7in SES ECP Expandable Stainless Steel 8.2in - 208.2mm RIH OD
4.1ft - 1.24m Sealing length
Up to 10in Expansion
www.saltel-industries.com
contextA 2-well campaign was conducted using Saltel Industries Expandable ECPs
Client encountered frequent losses zones while drilling and needed to perform one-stage and two-stage cementing operations
Packers had to be set either in Cased or OpenHole and needed to withstand difficult running conditions in deviated wells and under gauged holes. The possibility to rotate and put weight on the packer during RIH is therefore essential.
solutionSES ECP is a proprietary expandable steel packer specially designed for stage cementing applications. SES ECP 7in is a robust, simple and cost-effective barrier providing reliable ground for stage cementing operation.
•Simple setting process compatible with operator’s current string design and procedures •Quick installation time •Can be worked in doglegs or tight spots •Can be rotated while RIH •High sealing capability in cased hole or openhole
Successful stage cementing operations using Saltel Expandable Steel Packers run and worked in deviated well
cAse stuDY
siQ1187_AB - Mar2016
context
Coal Seam Gas Queensland, Australia
Shallow losses zones <800m / 2,600ft Depth
104°F (40°C) - 140°F (60°C) Downhole Temperature
7in casing cemented in •8-3/4in openhole •9-5/8in casing
operAtionAl chArActeristics
2,200psi / 15.2MPa Setting Pressure
2,400psi / 16.5MPa Opening of stage collar
15min Expansion duration
1st Well Two-stage cement job Expandable ECP set in 9-5/8in casing
total loss Zonetotal loss Zone
2nd Well One-stage cement job Expandable ECP set in 8-3/4in OH
results1st Well – Two-stage cement job
The 1st packer was successfully expanded in the vertical cased section of a deviated well at 300m - 984.2ft. Packer has been set in a 9-5/8in 36ppf casing (ID 8.921in). Cement has been pumped above the packer and circulated back to surface.
2nd Well – One Stage cement job
The 2nd packer was placed at the very bottom of the string for a one-stage cement job above a loss zone. The casing was worked for 6 hours attempting to go through under-gauge hole (String weight UP/SO, 70klbs/26klbs). When pulling the casing back to surface, the SES ECP showed no signs of deformation. It was run back and successfully set in nominal 8-3/4in Openhole (with potential washout).
Benefits
• Compatible with any stage cementing configuration • Robust design allows RIH in under-gauge hole • Simplified running & setting • No risk of premature expansion • Cement successfully pumped to surface