Airport Site Suitability Analysis- Final Project Mohit Khadka, CE 547- GIS in Water Resource Engineering Results Introduction This project was done to analyze the availability of suitable site for an international airport in Nepal. The major reason for this project was because of the present situation of airport in Nepal, which is in very primitive condition. Also, the fact that there is only one international airport in the entire country inspired me to carry out this project. Methods & Materials ArcGIS was used to do this project. Rivers, roads and land use data was used. Different weightage was given to these three data to get the final map. Conclusions This shows the Nepal has enough suitable site for airport construction and wide variety of site can be selected considering different factors. Acknowledgements References ESRI International Centre for Integrated Mountain Development (ICIMOD ) Dr. Julie Coonrod, University of New Mexico Smriti Chaulagain & Asifur Rahman, University of New Mexico Family Friends Weighted Map of 3 maps. Map showing total number of suitable sites. Most Suitable The future work for the project could include slope analysis which would surely filter the areas from the northern mountain region. Another analysis could be to study the possibility of incorporating any existing airport to the proposed new airport for service purpose such as apron, hanger, signal locations, emergency teams, etc. Finally, after all that, economic feasibility analysis and its impact in the district of the location and country can be studied to check if the project is viable. Future Work

Upload: others

Post on 11-Jul-2020

24 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Airport Site Suitability Analysis- Final Projectmkhadka17/Final Poster.pdf · Airport Site Suitability Analysis- Final Project Mohit Khadka, CE 547- GIS in Water Resource Engineering

Airport Site Suitability Analysis- Final ProjectMohit Khadka, CE 547- GIS in Water Resource Engineering

ResultsIntroduction

This project was done to analyze the availability ofsuitable site for an international airport in Nepal.The major reason for this project was because ofthe present situation of airport in Nepal, which is invery primitive condition. Also, the fact that there isonly one international airport in the entire countryinspired me to carry out this project.

Methods & MaterialsArcGIS was used to do this project. Rivers,roads and land use data was used. Differentweightage was given to these three data toget the final map.

ConclusionsThis shows the Nepal has enough suitable site for airport construction and wide variety of site can be selected considering different factors.

Acknowledgements

References• ESRI• International Centre for Integrated Mountain

Development (ICIMOD )

• Dr. Julie Coonrod, University of New Mexico

• Smriti Chaulagain & Asifur Rahman, University of New Mexico

• Family• Friends

Weighted Map of 3 maps.

Map showing total number of suitable sites.

Most Suitable

The future work for the project could include slopeanalysis which would surely filter the areas fromthe northern mountain region. Another analysiscould be to study the possibility of incorporatingany existing airport to the proposed new airportfor service purpose such as apron, hanger, signallocations, emergency teams, etc. Finally, after allthat, economic feasibility analysis and its impact inthe district of the location and country can bestudied to check if the project is viable.