROOM

310

ROOM

311

ROOM

312

BOYS

313

ROOM

314

ROOM

315

ROOM

316

ROOM

317

ROOM

318

ROOM

319A

ROOM

319B

ROOM

319C

ROOM

321

GIRLS

322

BOYS

323

ROOM

324B

ROOM

324A

CUST.

325

STOR.

CUST.

STOR.

CL.

ELEV.

SKYLIGHT

2 2

4

320B

ROOM

320

320A

ROOM

324B

ROOM

324A

4"C

MDF 220IDF 202B

MDF 220IDF 202B

4"C DOWNTO MDF

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:0

7 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOM PLAN– SMARTINTERMEDIATE –LEVEL THREE

T112

19035

NJO

AMS

07-22-2019 CD SET

1/16" = 1'-0"1 SMART TELECOM PLAN - LEVEL THREE

EXISTING

NEW / REVISED

NEW WORK KEY

N

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

Page 13: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

EXISTING TO REMAINSERVER CABINET

HCM

1

+84"

EXISTING TO REMAINSERVER CABINET

EXISTING TO REMAIN DR-1WITH VMS AND SECURITYCAMERA PATCH PANEL

VCM

2

VCM

2

T-2NEMA 5-30,3#10, E-1E-1

E-2

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:3

6:5

6 P

MB

IM 3

60://D

aven

port

Schoo

ls N

etw

ork

Rew

ire P

ha

se 3

20

19 1

903

5/M

EP

- D

CS

D J

effe

rso

n N

etw

ork

Rew

ire 2

019

190

35_

R18.r

vt

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMENLARGE VIEWS– JEFFERSONELEMENTARY

T400

19035

NJO

AMS

07-22-2019 CD SET

1/4" = 1'-0"1 ENLARGED ROOM 19A - DEMOLITION1/4" = 1'-0"2 ENLARGED ROOM 19A - TELECOM

RECEPTACLE KEY

TR - INDICATES TAMPER RESISTANT (SAFETY TYPE) RECEPTACLEGFI - INDICATES GROUND FAULT INTERRUPTER RECEPTACLETVSS - INDICATES TRANSIENT VOLT SURGE SUPPRESSOR RECEPTACLEIG - INDICATES ISOLATED GROUND RECEPTACLEWP - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ FLIPCOVERWPD - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ CORD AND PLUG COVER# - NUMBER INDICATES PANEL CIRCUIT NUMBER+##" - DIMENSION INDICATES HEIGHT TO CENTER OF RECEPTACLE ABOVE FINISH FLOOR (+18" IF NOT SHOWN)USB - INDICATES USB TYPE RECEPTACLE

EXISTING

TO BE REMOVED /REVISED

DEMO/NEW WORK KEY

NEW / REVISED

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

N

Page 14: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

I I

ROOM

202B

EXISTING TO REMAIN DR-1MOVE TO NEW LOCATION

TD-5

ROOM

202B

HCM

1

+90"

HCM

1

+90" 2-4"C

ROOM

202B

E-4

E-3NEMA 5-30, 3#10, E-3

VCM

2

VCM

2

EXISTING TO REMAIN DR-1MOVE OUT FROM NORTH WALL 2'.

HCM

1+144"-168"

HCM

1

+144"-168"

HCM

1

+90"

VCM

3

NEW CAGEWALL

E-6

NEMA 5-30, 3#10, E-5E-5

VCM

2

VCM

2

NEW CAGEWALL

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:0

9 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMENLARGE VIEWS– SMARTINTERMEDIATE

T401

19035

NJO

AMS

07-22-2019 CD SET

1/4" = 1'-0"1 ENLARGED ROOM 202B - DEMOLITION1/4" = 1'-0"2 ENLARGED ROOM 202B - TELECOM

1/4" = 1'-0"3 ENLARGED ROOM 220 - DEMOLITION1/4" = 1'-0"4 ENLARGED ROOM 220 - TELECOM

RECEPTACLE KEY

TR - INDICATES TAMPER RESISTANT (SAFETY TYPE) RECEPTACLEGFI - INDICATES GROUND FAULT INTERRUPTER RECEPTACLETVSS - INDICATES TRANSIENT VOLT SURGE SUPPRESSOR RECEPTACLEIG - INDICATES ISOLATED GROUND RECEPTACLEWP - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ FLIPCOVERWPD - INDICATES RECEPTACLE WITH WEATHERPROOF BOX/ CORD AND PLUG COVER# - NUMBER INDICATES PANEL CIRCUIT NUMBER+##" - DIMENSION INDICATES HEIGHT TO CENTER OF RECEPTACLE ABOVE FINISH FLOOR (+18" IF NOT SHOWN)USB - INDICATES USB TYPE RECEPTACLE

EXISTING

TO BE REMOVED /REVISED

DEMO/NEW WORK KEY

NEW / REVISED

REFER TO SHEET T503 FORTELECOM NOTES

REFER TO SHEET T503 FORELECTRICAL NOTES

N

Page 15: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

AP

HCM-2PP-1

HCM-2PP-1

HCM-2PP-1

HCM-2

PDU-1

AMP #1

VMS

PDU-1

FH-1

UPS-2

RGB

HCM-2PP-1

HCM-2PP-1

HCM-2PP-1

HCM-2

PDU-1

FH-2

RGB

UPS-2UPS-1

RGB

MC1

PDU-1

AMP #2

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

HCM-2PP-1

HCM-2PP-1

HCM-2PP-1

HCM-2

PDU-1

FH-1

UPS-2

RGB

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

HCM-2PP-1

HCM-2PP-1

HCM-2PP-1

HCM-2

PDU-1

FH-2

RGB

UPS-2

NETWORK EQUIPMENT

NETWORK EQUIPMENT

NETWORK EQUIPMENT

PD

U-2

PD

U-2

AMP #3

ZR1

HCM-2PP-1

HCM-2PP-1

HCM-2PP-1

HCM-2

PAIR 3

8BR

PAIR 1

6GN

7W-BR

5W-BL

4BL

PAIR 4PAIR 2

1W-G

20

1W-0

JACK POSITIONS

EIGHT POSITION MODULAR JACK PIN/PAIR ASSIGNMENT,

T568B

T17700-30B

T568B

NOTE:1. LOCATE WITHIN PLENUM SPACE ABOVE AN ACCESSIBLE

CEILING AT COORDINATED LOCATIONS FOR FUTURE ACCESS. FURNISH METAL UNISTRUT SUPPORT SYSTEMS AS NEEDED TO MAINTAIN AN EASILY ACCESSIBLE ELEVATION.

PROPERLY SUPPORTUTP CABLE

SURFACE MOUNTED HOUSING ONSTRUCTURE ABOVE ACCESSIBLECEILING, SEE PLANS FOR NUMBEROF DATA PORTS

~5' MIN. SLACK COIL FOR UTP CABLE NEAR THE SURFACE MOUNTED HOUSING

DATA SCHEMATIC DETAIL -ABOVE CEILING SURFACE

MOUNTED HOUSING DETAIL

T17700-71a

~Ø12"

T270526.1

TMGB TELECOMMUNICATION MAINGROUNDING BUSBAR DETAIL

20.00"

∅0.31" (48 PLCS)∅0.44" (12 PLCS)

INSULATION MOUNTING HOLES

∅0.44" (x

3)

6.75"

5.8"

1.0"

1.12" (x3)1.12" 1.06" 1.12"

0.62

"

1.5"

0.62

"

PANDUIT PART #GB4B0624TPI-1

0.25

"

T270526.2

TGB TELECOMMUNICATIONSGROUNDING BUSBAR DETAIL

PANDUIT PART #GB2B0312TPI-1

20.00"

∅0.44" (x

3)

6.75"

5.8"

1.0"

0.25

"

RGB RACK-MOUNTEDGROUNDING BUSBAR DETAIL

T270526.3

19"

CPI PART# 10610-019

1"

SPLICEHARDWARE

3/16"

###-X, X

1 2

3 4

###-X, X

DATA JACK

DATA JACKOR BLANK

DATA JACK

DATA JACKOR BLANK

OUTLET LOCATION LABEL. SEE OUTLET FACEPLATE LABELING DETAIL

100-1, 2 100-3, 4 100-5

100-10, 11 100-8, 9 100-6, 7

100-12

START

CLOCKWISE TO LEFT OF DOOR

W

2 2

2 2

EXAMPLE ROOM100

100-14, 15 2

100-13

NOTES:

1. INSTALL LABEL IN WINDOW AT TOP OF FACEPLATE TO INDICATE OUTLET LOCATION NUMBER. USE MANUFACTURE'S WHITE PAPER LABELS. LABELS SHALL BE PRINTED WITH A LETTERING DEVICE. HAND LABELING IS NOT ACCEPTABLE. REFER TO THE SPECIFICATIONS.

2. PROVIDE LABELING AT DISTRIBUTION FRAME TO INDICATE JACK NUMBER AND FIELD DESIGNATIONS. USE MANUFACTURE'S LABELS. LABELS SHALL BE PRINTED WITH LETTERING DEVICE. HAND LABELING IS NOT ACCEPTABLE. REFER TO THE SPECIFICATIONS.

100-01, 02

1 2

3 4

100-03, 04

DATA JACK

DATA JACK

DATA JACK

DATA JACK

OUTLET LOCATION LABEL. SEE OUTLET FACEPLATE LABELING DETAIL

1 2 3 4 5 6 7 8 9 10 11 12

2

DATA #'SOR BLANK

VCM-2VCM-2DR-1 DR-1 DR-2VCM-1DR-1VCM-2 VCM-1

DR-3

MDF RACK ELEVATION IDF 2 POST RACK ELEVATION IDF FLOOR CABINET ELEVATION IDF WALL CABINET ELEVATION

NOTES:1. ALL ELEVATIONS ARE TYPICAL TO HELP COORDINATE INSTALLATION LAYOUTS. CONTRACTORS SHALL NOT USE THE ELEVATIONS FOR MATERIAL AND OR EQUIPMENT TAKEOFFS.2. WHERE MULTIPLE LEVELS OF A BUILDING ARE SERVED FROM A SINGLE MDF/IDF, SEPERATE THE HORIZONTAL CABLES IN THE RACK OR CABINET BY LEVELS. SEE SPEC.3. HORIZONTAL CABLE SHALL BE SEPERATED AND TERMINATED IN ISOLATED PATCH PANELS BY TECHNOLOGY. SECURITY CAMERA CABLES, WIRELESS CABLES AND STANDARD WIRED DATA CABLES SHALL BE IN SEPERATE PATCH PANELS.

A. INSTALL THE HORIZONTAL CABLES MOVING FROM TOP TO BOTTOM BY LEVEL THEN BY TECHNOLOGY STARTING WITH CAMERAS, THEN WIRELESS THEN STANDARD DATA.

LEVEL 1

LEVEL 2

4-2"C TO 18" BELOW SLEEVES OR HORIZ. PATHWAY

LEGRAND WIREMOLD 2300 SERIES RACEWAY SYSTEM

2338A, 2337A

2344, 2347,2348

411, 811, 2311, 2311DFO

417, 817, 2317, 2317DFO415, 815, 2315406, 806, 2306

810A2, 2310A, 2310DFO418, 818, 2318, 2318DFO

417, 817, 2317

NOTES:1. CONTRACTOR IS RESPONSIBLE TO PROVIDE AND INSTALL ALL

MANUFACTURED COMPONENTS THAT APPLY TO AND COMPLETE THE 2300 RACEWAY SYSTEM INSTALLATION, WHETHER SHOWN OR NOT.

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:1

2 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMSCHMEATICSAND DETAILS

T500

19035

NJO

AMS

07-22-2019 CD SETNOT TO SCALE1TELECOM FACEPLATE AND PATCH PANEL STANDARDLABELING DIAGRAM

NOT TO SCALE2 DATA RACK ELEVATION DETAIL

Page 16: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

PAGING SYSTEM SCHEDULEPLAN MARK DESCRIPTION FURNISHED BY INSTALLED BY REMARKS NOTES

P1 14 AWG 2 Conductor Solid Bare Copper Plenum Rated Shielded Cable TC TC Belden Per Spec.

P2 Category 6A Patch Cord TC TC Belden Orange Per Spec. Anx. PN: B6120FL-1000 1

P3 Category 6, Shielded, White TC TC Anixter Part # CMP-00423COM-C6-S-01

BLANK ROW

AMP Bosch Paviro Amplifier 2 x500W TC TC PN: PVA-2P500

EOL Bosch Paviro End of Line Slave Module TC TC PN: PVA-1WEOL 2

MC1 Bosch Paviro Matrix Controller TC TC PN: PVA:4CR12

MCS Bosch Paviro Matrix Call Station TC TC PN: PVA-15CST

S1 Bosch Ceiling Loudspeaker TC TC PN: LBC3951/11-US

S2 Bosch Wall Mount Cabinet Loudspeaker TC TC PN: LB1-UW06-FL1

S3 Bosch Horn Loudspeaker TC TC PN: LBC3481/12-US

Contractor Shall Check Specifications For Possible Further Details

KEY:

EC: Electrical Contractor

TC: Telecommunication Contractor

OP: Owner Provided

ETR: Existing to Remain

NOTES:

1 Contractor Shall determine when 3' and or 10' are required.

2 Contractor Shall provide per EOL device all materials noted in the EOL Detail for a complete installation protecting the EOL from the plenum environment.

CST BUS 1

AMP IN A2

AMP IN A1

SPEAKER OUT B12

SPEAKER OUT B11

SPEAKER OUT B10

SPEAKER OUT B9

SPEAKER OUT B8

SPEAKER OUT B7

SPEAKER OUT A6

SPEAKER OUT A5

SPEAKER OUT A4

SPEAKER OUT A3

SPEAKER OUT A2

SPEAKER OUT A1

LINE OUT 1-4 RJ45 LINE IN 1-4 RJ45

CAN BUS CAN BUS

AMP OUT 1 70V

AMP OUT 2 70V

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

LOUDSPEAKERS:EACH TAPPED AT 6W

CALLSTATION

BOSCH

MATRIX CONTROLLER AT (MDF)PN: PVA-4CR12

BOSCH PAVIRO AMP #1 AT (MDF)PN: PVA-2P500

BOSCH PAVIRO CALL STATIONPN: PVA-15CST

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

NOTES: EOL= END OF LINE SLAVE MODULE. PN: PVA-1WEOL EVERY EOL SHALL BE CONNECTED TO GROUND.

CONTRACTOR: SEE EOL DETAIL FOR OTHER MATERIALS THATMAKE UP THE COMPLETE INSTALLED DEVICE.

P2

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P3

PAGING END OF LINE SLAVE MODULE CIRCUIT DIAGRAM

FILTER DC/DCSPEAKER +

SPEAKER -

SHIELD / WIRE / GROUNDCONTROL

ADDRESS

SEND/RECIEVE

SS

RG CG

+

-

RG

CG

= MINIMUM RESISTANCE BETWEEN SPEAKER LINE AND GROUND/EARTH

= MAXIMUM CAPACITY BETWEEN SPEAKER LINE AND GROUND

PAGING END OF LINE SLAVE MODULE COMPONETS

NEMA 1 JUNCTION BOXANX PN: 43769

5" PIECE 35 MM DIN RAILSQUARE D PN: 9080MH339

COMES IN 33" (CUT TO 5")

PLASTIC 35MM DIN RAIL MOUNT ADAPTERMcMASTER -CARR PN# 8961K32

BOSCH PAVIRO END-OF-LINESLAVE MODULEPN: PVA-1WEOL

COMES WITH (2) SCREWS

THAT WORK WITH DIN MOUNT ADAPTER

PART:A

PART:B

PART:C

PART:D

A

C

D

E

NON-METALLIC STRAIN RELIEF CABLE GLAND 1/2" FROM SKINTOPANX PN: S2112

PART:E

B

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:1

3 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMSCHMEATICSAND DETAILS

T501

19035

NJO

AMS

07-22-2019 CD SET

NOT TO SCALE1 PAGING SCHEMATIC DIAGRAM

Page 17: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

C

OWNERPROVIDEDNETWORK

EQUIPMENT

PP-1

AP

IGB

TMGB

DR

HCM

RGB

TMGB

DR

HCM

RGB

ELECTRICALENTRANCE

FACILITY

FH-3ISP FH

FH-1FH-2

IGB

TMGB

DR

HCM

RGB

ELECTRICALENTRANCE

FACILITY

FH-3ISP FH

FH-1

TYPICAL MDF/IDF

D4

D3

D2

D5

TYPICAL ADMIN, CLASSROOM OR CORRIDOR

N

G

ELEC.

LEVEL 2 RM. 220 (MDF)RM. 202B (IDF-1)

IC

LEVEL 1

TYP.

TYP.

TYP.

EK

EK

EK

TYP.

TYP.

TYP.

EK

EK

EK

FAN ROOM 02

LEVEL 2 RM. 220 (MDF)

F1

RM. 202B (IDF-1)

F1

LEVEL 1

INCOMING FIBER SERVICE

LOWER LEVEL ELEC

LEVEL 1

LEVEL 2

CRAWL SPACE

RM. 4A

RM. 19A (MDF)

IC

N

G

TYP.

TYP.

TYP.

EK

EK

EK

LOWER LEVEL CUSTODIAL (A)

LEVEL 1

LEVEL 2

CRAWL SPACE

RM. 4A

RM. 19A (MDF)

F1

INCOMING FIBER SERVICE

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:1

4 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMSCHMEATICSAND DETAILS

T502

19035

NJO

AMS

07-22-2019 CD SET

NOT TO SCALE1STRUCTURED CABLING TYPCIAL WIRING SCHEMATICDIAGRAM

NOT TO SCALE2 SMART BONDING AND GROUNDING SCHEMATIC

NOT TO SCALE3 SMART FIBER BACKBONE SCHEMATIC DIAGRAM

NOT TO SCALE4 JEFFERSON BONDING AND GROUNDING SCHEMATIC

NOT TO SCALE5 JEFFERSON FIBER BACKBONE SCHEMATIC DIAGRAM

Page 18: designengineers.com 319. 841. 1944 Davenport Schools ... · 7/22/2019 3:36:56 PM BIM 360://Davenport Schools Net work Rewire Phase 3 2019 19035/MEP - DCSD Jefferson Network Rewire

TELECOMMUNICATIONS SCHEDULE

PLAN MARK DESCRIPTION FURNISHED BY INSTALLED BY REMARKS NOTES

D2 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Orange Anx. PN: CMP-00423BNT-6A-08 1,8

D3 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Black Anx. PN: CMP-00423BNT-6A-02 2

D4 Category 6A Enhanced, 23 AWG Solid Bare Copper, FEP, Plenum TC TC Belden: Yellow Anx. PN: CMP-00423BNT-6A-05 3

D5 Category 6A Snagless Slim Patch Chord TC TC Q-Series Per. Spec 4

EK 6 AWG Grounding Conductor TC TC Per Spec.

F1 Corning Plenum 12 Strand OS2 Interlocked Armor Fiber TC TC Anx. PN: 370-407-ARMORMIC-12

IC Insulated, Copper, No.3/0 AWG EC EC Per Spec.

TBB Insulated, Copper, No.3/0 AWG TC TC Per Spec.

V1 Belden Multi-Conductor, Category 3, 25 pair, U/UTP, CMP, Plenum Cable TC TC Anx. PN: CMP-02524NDX-3

BLANK ROW

AP Wireless Access Point OP TC 7

DR-1 Two Post Equipment Rack TC TC Per Spec.

FH-1 Corning CCH-02U Closet Connector Housing TC TC Anx. PN: 180627

FH-2 Corning CCH-01U Closet Connector Housing TC TC Anx. PN: 180626 5

FH-3 Cornning WCH-02P TC TC Anx. PN: 180452

HCM-1 Horizontal Cable Management 12" x 2" Wire Basket Tray TC TC Per Spec.

HCM-2 19" Horizontal, Rack Mount, Cable Manager, 1RU TC TC Per Spec.

HCM-3 19" Horizontal, Rack Mount, Cable Manager, 2RU TC TC Per Spec.

IDC-1 25 Pair S110 Cross-Connect Block W/ Legs TC TC Siemon Company Anx. PN: 260449

PDU-1 Horizontal Power Distribution Unit TC TC Per Spec.

PDU-2 Vertical Power Distribution Unit TC TC Per Spec.

PP-1 24 Port Patch Panel, Flat Unloaded TC TC Belden Anx. PN: 371725 6

RGB Rack Grounding Busbar, Rack Mounted TC TC Per Spec.

TGB Telecommunication Grounding Busbar TC TC Per Spec.

TMGB Telecommunication Main Grounding Busbar TC TC Per Spec.

UPS-1 Uninterruptable Power Supply 3000va TC TC Per Spec.

UPS-2 Uninterruptable Power Supply 2500va TC TC Per Spec.

VCM-1 Vertical Cable Management, Single Sided, Black TC TC Per Spec.

VCM-2 Vertical Cable Management, Double Sided, Black TC TC Per Spec.

Contractor Shall Check Specifications For Possible Further Details

KEY:

EC: Electrical Contractor

TC: Telecommunication Contractor

OP: Owner Provided

ETR: Existing to Remain

NOTES:

1 Surveillance Camera Information Jacks

2 Wireless Access Point Information Jacks

3 Standard Data/VoIP Information Jacks. PC and Phone will utilize one (1) data port.

4 Contractor shall provide and install two (2) patch cables per information jack location. One (1) 3' and one (1) 10' in the appropriate color per system.

5 Contactor shall provide and install for each FH for Termination of OS2 fiber. Corning OS2 pigtail splice cassette 12F LC duplex. Anx. PN: 474222

6 Contractor shall provide and install dedicated PP-1's per systems. Surveillance Cameras, Wireless Access Points and Standard Data/VoIP.

7 Contractor shall provide and install patch cables per note 4 for AP's and verify with owner that the AP's are online.

8 Typically all existing security camera cables will remain. The contractor is responsible to work with the owner to ensure all security cameras are connected and online at the end of the project. If any cameras are notfunctioning per the owner. The contractor shall channel test the cable to verify the cable okay.

GENERAL TELECOMMUNICATIONS NOTES:

1. The Electrical Contractor shall study all Telecom plans including reading all Telecom general and

specific notes for instructions that will affect or pertain to the Electrical Contractor.

2. Electrical Contractor shall provide and install all telecom conduits to accessible ceiling space (they

shall not be terminated above hard lids or in exposed areas). Unless instructed otherwise, stub all

telecom conduits to the accessible ceiling space in the same room as the opening.

3. The Electrical Contractor shall not daisy chain any voice/data cabling or AV cabling conduits when

routing from boxes to accessible ceiling spaces, etc.

4. The Electrical Contractor shall provide and install bushings on all telecom conduits at the time of

conduit installation.

5. Coordinate routing of raceway and equipment to maintain access to filters, motors, electrical

equipment, and controls. In no case shall raceway, cabling bundles, or equipment pass directly over

electrical panels or disconnects or restrict access to any electrical equipment including junction boxes.

6. Conduit minimum sizes shall be per the electrical raceway specifications unless noted otherwise.

7. Contractor shall verify all quantities.

8. Contractor shall fasten all equipment to structure, so everything is completely solid.

9. Contractor shall use hook and loop fasteners on cabling exclusively, no tie wraps. Exception: tie wraps

may be used loosely for dressing cables during installation but shall be removed and replaced with

hook and loop fasteners before job is complete.

10. The maximum distance between all J hooks shall be four feet. All J hooks shall be sized to have at

least 50% capacity available for future growth. Contractor shall not fasten cabling to piping, ductwork,

conduits, or anything other than Contractor installed J hooks or cable tray supported from structure.

Contractor shall not lay cable over piping, ductwork, conduits, ceiling grid/tiles, and any other building

structure element or building support system device. Use low voltage pathway only.

11. All telecom cabling in finished spaces is to be routed concealed in walls, unless specifically noted

otherwise. All exposed cabling and cabling behind inaccessible construction (such as in walls and

above drywall ceilings) shall be routed in conduit which is provided and installed by the Electrical

Contractor. All wall penetrations shall be sleeved with conduit.

12. The Contractor shall not pull any telecom cabling through conduits that do not have the required

bushings installed. Cabling pulled through conduits with no bushings that receive cable jacket damage

shall be replaced by the contractor at no charge to the Owner.

13. The Contractor shall furnish and install fire stopping in all telecom conduits including those with cabling

in them and those telecom sleeves or conduits without cabling in them to meet wall ratings.

14. The telecom structured cabling shall not have paint or paint overspray on the cabling jacket which may

degrade the performance of the cabling and void the warranty. Cabling which has paint on it shall be

replaced at the Contractor's expense (it cannot be cleaned mechanically or with solvents, it shall be

replaced).

15. The Contractor shall utilize the existing horizontal primary pathways which are primarily 4" J-Hooks

and wire basket tray. Where the primary pathway does not meet the specified requirements called out

for J-hook pathways or the primary pathway J-hook or cable tray does not extend to necessary

locations, the Contractor shall add the needed matching materials required to bring the pathway up to

spec.

16. The Contractor shall utilize the existing horizontal and vertical secondary pathways for the placement

and replacement of the communications cabling. The contractor shall furnish and provide all support

mechanisms and fire stopping as directed in the plans and specifications.

17. Contractor shall install all wall mounted speakers, junction boxes, and wire mold, etc., devices as close

to ceiling structure as possible allowing room for placement of equipment.

GENERAL TELECOM DEMOLITION NOTES:

1. Unless noted otherwise all items to be removed and disposed of by Contractor. See demolition key.

The Owner may elect to salvage select electrical system components. Coordinate with Owner prior to

disposal of equipment. Equipment the District elects to keep shall be transported by Contractor to

District Warehouse located at 1008 West Kimberly Road, Davenport, Iowa. Allow time for scheduling

drop off time with Owners representatives.

2. Where communications equipment, and/or wiring devices are noted to be removed, demo wire back to

source or nearest active equipment. The Contractor shall leave 5' of cable securely supported until

Owner or Design Professional permits removal.

3. Where conduits penetrate CMU or cast-in-place concrete, cut conduit flush with wall or floor. Patch all

wall and floor penetrations to match existing surface. Under no circumstances shall abandoned

conduit, wire, or electrical equipment remain at the completion of construction.

4. Telecom demolition drawings are based on field observation and existing documentation where

available. Extensive efforts have been made to accurately portray existing conditions. Demolition

drawings are intended to convey the general scope of demolition. Miscellaneous abandoned boxes

and conduit may not be indicated. All electrical and communications systems, raceways and supports

in walls and ceilings scheduled to be removed are to be demolished. Contractor field verification is

required.

5. Coordinate any service outages affecting areas outside the remodel area with Owner at least 24 hours

prior to outage. Where required by the Owner, any work requiring power or network interruption shall

be scheduled outside of normal working hours.

6. Maintain integrity of existing circuit wiring and active devices serving areas outside the remodel area.

If specific items/devices are taken out of service temporarily to complete new work, return to service as

soon as possible.

7. The building will remain occupied and in use for the duration of construction. Refer to the

specifications as well as phasing plans for additional information regarding working access within and

adjacent to occupied areas and specific phasing requirements.

8. Where ceiling systems are removed, Contractor shall permanently support low voltage cabling systems

currently supported by ceiling system with j-hooks on building structure.

9. For all flush devices to be removed in remaining walls, cover abandoned opening with new cover plate,

unless noted otherwise. The existing wall mounted speakers and intercom call buttons shall be left in

place and cables to these devices shall be cut at conduit or wiremold path entrances and demolished.

10. The Contractor shall not demolish or affect the following devices and shall restore these systems if

they are affected. The Coaxial CATV system, the Altronix boxes and their cabling, Primex Clock

devices and cabling, and all other devices which are not scheduled for demolition.

GENERAL ELECTRICAL NOTES:

1. Below is a list of common requirements outlined in the Project Manual. Refer to the

Project Manual and standard details for more detailed information for these items

and for all other materials and construction methods required.

a. Minimum wire size to be #12 for power.

b. Wall boxes installed flush in common wall shall not be back-to-back or

throughwall type.

c. All conduits, junction boxes, wiring, equipment, etc. to be properly labeled.

d. Provide green ground conductor throughout entire electrical system.

e. All circuits shall have dedicated neutrals to meet NEC without having handle

ties. Shared neutrals are not allowed.

2. Penetrations for all conduits passing through fire and smoke rated walls and floors

shall be provided with firestopping to maintain the fire rating. Use other 3M (or

equal) UL-Listed details as applicable for specific installations.

3. Where conduit or sleeves pass through floors, roofs, walls and partitions that are not

fire or smoke rated, penetrations shall be sealed with grout or caulk.

4. Drawings are in part diagrammatic, intended to convey the scope of work, and to

indicate the general locations of equipment and some feeders. Contractor shall field

verify all dimensions and layout his own work according to the following guidelines:

a. Coordinate device locations and heights with Architectural elevations and

details prior to rough in. Fixtures and devices to be centered around

architectural construction. Verify exact box rough-in locations with

Architect prior to installation of conduit and wire. Architect reserves the

right to have the Contractor adjust box locations at this time.

b. Contractor shall be responsible for determining the exact locations for

equipment and rough-ins and the exact routing of feeders prior to

construction so as to best fit the layout of the work. Space above ceilings

is limited; coordinate final layout with all trades.

c. Where offsets in feeders are required to coordinate the work of other trades

or to maintain required ceiling heights, they shall be provided at no

additional cost to the Owner.

d. Coordinate location of equipment and routing of feeders to maintain access

to heat pumps, motors, electrical equipment, and controls.

e. Contractor shall install equipment per clearances listed in NEC.

5. All elements of the construction shall be performed by workmen skilled in the

particular craft involved, and regularly employed in that particular craft. All work

shall be performed in a neat, workmanlike manner in keeping with the highest

standards of the craft.

6. Electrical, communications and fire alarm systems shall not be supported by

mechanical ductwork, mechanical piping, sprinkler or ceiling system support wires.

Where coordinated with other trades, common support structures may be utilized.

7. Circuit numbers shown have been chosen to aid in design and to provide clarity of

scope of work. Adjust as necessary based on field conditions.

8. Where conduits and cable tray cross building expansion joints, provide suitable

expansion fittings. Unless fitting is listed for bonding, provide external bonding

jumper.

***REMODEL****

9. Electrical Contractor shall cut and patch walls and floors as required for installation

of new systems.

a. All openings in concrete or masonry construction shall be core drilled or saw

cut. Coordinate with existing structure and General Contractor as required

to maintain structural integrity and minimize size of openings. Do not

modify structural building components without coordinating modifications

with the Architect.

10. Electrical Contractor shall remove and reinstall acoustical ceiling tile (ACT) as

required to complete electrical work as indicated on the plans. Any tile damaged

during construction shall be replaced at the contractor's expense.

11. Provide updated typewritten circuit directories at all existing panelboards with new or

modified circuits.

12. The building will remain occupied and in use for the duration of construction.

Contractor shall maintain all circuits in occupied areas. Any work requiring power

interruption to occupied areas shall be scheduled with the Owner. After-hours work

may be required.

SPLICE CONNECTION FROMEXISTING TO NEW

CONDUIT CONTINUATION

CONDUIT TURNING DOWN

ANY WIRING DEVICE WITH THIS SYMBOLINDICATES SURFACE MOUNTED OUTLET BOX

MOTION DETECTOR

CONDUIT STUB

PUSH BUTTON

M

INTERCOM DEVICE - WALL MOUNTED

TELECOMMUNICATIONS SYMBOLS

INDICATES ADDITIONAL DETAIL PER THE FOLLOWING:

INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

INFORMATION JACK FOR VOICE OR DATA USE,MATCH RECEPTACLE HEIGHT UNLESS OTHERWISE NOTED

I

V VOLUME CONTROL - WALL MOUNTED

#

XYZ

ACCESS CONTROL READER - WALL MOUNTEDA

CONDUIT TURNING UP

INDICATES WALL PHONE PLATE AT+48" UNLESS OTHERWISE NOTED

XX

##

*** TELECOM ***

LADDER RACK

WIRE BASKET

CAMERA - CEILING MOUNTED

EQUIPMENT DESIGNATIONPER EQUIPMENT SCHEDULE

# -

XYZ -

-AC

-W

-W+

C CAMERA - WALL MOUNTED

INTERCOM DEVICEI

(NOTE: ALL SYMBOLS SHOWN MAY NOT BE REQUIRED FOR THIS PROJECT)

INDICATES 8" ABOVE COUNTERTOP OR 4"ABOVE BACKSPLASH

MOTION DETECTOR - WALL MOUNTEDM

SECURITY DEVICE - WALL MOUNTEDS

SECURITY DEVICES

JUNCTION BOX - IN FLOOR BOX OR CEILING

PULL BOX

J

J

JUNCTION BOX - WALL MOUNTED

ELECTRONIC DISPLAY - CEILING MOUNTED

ELECTRONIC DISPLAY - WALL MOUNTED

(NOTE: ALL STANDARD HEIGHT DEVICES 18" AFF TO CENTER OF BOX UNLESS NOTED OTHERWISE)

INDICATES WALL PHONE PLATE AT +48" UNLESS OTHERWISE NOTED, PLUS ONE JACK AT STANDARD OUTLET HEIGHT.

INDICATES LENS AIMED DOWNINDICATES LENS AIMED OUT

--

INDICATES LENS AIMED DOWNINDICATES LENS AIMED OUT

--

C

INFORMATION JACK FOR WIRELESS ACCESS POINT (WAP) - CEILING MOUNTED

INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

INFORMATION JACK FOR VOICE OR DATA USE - CEILING MOUNTED

# -#

#INDICATES NUMBER OF RJ-45 JACKS/CABLES.THE NUMBER ONE IS IMPLIED.

# -

EMERGENCY COMMUNICATION DEVICE - WALL MOUNTED,PROVIDE INFORMATION JACK FOR VOICE OR DATA

E

EMERGENCY COMMUNICATION DEVICE,PROVIDE INFORMATION JACK FOR VOICE OR DATA

E

INDICATES NUMBER OF INFORMATION JACKS.THE NUMBER ONE IS IMPLIED.

# -

INDICATES NUMBER OF INFORMATION JACKS.THE NUMBER ONE IS IMPLIED.

# -

ACD ACCESS CONTROL DOOR

# INDICATES TYPE, SEE ACCESS CONTROL DOOR SCHEDULE

# -

# INDICATES PLAN MARK, SEE ACCESS CONTROL DOOR SCHEDULE

# -

#

#

INDICATES PLAN MARK, SEE VIDEO SURVEILLANCE SCHEDULE

# -

INDICATES PLAN MARK, SEE VIDEO SURVEILLANCE SCHEDULE

# -

SPECIAL CABINET AS NOTED - SURFACE MOUNTED

*** EQUIPMENT ***

SPECIAL CABINET AS NOTED - RECESSED MOUNTED

(NOTE: ALL SYMBOLS SHOWN MAY NOT BE REQUIRED FOR THIS PROJECT)

ELECTRICAL SYMBOLS

EXISTING SURFACE BRANCH CIRCUIT PANELBOARD OR AS NOTED

OUTLET BOX WITH SPECIAL DEVICE AS NOTED

*** WIRING DEVICES ***

DOUBLE DUPLEX RECEPTACLE

ANY WIRING DEVICE WITH THIS SYMBOLINDICATES SURFACE MOUNTED OUTLET BOX

M E C H A N I C A L A N D E L E C T R I C A L C O N S U L T A N T S

8801 PRAIRIE VIEW LANE SW, CEDAR RAPIDS, IA 52404

designengineers.com 319. 841. 1944

CONSULTANTS

OWNER

PROJECT NAME

SHEET TITLE

A

1

PROJECT NUMBER:

DRAWN:

CHECKED:

ISSUE DATE AND DESCRIPTION

B

C

D

E

A

B

C

D

E

2 3 4 5 6

1 2 3 4 5 6

7/2

2/2

019

3:4

0:1

6 P

MB

IM 3

60

://D

ave

nport

Scho

ols

Netw

ork

Re

wire

Ph

ase

3 2

019

190

35/M

EP

- D

CS

D S

ma

rt N

etw

ork

Rew

ire

20

19 1

903

5_R

18 .rv

t

Davenport SchoolsNetwork RewirePhase 3 2019

TELECOMSCHEDULESAND DETAILS

T503

19035

NJO

AMS

07-22-2019 CD SET

KEYED NOTES

T-1 Contractor provide Wiremold 4000 two-gang overlapping cover duplex receptacle G4047BX coverplates for demo locations.

T-2 Contractor install new cable for data and wireless services to this data rack.

TD-1 After all services have been cut over to new cable and IP phones are installed. Remove existing wallfield equipment, termination hardware and phone switch. Leave only copper and fiber DMARCequipment and connectivity. Turn over all electronic equipment, racks, newer standard modular patchpanels, modular jacks and patch cables to owner.

TD-2 Contractor to verify if camera cable is routed to the existing MDF or to Rm.202B IDF-1. If the cameracable is routed to the old MDF then re-route existing or install new cable to Rm.202B IDF-1

TD-3 Contractor to coordinate with the owner relocating the video management server from its currentlocation to the rack in the new MDF .

TD-4 Contractor to remove all existing multi-mode fiber backbone and innerduct after services have beenmoved over to the new single mode fiber.

TD-5 Contractor coordinate service outages and relocate the existing data rack to the new location noted onthe enlarged details.

KEYED NOTES

E-1 Provide new 30A/1P breaker in existing GE panel 2D located just outside MDF room 19A. Replaceexisting spare single pole breaker. Return removed spare breaker to owner. New breaker AIC ratingshall match existing panel AIC ratings. New breaker is to serve new special receptacle in MDF room19A.

E-2 Utilize two existing spare 20A/1P breakers from existing panel 2D for new double duplex located inMDF room 19A.

E-3 Provide new Seimens type BL 30A/1P 10,000AIC breaker in existing Seimens panel 2M1. Replaceexisting 20A/1P spare in panel space 21 for new breaker. Return removed spare breaker to owner.New breaker is to serve new special receptacle in room 202B.

E-4 Utilize two existing spare 20A/1P breakers 23 and 25 from existing panel 2M1 for new double duplexlocated in room 202B.

E-5 Provide new Seimens type BL 30A/1P 10,000AIC breaker in existing Seimens panel 2M1. Replaceexisting 20A/1P spare in panel space 27 for new breaker. Return removed spare breaker to owner.New breaker is to serve new special receptacle in room 220. Prior to commencement of construction,contractor to field verify location of existing panel NB that serves existing room 220. The location ofpanel NB was unable to be discovered during design.

E-6 Utilize two existing spare 20A/1P breakers 29 and 31 from existing panel 2M1 for new double duplexlocated in room 220. Prior to commencement of construction, contractor to field verify location ofexisting panel NB that serves existing room 220. The location of panel NB was unable to bediscovered during design.