csh project nou
Post on 14-Apr-2018
227 Views
Preview:
TRANSCRIPT
-
7/30/2019 CSH Project Nou
1/53
TRANSILVANIA UNIVERSITY OF BRAOV
FACULTY OF ELECTRICAL ENGINEERING
AND COMPUTER SCIENCE
Master Study Program: Advanced Electrical
Systems
CSH PROJECT
Students: Banica Ana-Maria
Canja Cristina
Gr. SEA 4706
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 1
-
7/30/2019 CSH Project Nou
2/53
Project advisor: prof. Dr. ing. Corneliu
Marinescu
Project theme:
Design, modeling and performance analysis of a wind and PV hybrid system to supplyenergy for 10 - 12 rooms from a hotel situated in Bucovina.
The main objective of our project is to desing and analyze the hybrid system followingeach of these steps:
choice of the exact location and collect data about the wind speed, solar irradiance
coefficient, temperature, latitude, longitude, air pressure;
implementation of the bloc diagram;
design of the electrical scheme of the system;
calculation according to our consumers: number of appliances, installed power for
each appliance, power consumption for each month of the year;
choice of the wind turbine, solar panels, battery and diesel generator according to the
calculations on power consumption;
choice of the convertor based on the peak load of the system;
simulation of the system using all the details mentioned before;
analysis of the results, draw of the conclusions on the reliability and functionality of
the system also some further work solutions.
These steps are followed by the zone renewable energy sources, efficiency of the wind
turbine, solar panels, hydro generator and electric/electronic devices, economic issues all thisin accordance with comparison to other devices.
Introduction
Hybrid power systems based on new and renewable energy sources, especiallyphotovoltaic and wind energy, are an effective option to solve the power-supply problem forremote and isolated areas far from the grids.
Over the present years hybrid technology has been developed and upgraded its role in
renewable energy sources while the benefits it produces for power production can't be ignoredand have to be considered. Nowadays many applications in rural and urban areas use hybrid
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 2
-
7/30/2019 CSH Project Nou
3/53
systems. Many isolated loads try to adopt this kind of technology because of the benefitswhich can be received in comparison with a single renewable system.
For the Palestinian case, the daily average of solar radiation intensity on horizontal surfaceis about 5.4 kWh/m2 and day, while the total annual sunshine hours amounts to about 3000[1]. These figures are relatively high and very encouraging to use PV generators for
electrification of certain loads as it has been world wide successfully used.The annual average of wind velocity at different places in Palestine is about 3 m/s which
makes the utilization of wind energy converters surely un feasible in such places . In otherplaces it exceeds this number and reaches up 3 to 5.5 m/s (Al-Mazra'a Al-sharqiyah/Ramallahis an example and it is the case under study in the thesis ) which makes it feasible to be usedto operate a wind turbine. At Nablus, the annual average of wind velocity reaches to about4.5 m/s . Nablus site is also considered in this study as a comparison with Ramallah site [2] .
Technically a system which is entirely dependent only on renewable energy sources cannot be a reliable electricity supply, especially for isolated loads in remote areas. This is
because the availability of the renewable energy sources can not be ensured. Therefore, wind ,solar PV hybrid systems, which combine conventional and renewable sources of energies, are
a better choice for isolated loads.A hybrid system using wind , solar PV, diesel generator as a back up system, and a battery
as a storage system is expected to: satisfy the load demands , minimize the costs , maximizethe utilization of renewable sources, optimize the operation of battery bank, which is used as
back up unit , ensure efficient operation of the diesel generator, and reduce the environmentpollution emissions from diesel generator if it is used as a stand alone power supply. The highcapital cost of hybrid systems is affected by technical factors such as efficiency, technology,reliability, location, as well as some nontechnical factors, so the effect of each of these factorsshall be considered in the performance study of the hybrid system.
One of the important factors, which directly affects the electricity cost is
correct system-sizing mechanism of the systems components. Over-sizing of
components in hybrid system make the system, which is already expensive,
more expensive, while under-sizing makes the system less reliable. Thus
optimum sizing for different components gives economical and reliable
benefits to the system.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 3
-
7/30/2019 CSH Project Nou
4/53
1.Location Chosen
PROBOTA
47 38 33 N, 27 5 E
47.2300, 27.3000
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 4
-
7/30/2019 CSH Project Nou
5/53
Fig.1. Locations for the demonstration system (Google Earth)
Climatic conditions determine the availability and magnitude of solar and wind energy ata particular site. For different districts and locations, climatic conditions, including solarradiation, wind speed, air temperature, and so forth, are always changing.
For better utilization of the solar and wind energy resources we use a potential site whereare analysed the characteristics of solar radiation and wind.
1.1.Solar energy resource
With a solar radiation of 1000 1300 kWh/m Romania has a valuable potential forsolar energy application. Romanias geographical distribution of solar energy potential revealsthe fact that more than 50% of Romanias territory benefits from an annual energy flowranging between 1,000 1,300 kWh/m2 per annum. Solar energy potential is given by theaverage solar energy quantity received in horizontal plane which is estimated atapproximately 1,100 kWh/m2 per annum in Romania.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 5
-
7/30/2019 CSH Project Nou
6/53
Solar energy is converted into electricity using photovoltaic installations consisting ofsolar modules of different configurations and dimensions. Romanias exploitable potential forelectrical energy generation by photovoltaic systems is approximately 1,200 GWh perannum.
Performance of Grid-connected PV
PVGIS estimates of solar electricity generation
Location: 4722'47" North, 2731'14" East, Elevation: 0 m a.s.l.
Fixed system: inclination=35, orientation=0
Month Ed Em Hd Hm
Jan 1.54 47.8 1.82 56.4
Feb 2.39 67.0 2.88 80.6
Mar 3.27 101 4.10 127
Apr 3.59 108 4.71 141
May 4.26 132 5.78 179
Jun 4.23 127 5.83 175
Jul 4.30 133 5.96 185
Aug 4.31 133 5.93 184
Sep 3.78 113 5.01 150
Oct 2.94 91.1 3.75 116
Nov 1.68 50.3 2.05 61.5
Dec 1.27 39.3 1.50 46.5
Yearly average 3.13 95.3 4.12 125
Total for year 1140 1500
Ed: Average daily electricity production from the given system (kWh)Em: Average monthly electricity production from the given system (kWh)Hd: Average daily sum of global irradiation per square meter received by the modulesof the given system (kWh/m2)
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 6
-
7/30/2019 CSH Project Nou
7/53
Hm: Average sum of global irradiation per square meter received by the modules of thegiven system (kWh/m2)
Fig. 2. Global Solar Rank [http://www.3tier.com]
Fig.3. Global radiation and solar electrical potential1.2.Wind energy resource
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 7
-
7/30/2019 CSH Project Nou
8/53
For the first year since 2007, wind energy in 2010 was not the leading sector in termsof the value of the capacity of new facilities based on ecological electrical energy sources.Wind constituted 16.8% of the capacity of all new energy sources.
Wind energy has taken the lead among alternative energy sources in Romania.According to the Energy Regulatory Authority, the total capacity of wind farms in use
amounted to 469 MW at the end of May 2011.
Wind measured at 10 m height:
Mounth[day] Wind speed [m/s]
January 5.0
February 5.0
March 5.4
Aprilie 4.7
May 4.0
June 3.9
July 3.6
August 3.6
September 3.9
October 5.0
November 4.9
December 5.1
Monthly wind data recorded near the village Probota [http://www.inmh.ro]:
Fig.4. Wind speed in January
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 8
-
7/30/2019 CSH Project Nou
9/53
Fig.5. Wind speed in February
Fig.6. Wind speed in March
Fig.7. Wind speed in April
Fig.8. Wind speed in May
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 9
-
7/30/2019 CSH Project Nou
10/53
Fig.9. Wind speed in June
Fig.10. Wind speed in July
Fig.11. Wind speed in August
Fig.12. Wind speed in September
Fig.13. Wind speed in October
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 10
-
7/30/2019 CSH Project Nou
11/53
Fig.14. Wind speed in November
Fig.15. Wind speed in December
Fig. 16. Global Wind Rank [http://www.3tier.com]
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 11
-
7/30/2019 CSH Project Nou
12/53
Fig.17. Annual average wind speed
According to many renewable energy experts, a small "hybrid" electric system thatcombines wind and solar (photovoltaic) technologies offers several advantages over eithersingle system.
In much of the places, wind speeds are low in the summer when the sun shinesbrightest and longest. The wind is strong in the winter when less sunlight is available.Because the peak operating times for wind and solar systems occur at different times of theday and year, hybrid systems are more likely to produce power when you need it.
Solar and wind energy systems are omnipresent, freely available, environmentalfriendly, and they are considered as promising power generating sources due to theiravailability and topological advantages for local power generations. Hybrid solarwind
energy systems, uses two renewable energy sources, allow improving the system efficiencyand power reliability and reduce the energy storage requirements for stand-alone applications.The hybrid solarwind systems are becoming popular in remote area power generationapplications due to advancements in renewable energy technologies and substantial rise in
prices of petroleum products.
To demonstrate the efficiency of the wind and the solar in our location, we simulate ahybrid system for a hotel situated in Probota. We use also a wind turbine and a solar panels.In the next pages we describe the system components and the most efficiency solution.
The solar and wind power outputs can fluctuate on an hourly or daily basis. The stand-
alone system must, therefore, have some means of storing energy, which can be used later to
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 12
http://www.eere.energy.gov/consumer/your_home/electricity/index.cfm/mytopic=10880http://www.eere.energy.gov/consumer/your_home/electricity/index.cfm/mytopic=10710http://www.eere.energy.gov/consumer/your_home/electricity/index.cfm/mytopic=10710http://www.eere.energy.gov/consumer/your_home/electricity/index.cfm/mytopic=10880 -
7/30/2019 CSH Project Nou
13/53
supply the load during the periods of low or no power output. Alternatively, the wind or pv orboth can also be used in a hybrid configuration with diesel engine generator or with fuel cells.
2. Hybrid System Components
Block diagram:
Fig. 18. Block diagram of the hybrid system.
A hybrid solarwind system consists of PV array, wind turbine, battery bank, inverter,controller, and other accessory devices and cables. A schematic diagram of a basic hybridsystem is shown in Fig. 18. The PV array and wind turbine work together to satisfy the loaddemand. When the energy sources (solar and wind energy) are abundant, the generated power,after satisfying the load demand, will be supplied to feed the battery until its fully charged.
On the contrary, when energy sources are poor, the battery will release energy to assistthe PV array and wind turbine to cover the load requirements until the storage is depleted.
The hybrid solarwind system design is mainly dependent on the performance ofindividual components. In order to predict the systems performance, individual componentsshould be modeled first and then their combination can be evaluated to meet the demandreliability.
2.1.Wind turbine
General Aspects
Small wind turbines are wind turbines which have lower energy output than largecommercial wind turbines, such as those found in wind farms. These turbines may be as smallas a fifty watt generator for boat, caravan, or miniature refrigeration unit. Small units oftenhave direct drive generators, direct current output, aeroelastic blades, lifetime bearings and
use a vane to point into the wind. Larger, more costly turbines generally have geared power
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 13
http://en.wikipedia.org/wiki/Wind_farmshttp://en.wikipedia.org/wiki/Direct_currenthttp://en.wikipedia.org/wiki/Wind_farmshttp://en.wikipedia.org/wiki/Direct_current -
7/30/2019 CSH Project Nou
14/53
trains, alternating current output, flaps and are actively pointed into the wind. Direct drivegenerators and aeroelastic blades for large wind turbines are being researched.
Smaller scale turbines for residential scale use are available, they are usuallyapproximately 2.17.6 m in diameter and produce electricity at a rate of 300 to 10,000 wattsat their tested wind speed. Some units have been designed to be very lightweight in their
construction, e.g. 16 kilograms, allowing sensitivity to minor wind movements and a rapidresponse to wind gusts typically found in urban settings and easy mounting much like atelevision antenna. It is claimed, and a few are certified, as being inaudible even a few feet(about a metre) under the turbine.
The majority of small wind turbines are traditional horizontal axis windturbines, but Vertical axis wind turbines are a growing type of wind turbine in the small-windmarket. These turbines, by being able to take wind from multiple dimensions, are moreapplicable for use at low heights, on rooftops, and in generally urbanized areas. Their abilityto function well at low heights is particularly important when considering the cost of a hightower necessary for traditional turbines.
Dynamic braking regulates the speed by dumping excess energy, so that the turbine
continues to produce electricity even in high winds. The dynamic braking resistor may beinstalled inside the building to provide heat (during high winds when more heat is lost by the
building, while more heat is also produced by the braking resistor). The location makes lowvoltage (around 12 volt) distribution practical.
Wind turbine implementation
GENERAL SPECIFICATIONS:
Supplier / producer: WES BV
Life expectancy: Minimum 15 years
Service maintenance: once a year
Nominal Power Output: 2.5 kW at 140 rpm
Cut in wind speed: 3 m/s
Cut out wind speed: 20 m/s
Nominal wind speed: 9 m/s
Survival wind speed: 59,5 m/s (IEC 61400-
1 class 2).
Yawing active: yawing Power regulation: fixed pitch stall
Hub height: 12.25 m. or 6.25 m.
Number of blades: 3
Rotor diameter: 5 m
Noise emissions: at 9 m/s 35 dB(A) at 20 m
Fig.19.WES 5 Tulipo 2.5 kW AC
Wind Turbine
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 14
http://en.wikipedia.org/wiki/Wind_turbine#Horizontal_axishttp://en.wikipedia.org/wiki/Wind_turbine#Horizontal_axishttp://en.wikipedia.org/wiki/Vertical_axis_wind_turbinehttp://en.wikipedia.org/wiki/Dynamic_brakinghttp://en.wikipedia.org/wiki/Wind_turbine#Horizontal_axishttp://en.wikipedia.org/wiki/Wind_turbine#Horizontal_axishttp://en.wikipedia.org/wiki/Vertical_axis_wind_turbinehttp://en.wikipedia.org/wiki/Dynamic_braking -
7/30/2019 CSH Project Nou
15/53
ELECTRICAL SPECIFICATIONS:
Power: 2,5 kW
Voltage: 400V/50Hz 3 phase or 400V/60Hz 3 phase Connection grid: connected
Converter back-to-back inverter (IGBT)
CERTIFICATION: Wind turbine IEC 61400-2 (wind class 2)
Certification IEC 61400-22 by ULLightning security NEN 1014Protection IEC 529Harmonics NEN 11000-3-2- (< 16A)EMC EN 55081-1 en EN 55082-2 (CE)SAFETY (IEC 61400-2)
Safety: normal safety through central control Autonomous: safety circuit rpm > 150, stop (brake and emergency yawing)
Safety actions: Failsafe brake on fast shaft of generator independent yawing of 90
degrees
Emergency battery: 24Vdc/24 Ah for yawing and safety circuit
GENERATOR:
Type: a-synchronous
Brake: Spring powered electromagnetic brake of 80 Nm on fast shaft
MATERIAL SPECIFICATIONS: Tower: steel, height 12 m, diameter 273 mm
Total weight: 850 kg
Foundation: Concrete block with anchor
Nose, cover glass reinforced epoxy
Blades glass reinforced epoxy
Corrosion protection
Total construction is galvanised
Fig. 20. Energy production of the turbine WES Tulipo
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 15
-
7/30/2019 CSH Project Nou
16/53
The power of the turbine at the specifical wind speed:
Windspeed[m/s]
Poweroutput[kW]
1.00 0.0002.00 0.0003.00 0.0684.00 0.2435.00 0.5306.00 0.9587.00 1.553
8.00 2.1599.00 2.47410.00 2.59511.00 2.62512.00 2.59813.00 2.55214.00 2.38215.00 2.19216.00 1.96017.00 1.76818.00 1.49519.00 1.31020.00 1.055
Fig. 21. The power curve of the WES Tulipo Turbine
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 16
-
7/30/2019 CSH Project Nou
17/53
2.2. Solar panel
General Aspects
Photovoltaic energy is the energy produced by photovoltaic cells that convert solarenergy directly into electricity, based on the photoelectric effect. These cells are made ofsemiconductor materials similar to those used in electronic circuits in semiconductor chipsand electronic devices composition.Today, solar energy is considered as an alternative to conventional fuels, used for powergeneration. However, because this energy depends on many factors such asweather, season, day-night alternation or positioning on the globe, the use of this resource ismore restricted. In order to optimize and obtain a good efficiency as specialmethods have been developed, such as MPPT (Maximum Power Point Tracking), which aims
to extract maximum power at any point of time.Whether we speak of power watts or order of tens of kilowatts, solar panels are always
accompanied by a voltage and frequency converter (inverter power) which allows itsconnection to the grid (or another application) and transfer control power. At the same time,these power converters include some algorithms to improve the overall efficiency of theentire equipment. However, any constructive solution would choose, high efficiency can notexceed a few percent. Because of this, and the relatively high price per kW installed, thespreading of this type of energy is made in a reduced rhythm.
Even so, solar panels are starting to be used increasingly often in residentialapplications, to provide part of the electricity consumed in homes.Solar PV generation involves the generation of electricity from free and inexhaustible solarenergy.
The major advantages of a PV system are:
Sustainable nature of solar energy as fuel;
Minimum environmental impact;
Drastic reduction in customers electricity bills due to free availability of sunlight;
Long functional lifetime of over 30 years with minimum maintenance;
Silent operation no sound pollution (no moving parts).
The major disadvantages of PV system are:
Initial cost;
Solar cells produce DC which must be converted to AC when used in curently existing
distribution grids;
The PV energy conversion efficiency is up to 22%, but usually under 15%;
Limited power density: approximately 1000W/m2 depends of the location;
Solar electricity is not available at night and is less available in cloudy weather
conditions;
Solar electricity is almost always more expensive than electricity generated by other
sources.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 17
-
7/30/2019 CSH Project Nou
18/53
A PV system consists mainly of:
PV panels that convert the solar power into DC electrical power; Power converter that transforms the DC power into AC power.
Basics of PV energy conversion: PV cell converts sunlight directly into electricity;
It is made of semi-conducting material in two layer: P and N;
When radiation from the sun hits the photovoltaic cell, the boundary between P and N
acts as a diode: electrons can move from N to P, but not the other way around; Photons with sufficient energy hitting the cell cause electrons to move from the P
layer into the N layer;
An excess of electrons builds up in the N layer while the P layer builds up a deficit; The difference in the amount of electrons is the voltage difference, which can be used
as a power source.
PV Module Characteristics:
Fig. 22. Sunmodule SW 245 Mono
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 18
-
7/30/2019 CSH Project Nou
19/53
Nominal voltage = 24 VPrice per module (5>quantities) = 470 $Price per module (10>quantities) = 450 $Price per module (20>quantities) = 400 $
[http://www.solarpanelstore.com/solar-power.large-solarpanels.solarworld_sw.sw_245.info.1.html]
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 19
http://www.solarpanelstore.com/solar-power.large-solarhttp://www.solarpanelstore.com/solar-power.large-solar -
7/30/2019 CSH Project Nou
20/53
Maximum power of one module calculated in the month with the lowest daily solar radiation :22065.219230045.0245245'
maxmaxmax=== tempcoef dtPPP (W)
where:
maxP - maximum power at a cell temperature of 25 C;
coeft - temperature coefficient;
tempd - difference between 25 C and 2 C (temperature in december)
2.3. Charge Controller (Regulator) Modeling and Sizing
Charge controller is an essential component in hybrid systems where astorage system is required. It protects battery against both excessiveovercharge and deep discharge. Charge controller shall switch off the loadwhen a certain state of discharge is reached, also shall switch off battery from the DC buswhen it is fully charged. Charge controller can be adjusted to dealwith different charge and discharge conditions.Charge controller act as interface between each of wind turbine and PV
panel and the DC bus where the battery is connected
2.4.Battery
Leadacid batteries are the oldest type of rechargeable battery. Despite having a verylow energy-to-weight ratio and a low energy-to-volume ratio, their ability to supply highsurge currents means that the cells maintain a relatively large power-to-weight ratio. Thesefeatures, along with their low cost, make them attractive for use in motor vehicles to providethe high current required by automobile starter motors.
The following battery is used:
MODEL: L16RE-BDIMENSIONS: inches (mm)BATTERY: Flooded/wet lead-acid batteryCOLOR: Maroon (case/cover)MATERIAL: Polypropylene
Fig. 23. Trojan L16P Battery
Product specification:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 20
http://en.wikipedia.org/wiki/Rechargeable_batteryhttp://en.wikipedia.org/wiki/Surge_currenthttp://en.wikipedia.org/wiki/Power-to-weight_ratiohttp://en.wikipedia.org/wiki/Automobile_self_starterhttp://en.wikipedia.org/wiki/Rechargeable_batteryhttp://en.wikipedia.org/wiki/Surge_currenthttp://en.wikipedia.org/wiki/Power-to-weight_ratiohttp://en.wikipedia.org/wiki/Automobile_self_starter -
7/30/2019 CSH Project Nou
21/53
Charging Instruction:
Operational data:
TROJAN L16RE-B PERFORMANCE:
CYCLE LIFE:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 21
-
7/30/2019 CSH Project Nou
22/53
Capacity vs. temperature:
Battery dimensions:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 22
-
7/30/2019 CSH Project Nou
23/53
Price for 1 baterry = 155$[http://www.solarpanelstore.com/solar-
power.batteries.trojan_battery.trojan_l16reb.info.1.html]
2.5.Diesel Generator
A diesel generator is the combination of a diesel engine with an electrical generator(often called an alternator) to generate electrical energy. Diesel generating sets are used in
places without connection to the power grid, as emergency power-supply if the grid fails, as
well as for more complex applications such as peak-lopping, Grid Support and export to thepower grid. Sizing of diesel generators is critical to avoid low-load or a shortage of power andis complicated by modern electronics, specifically non-linear loads.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 23
http://en.wikipedia.org/wiki/Diesel_enginehttp://en.wikipedia.org/wiki/Electrical_generatorhttp://en.wikipedia.org/wiki/Alternatorhttp://en.wikipedia.org/wiki/Electric_power_transmissionhttp://en.wikipedia.org/w/index.php?title=Peak-lopping&action=edit&redlink=1http://en.wikipedia.org/wiki/Diesel_enginehttp://en.wikipedia.org/wiki/Electrical_generatorhttp://en.wikipedia.org/wiki/Alternatorhttp://en.wikipedia.org/wiki/Electric_power_transmissionhttp://en.wikipedia.org/w/index.php?title=Peak-lopping&action=edit&redlink=1 -
7/30/2019 CSH Project Nou
24/53
Fig.24. Diesel Generator
Product Description:
Max. AC output(KVA): 2.2/2.5
Rated AC output(KVA): 1.7/2.0
Rated AC Voltage(V): 110, 220, 230, 240, 110/220V, 120/240V
Power Factor(cos): 1.0
Type: Brushless, self-excitation, 2-poles, Single-phase
Voltage Regulator: Condenser Type
DC Output: 12V/8.3A(option)
Engine Model: DH170F
Type: Forced air-cooled, 4-stroke, Diesel Engine Displacement(cc): 211
Max. Output(Hp/rpm): 4.2/3600
Fuel: Diesel Light Fuel
Fuel Tank capacity(L): 14
Continuous Operating Hours(H): 12.0/11.0
Oil: SAE 10W30(Above CC grade)
Oil capacity(L): 0.75
Ignition System: Direct injection
Starting System: Recoil
Operating Noise Level(7m)db(A): 78 79
Net Dimension LXWXH(mm): 640x480x535
Overall Dimension LXWXH(mm): 655x495x555 N. W. /G. W. (kg): 58/61
20GP/40GP/40HQ: 156/324/324 Place of Origin: China(Mainland)
Model No.: Andi2500L
Payment Terms: 30% T/T before production
Minimum Order: 5 pcs
Price Terms: CIF
Packaging: Carton
Delivery Lead Time: 20-25 days
Price for 1 diesel generator = 685 $
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 24
-
7/30/2019 CSH Project Nou
25/53
Fuel consumption: 895 l/year
Fuel price: 1.65 $/l
Total price for Diesel generator and fuel for a 5 years project:
8068565.1895685_ =+=priceDG ($)
[http://chinaandi.en.made-in-china.com/product/XqSEUcpvXukg/China-Diesel-
Generator-AD-03-.html]
2.6.Convertor
Fig. 25. FX & VFX Series FX3048T Convertor
The OutBack FX Series is a modular "building block" sine wave inverter/chargerwhich can be used for both small and large power systems. Each OutBack FX inverter/chargermodule is a complete power conversion system - DC to AC inverter, battery charger and ACtransfer switch. Additional FX inverter/chargers can be connected at any time in parallel (120VAC), series (120/240 VAC), or three-phase (120Y208 VAC) configurations. This allows asystem to be tailored to meet the specific power conversion requirements of the application,
both at the time of the installation and in the future. The OutBack FX series is also availablein export versions with 230 VAC, 50 Hz output that can be connected in parallel (230 VAC)or in three-phase (230Y400 VAC) configurations. Up to eight FX inverter/chargers can beconnected together to provide up to 20 KW of continuous power conversion capacity.
The OutBack FX is designed to survive harsh environments anywhere in the world.The unique sealed, gasketed die-cast aluminum chassis protects and keeps the powerconversion components cool without requiring outside air to be blown through the sensitiveelectronics. This reduces the major causes of inverter failure - corrosion, dust, insect andanimal damage.
The FX can be used in high ambient applications up to 60 degree C with reducedoutput ratings.
The OutBack FX series inverter/charger system is designed for both residential andcommercial stand-alone or back-up power applications with battery energy storage. It isdesigned to operate as a coordinated system with the other OutBack products (i.e. the PSDC,PSAC and PSR enclosures as well as the MX60 MPPT charge controllers and MATE system
controller and display).Applications:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 25
http://chinaandi.en.made-in-china.com/product/XqSEUcpvXukg/China-Diesel-Generator-AD-03-.htmlhttp://chinaandi.en.made-in-china.com/product/XqSEUcpvXukg/China-Diesel-Generator-AD-03-.htmlhttp://chinaandi.en.made-in-china.com/product/XqSEUcpvXukg/China-Diesel-Generator-AD-03-.htmlhttp://chinaandi.en.made-in-china.com/product/XqSEUcpvXukg/China-Diesel-Generator-AD-03-.html -
7/30/2019 CSH Project Nou
26/53
Hot and humid climates where a protected area is not available for installation
of the inverter/charger system
Salt air environments such as Hawaii where you can't get away from the salt air
and where there is little difference between indoors and outdoors
Dirty environments where dust or drifting organic matter such as cottonwood
could clog air openings in an unattended system
Boats and RV's where water might splash on the inverter
Greater control of unwanted radio frequency interference
Specifications:
Continuous Output Power: 3000 VA
Continuous Output Current at 25 degrees: 25 amps AC RMS
Idle Power (120 VAC Output No Load): 23 W DC
Output Voltage: 120 VAC/60 Hz
DC Input Voltage (Nominal): 48 VDC
Peak Efficiency: 92%
Output Voltage Regulation: +/-2%
Continuous DC Charge Rate: 35 Amps DC
Frequency Range: 50-70 Hz
DC Input Voltage Range: 42-68 VDC
Warranty: 2 years (Optional 5 year extended warranty
Price for one inverter/charger = 1863 $
[http://www.solarpanelstore.com/pdf/fx_vfx_series_domestic.pdf
http://www.solarpanelstore.com/solar-power.outback-inverters.outback-
fx.fx2548t.info.1.html]
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 26
http://www.solarpanelstore.com/solar-power.outback-inverters.outback-fx.fx2548t.info.1.htmlhttp://www.solarpanelstore.com/solar-power.outback-inverters.outback-fx.fx2548t.info.1.htmlhttp://www.solarpanelstore.com/solar-power.outback-inverters.outback-fx.fx2548t.info.1.htmlhttp://www.solarpanelstore.com/solar-power.outback-inverters.outback-fx.fx2548t.info.1.html -
7/30/2019 CSH Project Nou
27/53
6. Consumers (Loads)
Power consumers:
DISPOZITIVE Quantity Power[W] hours/day day/week Wh/dayTotal
percentage/day
Becuri economice 40 20 6 7 4800 10.85%
Frigider 2 90 5 7 900 2.04%
Congelator 1 90 5 7 450 1.02%
Masina de spalat rufe 1 2200 2 6 4400 9.95%
Cuptor microunde 1 1220 0.5 7 610 1.38%
Masina de spalat vase 1 2300 7.5 7 17250 39.01%
Aspirator 1 1000 1 7 1000 2.26%
Mixer 1 450 0.5 1 225 0.51%
Cafetiera 1 1160 0.25 7 290 0.66%
Statie de calcat rufe 1 2400 0.5 5 1200 2.71%
TV 13 100 6 7 7800 17.64%
Computer 2 500 3 7 3000 6.78%
Imprimanta Ink jet 1 35 1 1 35 0.08%
Sistem 5.1 1 200 2 2 400 0.90%
Storcator de fructesi legume 1 700 0.25 5 175 0.40%
Lampa de birou 10 7 1 7 70 0.16%
Toaster 1 860 0.25 5 215 0.49%
Centrala electrica 1 100 14 7 1400 3.17%
Energie totala/zi
= 44220
Power consumed during one day:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 27
-
7/30/2019 CSH Project Nou
28/53
Power consumed during one day
Energy daily consumption
There are considered two types of loads:
AC consumers (big consumers)
DC consumers represented by the iluminate, refrigerator, microwave
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 28
-
7/30/2019 CSH Project Nou
29/53
Fig. .AC Consumers
Fig. DC Consumers
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 29
-
7/30/2019 CSH Project Nou
30/53
For a complex analysis Homer software is used.
Fig. Designed Hybrid System in Homer software
In Homer we simulated a lot of systems. We chose six exemple s to find the best pricefor our implementation project.
Case 1.PV(2.2kW)+WT(2.5kW)+Diesel Generator(5kW)+Batteries(8strings x 3 in parallel)+Converter(3kW)
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 30
-
7/30/2019 CSH Project Nou
31/53
Figure: Monthly average active power production
We optained a total production of 12.398 kWh/year and the consumption is 10.096 kWh/yearand we have a 622 kWh/year excess of the electricity.The fuel consumption of the diesel generator is 1.002 l/year and the electrical production is
2.751 kWh/year.The total cost of the system is: 202.048$.
2. PV(3.51kW)+WT(2.5kW)+Diesel Generator(5kW)+Batteries(8strings x 4 in parallel)+Converter(3kW)
Figure: Monthly average active power production
We optained a total production of 12.375 kWh/year and the consumption is 10.096 kWh/yearand we have a 784 kWh/year excess of the electricity.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 31
-
7/30/2019 CSH Project Nou
32/53
The fuel consumption of the diesel generator is 433 l/year and the electrical production is1.244 kWh/year.The total cost of the system is: 199.311$.
3.PV(7.91kW)+WT(2.5kW)+Diesel Generator(5kW)+Batteries(8strings)+Converter(3kW)
Figure: Monthly average active power production
We optained a total production of 18.047 kWh/year and the consumption is 10.096 kWh/yearand we have a 6.863 kWh/year excess of the electricity.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 32
-
7/30/2019 CSH Project Nou
33/53
The fuel consumption of the diesel generator is 943 l/year and the electrical production is1.967 kWh/year.The total cost of the system is: 209.259$.
4. WT(2.5kW)+Diesel Generator(5kW)+Batteries(8strings x 4 in parallel)+Converter(3kW)
Figure: Monthly average active power production
We optained a total production of 12.318 kWh/year and the consumption is 10.096 kWh/yearand we have a 36.1 kWh/year excess of the electricity.The fuel consumption of the diesel generator is 1.819 l/year and the electrical production is5.144 kWh/year.The total cost of the system is: 207.588$.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 33
-
7/30/2019 CSH Project Nou
34/53
5. PV(7.91kW)+Diesel Generator(5kW)+Batteries(8strings x 4 in parallel)+Converter(3kW)
Figure: Monthly average active power production
We optained a total production of 12.792 kWh/year and the consumption is 10.096 kWh/year
and we have a 644 kWh/year excess of the electricity.The fuel consumption of the diesel generator is 1.360 l/year and the electrical production is3.885 kWh/year.The total cost of the system is: 46.357$.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 34
-
7/30/2019 CSH Project Nou
35/53
6. Diesel Generator(5kW)+Batteries(8strings x 3 in parallel)+Converter(3kW)
Figure: Monthly average active power production
We optained a total production of 12.238 kWh/year and the consumption is 10.096 kWh/year
and we have a 0.0711 kWh/year excess of the electricity.The fuel consumption of the diesel generator is 4.442 l/year and the electrical production is12.238 kWh/year.The total cost of the system is: 60.201$.
System[kW] Totalproduction[kWh/year]
Excess ofthe
electricity[kWh/year]
Fuelconsumption
[l/year]
El.Productionof the DG
[kWh/year]
TotalCost[$]PV WT DG Bat Conv
2.2 2.5 5 8x3 3 12.398 622 1.002 2.751 202.048
3.5 2.5 5 8x4 3 12.375 784 433 1.244 199.3117.9 2.5 5 8 3 18.047 6.863 943 1.967 209.259
X 2.5 5 8x4 3 12.318 36 1.819 5.144 207.588
7.9 X 5 8x4 3 12.792 644 1.360 3.885 46.357
X X 5 8x3 3 12.238 0.071 4.442 12.238 60.201
The best price of the system simulated in Homer is obtained in the second exempleand we detail in the next pages.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 35
-
7/30/2019 CSH Project Nou
36/53
Figure : Solar resource for PV
Figure: Output active power of the PV power
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 36
-
7/30/2019 CSH Project Nou
37/53
Figure: Site specific wind resource
Figure 22: Wind turbine output active power
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 37
-
7/30/2019 CSH Project Nou
38/53
Figure 23: WT inverter and rectifier output active power
Figure : Diesel generator output active power
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 38
-
7/30/2019 CSH Project Nou
39/53
Figure Battery Characteristics
Figure: Monthly average active power production
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 39
-
7/30/2019 CSH Project Nou
40/53
Figure: Cash Flow by components
Figure: Cash Flow by cost type
PV + battery+WT+Diesel Generator
We use :
16 PV modules were chosen, 4 strings connected in parallel with 4 PV modules connected inseries on each string, so that we have a 48 V DC Bus;
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 40
-
7/30/2019 CSH Project Nou
41/53
8 string x 4 in paralle battery Trojan L16P with this specification:
Because one Trojan T105 Plus battery has 6 V nominal voltage, 8 batteries connected inseries must be used in one or more strings connected in parallel so that the total nominalvoltage of the batteries to be the same as the DC Bus voltage.A Tulipo wind turbine:
Diesel Generator
Maximum power of one module calculated in the month with the lowest daily solar radiation :22065.219230045.0245245'
maxmaxmax=== tempcoef dtPPP (W)
where:
maxP - maximum power at a cell temperature of 25 C;
coeft - temperature coefficient;
tempd - difference between 25 C and 2 C (temperature in december)
Total power obtained from solar panels:
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 41
-
7/30/2019 CSH Project Nou
42/53
3520220*16 ==P [W]Total price for the solar panels:
6400400*16_ ==pricePV ($)
After we explain the most efficient method, we calculate the total electrical consumption ofthe hotel.
The amount of electricity bill based on annual consumption is:
Tariff D
simple monomial
Quantity
[kVARh]
Price unitary
without TVA
Value
excluding
TVA[lei]
Value with
TVA[lei]
Consumption 10096 0.4651 4695.65 5822.61
Inductive energy billed 0 0 0.00 0.00
Capacitive energy billed 0 0.0635 0.00 0.00
Loss 0 0.4651 0.00 0.00
Excise 10096 21.55 26.72
Total 4717.20 5849.33
Result a invoice monthly average of 60 million.
7. HYBRID SYSTEM SIMULATION in Matlab
A software program using Matlab was developed to simulate the hybrid
system behavior. An hourly time step is used through this simulation. Byusing computer simulation, the optimum system configuration can be foundby comparing the performances and energy production costs of differentsystem configurations.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 42
-
7/30/2019 CSH Project Nou
43/53
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 43
-
7/30/2019 CSH Project Nou
44/53
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 44
-
7/30/2019 CSH Project Nou
45/53
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 45
-
7/30/2019 CSH Project Nou
46/53
8.Economic Evaluation of the Hybrid SystemThe costs of a hybrid system include acquisition costs, operating costs,maintenance costs and replacement costs. At end of the life of the system, thesystem may have a salvage value. An economic analysis is done based on lifecycle costing method, which accounts for all costs associated with the systemover its life time, taking into account the value of money. Life cycle costing isused in the design of the hybrid system that will cost the least amount over itslifetime. Cost annuity( cost required to generate 1 kWh of energy) is anindication on the cost of the system so that the system with the least costannuity is selected.
Costs of hybrid system include: components initial costs, components
replacement costs, system maintenance costs, fuel and/or operation costs, andsalvage costs or salvage revenues.Initial costs include purchasing the following equipments required bythe hybrid system: wind turbine, PV modules, batteries, diesel generator,charge controllers, bidirectional inverter, management unit, cables, and otheraccessories used in the installation including labors .
We know that the entire investition is aprox. 200.000$. We can calculate the amortization ofthe investition, and we can see that is 20 years.
Amortization Calculator
Calculation Results:
Summary:
monthly pay $716.43
total of 240.00 monthly payments $171,943.45
total interest paid $71,943.45
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 46
-
7/30/2019 CSH Project Nou
47/53
Annual Amortization Schedule
beginning balance interest principal ending balance
1 $100,000.00 $5,927.37 $2,669.80 $97,330.20
2 $97,330.20 $5,762.71 $2,834.47 $94,495.74
3 $94,495.74 $5,587.88 $3,009.29 $91,486.45
4 $91,486.45 $5,402.28 $3,194.90 $88,291.55
5 $88,291.55 $5,205.22 $3,391.95 $84,899.60
6 $84,899.60 $4,996.01 $3,601.16 $81,298.44
7 $81,298.44 $4,773.90 $3,823.27 $77,475.17
8 $77,475.17 $4,538.09 $4,059.08 $73,416.09
9 $73,416.09 $4,287.74 $4,309.44 $69,106.65
10 $69,106.65 $4,021.94 $4,575.23 $64,531.42
11 $64,531.42 $3,739.75 $4,857.42 $59,674.0012 $59,674.00 $3,440.15 $5,157.02 $54,516.98
13 $54,516.98 $3,122.08 $5,475.09 $49,041.89
14 $49,041.89 $2,784.39 $5,812.78 $43,229.10
15 $43,229.10 $2,425.87 $6,171.30 $37,057.80
16 $37,057.80 $2,045.24 $6,551.94 $30,505.86
17 $30,505.86 $1,641.13 $6,956.05 $23,549.82
18 $23,549.82 $1,212.09 $7,385.08 $16,164.74
19 $16,164.74 $756.60 $7,840.57 $8,324.1620 $8,324.16 $273.01 $8,324.16 $0.00
An annual interest rate of 6% was considered, while the project life year was taken as 20years.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 47
-
7/30/2019 CSH Project Nou
48/53
9. Conclusions:
Based on the simulation program results previously presented, the followingconclusions can be demonstrated:
Anna & Cristina Mountain House (Fig. ) is an example of a building used through the entire
year and powered by a hybrid system consisting of a diesel generator,solar panels, wind
turbine and storage batteries.
Fig. . Anna&Cristina Mountain House
The building reliable electricity supplies.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 48
-
7/30/2019 CSH Project Nou
49/53
Solar modules installed on the roof convert sunlight into ecological electricity -no noise and emissions. While electrical consumers can be fully electrical fed when sunlightis strong enough, and the energy excess can be stored in batteries, and the power can be usedfrom the batteries at night and during bad weather.If the wind speed is high enough, wind turbine provides energy and charge batteries.
Once the batteries are fully charged, wind turbine production is reduced when thewind is strong.An inverter converts direct current from batteries in 230 V, alternating the current so that allordinary commercial electrical can be used. A diesel generator provides energy security evenwhen the weather is bad. To take advantage of energy supply as well as possible,computer monitors and controls the whole system.
Solar and wind energy are the most accessible natural resources, and inexhaustiblesource of renewable energy. Depending on the weather, and the geographical area, solarand wind energy are complementary. Making a hybrid system (sun, wind) generation usingthe most favorable state of nature at a time, renewable energy is the essenceof efficiency.Wind-solar hybrid system (WSH) is the best (complete, efficient, versatile,
economical, advantageous) power supply system, totally or partially independent of localresources / national.WSH is a power generation system that uses wind energy entirely and solar energy. The results are widely used in areas withoutelectricity or frequent power interruptions, the lighting ofroads, housing, communications stations, islands. The system combines two types of greenenergy, wind energy and solar energy, taking into account environmental protectionand energy saving,wind-solar combination can produce more energy. The system is easy toinstall, low maintenance cost.
The WSH is more efficient than classic solar generation system (PV), inensuring power supply and is ideal as a new source of supply of housing.
The stand-alone hybrid solarwind power generation system is recognized as a viablealternative to grid supply or conventional fuel-based remote area power supplies all over theworld. It is generally more suitable than systems that only have one energy source for supplyof electricity to off-grid applications. However, the design, control, and optimization of thehybrid systems are usually very complex tasks.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 49
-
7/30/2019 CSH Project Nou
50/53
References
[1] Mahmoud M.M. , Ibrik H.I. . Techno-economic feasibility of energy
supply of remote villages in Palestine by PV- systems, diesel
generators and electric grid. Renewable & Sustainable Energy
Reviews. 10(2006) 128-138.
[2] Energy Research Center (ERC) , Meteorological measurements in
West Bank / Nablus & Ramallah. An-Najah National University.
[3] B. Ai, H. Yang, H. Shen, X. Liao . Computer-aided design of PV /
wind hybrid system. Renewable Energy 28 (2003) 14911512.
[4] Wind energy: our wind farms. Available at: http://www.Stable
windenergy.net/windenergy/wind_enrgy20.html [access date 3
December 2007]
[5] Boyle G., 2004 , Renewable Energy, OXFORD university press.
[6] Wind and Hydro Power Technologies Program. Available at :
http://
www . eere .energy.gov/windandhydro/wind_how.html [access date 3
December 2007]
[7] Basic Wind Turbine Configurations. Available at: http://www.awea.
org/ faq/ basiccf.html [access date 7 December 2007]
[8] Marwan Mahmoud. Lecture notes: Renewable Energy Technology
1 &2 . An-Najah National University. 2006-2007.
[9] Roger A. Messenger, Jerry Ventre, 2004, Photovoltaic Systems
Engineering, 2
nd
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 50
-
7/30/2019 CSH Project Nou
51/53
edition, CRC press.
[10] Marwan Mahmoud, Ismail Nabhan. Determination of optimum tilt
angle of single and multi rows of photovoltaic arrays for selected
sites in Jordan. Solar & Wind technology Vol.7 , No. 6 , pp. 739-
745,1990 .
[11] Iakovos Tzanakis. Combining Wind and Solar Energy to Meet
Demands in the Built Environment ( thesis report). Energy Systems
Research Unit. University of Strathclyde. 2005-2006 . 158
[12] Research and markets Brochure. Available at: http:// www
.research
andmarkets.com/reports/328418/ [access date 4 February 2008]
[13] Technical Status of Thin Film Solar Cells. Available at : http://
www . udel.edu/iec/status.html [access date 10 February]
[14] Solar cell-Wikipedia, the free encyclopedia. Available at : http://
en.wikipedia.org/wiki/Solar_cell [access date 10 February]
[15] EV World Blogs: Personal Perspectives on the Future In Motion.
Available at http://www.evworld.com/blogs/index.cfm?page= blogentry
&blogid=497&authorid=183&archive=0 [access date 10 April 2008]
[16] PV payback .Available at :http://www.gosolarnow.com/pdf
%20files /
pvpaybackHP.pdf [access date10 April 2008]
[17] Energy Payback: Clean Energy from PV. Available at :http://
www.nrel.gov /docs/fy99osti/24619.pdf [ access date 12 April 2008]
[18] Environmental Impact of Photovoltaic. Electrification in Rural
Areas. Available at : http:// www.tiedekirjasto.helsinki.fi:8080
/bitstream /1975/295/1 [Access date 12 April 2008]
[19] A Decision Support Technique for the Design of Hybrid Solar
Power. Available at : http:// www.ceage.vt.edu /2DOC /IEEE_ cov1998
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 51
-
7/30/2019 CSH Project Nou
52/53
_v13_no1 _76-83.pdf [ access date 20 April 2008]
[20] Mahmoud M.M. On the Storage Batteries Used in Solar Electric
Power Systems and Development of an Algorithm for Determining
their Ampere-Hour Capacity. Electric Power Systems Research 2004.
71(85-89)
[21] Panichar P.S., Islam S.M. and PryorT.L. Effect of Load
Management
and Optimal Sizing on the Economics of a Wind-Diesel Hybrid
power System. Murdoch University Energy Institute. Available at:
http:/ www.itee.uq.edu.au/~aupec/aupec99/paper_index.html.
[22] Omar M.A. Computer-Aided Design and Performance Evaluation
of PV-Diesel Hybrid System. Thesis report at An-Najah
University.2007. 159
[23] EnergyAtlasFinal2006.pdf Coastal zone management. Available at
:
http ://www.akenergyauthority.org/Reports%20and%20Presentations
/Analysis %20of%20Loads%20and%20Wind-Disel%20Option
[ access
date 22 April 2008]
[24] Optimization of Hybrid Energy Systems. Sizing and Operation
control. Available at : http:// www.upress.uni-kassel. de/ online/inhalt /
978-3-933146-19-9.[ access date 4 may 2008]
Agentia Nationala de Meteorologie (2008), Atlasul climatologic al Romaniei, Bucuresti
Alpopi, Cristina, Florescu Margareta (2006), Utilizarea surselor regenerabile de energie
http://www.ramp.ase.ro/_data/files/articole/6_04.pdf
ANRE (2005), Ghidul producatorului de energie electrica din surse regenerabile de energie
Bazac, Gh., (1983), Influenta reliefului asupra principalelor caracteristici ale climeiRomaniei, Editura Academiei RSR, Bucuresti.
CSH PROJECT Wind-Solar Hybrid system for Probota hotel Pagin 52
-
7/30/2019 CSH Project Nou
53/53
Bernow,S., Biewald, B., Singh, D. (1993), Modelarea surselor de energie regenerabila: un
studiu de caz asupra viabilitatii energiei eoliene, Conferinta nationala NARUC-DOE asupra
energiei regenerabile, Savannah, Georgia
Centrul de Informare al Comisiei Europene (2007), Energia eoliana perspective,
provocari, politici europene, Suport curs EUROPE DIRECT IASI
Chitu, M., Ungureanu, A., Mac, I., (1983), Geografia resurselor naturale, Editura
Didactica si Pedagogica, Bucuresti
top related