Case study of Copenhagen International School:
Electrical noise generated by PV system
Presented by Boris Lund Havmøller
PV systems and electrical disturbance
3 | ##
DC/AC
InverterDC AC Main circuit
board
Meter
POC: Point of connection
10 kV/ 0,4 kV
Transformer
0,4 kV
10 kV
AC
AC
ACConsumption
Inverters modulation of a sine waveform
4 | ##
Pulse Width Modulation
Types of AC signal in inverter systems
Harmonic disturbances
5 | ##
-1.5
-1
-0.5
0
0.5
1
1.5
Fundamental
3. harmonic
5. Harmonic
7. Harmonic
11. Harmonic
Resulting Waveform
-1.5
-1
-0.5
0
0.5
1
1.5
Fundamental
3. harmonic
Resulting Waveform
Example of disturbance
6 | ##
Measured U, I and P for an LED lamp
THD,i
Technical regulations for connecting PV
systems to the distribution grid
Technical regulation 3.2.2 for PV power plants above 11 kW
The electricity supply undertaking
• is responsible for setting emission limits in the Point of Connection.
• must agree on a schedule for determining emission limits with grid connection applicants.
Plant owner
• must ensure that the PV power plant is designed, constructed and configured in observance of the specified emission limits without grid reinforcements being required.
• may, according to agreement, purchase supplementary services from the electricity supply undertaking to ensure compliance with the specified limit values.
7 | ##
PV plants categorized based onrated power
The technical requirements of the regulation are divided into the following categories based on the total rated power in the Point of Connection:
• A2. Plants above 11 kW up to and including 50 kW
• B. Plants above 50 kW up to and including 1. 5 MW
• C. Plants above 1.5 MW up to and including 25 MW
• D. Plants above 25 kW or connected to over 100 kV
The requirements concern: DC-content, asymmetry, fast voltage changes, flicker, harmonic disturbances, interharmonic disturbances, disturbances 2 - 9 kHz.
8 | ##
Copenhagen International School
• Vis skolen
9 | ##
Copenhagen International School –EnergyLab Nordhavn
10
• Flexible energy demand and production
• Cognitive buildings
• Storage
• BESS as a grid investment
• EV fleet
• Aggregators in the energy market