Page 1: Chatham lsa briefing

Georgia Emergency Management Agency

Page 2: Chatham lsa briefing

State of Georgia LSA

May 3, 2010

Page 3: Chatham lsa briefing
Page 4: Chatham lsa briefing

SOC

DISASTER AREA

DISASTER RESPONSE FOOTPRINT

BASE CAMP

LSA/GSA

SASA

CAMP CAMP

POD

POD POD

POD

ERB

POD

POD

Command & ControlCoordination

ASOCASOC

ATLANTA

GSAR TFs

COEOC

COEOC

SA

STATE

AVIATION

RE-ENTRY TFs

GSAR TFs

RE-ENTRY TFs

FORSYTH

POD

Page 5: Chatham lsa briefing

BASIC PHILOSOPHY

• There is no success until the needs of our citizens have been met.

• Serve the citizens during daylight, resupply after dark.• The anticipated response time in the logistical system is 25%

delivery on day one, 50% for day two and 100% by day three.• PODS will serve as the distribution point during a disaster.• Counties plan and run PODs to include staffing and equipping. • POD locations should be on record with GEMA Logistics.• GEMA will ship direct from vendor where possible.• GEMA delivers to the desired location specified by the county.

Page 6: Chatham lsa briefing

THINK TRUCKLOADS

• A 53’ foot trailer of water or ice will supply 5,000 people per day.• A 53’ foot trailer of meals will supply 5,000 people for two days.• FEMA trailers are leased by the month. Use them as an asset to

support your plan. No reason to immediately offload.• Refrigerated trailers have to be unloaded immediately.• Pallet of Ice melt factor @ 90 degrees = 2 days.

Page 7: Chatham lsa briefing

Georgia Forestry Commission

Develop and maintain the LSA SOG.

Operate the LSA Branch as a United Command with GPSTC and GaDOD. Form core staff of LSA.

Coordinate the acquisition of equipment rental/leases and services.

Conduct IRR and RSOI operations.

Provide personnel and trucks (tractors) to tow federal and state cargo trailers.

Transport IRR from the LSA to county PODs.

Page 8: Chatham lsa briefing

Georgia Public Safety Training Center

Provide the GPSTC campus and facilities for LSA operations.

Operate the LSA Branch as part of the Unified Command.

Prepare and maintain a temporary sign cache to facilitate LSA operations

Page 9: Chatham lsa briefing

Georgia Department of Defense

Operate the LSA Branch as a Unified Command with GPSTC and GFC.

Plan for the integration of military personnel and equipment in support of the LSA forward to the county PODs

Assist counties with commodity distribution if necessary.

Be prepared to assist counties with POD operations.

Page 10: Chatham lsa briefing

Technical College System of Georgia

Provide personnel and vehicles (tractor-trailer rigs).

Manage all state truck drivers supporting the LSA operation.

Transport IRR from LSA to county PODs.

Assist counties with commodity distribution if necessary.

Page 11: Chatham lsa briefing

Georgia Department of Transportation

Coordinate and assemble a fleet of state owned tractor trailer rigs and state owned tractors (without trailers).

Provide illuminated signs on I-75.

Page 12: Chatham lsa briefing

Department of Public Safety

Provide personnel and equipment for LSA and convoy security.

Make weigh station available for truck holding area.

Page 13: Chatham lsa briefing

Department of Administrative Services

Provide State Purchasing Card.

Conduct purchasing and contracting activities in support of the LSA.

Page 14: Chatham lsa briefing

Board of Regents

Provide personnel and vehicles (busses) for shuttle service within the LSA area.

Page 15: Chatham lsa briefing

Department of Corrections

Provide personnel to assist in loading/unloading.

Augment GPSTC staff as necessary.

Provide pallet repair.

Page 16: Chatham lsa briefing

Department of Agriculture

Ensure appropriate handling and quality of IRR.

Provide and operate a temporary re-fueling point (TRP) for diesel, gasoline and propane.

Page 17: Chatham lsa briefing

THE BIG FIVE

ITEM SOURCE

WaterState: Emergency Purchase Contract

Federal: FEMA

MealsState: DOAS Statewide MRO Contract

Federal: FEMA

IceState or Federal: State Emergency

Purchase Contract

TarpsState: DOAS Statewide MRO Contract

Federal: FEMA

GeneratorsState: DOAS Statewide MRO Contract

Federal: FEMA/USACE

Page 18: Chatham lsa briefing

THE REAL DAY ONETHE REAL DAY ONE

Page 19: Chatham lsa briefing

TRIGGER FOR PRE-DISASTER EMERGENCY TRIGGER FOR PRE-DISASTER EMERGENCY DECLARATIONDECLARATION

National Weather Service has determined the State, or a National Weather Service has determined the State, or a portion, is threatened by landfall of a major hurricane, portion, is threatened by landfall of a major hurricane, ANDAND;;

The Governor has declared a State of Emergency, The Governor has declared a State of Emergency, ANDAND;; Either:Either: a. The State, or any jurisdiction thereof, has issued a. The State, or any jurisdiction thereof, has issued

mandatory mandatory evacuation orders for three or more counties, or evacuation orders for three or more counties, or any geographical area with a combined population of more any geographical area with a combined population of more than 100,000 residents, than 100,000 residents, OROR::

b. The declaration is necessary to provide direct federal b. The declaration is necessary to provide direct federal assistance to meet critical emergency protection assistance to meet critical emergency protection requirements before landfall, other than pre-positioning, that requirements before landfall, other than pre-positioning, that would overwhelm the capability or capacity of State would overwhelm the capability or capacity of State resources.resources.

Page 20: Chatham lsa briefing

LSA ACTIVATION SEQUENCE

• Within 1 Hour. Log Chief notifies GFC, GPSTC 7 GaDOD primary ESF leads.

• Within 3 hours. GFC, GPSTC & GaDOD notify internal staff and LSA supporting Agencies. Reports Completion to ESF #7.

• Within 12 hours. LSA advance party arrive and establishes phone, fax and E-Team connectivity with the SOC.

• Within 24 hours. Remainder of LSA Branch Headquarters staff report for duty.

• Within 36 hours. Remainder of the LSA Staff and equipment report.

• Within 48 hours. LSA is fully prepared to begin IRR and RSOI operations.

Page 21: Chatham lsa briefing

www.englink.usace.army.mil

Page 22: Chatham lsa briefing

www.englink.usace.army.mil

Page 23: Chatham lsa briefing
Page 24: Chatham lsa briefing
Page 25: Chatham lsa briefing

CURRENT COUNTY POD PLAN

COUNTY

USACE MODEL

IN

TRUCKLOADS

CURRENT NUMBER OF

LANES PLANNED

CURRENT NUMBER OF LOCATIONS

Bryan (3) 2 3 3

Bulloch (5) 4 5 4

Burke (3) 1 0 0

Candler (3) 1 0 0

Chatham (5) 13 20 13

Effingham (5) 3 6 3

Emanuel (3) 1 0 0

Evans (3) 1 1 1

Glynn (5) 1 6 4

Jenkins (3) 1 0 0

Liberty (5) 3 20 10

Long (5) 1 3 3

McIntosh (5) 1 3 3

Screven (3) 1 1 1

Totals: 34 68 45

Page 26: Chatham lsa briefing

PLANNING FACTORSFIRST THREE DAYS

DAY 1

25 %

DAY 2

50%

DAY 3

100%

OVER THREE DAYS

WATER 9 17 34 60

ICE 9 17 34 60

MEALS 5 10 17 32

DAILY: 23 44 85 152

Page 27: Chatham lsa briefing

THE REQUEST PROCESS

• Counties develop requirements.• Requirements are funneled to the state by various

processes including conference or phone calls, fax, electronic transmission or hand-delivered.

• State requests are submitted to FEMA on a daily basis.• FEMA fills from stockpiles and normally available for

distribution the next operational day.

Page 28: Chatham lsa briefing

CONFERENCE CALL

• Used as the State commodities forecasting tool.• Call most likely in the early AM.• Order for Tomorrow’ Delivery in Truckloads - Delivery location,

water, meals, ice, other• PODs Opening Tomorrow. Name/Address & Size• PODs Closing Tomorrow. Name/Address & Size.

Page 29: Chatham lsa briefing

POD OperationsSuggested Topics

• Estimated number of people requiring commodities tomorrow.

• Commodity Levels: Available, Shortages and other issues.

• Shipping and Receiving Concerns. Road conditions and available routes. Local handling and distribution issues.

• Burn Rates, report last 24 hours and provide estimate for the next 72 hours.

Page 30: Chatham lsa briefing

Logistical Resource RequestSuggested Topics

• Resources reported as enroute but not yet received.

• Critical resources arriving in the last 24 hours

• Resources released in the last 24 hours or expected to be released

• Resources cancelled.

Page 31: Chatham lsa briefing

Status of Utilities and Critical FacilitiesSuggested Topics

• Power. Number of homes without power today.

• Status of Water Treatment facilities and number of customers affected.

• Local businesses that have or will reopen to relieve logistical support requirements.

Page 32: Chatham lsa briefing

Planning IssuesSuggested Topics

• Mutual Aid Request anticipated

• Anticipated logistical request for future operations but not yet requested.

• Anticipated purchases of goods and services exceeding county contract or leasing capability for which state assistance might be requested.

Page 33: Chatham lsa briefing

DAILY POD REPORT

• Prepared after the close of POD Operations daily.

• Used as the historical record for POD Operations.

Page 34: Chatham lsa briefing

FEMA PARTNERSFEMA PARTNERS

Page 35: Chatham lsa briefing

ESTES OPERATIONAL ESTES OPERATIONAL EXECUTIONEXECUTION

Management staff on-site at FEMA ISBs (Ft. Gillem or MCSC), Management staff on-site at FEMA ISBs (Ft. Gillem or MCSC), Cross-docks and Region IV to rapidly execute FEMA (State) Cross-docks and Region IV to rapidly execute FEMA (State) directives.directives.

Conducts FEMA cross-dock operations allowing all commodities Conducts FEMA cross-dock operations allowing all commodities to flow to a single destination.to flow to a single destination.

Allows for greater control of flow of supplies by diminishing log-Allows for greater control of flow of supplies by diminishing log-jams down range.jams down range.

Terminals can also serve as potential staging locations for Terminals can also serve as potential staging locations for FEMA/GEMA (Savannah & Albany).FEMA/GEMA (Savannah & Albany).

In direct contact with all drivers and can make immediate In direct contact with all drivers and can make immediate changes to plans when dictated.changes to plans when dictated.

Tractors have GPS transponders.Tractors have GPS transponders. Will locate trailers to POD locations.Will locate trailers to POD locations.

Page 36: Chatham lsa briefing

Xtra-Lease TrailersXtra-Lease Trailers Trailers are leased by FEMA for 30 day periods.Trailers are leased by FEMA for 30 day periods. All trailers come with GPS transponders mounted to allow All trailers come with GPS transponders mounted to allow

visibility and load verification.visibility and load verification. Common carrier equipment is not tied up, thus no detention Common carrier equipment is not tied up, thus no detention

charges.charges.

Page 37: Chatham lsa briefing

GEMA PARTNERSGEMA PARTNERS

Technical College System of Georgia

National Guard M915 Commercial Line Haul Tractor

Page 38: Chatham lsa briefing

LSA MAJOR EXERCISE OBJECTIVES

Establish, man and equip the LSA.

Validate the interface/communications between the SOC, ESF #7, LSA and convoy operations necessary to support County POD operations. What are the critical elements of information and how and when are they communicated?

Validate complete (commodities, people and equipment) resource accountability – audit trail. Practice Standardization. Refine reporting requirements and procedures and establish request protocols.

Identify (Using modeling), refine and validate resource requirements estimates.

Page 39: Chatham lsa briefing