11/7/2019 1 FPL Hardening Project – L-13 Canal between Ohio Road and Lucerne Lakes Boulevard LWDD Project No. 16-10008U.01 Nicole Smith, Right-of-Way Permit Coordinator November 13, 2019 SITE 1 2 Board Meeting - 11/13/19 Agenda Item #8 - FIINAL

Upload: others

Post on 18-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

1

FPL Hardening Project – L-13 Canal between Ohio Road and Lucerne Lakes BoulevardLWDD Project No. 16-10008U.01

Nicole Smith, Right-of-Way Permit Coordinator November 13, 2019

SITE

1

2

Board Meeting - 11/13/19Agenda Item #8 - FIINAL

Page 2: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

2

Background

As part of their capital program to harden power lines in PalmBeach County, FPL has applied for a permit to install seven (7)utility poles and remove six (6) existing utility poles from the L-13Canal Right-of-Way, between Ohio Road and Lucerne LakesBoulevard• Five (5) new poles to be placed 25’ north of the existing poles• Two (2) replaced in current location at roadway crossings behind

guardrail• One (1) pole removed from the south right-of-way of the L-13 Canal

and replaced with one (1) new pole south of and outside of the right-of-way

No record of permit for initial installation; permits for new parallelinstallations require board authorization

Relocation of existing poles beneficial for right-of-way maintenanceaccess

Overall Aerial

Ohi

o Roa

d

Luce

rne

Lake

s

3

4

Page 3: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

3

L-13 canalLooking west from Ohio Road

L-13 CanalLooking east from Ohio Road

5

6

Page 4: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

4

L-13 CanalLooking east from Lucerne Lakes Blvd.

Existing vs Proposed Poles

7

8

Page 5: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

5

Staff Recommendation Approval to issue a permit for parallel installation of seven (7) utility poles

within north L-13 Canal Right-of-Way between Ohio Road and LucerneLakes Blvd• Five (5) poles to be removed from top of bank and replaced with five (5) poles within

north 5’ of right of way, and two (2) poles to remain in current location, installedbehind guardrail on the west side of Ohio Road and the east side of Lucerne LakesBoulevard; Removal of one (1) FPL Pole from the south side of the L-13 Canal Right-of-Way

• FPL responsible for coordination with other utility companies utilizing existing poles tofacilitate timely removal

Subject to:• Approval of plans, District operating policies and permit conditions• Application Fee:

• $2.00 x 720 LF = $1,440.00 (Paid)• $710.00 x 7 Poles = $4,970.00 (Paid)

• Use Fee:• $20.00 x 720 LF = $14,440.00 (Paid)• $1,065.00 x 7 Poles = $7,455.00 (Paid)

• Annual Fee (Commencing 2020):• $4.00 x 720 LF = $2,880.00• $1,065.00 x 6 Poles = $6,390 (If poles are not removed within 1 year of issuance)• Adjusted every five (5) years by the compounded CPI

9

10

Page 6: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

1

Control Structure 20 Structural ImprovementsRFB 19-10176L.01

Anthony LasCasas P.E.Director of Operations & Maintenance

Board Meeting – November 13, 2019

Control Structure 20

1

2

Board Meeting - 11/13/19Agenda Item #9 - FIINAL

Page 7: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

2

Control Structure 20

E-1WS

L-43W

CS 20 CS 20

Engineering Study December 2017

Mock Roos / WGIRECOMMENDATIONS“Control Structure 20 be salvaged but improved with the addition of reinforced concrete facing walls to protect the exposed steel sheets and strengthen the wall to resist the lateral earth pressures.”

3

4

Page 8: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/7/2019

3

Timeline

July 17, 2019 – $300,000 approved as part ofFY20 Budget

November 13, 2019 – Request authorization tosolicit Bids

November/December 2019 – Advertise Request forBid for additional services

January 2020 – Board approval to award Bid

February 2020 – Notice to Proceed

May/June 2020 – Projected completion

Staff Recommendation

Approval to advertise a Request for Bid forStructural Improvements and Rehabilitation ofControl Structure 20

5

6

Page 9: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

1

CCRP – Horticultural Waste Disposal Site (HWDS) Vegetation Reduction ServicesRFB No. 19-9735L.03

Megan Hoffman, Project ManagerBoard Meeting, November 13, 2019

HWDS – Vegetation Reduction

1

2

Board Meeting - 11/13/19Agenda Item #11 - FIINAL

Page 10: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

2

Proposed Timeline

October 16th - Board authorization to advertise

October 27th - Advertise RFB in Sun Sentinel

November 12th – Bid Opening

November 13th – Board approval to award

November 18th – Early start date

December 2nd – Late start date

December 30th – Final Completion

Bid Results

Company Name Total Base Bid

Arbor Tree & Land, Inc. (ATL Diversified) $49,000

Tetro Land Development & Construction $81,957

RKC Land Development Inc. $92,500

*Apparent Low Bidder

3

4

Page 11: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

3

Staff Recommendation

Approval to award bid to Arbor Tree & Land, Inc.in the amount of $49,000.00 for vegetationreduction services at the Horticultural WasteDisposal Site for the Consolidated CanalRehabilitation Program.

5

Page 12: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

1

Canal Rehabilitation Program UpdateNovember 2019

Total Mileage – 30.10 mi past 12 months(97.86 mi Oct 2015 to current)

LWDD 17.10 mi Contractor Services 12.78 mi3RD Party (Developer/Govt.) 0.22 mi

Total Cost of Contract Services Expended or Encumbered

FY20 $0 FY19 $1,268,906 FY18 $1,326,928 FY17 $630,785 FY16 $120,475

Tree Clearing Projects November 2018 – November 2019

ROW Clearing

Completed Remaining

1

2

Board Meeting - 11/13/19Agenda Item #12 - FIINAL

Page 13: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

2

Tree Clearing Projects November 2018 – November 2019

Canal Segment Project # Distance LWDD/Contractor Clearing Status Cost

L-42; ~950ft e/o Jog Rd to ~250ft w/o Military 16-9969P.03/.05 1.28 mi LWDD/Survey In Progress - /$17,230

L-49; SW 12th Ave to SW 9th Ave 16-9977P.03a 0.38 mi LWDD/Survey In Progress - /$4,600

L-41; Jog Rd to Military Trail (Broken Sound) 16-9968P.02/.05 1.50 mi LWDD/Survey Complete - /$13,195

E-3; L-42 to Clint Moore Rd (Broken Sound) 17-9921P.17/.18 0.83 mi LWDD/Survey Complete - /$12,666

L-29; 1300ft east of Congress & ~100ft south 16-9957P.05 0.18 mi LWDD Complete -

L-41; ~2600ft west of Jog Rd to Jog Rd 16-9968P.01 0.50 mi LWDD/Survey Complete - /$4,398

L-40; ~375’ e/o Claridge Oval to ~750’ e/o Jog 16-9967P.01 0.99 mi LWDD/Mulch/Survey Complete - /$47,000 /$5,920

CCRP 5; Portions of L-16 19-10166P.04 1.43 mi Contractor/Survey Complete $79,000 /$13,240

CCRP 4; Portions of E-1, E-1E & E-1 1/2 19-10166P.03 3.37 mi Contractor/LWDD/Survey Complete $148,928 /$35,320

L-17; 2700’ west of Congress to Lake Osborne 16-9947P.01/.02 1.06 mi LWDD/Survey Complete - /$3,680

L-39; ~2000ft west of Jog Rd to Jog Rd 16-9965P.03 0.38 mi LWDD/Survey Complete - /$4,225

L-9; Davis Rd to Henthorne Rd 18-9709P.08 0.25 mi LWDD Complete -

L-45; Lyons Rd to Golf Course Rd 16-9974P.01 0.49 mi LWDD/Survey Complete - /$6,995*

CCRP 2&3; Portions of L-46, L-48 & L-49 18-10166P.02 4.09 mi Contractor/Survey Complete $288,260/$39,470

L-46; ~2100ft west of Jog to St. Andrews 16-9387P.03 1.27 mi LWDD/Haul/Survey Complete - /$9,600/$11,800

L-47; Military Trail to CSX Railroad 16-9827P.04 0.50 mi LWDD/Survey Complete - /$6,215

L-46; Portions from E-1 to Boca Rio Rd 16-9387P.02 0.93 mi LWDD/Survey Complete - /$8,860

CCRP 1; Portions of L-7, L-8, L-9 & L-10 18-10166P.01 4.04 mi Contractor Complete $391,300

L-50; ~700ft west of I-95 to SW 8th Ave 16-9763P.04 1.15 mi LWDD/Survey Complete - /$7,850

L-8; ~425ft west of FL Mango to FL Mango 18-9760P.09 0.08 mi LWDD/Survey Complete - /$5,415*

*NOTE: After staking, it was determined that the majority of the ROW is inaccessible for 16-9974P.01 - L-45 (0.79 mi) & 18-9760P.09 - L-8 (0.34 mi)

Tree Clearing Projects November 2018 – November 2019

Canal Segment Project # Distance LWDD/Contractor Clearing Status Cost

L-47; Verde Trail to L-46 16-9827P.03 0.15 mi LWDD/Survey Complete - /$1,400

L-34; Sherwood to E-31/2-3 & E-31/2-3 16-9539P.07b 0.24 mi LWDD Complete - /$850

L-37; Military Trail to 3000’ east of Military 16-9857P.01 0.57 mi LWDD/Survey Complete - /$7,499

L-2; E-2 to FL Turnpike 16-9933P.02/.03 1.37 mi LWDD/Haul/Survey Complete - /$4,000/$5,355

L-48; Royal Palm Rd to ~100ft east of SW 9th 16-9975P.06 0.40 mi LWDD/Survey Complete - /$4,150

L-37; ~2000ft west of E-4 to E-4 16-9857P.04 0.38 mi LWDD/Survey Complete - /$3,800

L-33; ~1850ft to ~850ft west of Military 16-9961P.04 0.19 mi LWDD Complete -

L-38; E-2.5 to Jog Rd 16-9856P.02 0.75 mi LWDD Complete -

E-4; North of Atlantic Ave (3 sites) 16-9897P.02 0.51 mi LWDD Complete -

L-34; Sherwood to E-31/2-3 & E-31/2-3 16-9539P.07a 0.65 mi LWDD Complete - /$2,278

L-35; Military Trail to E-31/2 -3 169415P.04 1.00 mi LWDD/Survey Complete - /$7,650

L-38; ~4000ft west of Jog Rd to Jog Rd 16-9856P.02 0.75 mi LWDD Complete -

3

4

Page 14: Agenda Item #8 - FIINAL í í l ó l î ì í õ€¦ · agenda item #9 - fiinal í í l ó l î ì í õ î &rqwuro 6wuxfwxuh r ít^ > r ð ït ^ î ì ^ î ì (qjlqhhulqj 6wxg\

11/13/2019

3

L-41; Jog Rd to Military Trail (Broken Sound) (1.50 mi)

E-3; L-42 to Clint Moore Road (Broken Sound) (0.83 mi)

5