Agua Rica Project Michael Holmes – General Manager Minera Alumbrera
Dave Dicaire - General Manager Studies, Project Development South America 18 September 2011
Minera Alumbrera Overview
Xstrata is the major shareholder (50%) and operator of Minera Alumbrera
Largest copper mine in Argentina
Safety improvements: LTIFR improved from 3.62 to 0 (June 2003 – present)
6 consecutive years of CAT 5 Star Rating for mine haul truck fleet contamination control (unique in Global Mining Industry)
Strong community programs have consolidated reputation in region
5 consecutive years of extension to ore reserves
− 218 million tonnes of additional reserves, 6 years added to mine life
Plant continuous improvement − Ore milled from 34Mtpa to 38.5Mtpa, targeting 40Mtpa − Molybdenum concentrate plant commissioned in 2008
First quartile C1 cash cost position with continuous improvement culture
Located 35km from Minera Alumbrera
Signed an exclusive four year option with Yamana Gold Inc. for the acquisition of Agua Rica property
Deposit is a large copper-gold-moly porphyry
Minera Alumbrera will manage and fund the Feasibility Study and, if approved, the development costs
Part of company’s long term growth strategy
Attractive opportunity to expand production and extend the current mine life by 25+ years
The Agua Rica Project
Description Location: Province of Catamarca,
Argentina Mineral Resource: 1,750Mt @ 0.42%
Cu using a 0.20% Cu Cut-off Concentrator: three lines - 105ktpd Estimated production: 250ktpa Cu for
first five years, average over LOM 150ktpa Cu, significant Au + Mo credits
LOM: 26 years
Project Status Feasibility Study stage Resource definition drilling program
starting Oct 2011 – 30,000 metres Fluor Canada conducting Feasibility
Study – World class materials handling
expertise on Study
Agua Rica Overview
Copper in resource
Agua Rica Site
0
2
4
6
8
10
MAA Agua Rica Agua Rica + MAA
Inferred Indicated Measured
Mt Cu
Extend Minera Alumbrera’s operations from 2018 to 2041
Expand current contained copper production by 40% compared to remaining life of mine average
Significant synergy benefits with Minera Alumbrera operations and people
Leverage Sustainable Development achievements of Minera Alumbrera
Integration case and stand-alone case being studied
Benefits from utilization of Alumbrera facilities (financial, schedule, permitting and Sustainable Development)
Agua Rica: Key strategic benefits
Proximity to Minera Alumbrera
Production Profile
0
50
100
150
200
250
300
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Kt Cu in concentrate
Agua Rica: Potential Integration with Alumbrera with Ore Conveyor route from Agua Rica
Tunnel Profile
Conveyor route to Minera Alumbrera
0 M 5.000 M 10.000 M
Truck shop
Concentrator
Moly Plant
Stock Pile
Central Office Warehouse
TIE-IN TO STOCK PILE
Minera Alumbrera site map
Agua Rica Preliminary Pit Design
2700
2895
3630 3270 3420
Xstrata Copper & MAA’s disciplined approach to project development through study and execution phases
Leverage recent major project development experience from Xstrata Copper’s Project Development South America Division and other sites
The Agua Rica Project Management
Activity
Complete Transaction with Yamana
Feasibility Study
Approval Decision to Proceed
Prepare and Submit IIA
IIA Approval Provess
Detailed Engineering and Procurement
Construction Phase
Transfer to Mining Phase at Agua Rica
1H14 2H14 1H15 2H15 1H16 2H161H11 2H11 1H12 2H12 1H13 2H13
Indicative Development Timeline
Injury-Free, Safe Work Places
Leadership in Environmental Performance
Reputation for Social Responsibility
Realization of the full potential of our people
Supported by Sustainable Development
Minera Alumbrera Safety Performance
Strategic Objectives focusing on Sustainable Development
8,22
6,29 6,81
3,95
2,47 1,54
0 1 2 3 4 5 6 7 8 9
2006 2007 2008 2009 2010 2011
Mill
ion
wor
ked
Hou
rs
Total recordable Injury Frequency Rate
Hualfin Vineyard and Winery School No 33 El Paso Amaicha Catamarca Maternity Hospital
Signed exclusive four year option for the acquisition of Agua Rica property
Opportunity to extend current Minera Alumbrera mine life by 25+ years
Close proximity to operating Minera Alumbrera facilities
Commencement of Feasibility Study – strong technical knowledge with Fluor
and Minera Alumbrera – strong social knowledge from
operating in area for 14 years
Leveraging opportunities
Option/investment decision targeted for H1 2013 with possible production in 2016
Conclusions
Minera Alumbrera Concentrator
Agua Rica Site and Exploration Camp
Questions?