August 28, 2017 - Day 1 11:00a-1:00p Duke Employee Registration at South Convention Center Entrance
NOON - 1:00 Box Lunch
1:00 - 1:50 Keynote Speaker - Joseph Miller - Vice President of Central Services and Compliance ( General Session - Concord I&J)
2:00-3:20
Fleet Topics (Concord I&J)
Pulverizers (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
Project Management (Harrisburg A&B)
Coal / Gas Strategy Initiative Debrief by Dan Donochod
Fleet Pulverizer Maintenance Issues
by Tom Johnson
Enhanced Low-Load SCR Operation by Chad Donner
Gas Purge Program by Doug Lee
H. F. Lee Iso-phase Bus Event by Matt Siena, John
Capps
Top CT Issues by Kelly Rivera
Project Management Programming
Next Generation of Combined Cycles by Rob Niehaus, Patrick Burkett
Feeder Maintenance
and Inspections by Tom Johnson
CSAPR and the Midwest Fleet
by Chris Hillebrand
Valve Application 101
Part 1 by Jonathan Atkins
Lightning Protection Analysis and Design
by Gary Brandon
3:20-3:40
3:40-5:30
Fleet Topics (Concord I&J)
Pulverizers (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
Project Management (Harrisburg A&B)
GIST – Resource Portfolio Strategies
in our Regions by Mike Rib, Greg
Roberts, Dan Sympson
Pulverizer Fires Lessons Learned
by Rick Roy
MATS Mercury Control Update
by Stephen Potter
Valve Application 101
Part 2 by Jonathan Atkins
Grounding Design
Modeling & Measurement
Techniques by Dr. Gary Gilbert
I&A Dashboard by Anthony Funk
Project Management Programming
Pulverizer Inspection
Template Implementation by Tom Johnson
FGD Induced Hg Emission Issues
by Ron Laws
Secondary Containment Requirements by Gary Blevins
Perils of 3rd Party Performing Breaker
Maintenance by Bill Norman
Retirement Analysis Process
by Dan Donochod
Pulverizer Testing for Improved
Performance by Stephen Storm &
Tom Johnson
FGD Maintenance Initiatives
by Ron Laws
Mechanical BOP Open Forum
by Jim McCarthy
NERC Culture of Compliance
by Dale Goodwine
5:30 Networking - On Your Own
August 29, 2017 - Day 2 7:00a-5:00p Registration at South Convention Center Entrance
8:00 - 8:50 Keynote Speaker - Lynn Good-President and CEO of Duke Energy ( General Session - Concord I&J)
9:00-10:20
Fleet Topics (Concord I&J)
Boilers & Combustion (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
The Future of Renewables
by Jose Merino
Boiler & Combustion Program Updates by Rich Coutant &
Stephen Storm
How To Improve SCR Performance
by Scott Williams
Crystal River Discharge Canal
Analysis by Morgan Beveridge
Arc Flash Safety Considerations by George Bolos
Combustion
Turbine Basics by Sidney Nettles
Vibration Topics – Case Histories
by Clay Boyd, Steve Raver, Perry
Troutman, Virgil Gunter
Solar PV: Build and Operations
by Bill Kirkenir / Matt Israel
EtaPRO Models for Monitoring Boiler
Performance by Stephen Storm
Dry Sorbent Injection O&M Update
by Chad Donner
Cliffside Gas Conversion Update
by Chris Dopirak
Isolated Phase Bus: Design Decisions
by Matt Siena
Combustion
Turbine Parts by Jeff Biega
10:20-10:40 BREAK - Duke Service Booths Open in Foyer
10:40-NOON
Fleet Topics (Concord I&J)
Boilers & Combustion (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Unit Flexibility by Peter Hoeflich
Pulv and Pressure Parts Alliances
by Dan Sammons
FGD Absorber Clinic by Ron Laws
Condenser Inspections - A Practical Guide
by Jennifer Hynes
Cathodic Protection by Mark Turner
CT Borescope Program
by Kelly Rivera
Electrical Testing – Understanding
EMSA and MCSA by Kent Smith, Bruce
Hoge, Russ Flagg Fleet Dispatch &
Modeling by Mark Oliver
Historic Boiler Inspection and
Certification by Rich Coutant
Roundtable Discussion by John Brotherton
Essential Power Plant Design Codes
By Jim McCarthy
Kelman DGA Data Monitoring &
Review by Kumar Mani & Kreig Leuschner
CT Outage Scope
Creation by Kelly Rivera
NOON - 3:00 Lunch and Vendor Expo in Concord Convention Hall
3:00-4:20
Fleet Topics (Concord I&J)
Boilers & Combustion (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Pumped Hydro Storage
by Eddie Duncan
EPRI Program 71 Update
by Stephen Storm
Precip-RADAR: Optimizing ESP
Operation by Mike Williams
Small Tank Inspection (STI) Program Update
by Dave Daily
WS Lee CT DC Modifications
Project by Jeff Gruseck
CT Rotor End of Life Management
by Kenny Baxter
Lubrication Topics by Perry Troutman,
Russ Flagg, Clay Boyd
Dual Fuel Optionality / Gas
Co-firing by Brad Rudolph
EPRI Supplemental Project at Belews
Creek by Stephen Storm
Marshall 2 Precipitator Fire
by George Ghally
Steam Bypass Considerations
by Harry Carbone/Jim
McCarthy
Transformer Maintenance
Template by Tom Short
CT Inventory
Strategies by Roger Harding
4:20-4:40 BREAK - Duke Service Booths Open in Foyer
4:40-5:30
Fleet Topics (Concord I&J)
Boilers & Combustion (Fairway A&B)
Environmental Controls (Concord H)
Balance of Plant (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Flexible Unit Operation - Osprey
by Mike Rabs
Boiler/HRSG Layup Guideline Review by Rich Coutant
FGD Reagent Preparation by Ron Laws
Coal Station Air Plenum and
Combustible Dust Considerations by Mike Brown
VAR-002, AVR Operation and
Voltage Schedule Compliance
by Dale Goodwine
Aero Updates by Josh Coots
InsightCM 3.1 by Tommy Wickline,
Clay Boyd
Emerging Technologies by Neil Kern
Boiler & Combustion Round Table
by All
FGD Primary and Final Byproduct Dewatering
by Ron Laws
High Risk Mapping Program
by Jim McCarthy
5:30 -8:30 Duke Staff and Vendor Social Event ( Rocky River and Pool Terrace)
August 30, 2017 - Day 3 7:00a-5:00p Registration at South Convention Center Entrance
8:00 - 8:50 Julie Turner - Vice President Carolinas Natural Gas Generation ( General Session - Concord I&J)
9:00-10:20
Fleet Topics (Concord I&J)
HRSGs (Fairway A&B)
Wastewater Treatment (Concord H)
High Energy Piping (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Controls (Carolina A&B)
GISMO by Amy Barron &
Mark Blinson
Pressure Wave Cleaning Experience
At Smith by Eugene Eagle
BIO Reactor Technology by Ray Lidke
Weld Life Analysis Including Grade 91
Material by Brian Chambers
NERC Compliance Overview
by Don Steinmetz
Asheville CT Fuel Nozzle Event by Chris Dunn
Thermography by Bruce Hoge
Control Systems today and in our
Future by Carl King
NERC CIP: for Non-EEs
by John Grube
Exhaust Stack Liner/Stud Issues by David Burchnall
ELG's Update by Bill Kennedy
Pipe Hanger Inspections
by Ben Carter & Brian Chambers
Service Level Agreements with
Transmission by Tom Short
Single Point Vulnerability
by Greg Young
Gigabit Communication
Highway by Wayne Cody
and Chris Christenbury
10:20-10:40 BREAK - Duke Service Booths Open in Foyer
10:40-NOON
Fleet Topics (Concord I&J)
HRSGs (Fairway A&B)
Wastewater Treatment (Concord H)
High Energy Piping (Concord G)
Electrical (Kannapolis A)
Combustion Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Controls (Carolina A&B)
Hazard Classification
Areas (HCAs) by Dan Mottola
Combined Cycle and CHP Project Updates by Randel Kaupang
Chemical Addition/Clarification
by Ray Lidke
Flow Accelerated Corrosion
by Nick Brown
Challenges with Protective Relaying
Upgrades by Zachary Wieger
OPTIM Overview by Clift Pompee
PlantView pdm Module
by Tony File, Kim Green
Rotating Equipment Data Acquisition and
Protection by Jeff Finan
Life After Ash Basins by Bill Kennedy
Valve Issues/Failures at HRSGs
by J. Atkins & Josh Bevill
Ultra Filtration by Derek Henderson
Construction Quality Assurance
by Chris Barbee
Electrical Round Table Discussion
by All
NOON - 3:00 Lunch and Vendor Expo in Concord Convention Hall
3:00-4:20
Fleet Topics (Concord I&J)
HRSGs (Fairway A&B)
Chemistry (Concord H)
High Energy Piping (Concord G)
Generators (Kannapolis A)
Steam Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Controls (Carolina A&B)
Unit Capacity Ratings / Testing
by Greg Augspurger
Impacts from Cycling Service
by Eugene Eagle
Filming Amine Corrosion Research on
Turbine Blades by Dave Reynolds
Seam Weld Inspection Updates
by Ben Carter
Fleet Maintenance Strategy
by Felix Lynch
Lube Oil Flush
Guidance Document
by Nelson Tyner
M&D interaction with CBM
by Tony File, Mike Rowe, Chris Griffin
The Ins and Outs of Control System
Networking by Carl King
Advances in Ultrasonic
Examinations by Brian Chambers
EPRI Bearing Analysis Software by Jim Winborne
OPTIM - New Maintenance
Strategy by Sean Motta
Gas Side Layup Options
by Doug Ausbon
Continuous Analyzers for Boiler Cycles by Dave Reynolds
Brush Rigging Maintenance
by Bruce Krieger
Steam Turbine Layup when NID by Bruce Butler
4:20-4:40 BREAK - Duke Service Booths Open in Foyer
4:40-5:30
Fleet Topics (Concord I&J)
HRSGs (Fairway A&B)
Chemistry (Concord H)
High Energy Piping (Concord G)
Generators (Kannapolis A)
Steam Turbines (Kannapolis B)
CBM (Harrisburg A&B)
Controls (Carolina A&B)
Planning for the Connected Utility of
the Future by Mike Rib
HRSG Round Table
Discussion
by All
Chlorine Dioxide for Cooling Towers
by Alexandra Tessier-Renninger
HEP Round Table Discussion
by All
Online Generator Monitoring
by Felix Lynch
Alignment- Tops-on/Tops-off by Tick Lyle
CBM Summit Wrap-up
by Tony File
Duke Simulator Update
by David OHara Utility Anodamine Treatment Update by Dave Reynolds
Electrical Testing by Jim Winborne
OPTIM Inspection Intervals-
ST Perspective by Nelson Tyner
5:30 Networking - On Your Own
August 31, 2017 - Day 4
8:00-9:50
Fleet Topics (Concord I&J)
Material Handling (Fairway A&B)
Chemistry (Concord H)
Welding (Concord G)
Generators (Kannapolis A)
Steam Turbines (Kannapolis B)
Controls (Carolina A&B)
Coal Selection and Testing
by Stephen Dean
Component Assessments for
Conveying Equipment by Bob Cooper
Phosphate Treatment for HRSG
Units by Dave Reynolds
Managing the Welding Program
at Generating Stations
by Scott Bowes
Generator Fleet Failures
by Fred King
Outage Planning, Staffing, Execution
by Kent Davis
Cyber Compliance and the Real World
by John Grube
Bearing Failures & Bearing
Inspections by Dan Ruggiero
Mayo Bulldozer Event Update
by Jeff Robinson
Ultrasonic Testing Techniques
by Adam Gardner
Silica Upset Event at HF Lee
by Tommy Hare
When is New Copper Required?
by Felix Lynch
Last Stage Blade Inspections by Eric Russell
Duke Controls Round Table by Jeff Finan
Monitoring & Diagnostics
by Michael Reid / Tony File / Greg
Augspurger
Rail Inspections and Maintenance
by Jeff Robinson
Radioactive Material Licensing
X-Ray Machine Registration
by Rob Hathorn
Event Tracking Database
by Jim Winborne
Bartow L-0 Failures by John Huls
Generator Inspection Recommendations
by Felix Lynch
Over speed Trip Testing Recommendations
by Bruce Butler
9:50-10:10 BREAK
10:10-NOON
Fleet Topics (Concord I&J)
Material Handling (Fairway A&B)
Chemistry (Concord H)
Welding (Concord G)
Generators (Kannapolis A)
Steam Turbines (Kannapolis B)
Controls (Carolina A&B)
Equipment Reliability Program
by Tony File
Coal Storage Hot Spot Detection & Mitigation
by Bob Cooper
HRSG Corrosion Reduction Utilizing
O2 Injection by Peyton Garrison
Post Weld Heat Treatment
by Scott Bowes
Cayuga Failure by Cameron Koenig
Vibration Trip Logic & Trip Level Recommendations
by Bruce Butler
Duke Controls Round Table by Jeff Finan
Environmental Compliance Impacts
by Shannon Todd
Coal Stockpile Management
Guidelines by Jeff Robinson
Results From Anodamine
Application in a Cycling HRSG
by Megan Nevill
Generator Rotors-When to Pull Them
by Felix Lynch
Steam Turbine
Valve Maintenance by Tick Lyle
Controlled Waveform Welding
by Scott Bowes
Hydrogen Systems by Bruce Krieger
Material Handling Team Round Table
by All
Eng, Plan.& Support Q&A
by TGS ST Engineering
Steam Turbine Wrap Up
by Jeff Ingraham
NOON Adjourned
Topic Listing
Fleet Topics (Concord I&J) - 400
Discussion Subject Presenter
Description of subject matter
1 Coal / Gas Strategy Initiative Debrief
by Dan Donochod A presentation on the 15-month Coal Gas Strategy (CGS) initiative process and results.
2 Next Generation of Combined Cycles
by Rob Niehaus, Patrick Burkett
A presentation on the design and operating characteristics of the next generation of Duke Energy Combined Cycles.
3
GIST – Resource Portfolio Strategies in our Regions
by Mike Rib, Greg Roberts, Dan Sympson
Panel Presentation - Generation Investment Strategy Team (GIST) leads from each of our regions discuss the resource portfolios in their regions, some of the key elements shaping our fleet and how our GIST stakeholder teams work together to determine how to best serve our customers in the future.
4 Retirement Analysis Process
by Dan Donochod A brief on the retirement analysis process and the dynamics for which strategy plays a role.
5 The Future of Renewables
by Jose Merino A presentation on the potential for renewables growth on the Duke System: Solar PV, Wind, and Battery Storage.
6 Solar PV: Build and Operations
by Bill Kirkenir / Matt Israel A presentation on the construction of a typical solar PV facility and a look at the everyday Operations and Maintenance.
7 Unit Flexibility
by Peter Hoeflich
Why does our fleet require flexibility? Project Overview and to-date results. A discussion of available technology supporting 'flexibility' for generation fleet retrofit options.
8 Fleet Dispatch & Modeling
by Mark Oliver
A presentation of Fleet Dispatch & Modeling and potential effects/changes due to increased intermittent renewables on the system.
9 Pumped Hydro Storage
by Eddie Duncan A presentation of on the Bad Creek and Jocassee Pumped Hydro Storage facilities, their uses and how they may change, and the upgrades coming to Bad Creek.
10 Dual Fuel Optionality / Gas Co-firing
by Brad Rudolph A presentation on the DFO progress at CS (mods required and high-level review), evaluation progress of other sites and the considerations for those sites that really make or break the economics.
11 Flexible Unit Operation - Osprey
by Mike Rabs / Jim Guevera / Andrew Martin
How we do it! An example of how Combined Cycles may be operating in Duke Energy's future.
12 Emerging Technologies
by Neil Kern A presentation on emerging technologies that have the potential to change our business.
13 GISMO
by Amy Barron / Mark Blinson Emergency Site Planning, Master Site Planning.
14 NERC CIP: for Non-EEs
by John Grube Presentation on NERC CIP for non-Electrical Engineers.
15 Hazard Classification Areas (HCAs)
by Dan Mottola
A discussion on the process and progress of the Hazard Classification Area Program effort for Duke Energy
facilities.
16 Life After Ash Basins
by Bill Kennedy A look at the future of our fossil sites water management strategy options.
17 Unit Capacity Ratings / Testing
by Greg Augspurger Why the RIE? Results of the RIE. New fleet-wide procedure and WOs supporting summer and winter testing.
18 OPTIM - New Maintenance Strategy
by Sean Motta Maintenance Management of the Future? Current and potential applications for this Duke tool.
19 Planning for the Connected Utility of
the Future by Mike Rib
Modern energy production and delivery systems are becoming much more complex with the increasing presence of distributed resources, new technologies and systems automation. This discussion will address new planning approaches that are being developed to establish better understanding of the needs of these evolving systems and which will enable timely and informed decisions on the changes needed to support the evolution of these new connected systems.
20 Coal Selection and Testing
by Stephen Dean A presentation on the Coal fuel selection process and Coal Testing. Also, a brief discussion on infrared boiler slagging camera installations and uses.
21 Monitoring & Diagnostics
by Michael Reid / Tony File / Greg Augspurger
Monitoring & Diagnostics Center - Catches and Near Misses (An event avoidance system)
22 Equipment Reliability Program
by Tony File Equipment Reliability Program / ERI - vision / status / benefits etc.
23 Environmental Compliance Impacts
by Shannon Todd Environmental compliance and expectations of power plant employees. Additionally, a look at potential future impacts to FHO.
Pulverizers (Fairway A&B) - 84
Discussion Subject Presenter
Description of subject matter
1 Fleet Pulverizer Maintenance Issues
by Tom Johnson
Discussion of fleet pulverizers, maintenance problems and critical inspection points.
2 Feeder Maintenance and Inspections
by Tom Johnson Discussion of coal feeders, maintenance problems and critical inspection points.
3 Pulverizer Fires Lessons Learned
by Rick Roy Discussion on how to avoid pulverizer fires.
4 Pulverizer Inspection Template
Implementation by Tom Johnson
Discussion of inspection templates and how they should be used, as well as implementation into PlantView.
5 Pulverizer Testing for Improved
Performance by Stephen Storm& Tom Johnson
Where testing should be performed to validate the maintenance work and critical settings.
Boilers & Combustion (Fairway A&B) - 84
Discussion Subject Presenter
Description of subject matter
1 Boiler & Combustion Program
Updates by Rich Coutant & Stephen Storm
Update on the program initiatives, goals, self-assessment performance audit process, BTFR program integration effort and 2017 focal points
2 EtaPRO Models for Monitoring Boiler
Performance by Stephen Storm
An overview and update of 2016 EtaPRO pilot projects and new models developments being deployed at Belews Creek.
3 Pulv and Pressure Parts Alliances
by Dan Sammons Discuss alliance partnerships for pulverizer and boiler pressure parts.
4 Historic Boiler Inspection and
Certification by Rich Coutant
Inspection of a 1902 historic boiler at the Charlotte Fire Department.
5 EPRI Program 71 Update
by Stephen Storm An update including boiler operating variables, corrosion studies and new technologies.
6 EPRI Supplemental Project at Belews
Creek by Stephen Storm
Operational Performance Improvements through Dynamic Combustion Optimization
7 Boiler/HRSG Layup Guideline Review
by Rich Coutant Provides a high level overview of the new guidelines for plant staff.
8 Boiler & Combustion Round Table
by All Open forum discussion.
HRSGs (Fairway A&B) - 84
Discussion Subject Presenter
Description of subject matter
1 Pressure Wave Cleaning Experience At
Smith by Eugene Eagle
A discussion on our experience with the pressure wave cleaning, lessons learned and results presentation.
2 Exhaust Stack Liner/Stud Issues
by David Burchnall
Discussion of status of liner studs and stack inspection expectations.
3 Combined Cycle and CHP Project
Updates by Scott Trombley
Discuss project status and update on combined cycle and combined heat and power projects.
4 Valve Issues/Failures at HRSGs by Jonathan Atkins & Josh Bevill
Discuss issues from across the fleet.
5 Impacts from Cycling Service
by Eugene Eagle
A presentation of the impacts of cycling duty on HRSGs external to Duke Energy.
6 Gas Side Layup Options
by Doug Ausbon
Discussion of layup options including balloons, dampers, and others.
7 HRSG Round Table Discussion
by All Discuss Heat Recovery Steam Generator issues from around the fleet.
Material Handling (Fairway A&B) - 84
Discussion Subject Presenter
Description of subject matter
1
Component Assessments for Conveying Equipment
by Bob Cooper
A demonstration on locating and entering assessments conveying equipment in PlantView.
2 Mayo Bulldozer Event Update
by Jeff Robinson
A discussion of the details surrounding the event and an update of the follow-up actions for coal increased pile safety.
3 Rail Inspections and Maintenance
by Jeff Robinson
A review of best practices for rail yard maintenance.
4
Coal Storage Hot Spot Detection & Mitigation
by Bob Cooper
A discussion of what to do with hot spots in bunkers and silos.
5 Coal Stockpile Management
Guidelines by Jeff Robinson
A discussion of the best practices and new technology for coal stockpile management.
6 Material Handling Team Round Table
by All
Discuss Material Handling issues from around the fleet.
Environmental Controls
(Concord H) - 50
Discussion Subject Presenter
Description of subject matter
1 Enhanced Low-Load SCR Operation
by Chad Donner
Update on experience and NOx tons with enhanced low-load SCR operation at Gibson Station by mitigating the SO3 prior to the SCR.
2 CSAPR and the Midwest Fleet
by Chris Hillebrand
An assessment of the impacts of the 2016 CSAPR update on the Midwest Generating Stations, including developing and implementing a plan for compliance.
3 MATS Mercury Control Update
by Stephen Potter A summary update of demonstrated effective mercury control technologies currently utilized across the Duke fleet. Challenges to mercury compliance will be presented and discussed.
4 FGD Induced Hg Emission Issues
by Ron Laws
Discuss proper actions to initiate when conditions exist which may contribute to elevated Hg Emissions (Air and Wastewater Treatment). Actions covered include sampling protocols/isolation of source, instrumentation checks, and remedial efforts to maintain permit compliance.
5 FGD Maintenance Initiatives
by Ron Laws
Review of recent initiatives to reduce maintenance costs and improve reliability of Absorber Recycle pumps and Side Mounted Agitators.
6 How To Improve SCR Performance
by Scott Williams
Discussion on methods to improve SCR Performance by minimizing catalyst pluggage, increasing catalyst potential, and getting more life from catalyst.
7 DSI O&M Update by Chad Donner
Hydrated Lime system updates with focus on Belews Creek design, testing and benefits at East Bend. Discussion will also include updates on the SO3 operating protocol procedure.
8 FGD Absorber Clinic
by Ron Laws
A review of critical FGD Absorber components requiring frequent attention including: Instrumentation, Pumps, Agitators, and Absorber vessel corrosion/deterioration (alloy, Stebbins tiled and coated vessels), including corrosion abatement systems.
9 Roundtable Discussion
by John Brotherton An opportunity to discuss any Environmental Control topic and ask questions of the group.
10 Precip-RADAR: Optimizing ESP
Operation by Mike Williams
Discussion of a plotting, tracking, & optimizing tool for Precipitators. A new and unique approach to analyzing precipitator operation.
11 Marshall 2 Precipitator Fire
by George Ghally
Experience from a precipitator fire, including relation to prolonged fuel oil start-up and procedure for energizing the precipitator.
12 FGD Reagent Preparation
by Ron Laws
A review of critical operating instrumentation and performance monitoring, and equipment maintenance protocols for efficient and reliable subsystem operation which achieves required environmental compliant operation.
13 FGD Primary and Final Byproduct
Dewatering by Ron Laws
A review of critical Byproduct Dewatering systems and equipment maintenance protocols. Includes review of operating and maintenance of dewatering classifiers and final dewatering systems such as horizontal belt filters, rotary drum vacuum filters, thickeners, and centrifuges.
Wastewater Treatment
(Concord H) - 50
Discussion Subject Presenter
Description of subject matter
1 BIO Reactor Technology
by Ray Lidke A new selenium removal treatment system for FGD Wastewater treatment / System description with operation expectations
2 ELG's Update
by Bill Kennedy
What were the Stations issued in their permits and what new constituents were issued / What new treatment systems might be needed to meet compliance
3 Chemical Addition/Clarification
by Ray Lidke This discusses the capabilities of Chemical Addition/Clarifications and system components overview
4 Ultra Filtration
by Derek Henderson The new need for Ultra Filtration on FGD Wastewater treatment systems and system components overview
Chemistry (Concord H) - 50
Discussion Subject Presenter
Description of subject matter
1
Results from Filming Amine Corrosion Research on Turbine Blades
by Dave Reynolds
EPRI Staff Update Report on Filming Amine Corrosion Research at Duke Marshall Station - EPRI staff to provide this a 2017 current update of the filming amine research being conducted to determine corrosion prevention of turbine blade materials.
2 Continuous Analyzers for Boiler Cycles
by Dave Reynolds
Technical Presentation on Continuous Analyzers for Boiler Cycles - technical approach methodology, maintenance, and trouble-shooting for analyzers that are in use within the Duke Energy fleet and a selection of comparable instruments that are used throughout the power industry.
3 Chlorine Dioxide Treatment for
Cooling Towers by Alexandra Tessier-Renninger
Duke Energy staff to co-present recent application of Chlorine Dioxide treatment at Duke facility.
4 Utility Anodamine Treatment Update
by Dave Reynolds Duke Energy staff to present results from 1 year of filming amine product's effect of reducing iron and copper corrosion rates in cycling Units.
5 Phosphate Treatment for HRSG Units
by Dave Reynolds
Provides detailed review of phosphate treatment for drum water, including control targets, ammonia effect, cascading blowdown effects, phosphate hideout, upset operating conditions, etc.
6 Silica Upset Event at HF Lee
by Tommy Hare Duke plant staff to provide this experience report on a 2017 HRSG upset incident.
7 HRSG Corrosion Reduction Utilizing
O2 Injection by Peyton Garrison
A discussion of the benefits of O2 injection for use at a combined cycle station.
8 Results From Anodamine Application
in a Cycling HRSG by Megan Nevill
A presentation of the benefits and observations of Anodamine treatment at Noblesville Station.
Balance of Plant
(Concord G) - 50
Discussion Subject Presenter
Description of subject matter
1 Gas Purge Program
by Doug Lee
NFPA 56 released on 6/17/2013 requires that all gas sites have detailed site specific purge procedures. This program manages the development, implementation and management of these procedures across the fleet.
2 Valve Application 101
Part 1 by Jonathan Atkins
Guidance on basic steam, water, air and compressed gas valve selection
3 Valve Application 101
Part 2 by Jonathan Atkins
Guidance on basic steam, water, air and compressed gas valve selection (continued)
4 Secondary Containment
Requirements by Gary Blevins
Overview of secondary containment requirements for specific applications.
5 Mechanical BOP Open Forum
by Jim McCarthy General discussion of piping, valves, pumps, heat exchangers, etc.
6 Crystal River Discharge Canal Analysis
by Morgan Beveridge
With the retirement of units 1,2 and 3 and the commissioning of Citrus Combined Cycle at Crystal River the flow into the discharge canal will be greatly diminished. This poses a problem for Units 4 and 5 which draws makeup water from this canal. A study employing computational fluid dynamics was performed to model temperature and salinity impacts and identify possible solutions.
7 Cliffside Gas Conversion Update
by Chris Dopirak
Cliffside Unit 6 is being converted to burn both coal and natural gas either individually or in combination. This project poses multiple technical challenges that affect the boiler, air quality control system and multiple balance of plant systems.
8 Condenser Inspections - A Practical
Guide by Jennifer Hynes
How to prepare for an inspection, what to look for and how to document.
9 Essential Power Plant Design Codes
By Jim McCarthy
In order to protect public safety, power plants are designed, built and tested to a variety of industry codes and standards. This presentation identifies and explains the essential codes that power plant engineers need to be familiar with.
10 Small Tank Inspection (STI) Program
Update by Dave Daily
FHO site SPCC plans call for routine inspection of shop fabricated tanks in accordance with STI -SP001. This program manages the development, implementation and management of a fleet wide approach to conduct and document these inspections.
11 Steam Bypass Design Considerations
by Harry Carbone/Jim McCarthy
Modern gas combined cycle and coal units require steam bypass systems to enable startup/shutdown and blending in/out of HRSGs. This is a demanding service that requires proper system design, equipment selection, piping layout and control logic.
12
Coal Station Air Plenum and Combustible Dust Considerations
by Mike Brown
The Allen, Belews Creek and Marshall boiler and turbine buildings are specifically designed to use ambient building heat to preheat the combustion air entering the FD fans. This results in coal dust being drawn from the tripper room into the plant and posing a combustible dust issue. This study evaluates the impact of discontinuing use of the station air plenum to address the HCA issue.
13 High Risk Mapping Program
by Jim McCarthy
The Catastrophic Chemical and Oil Release (CCOR) tail risk evaluation noted the need to map each FHO site to accurately map yard areas to identify spill risks with respect to storm water drains, waste water drains and surface waters. This program manages the development, implementation and management of these procedures across the fleet.
High Energy Piping (Concord G) - 50
Discussion Subject Presenter
Description of subject matter
1 Weld Life Analysis Including Grade 91
Material by Brian Chambers
A continuation of inspection protocols to support life analysis of our piping systems with an emphasis on Grade 91.
2 Pipe Hanger Inspections
B. Carter & Brian Chambers A discussion of pipe hanger inspections and neglected maintenance.
3 Flow Accelerated Corrosion
by Nick Brown What is the failure mechanism, where we find it, how we monitor it, and how to prevent it.
4 Construction Quality Assurance
by Chris Barbee Importance of construction QA in regards to HEP piping, inspections, and repairs
5 Seam Weld Inspection Updates
by Ben Carter Review recent findings of seam weld inspections and report on fleet status.
6 Advances in Ultrasonic Examinations
by Brian Chambers A presentation on advances in ultrasonic examinations.
7 HEP Round Table Discussion
by All Discuss HEP issues from around the fleet.
Welding (Concord G) - 50
Discussion Subject Presenter
Description of subject matter
1 Managing the Welding Program at
Generating Stations by Scott Bowes
An overview of the responsibilities of involved in managing the welding program at out stations. Topics will include code welding, R Stamp program, NDE requirements and welder qualifications.
2 Ultrasonic Testing Techniques
by Adam Gardner Presentation on various ultrasonic testing techniques, their applications and benefits.
3 Radioactive Material Licensing
X-Ray Machine Registration by Rob Hathorn
Radioactive gauges and material analyzers are used throughout Fossil/Hydro Generation. This presentation will review corporate and regulatory requirements.
4 Post Weld Heat Treatment
by Scott Bowes This course will cover the essentials of Post Weld Heat Treatment including when it is required, common methods of heat treatment, potential issues, and Code requirements.
5 Controlled Waveform Welding
by Scott Bowes
An overview of new GMAW welding processes available for use. This will include descriptions of the RMD, STT and GMAW-P processes.
Electrical
(Kannapolis A) - 80
Discussion Subject Presenter
Description of subject matter
1
H. F. Lee Iso-phase Bus Event
by Matt Siena, John Capps
Review causes of Steam Turbine Generator ground and mitigation steps which were taken to prevent future water ingress into Iso-phase bus.
2
Lightning Protection Analysis and Design
by Gary Brandon
Lightning protection and design can be a very tedious task, especially the risk analysis which determines the need and level of lightning protection required. Using drop down windows and preloaded data, the DEHN Support Toolbox software cuts down on the time required to review or perform lightning protection analysis or design.
3
Grounding Design Modeling & Measurement Techniques
by Dr. Gary Gilbert
Soil resistivity has an important impact on grounding system design parameters and it is important to model the soil correctly to ensure touch and step voltages are within safe limits. It is also important to verify model accuracy through field testing.
4
Perils of Having 3rd Party Perform Your Breaker Maintenance
by Bill Norman Review of quality and workmanship issues encountered with breaker maintenance performed by 3rd parties.
5 NERC Culture of Compliance
by Dale Goodwine Spreading the word. What's the matter? How can we improve?
6 Arc Flash Safety Considerations
by George Bolos A brief overview of the factors impacting arc flash safety and some of the common mitigation techniques in the industry.
7
Isolated Phase Bus: Thermal and Moisture Control Design Decisions
by Matt Siena
Isolated phase bus designs differ widely in terms of cooling and moisture control methods. The presentation will provide an overview of different design approaches and their impact on thermal rating and moisture control.
8 Cathodic Protection
by Mark Turner Overview of cathodic protection system design and required maintenance activities.
9
Kelman DGA Data Monitoring and Review
by Kumar Mani, Kreig Leuschner
Overview of results of dissolved gas analyzer on-line monitors so far and steps being taken to review and assess DGA data.
10 WS Lee CT DC Modifications Project
by Jeff Gruseck Two separate DC systems, each with extremely limited flexibility for battery maintenance and testing, were converted into one common system with full flexibility and higher reliability
11 Transformer Maintenance Template
by Tom Short Transformer PM Template and job plans. Implementation and experiences.
12
VAR-002, AVR Operation and Voltage Schedule Compliance
by Dale Goodwine
A review of common cause analysis for VAR-002 violations and processes implemented to mitigate further non-compliance issues.
13 NERC Compliance Overview
by Don Steinmetz An overview of programs being implemented to comply with new standards moving towards their enforcement dates.
14
Service Level Agreements with Transmission by Tom Short
An overview of Service Level Agreements between FHO and Transmission: service expectations for Transmission and requirements for work performed around generation/transmission interface points.
15
Challenges with Protective Relaying Upgrades
by Zachary Wieger Discussions on challenges with implementing relay upgrades.
16 Electrical Round Table Discussion
by All Bring any successes, challenges or recommendations from your sites and be prepared to talk about what is going on in your world.
Generators
(Kannapolis A) - 80
Discussion Subject Presenter
Description of subject matter
1 Intro to Generator Engineering Group
by Jim Winborne
2 Fleet Maintenance Strategy
by Felix Lynch Discuss maintenance templates for generators
3 EPRI Bearing Analysis Software
by Duke Discuss EPRI bearing analysis software
4 Brush Rigging Maintenance
by Bruce Krieger Brush/brush rigging maintenance & problems – maintenance intervals and replacement of brush/brush riggings
5 Generator Monitoring
by Felix Lynch Generator Monitoring – Vibrosystem online monitoring for generators
6 Electrical Testing by Jim Winborne
Electrical testing – Discuss the values of electrical testing and interpretation of results – general discussion/education: Megger Hi-pot Water purity HVB
7 Generator Fleet Failures
by Fred King GE 7FH2 Fleet Failures – Discuss 7FH2 failures in Duke Fleet
8 When is New Copper Required?
by Duke Rewind of stators and rotors (why/when) use of new copper vs use of old for rotor rewind
9 Event Tracking Database
by Jim Winborne Event tracking database - what we are looking for, what we have seen, PM, listing – generator engineering Q&A on events across the fleet. Discussion about events at various plants in the fleet
10 Generator Inspection
Recommendations by Felix Lynch
Generator Inspection Recommendations (GEK-103556) – generator inspection per GEK-103556
11 Cayuga Failure
by Cameron Koenig
12 Generator Rotors-When to Pull Them
by Felix Lynch Pulling Rotors (when should rotors be pulled) – Fleet maintenance on when rotors are pulled and risk associated
13 Hydrogen Systems
by Bruce Krieger Hydrogen System best practices.
Combustion Turbines
(Kannapolis B) - 80
Discussion Subject Presenter
Description of subject matter
1 Top CT Issues by Kelly Rivera
Discussion of 501F industry issues topics – AS inspections, RAC piping bolts, Exhaust bearing bore drop, etc.
Discussion of 7FA industry issues/topics.
Discussion of 7EA industry issues/topics – emissions issues following maintenance, casing slip and the need to machine flats during outages, stator cracking strategy and current TGS inspection recommendations/ findings, how corrosion can affect C450 and how we’re dealing with it.
2 I&A Dashboard by Anthony Funk
Dashboard monitoring system overview and analysis of critical parameters
3 Combustion Turbine Basics
by Sidney Nettles CT 101 – review of Gas Turbines and Duke Fleet, explain DLN vs. MNQC; 501F vs. GE 7F; what is a CI, HGPI, Major etc.
4 Combustion Turbine Parts
by Jeff Biega CT Parts Strategy
5 CT Borescope Program
by Kelly Rivera
Borescope Program/Component assessments – interval recommendations, prep of units and how OEM advisories are incorporated, how this data feeds component assessments, how assessments feed outage work scopes
6 CT Outage Scope Creation
by Kelly Rivera Outage Scoping/Intervals discussion – how a work scope is generated, Capital Parts Plan. How it can change based on specific unit condition or industry issues.
7 CT Rotor End of Life Management
by Kenny Baxter
Rotor end of life issues a discussion on how end of life is determined, what scope is required to manage, and financial impacts to the business.
8 CT Inventory Strategies
by Roger Harding CT Part Inventory Managing Strategies (joint presentation with supply chain Linda Constantino)
9 Aero Updates by Josh Coots
Aero Unit updates – insufficiency of hours-based OEM maintenance intervals and where we are with creating starts-based targets for OPTIM, package inspections… what is it and how can we offset the OEM and/ or drive down the cost, changing strategy in the legacy aero fleet regarding expected retirement dates and the maintenance plan going forward.
10 Asheville CT Fuel Nozzle Event
by Chris Dunn A review of Asheville fuel nozzle event.
11 Single Point Vulnerability
by Greg Young Analysis to determine what devices pose single point trips.
12 OPTIM Overview by Clift Pompee
Outage Tracking – New OPTIM, how it will be used in FHO.
Steam Turbines (Kannapolis B) - 80
Discussion Subject Presenter
Description of subject matter
1 Lube Oil Flush Guidance Document
by Nelson Tyner Review of the Turbine Generator LO System Cleanliness Guidance Document and provide criteria for performing flushes on lube oil, seal oil, and EHC systems.
2 Steam Turbine Layup when NID
by Bruce Butler Provide recommended guidance on laying up units with increasing NID time to optimize unit longevity and reliability.
3
Alignment- Tops-on/Tops-off, Tight-Wire vs Laser
by Tick Lyle Description of methodologies and uses for laser and tight-line alignment.
4
OPTIM Inspection Intervals- ST Perspective by Nelson Tyner
Explanation of the major and minor steam turbine, boiler feed pump turbine, and valve inspection intervals utilized in OPTIM.
5 Outage Planning, Staffing, Execution
by Kent Davis TGS model for planning, staffing, and executing steam turbine and valve outages across the Duke fleet.
6 Bearing Failures & Bearing Inspections
by Dan Ruggiero Steam turbine bearing inspections and failure presentation.
7 Last Stage Blade Inspections
by Eric Russell Discuss the importance of yearly last stage blade inspections, OEM inspection criteria, and needed station support required for inspections.
8 Bartow L-0 Failures
by John Huls Bartow Station last stage blade failure presentation.
9
Over speed Trip Testing Recommendations
by Bruce Butler
Clarification of the over speed trip testing guidelines for different OEMs and discuss recommendations of when to perform physical over speed vs simulated/reduced speed tests.
10
Vibration Trip Logic & Trip Recommendations
by Bruce Butler
Discussion on the differences of current legacy guidelines for vibration trip/alarm settings and automatic vs. manual vibration trips.
11 Steam Turbine Valve Maintenance
by Tick Lyle Provide TGS recommended strategies to standardize valve maintenance activities.
12 Eng., Plan.& Support Q&A
by TGS ST Engineering TGS Steam Turbine Engineering will field all questions and interact with audience in a panel type discussion.
13 Steam Turbine Wrap Up
by Jeff Ingraham
CBM (Harrisburg A&B) - 50
Discussion Subject Presenter
Description of subject matter
1 Vibration Topics – Case Histories by Clay Boyd, Steve Raver, Perry
Troutman, Virgil Gunter
Case histories on a number of topics that will include APR and Cooling Tower Gear Boxes, investigating time wave forms and polar plots and a discussion topic on “how bad is bad”
2 Electrical Testing – Understanding
EMSA and MCSA by Kent Smith, Bruce Hoge, Russ Flagg
Electromagnetic Signature Analysis technical discussion plus a demonstration of the monitoring and analytics features within InsightCM
3 Lubrication Topics
by Perry Troutman, Russ Flagg, Clay Boyd
Care/Maintenance of Phosphate-Ester EHC Systems & CT Fleet Turbine Lube Oil recommendations
4 InsightCM 3.1
by Tommy Wickline, Clay Boyd Features and capabilities of InsightCM 3.1 to include baseline capture, alarming, ON operating state and fault frequency discussion
5 Thermography by Bruce Hoge
Best Practices in the field plus a review of Lumasense software for monitoring and diagnostics
6 PlantView pdm Module by Tony File, Kim Green
PlantView open discuss – what’s working and what’s not
7 M&D interaction with CBM
by Tony File, Mike Rowe, Chris Griffin M&D Generated Tech Exams, Outage Coordination, Finds/Notifications Tracking, & Annunciator Panel utilization
8 CBM Summit Wrap-up
by Tony File Two day wrap up with take away and action item review
Controls (Carolina A&B) - 60
Discussion Subject Presenter
Description of subject matter
1
Control Systems today, and in Your
Future by Carl King
This review of our current controls system plan will emphasize managing system data for record and future planning
2 Gigabit Communication Highway
by Wayne Cody and Chris Christenbury Cliffside 6 is the first unit in our fleet to use a Gigabit Communication Highway. This presentation will describe how the project is progressing from the Plant’s perspective.
3 Rotating Equipment Data Acquisition
and Protection by Jeff Finan
Want to learn how to reduce hardware requirements, protect our rotating equipment, and still give our operations, maintenance and engineering folks the information that they need? If so, this informative session is for you.
4 The Ins and Outs of Control System
Networking by Carl King
Learn about access to and from our Duke Corporate Network. Includes Remote Access, File Transfers and PI interfaces.
5 Duke Simulator Update
by David OHara
We all see that Simulators are becoming more important for many of our stations. Come and hear about where we have simulators and how they are helping our operations groups.
6 Cyber Compliance and the Real World
by John Grube Cyber security is a buzzword in the media and conversations with your geeky friends. Some recent cyber security events and how they can or cannot affect our plant systems will be presented.
7 Controls Roundtable
by Jeff Finan
Bring any successes, challenges or recommendations from your sites and be prepared to talk about what is going on in your world.
1
2
7
6
5
4
3
12 13 14
11 10 9 8 16 17
22
21
15
23
24
26
25
29
28
27 37
36
35
34
33
32
31
38
47
46
45
44
43
42
41
48
51
52
53
54
55
56
57
58
59
61
62
63
64
65
66
67
68
69
71
72
73
74
75
76
77
78
81
82
83
84
85
86
87
88
91
92
93
94
95
96
97
98
99
101
102
103
104
105
106
107
108
109
111
112
113
114
115
116
121
122
123
124
125
126
131
132 133 134 135 136 137 138
Front Expo Entrance South
Registration
Area
Sid
e E
xp
o E
ntr
an
ce