before starting the project listings for the coc priority listing priority...eliminated project...

35
Before Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC Consolidated Application requires TWO submissions. Both this Project Priority Listing AND the CoC Application MUST be submitted prior to the CoC Program Competition deadline as required by the FY 2016 CoC Program Competition NOFA. The FY 2016 CoC Priority Listing includes the following: - Reallocation forms – must be fully completed if the CoC is reallocating eligible renewal projects to create new permanent housing – permanent supportive housing or rapid rehousing, new HMIS, or new SSO specifically for Coordinated Entry projects. - New Project Listing – lists all new project applications created through reallocation and the permanent housing bonus that have been approved and ranked or rejected by the CoC. - Renewal Project Listing – lists all eligible renewal project applications that have been approved and ranked or rejected by the CoC. - UFA Costs Project Listing – applicable and only visible for Collaborative Applicants that were designated as a Unified Funding Agency (UFA) during the FY 2016 CoC Program Registration process. Only 1 UFA Costs project application is permitted and can only be submitted by the Collaborative Applicant. - CoC Planning Project Listing – Only 1 CoC planning project is permitted per CoC and can only be submitted by the Collaborative Applicant. - Grant Inventory Worksheet (GIW) – Collaborative Applicants must attach the final HUD- approved GIW. - HUD-2991, Certification of Consistency with the Consolidated Plan – Collaborative Applicants must attach an accurately completed, signed, and dated HUD-2991. Things to Remember: - All new and renewal projects must be approved and ranked or rejected on the Project Listings. - Collaborative Applicants are responsible for ensuring all project applications are accurately appearing on the Project Listings and there are no project applications missing from one or more Project Listings. - Collaborative Applicants are strongly encouraged to list all project applications on the FY 2016 CoC Ranking Tool located on the FY 2016 CoC Program Competition: Funding Availability page on the HUD Exchange as this will greatly simplify and assist Collaborative Applicants while ranking projects in e-snaps by ensuring no rank numbers or duplicated and that all rank numbers are consecutive (e.g., no missing rank numbers). - If a project application(s) is rejected by the CoC, the Collaborative Applicant must notify the affected project applicant(s) no later than 15 days before the CoC Program Competition application deadline outside of e-snaps and include the reason for rejection. - For each project application rejected by the CoC the Collaborative Applicant must select the reason for the rejection from the dropdown provided. - If the Collaborative Applicant needs to amend a project application for any reason after ranking has been completed, the ranking of other projects will not be affected: however, the Collaborative Applicant MUST ensure the amended project is returned to the applicable Project Listing AND re-rank the project application BEFORE submitting the CoC Priority Listing to HUD in e-snaps. Additional training resources are available online on the CoC Training page of the HUD Exchange at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition- resources/ Applicant: San Francisco Collaborative Applicant CA-501 Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978 Project Priority List FY2016 Page 1 09/12/2016

Upload: others

Post on 01-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Before Starting the Project Listings for the CoCPriority Listing

The FY 2016 CoC Consolidated Application requires TWO submissions.Both this Project Priority Listing AND the CoC Application MUST besubmitted prior to the CoC Program Competition deadline as required bythe FY 2016 CoC Program Competition NOFA.

The FY 2016 CoC Priority Listing includes the following: - Reallocation forms – must be fully completed if the CoC is reallocating eligible renewalprojects to create new permanent housing – permanent supportive housing or rapid rehousing,new HMIS, or new SSO specifically for Coordinated Entry projects. - New Project Listing – lists all new project applications created through reallocation and thepermanent housing bonus that have been approved and ranked or rejected by the CoC. - Renewal Project Listing – lists all eligible renewal project applications that have been approvedand ranked or rejected by the CoC. - UFA Costs Project Listing – applicable and only visible for Collaborative Applicants that weredesignated as a Unified Funding Agency (UFA) during the FY 2016 CoC Program Registrationprocess. Only 1 UFA Costs project application is permitted and can only be submitted by theCollaborative Applicant. - CoC Planning Project Listing – Only 1 CoC planning project is permitted per CoC and can onlybe submitted by the Collaborative Applicant. - Grant Inventory Worksheet (GIW) – Collaborative Applicants must attach the final HUD-approved GIW. - HUD-2991, Certification of Consistency with the Consolidated Plan – Collaborative Applicantsmust attach an accurately completed, signed, and dated HUD-2991.

Things to Remember: - All new and renewal projects must be approved and ranked or rejected on the Project Listings. - Collaborative Applicants are responsible for ensuring all project applications are accuratelyappearing on the Project Listings and there are no project applications missing from one or moreProject Listings. - Collaborative Applicants are strongly encouraged to list all project applications on the FY 2016CoC Ranking Tool located on the FY 2016 CoC Program Competition: Funding Availability pageon the HUD Exchange as this will greatly simplify and assist Collaborative Applicants whileranking projects in e-snaps by ensuring no rank numbers or duplicated and that all rank numbersare consecutive (e.g., no missing rank numbers). - If a project application(s) is rejected by the CoC, the Collaborative Applicant must notify theaffected project applicant(s) no later than 15 days before the CoC Program Competitionapplication deadline outside of e-snaps and include the reason for rejection. - For each project application rejected by the CoC the Collaborative Applicant must select thereason for the rejection from the dropdown provided. - If the Collaborative Applicant needs to amend a project application for any reason after rankinghas been completed, the ranking of other projects will not be affected: however, theCollaborative Applicant MUST ensure the amended project is returned to the applicable ProjectListing AND re-rank the project application BEFORE submitting the CoC Priority Listing to HUDin e-snaps.

Additional training resources are available online on the CoC Training page of the HUDExchange at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources/

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 1 09/12/2016

Page 2: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

1A. Continuum of Care (CoC) Identification

Instructions:The fields on this screen are read only and reference the information entered during the CoCRegistration process. Updates cannot be made at this time. If the information on this screen isnot correct, contact the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/ask-a-question/.

Collaborative Applicant Name: City and County of San Francisco

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 2 09/12/2016

Page 3: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

2. Reallocation

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

2-1. Is the CoC reallocating funds from one ormore eligible renewal grant(s) that will expire

in calendar year 2017 into one or more newprojects?

Yes

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 3 09/12/2016

Page 4: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

3. Reallocation - Grant(s) Eliminated

CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2016 CoC Program CompetitionNOFA – may do so by eliminating one or more expiring eligible renewalprojects. CoCs that are eliminating eligible renewal projects entirely mustidentify those projects on this form.

Amount Available for New Project:(Sum of All Eliminated Projects)

$1,381,513

Eliminated ProjectName

Grant NumberEliminated

Component Type AnnualRenewalAmount

Type of Reallocation

Advocacy Services... CA0064L9T011508 PH $362,876

Regular

The Salvation Arm... CA0077L9T011508 TH $434,421

Regular

Compass Clara House CA0043L9T011508 TH $297,469

Regular

Supportive Housin... CA0075L9T011508 PH $128,246

Regular

Dudley Apartments CA0047L9T011508 PH $158,501

Regular

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 4 09/12/2016

Page 5: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Advocacy Services for Formerly HomelessPeople

Grant Number of Eliminated Project: CA0064L9T011508

Eliminated Project Component Type: PH

Eliminated Project Annual Renewal Amount: $362,876

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The project sponsor elected not to renew CoC funding for this project providingservices to residents in PSH, and to make the funds available for new projectapplications for PSH and RRH units. The project sponsor identified a localfunding source better aligned to the project model. The project notified theCollaborative Applicant of it's intent to reallocate on August 27, 2016, and thelist of projects to be included in the Consolidated Application was sent to theproject sponsor on August 30, 2016.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. Collaborative

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 5 09/12/2016

Page 6: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Applicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: The Salvation Army Harbor House

Grant Number of Eliminated Project: CA0077L9T011508

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $434,421

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The project sponsor elected not to renew CoC funding for this transitionalhousing project and to make the funding available for new units in PSH andRRH projects. The project sponsor identified a local funding source betteraligned with the project model. The project notified the Collaborative Applicantof it's intent to reallocate on August 25, 2016, and the list of projects to beincluded in the Consolidated Application was sent to the project sponsor onAugust 30, 2016.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Compass Clara House

Grant Number of Eliminated Project: CA0043L9T011508

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $297,469

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified.

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 6 09/12/2016

Page 7: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

(limit 750 characters)

The project sponsor elected not to renew CoC funding for this transitionalhousing project and to make the funding available for new units in PSH andRRH projects. The project sponsor identified a local funding source betteraligned with the project model. The project notified the Collaborative Applicantof it's intent to reallocate on August 19, 2016, and the list of projects to beincluded in the Consolidated Application was sent to the project sponsor onAugust 30, 2016.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Supportive Housing Employment Collaborative

Grant Number of Eliminated Project: CA0075L9T011508

Eliminated Project Component Type: PH

Eliminated Project Annual Renewal Amount: $128,246

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The project sponsor elected not to renew CoC funding for this project providingservices to residents in PSH, and to make the funds available for new projectapplications for PSH and RRH units. The project sponsor identified a localfunding source better aligned to the project model. The project notified theCollaborative Applicant of it's intent to reallocate on August 15, 2016, and thelist of projects to be included in the Consolidated Application was sent to theproject sponsor on August 30, 2016.

3. Reallocation - Grant(s) Eliminated Details

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 7 09/12/2016

Page 8: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Dudley Apartments

Grant Number of Eliminated Project: CA0047L9T011508

Eliminated Project Component Type: PH

Eliminated Project Annual Renewal Amount: $158,501

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

In accordance w/ the CoC's written process for reallocating, the SF PriorityPanel recommended reallocation after review of the project's performance onkey national & community measures. The Dudley Apartments PSH projectreceived the lowest performance score in the FY 2016 San FranciscoContinuum of Care local funding competition & the Priority Panel recommendedreallocation based on the project's low performance increasing client income,responding to client feedback, & low-barrier system design. The CoC Boarddecided to reallocate based on the Priority Panel's recommendation & theproject's written & oral appeal. The project was notified on August 30, 2016 via1) a public LHCB mtg 2) email distribution of the final Priority Listing & 3) anemail from LHCB staff.

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 8 09/12/2016

Page 9: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

4. Reallocation - Grant(s) Reduced

CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2016 CoC Program CompetitionNOFA – may do so by reducing one or more expiring eligible renewalprojects. CoCs that are reducing eligible renewal projects entirely mustidentify those projects on this form.

Amount Available for New Project(Sum of All Reduced Projects)

$387,782

Reduced ProjectName

Reduced GrantNumber

AnnualRenewalAmount

AmountRetained

Amount availablefor new project

Reallocation Type

ECS- Henry CA1387L9T011500 $755,496 $748,021 $7,475 Regular

Hamilton New Rapi... CA1461L9T011500 $843,013 $836,012 $7,001 Regular

Homeless Prenatal... CA1460L9T011500 $474,076 $394,284 $79,792 Regular

Mercy Housing Ric... CA1295L9T011400 $197,786 $194,193 $3,593 Regular

THC- National, Cr... CA1462L9T011500 $2,416,863

$2,383,537

$33,326 Regular

Rental Assistance... CA1386L9T011500 $428,553 $362,578 $65,975 Regular

THC- Baldwin House CA1296L9T011501 $2,289,156

$2,098,536

$190,620 Regular

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 9 09/12/2016

Page 10: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: ECS- Henry

Grant Number of Reduced Project: CA1387L9T011500

Reduced Project Current Annual RenewalAmount:

$755,496

Amount Retained for Project: $748,021

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$7,475

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The list of projects and grantamounts to be included in the Consolidated Application was sent to the projectsponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 10 09/12/2016

Page 11: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: Hamilton New Rapid Rehousing

Grant Number of Reduced Project: CA1461L9T011500

Reduced Project Current Annual RenewalAmount:

$843,013

Amount Retained for Project: $836,012

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$7,001

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The list of projects and grantamounts to be included in the Consolidated Application was sent to the projectsponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: Homeless Prenatal Project - HPP TRA

Grant Number of Reduced Project: CA1460L9T011500

Reduced Project Current Annual RenewalAmount:

$474,076

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 11 09/12/2016

Page 12: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Amount Retained for Project: $394,284

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$79,792

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The project sponsor alsoelected to reallocate its supporting services line item, in favor of a local fundingsource, to make the funding available for new applications for units in PSH andRRH projects. The list of projects and grant amounts to be included in theConsolidated Application was sent to the project sponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: Mercy Housing Richardson Hall

Grant Number of Reduced Project: CA1295L9T011400

Reduced Project Current Annual RenewalAmount:

$197,786

Amount Retained for Project: $194,193

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$3,593

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 12 09/12/2016

Page 13: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The list of projects and grantamounts to be included in the Consolidated Application was sent to the projectsponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: THC- National, Crowne, Winton

Grant Number of Reduced Project: CA1462L9T011500

Reduced Project Current Annual RenewalAmount:

$2,416,863

Amount Retained for Project: $2,383,537

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$33,326

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The list of projects and grantamounts to be included in the Consolidated Application was sent to the projectsponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 13 09/12/2016

Page 14: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicantsshould refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: Rental Assistance for Homeless Veterans II

Grant Number of Reduced Project: CA1386L9T011500

Reduced Project Current Annual RenewalAmount:

$428,553

Amount Retained for Project: $362,578

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$65,975

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The project sponsor alsoelected to reallocate its supporting services line item, in favor of a local fundingsource, to make the funding available for new applications for units in PSH andRRH projects. The list of projects and grant amounts to be included in theConsolidated Application was sent to the project sponsor on August 30, 2016.

4. Reallocation - Grant(s) Reduced Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

4-1. Complete the fields below for each eligible renewal grant that is beingreduced during the FY 2016 reallocation process. Collaborative Applicants

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 14 09/12/2016

Page 15: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

should refer to the final HUD-approved FY 2016 Grant Inventory Worksheetto ensure all information entered here is accurate.

Reduced Project Name: THC- Baldwin House

Grant Number of Reduced Project: CA1296L9T011501

Reduced Project Current Annual RenewalAmount:

$2,289,156

Amount Retained for Project: $2,098,536

Amount available for New Project(s):(This amount will auto-calculate by selecting

"Save" button)

$190,620

4-2. Describe how the CoC determined that this project should be reducedand include the date the project applicant was notified of the reduction.(limit 750 characters)

The project sponsor, grant recipient, and Collaborative Applicant collaborated toreallocate the project's HMIS line item into a dedicated HMIS project to supportimprovement and expansion of the HMIS system. The project sponsor alsoelected to funding for reallocate 15 of 170 SRO units to reflect actual lease up,and to make the funding available for new applications for units in PSH andRRH projects. The list of projects and grant amounts to be included in theConsolidated Application was sent to the project sponsor on August 30, 2016.

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 15 09/12/2016

Page 16: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

5. Reallocation - New Project(s)

Collaborative Applicants must complete each field on this form thatidentifies the new project(s) the CoC created through the reallocationprocess.

Sum of All New Reallocated Project Requests(Must be less than or equal to total amount(s) eliminated and/or reduced)

$1,769,295

Current Priority # New ProjectName

ComponentType

Transferred Amount Reallocation Type

50 San Francisc... HMIS $33,909 Regular

57 Canon Kip Ne... PSH $177,065 Regular

55 95 Laguna Se... PSH $362,764 Regular

53 Veterans Hop... PSH $519,368 Regular

28 Compass Rapi... RRH $325,000 Regular

54 Compass Rapi... RRH $351,189 Regular

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 16 09/12/2016

Page 17: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 50

Proposed New Project Name: San Francisco HMIS 2016

Component Type: HMIS

Amount Requested for New Project: $33,909

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 57

Proposed New Project Name: Canon Kip New Project

Component Type: PSH

Amount Requested for New Project: $177,065

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 17 09/12/2016

Page 18: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 55

Proposed New Project Name: 95 Laguna Senior Housing

Component Type: PSH

Amount Requested for New Project: $362,764

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 53

Proposed New Project Name: Veterans Hope House II

Component Type: PSH

Amount Requested for New Project: $519,368

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 18 09/12/2016

Page 19: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 28

Proposed New Project Name: Compass Rapid Rehousing I

Component Type: RRH

Amount Requested for New Project: $325,000

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 54

Proposed New Project Name: Compass Rapid Rehousing II

Component Type: RRH

Amount Requested for New Project: $351,189

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 19 09/12/2016

Page 20: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

6. Reallocation: Balance Summary

InstructionsFor guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

6-1. Below is a summary of the information entered on the eliminated andreduced reallocation forms. The last field on this form, “RemainingReallocation Balance” should equal zero. If there is a positive balanceremaining, this means the amount of funds being eliminated or reducedare greater than the amount of funds requested for the new reallocatedproject(s). If there is a negative balance remaining, this means that morefunds are being requested for the new reallocated project(s) than havebeen reduced or eliminated from other eligible renewal projects, which isnot permitted.

Reallocation Chart: Reallocation Balance SummaryReallocated funds available for new project(s): $1,769,295

Amount requested for new project(s): $1,769,295

Remaining Reallocation Balance: $0

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 20 09/12/2016

Page 21: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Continuum of Care (CoC) New Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload all new project applications that have been submitted to this CoC Project Listing, clickon the "Update List" button. This process may take a few minutes based upon the number ofnew projects submitted that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the New Project Listing, click on the magnifyingglass next to each project to view project details. To view the actual project application, click onthe orange folder. If there are errors identified by the Collaborative Applicant, the project can beamended back to the project applicant to make the necessary changes by clicking on the amendicon. The Collaborative Applicant has the sole responsibility for ensuring all amended projectsare resubmitted and appear on this project listing BEFORE submitting the CoC Priority Listing ine-snaps.

Project Name DateSubmitted

Grant Term ApplicantName

BudgetAmount

Rank Comp Type

Rapid Re-Housing ...

2016-09-1116:11:...

1 Year City andCounty o...

$434,098 57 PH

Canon KipExpansion

2016-09-1115:33:...

1 Year City andCounty o...

$177,064 58 PH

CompassRapid Reh...

2016-09-1114:16:...

1 Year City andCounty o...

$325,000 28 PH

1036 Mission 2016-09-1118:42:...

1 Year City andCounty o...

$717,367 51 PH

Rapid Re-Housing ...

2016-09-1117:07:...

1 Year City andCounty o...

$210,000 43 PH

Veterans'Hope Ho...

2016-09-1214:59:...

1 Year City andCounty o...

$519,368 53 PH

Veterans'Hope Ho...

2016-09-1215:05:...

1 Year City andCounty o...

$170,090 52 PH

95 LagunaSenior ...

2016-09-1215:21:...

1 Year City andCounty o...

$362,764 55 PH

CompassRapid Reh...

2016-09-1215:25:...

1 Year City andCounty o...

$351,189 54 PH

San FranciscoHMI...

2016-09-1218:21:...

1 Year City andCounty o...

$33,909 50 HMIS

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 21 09/12/2016

Page 22: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Continuum of Care (CoC) Renewal Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload all renewal project applications that have been submitted to this Renewal ProjectListing, click on the "Update List" button. This process may take a few minutes based upon thenumber of renewal projects that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the Renewal Project Listing, click on themagnifying glass next to each project to view project details. To view the actual projectapplication, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon. The Collaborative Applicant has the sole responsibilityfor ensuring all amended projects are resubmitted and appear on this project listing BEFOREsubmitting the CoC Priority Listing in e-snaps.

The Collaborative Applicant certifies thatthere is a demonstrated

need for all renewal permanent supportivehousing and rapid

re-housing projects listed on the RenewalProject Listing.

X

The Collaborative Applicant does not haveany renewal permanent

supportive housing or rapid re-housingrenewal projects.

Project Name DateSubmitted

Grant Term ApplicantName

BudgetAmount

Rank Comp Type

Rita de CasciaPo...

2016-09-0213:13:...

1 Year City andCounty o...

$183,619 40 PH

ParkviewTerraces

2016-09-0619:40:...

1 Year City andCounty o...

$303,656 39 PH

TreasureIsland

2016-09-0618:45:...

1 Year City andCounty o...

$1,887,944 33 PH

VeteransAcademy

2016-09-0213:27:...

1 Year City andCounty o...

$358,694 19 PH

Direct Accessto ...

2016-09-0620:16:...

1 Year City andCounty o...

$985,303 29 PH

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 22 09/12/2016

Page 23: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Lyric 2016-09-0620:02:...

1 Year City andCounty o...

$777,014 10 PH

Allen Hotel 2016-09-0213:14:...

1 Year City andCounty o...

$470,753 15 PH

ScatteredSites

2016-09-0618:17:...

1 Year City andCounty o...

$1,160,180 31 PH

Hazel Betsey 2016-09-0617:53:...

1 Year City andCounty o...

$176,063 26 PH

Hope House 2016-09-0213:42:...

1 Year City andCounty o...

$1,391,258 49 PH

Direct Accessto ...

2016-09-0620:32:...

1 Year City andCounty o...

$864,902 22 PH

ElDorado/Midori

2016-09-0619:55:...

1 Year City andCounty o...

$241,142 8 PH

VeteransCommons

2016-09-0213:36:...

1 Year City andCounty o...

$271,951 12 PH

IntegratedServic...

2016-09-0213:20:...

1 Year City andCounty o...

$1,184,117 41 PH

BroadwaySansome

2016-09-0619:31:...

1 Year City andCounty o...

$89,501 44 PH

First Avenues 2016-09-0213:10:...

1 Year City andCounty o...

$185,315 37 PH

Hamilton NewRapi...

2016-09-0213:11:...

1 Year City andCounty o...

$836,012 18 PH

MissionHousing S...

2016-09-0719:26:...

1 Year City andCounty o...

$200,952 35 PH

TNDCScatteredSites

2016-09-0718:50:...

1 Year City andCounty o...

$666,150 32 PH

TNDCAmbassador

2016-09-0718:47:...

1 Year City andCounty o...

$669,840 21 PH

Glide CecilWilli...

2016-09-0719:04:...

1 Year City andCounty o...

$392,967 11 PH

FranciscanTowers

2016-09-0718:52:...

1 Year City andCounty o...

$722,097 30 PH

Canon Kip 2016-09-0621:49:...

1 Year City andCounty o...

$1,071,744 14 PH

Tenant BasedRent...

2016-09-0718:44:...

1 Year City andCounty o...

$933,970 13 PH

HomelessPrenatal...

2016-09-0717:01:...

1 Year City andCounty o...

$394,284 6 PH

ECS- Henry 2016-09-0715:00:...

1 Year City andCounty o...

$748,021 5 PH

Hotel Isabel 2016-09-0718:53:...

1 Year City andCounty o...

$133,968 45 PH

TNDCFranciscan T...

2016-09-0718:48:...

1 Year City andCounty o...

$722,097 9 PH

RentalAssistance...

2016-09-0720:15:...

1 Year City andCounty o...

$362,578 4 PH

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 23 09/12/2016

Page 24: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Canon BarcusComm...

2016-09-0621:52:...

1 Year City andCounty o...

$513,222 23 PH

MissionHousing J...

2016-09-0719:52:...

1 Year City andCounty o...

$104,760 25 PH

Bayview HillGardens

2016-09-0718:40:...

1 Year City andCounty o...

$312,814 38 PH

Knox 2016-09-0718:51:...

1 Year City andCounty o...

$241,142 34 PH

ECS BishopSwing

2016-09-0714:02:...

1 Year City andCounty o...

$305,055 16 PH

RentalAssistance...

2016-09-0718:54:...

1 Year City andCounty o...

$462,567 1 PH

Folsom/Dore 2016-09-0718:51:...

1 Year City andCounty o...

$398,052 17 PH

Railton Place 2016-09-0718:46:...

1 Year City andCounty o...

$303,656 56 PH

Leland House 2016-09-0816:07:...

1 Year CatholicCharitie...

$151,479 20 PH

THC- BaldwinHouse

2016-09-0814:53:...

1 Year City andCounty o...

$2,098,536 2 PH

IroquoisResidence

2016-09-0816:04:...

1 Year CommunityHousing...

$158,804 36 PH

Geary House 2016-09-0816:21:...

1 Year Larkin StreetYou...

$445,538 42 TH

THC- National,Cr...

2016-09-0815:13:...

1 Year City andCounty o...

$2,383,537 3 PH

CHP ScatteredSites

2016-09-0813:56:...

1 Year City andCounty o...

$691,542 24 PH

San FranciscoHMI...

2016-09-0817:31:...

1 Year City andCounty o...

$396,000 46 HMIS

San FranciscoHMIS

2016-09-0817:35:...

1 Year City andCounty o...

$110,712 47 HMIS

Mercy HousingRic...

2016-09-0921:13:...

1 Year City andCounty o...

$194,193 7 PH

Cadillac/William ...

2016-09-0920:27:...

1 Year City andCounty o...

$1,071,744 27 PH

San FranciscoCES

2016-09-1218:29:...

1 Year City andCounty o...

$120,331 48 SSO

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 24 09/12/2016

Page 25: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Continuum of Care (CoC) Planning Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload the CoC planning project application that has been submitted to this CoC PlanningProject Listing, click on the "Update List" button. This process may take a few minutes as theproject will need to be located in the e-snaps system. The Collaborative Applicant may updateeach of the Project Listings simultaneously. The Collaborative Applicant can wait for the ProjectListings to be updated or can log out of e-snaps and come back later to view the updated list(s).To review the CoC Planning Project Listing, click on the magnifying glass next to view the projectdetails. To view the actual project application, click on the orange folder. If there are errorsidentified by the Collaborative Applicant, the project can be amended back to the projectapplicant to make the necessary changes by clicking on the amend icon. The CollaborativeApplicant has the sole responsibility for ensuring all amended projects are resubmitted andappear on this project listing BEFORE submitting the CoC Priority Listing in e-snaps.

Only one CoC Planning project application can be submitted and it must match the CollaborativeApplicant information on the CoC Applicant Profile. Any additional CoC Planning projectapplications must be rejected.

Project Name Date Submitted Grant Term Applicant Name Budget Amount Comp Type

SF CoC Planning2016

2016-09-1217:17:...

1 Year City and Countyo...

$918,933 CoC PlanningProj...

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 25 09/12/2016

Page 26: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Funding Summary

InstructionsFor additional information, carefully review the FY 2016 CoC Priority Listing Detailed Instructionsand the CoC Priority Listing Instructional Guide.

This page contains the total budget summaries for each of the project listings for which theCollaborative Applicant approved and ranked or rejected project applications. The CollaborativeApplicant must review this page to ensure the totals for each of the categories is accurate. The"Total CoC Request" indicates the total funding request amount the Collaborative Applicant willsubmit to HUD for funding consideration. As stated previously, only 1 UFA Cost projectapplication (for UFA designated Collaborative Applicants only) and only 1 CoC Planning projectapplication can be submitted and only the Collaborative Applicant designated by the CoC iseligible to request these funds.

Title Total Amount

Renewal Amount $28,849,776

New Amount $3,300,849

CoC Planning Amount $918,933

Rejected Amount $0

TOTAL CoC REQUEST $33,069,558

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 26 09/12/2016

Page 27: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Attachments

Document Type Required? Document Description Date Attached

1. Certification of Consistencywith the Consolidated Plan

Yes Certification of ... 09/08/2016

2. FY 2016 HUD-approvedGrant Inventory Worksheet

Yes FY 2016 HUD-Appro... 09/08/2016

3. FY 2016 Rank (from ProjectListing)

No

4. Other No

5. Other No

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 27 09/12/2016

Page 28: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Attachment Details

Document Description: Certification of Consistency with theConsolidated Plan

Attachment Details

Document Description: FY 2016 HUD-Approved GIW

Attachment Details

Document Description:

Attachment Details

Document Description:

Attachment Details

Document Description:

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 28 09/12/2016

Page 29: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Submission Summary

WARNING: The FY2016 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated

Application MUST be submitted.

WARNING: The FY2016 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated

Application MUST be submitted.

Page Last Updated

Before Starting No Input Required

1A. Identification 09/02/2016

2. Reallocation 09/02/2016

3. Grant(s) Eliminated 09/08/2016

4. Grant(s) Reduced 09/08/2016

5. New Project(s) 09/12/2016

6. Balance Summary No Input Required

7A. CoC New Project Listing 09/12/2016

7B. CoC Renewal Project Listing 09/12/2016

7D. CoC Planning Project Listing 09/12/2016

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 29 09/12/2016

Page 30: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Attachments 09/08/2016

Submission Summary No Input Required

Applicant: San Francisco Collaborative Applicant CA-501Project: San Francisco Collaborative Applicant 2016 COC_REG_2016_135978

Project Priority List FY2016 Page 30 09/12/2016

Page 31: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Applicant: San Francisco Collaborative Applicant FY2016 CoC Application Applicant Number: CA-501 ATTACHMENT: CERTIFICATION OF CONSISTENCY WITH THE CONSOLIDATED PLAN DOCUMENT SATISFYING REQUIREMENT PAGE Certification of Consistency with the Consolidated Plan of the City and County of San Francisco 1 - 4

Page 32: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Certification of Cons istenc U.S. Department of Housingand Urban Development

with the Consolidated Plan

I certify that the proposed activities/projects in the application are consistent with the jurisdiction’s current, approved Con solidated Plan.

(Type or clearly print the following information:)

City andCountyof SanFranciscoApplicant Name:

______________________________________________________________________

Multiple projects(seeattachedist)Project Name:

______________________________________________________________________________

San Francisco, CALocation of the Project:

______________________________________________________________________

Name of the FederalProgram to which the

HUD ContinuumofCare(C0C)Programapplicant is applying:

______________________________________________________________________________

Name of

City andCountyof SanFranciscoCertifying Jurisdiction:

______________________________________________________________________________

Certifying Officialof the Jurisdiction

Brian CheuName:

Directorof CommunityDevelopmentTitle:

____________________________________________________________________________________

Signature:

_______________________________________________________________

Date: Septembe6, 2016

Page 1 of 1 form HUD-2991 (3/98)

Page 33: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

Rank Project TypeNew/

Renewal

1 Rental Assistance for Homeless Veterans I PSH Renewal

2 Baldwin House PSH Renewal

3 National Crown Winton PSH Renewal

4 Rental Assistance for Homeless Veterans II PSH Renewal

5 Henry Hotel PSH Renewal

6 HPP Housing Plus PSH Renewal

7 Richardson Hall PSH Renewal

8 El Dorado/Midori PSH Renewal

9 Franciscan Towers 2 PSH Renewal

10 Lyric PSH Renewal

11 Glide Cecil Williams Community House PSH Renewal

12 Veterans Commons PSH Renewal

13 Tenant Based Rental Assistance PSH Renewal

14 Canon Kip PSH Renewal

15 Allen Hotel PSH Renewal

16 Bishop Swing Community House PSH Renewal

17 TNDC Folsom Dore PSH Renewal

18 Hamilton Family Rapid Re-Housing RRH Renewal

19 Veterans Academy at the Presidio PSH Renewal

20 Leland House PSH Renewal

21 Ambassador Hotel PSH Renewal

22 Direct Access to Housing: Empress/Folsom Dore PSH Renewal

23 Canon Barcus PSH Renewal

24 CHP Scattered Sites (Consolidated) PSH Renewal

San Francisco Local Homeless Coordinating Board 2016 Continuum of Care Funding List

Page 34: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

25 Juan Pifarre Plaza PSH Renewal

26 Hazel Betsey (Consolidated) PSH Renewal

27 Cadillac/William Penn PSH Renewal

28 Compass Rapid Rehousing RRH New

29 Direct Access to Housing: Chronic Alcoholics PSH Renewal

30 Franciscan Towers PSH Renewal

31 CCCYO Scattered Sites PSH Renewal

32 TNDC Scattered Sites PSH Renewal

33 Treasure Island (Consolidated) PSH Renewal

34 Knox PSH Renewal

35 South Park Residences PSH Renewal

36 Iroquois Residence PSH Renewal

37 First Avenues RRH Renewal

38 Bayview Hill Gardens PSH Renewal

39 Parkview Terrace Apartments PSH Renewal

40 Rita da Cascia-Positive MATCH PSH Renewal

41 Integrated Services Network PSH Renewal

42 Geary House (Consolidated) TH Renewal

43 Rapid Re-Housing for TAY RRH New

44 Broadway Sansome Apartments PSH Renewal

45 Hotel Isabel PSH Renewal

46 San Francisco HMIS 2015 HMIS Renewal

47 San Francisco Homeless Management Information System HMIS Renewal

48 San Francisco Coordinated Entry CE Renewal

49 Hope House (Consolidated) PSH Renewal

50 San Francisco HMIS 2016 HMIS New

51 1036 Mission PSH New

52 Veteran's Hope House I PSH New

Page 35: Before Starting the Project Listings for the CoC Priority Listing Priority...Eliminated Project Annual Renewal Amount: $158,501 3-2. Describe how the CoC determined that this project

53 Veteran's Hope House II PSH New

54 Compass Rapid Rehousing RRH New

55 95 Laguna Senior Housing PSH New

56 Railton Place PSH Renewal

57 Rapid Re-Housing for TAY RRH New

58 Canon Kip New Project PSH New