  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    1/12

    DCO-DT-000-ZZZZZ-071902 I February 2014

    Code of Construction PracticePart B: Site-specific

    requirements

    Albert Embankment Foreshore

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    2/12

    Code of Construction Practice Part B

    This page left intentionally blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    3/12

    Code of Construction Practice Part B i

    Thames Tideway Tunnel

    Code of Construction Practice Part B

    Albert Embankment Foreshore

    List of contents

    Page number

    1 Introduction ...................................................................................................................12 General requirements .................................................................................................23 Communications and community/stakeholder liaison ......................................24 Site operation ................................................................................................................25 Public access, highway and river transport .........................................................36 Noise and vibration .....................................................................................................47 Air quality .......................................................................................................................58 Water resources ...........................................................................................................59 Land quality .................................................................................................................6510 Waste management and resource use ...................................................................611 Ecology (aquatic and terrestrial) .............................................................................612 Historic environment ..................................................................................................613 Other..............................................................................................................................76

    List of figures

    Page number

    Figure 1.1 Albert Embankment Foreshore: Site context and location plan....................2Figure 13.1 Known Mesolithic timbers in the foreshore....................................................7

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    4/12

    Code of Construction Practice Part B ii

    This page left intentionally blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    5/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 1

    1 Introduction

    1.1.1 All works described in this document are to be managed and performed tomeet the health and safety vision of Zero Incidents, Zero Harm, Zero

    Compromise for the Thames Tideway Tunnel project (the project).

    1.1.2 The Code of Construction Practice(CoCP) comprises two parts:

    a. Part A: General requirements. These measures are applicable projectwide.

    b. Part B: Site-specific requirements. These are site-specific measureswhere deviations from the general requirements are indicated in Part A.

    1.1.3 This document forms the CoCPPart B for the project works at the AlbertEmbankment Foreshore site and sets out detailed site-specific measuresincluding working hours, site set-up and servicing arrangements, taking into

    account environmental matters and consultations with the London Boroughof Lambeth and other stakeholders.

    1.1.4 For ease of reference,this document mirrors the headings in Part A. It setsout site-specific issues and deviations from Part A; therefore where nosite-specific measures are specified, reference should be made to PartA.

    1.1.5 A plan showing the location of the site is shown in Figure 1.1 overleaf.

    1.1.6 The application for development consent includes two options for temporaryconstruction access to the site: Option A via Lacks Dock and Option B via anew access to be created between Camelford House and Tintagel House.

    For both options, occasional access for construction plant to the worksiteunder Vauxhall Bridge will be required along the Lacks Dock slipway. TheSecretary of State shall confirm which option should be provided in anydecision to grant development consent for the project. Where controlmeasures relate to one access option but not to the other, this is specifiedwithin this document. All other control measures apply regardless of whichaccess option is confirmed.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    6/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 2

    Figure 1.1 Albert Embankment Foreshore: Site context and location plan

    Note: For detailed limits of land to be acquired or used, refer to the drawings in the Book of Plans.

    2 General requirements

    2.1.1 As per the CoCPPart A.

    3 Communications and community/stakeholderliaison

    3.1.1 As per the CoCPPart A.

    4 Site operation

    Topic Site-specific requirement

    Working hours The following working hours shall apply to this site:

    a. standard

    b. extended

    c. continuous during construction of theClapham/Brixton connection tunnel.

    When other types of working hours (CoCPPart A,Table 4.1) are required, these will be subject to

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    7/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 3

    Topic Site-specific requirement

    consent from the local authority under Section 61 ofthe Control of Pollution Act 1974.

    Site layout Suitable protection, such as concrete interlocking

    block structure,or similar, shall be placed on areas offoreshore between the working areas to enablevehicle movements to transport materials.

    Site security/hoardingrequirements

    The hoarding shall incorporate suitable art work andviewing windows,as defined in CoCPPart A para.4.3.4a and b.

    The hoarding height shall be 3.6m at this site.

    River works As per the CoCPPart A.

    Other items A separate specification for security measures

    applies on this site.The contractor shall produce a site-specific lightingmanagement plan. The lighting scheme shalladdress impacts on terrestrial and aquatic ecologyand include the use of low level directional lighting,where possible,while providing safe workingconditions.

    5 Public access, highway and river transport

    Topic Site-specific requirement

    Site access and gates Access to Lacks Dock for London Duck ToursLimited shall be maintained throughout the works,unless agreed otherwise.

    The security barrier shall be positioned at theentrance to the site access road to enable a standardrigid tipper vehicle to sit wholly off AlbertEmbankment (A3036) while awaiting barrieroperation.

    Option A: The existing security kiosk shall berelocated and utilised for joint access security for theproject and London Duck Tours Limited.

    Access to the site shall be from Vauxhall Gyratoryand Albert Embankment. The new site access roadshall be adjacent to Lacks Dock.

    Option B: The new site access road shall be betweenCamelford House and Tintagel House and a newcrossover shall be constructed in the pavement.

    Options A and B: Vehicles shall turn left in and out of

    the site only and exit northbound along AlbertEmbankment.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    8/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 4

    Topic Site-specific requirement

    Drivers of construction vehicles shall obtain securityclearance before arriving at the site. The method forobtaining this clearance will be detailed in the securityplan.

    Vehicles arriving at the site entrance withoutclearance to access the site shall be denied entry andleave the site via a left turn onto Albert Embankmentunder the supervision of a Traffic Marshal to preventconflict with other road users on Albert Embankment,or vehicles entering the Lacks Dock or CamelfordHouse vehicle entrance. Any large vehicle deniedaccess that is unable to turn off the highway shallreverse onto Albert Embankment under thesupervision of a Traffic Marshal.

    Option A: A Traffic Marshal shall be stationed at thesite entrance to manage potential conflicts (eg,between incoming/outgoing London Duck Toursvehicles) and ensure that no vehicles queue/wait onAlbert Embankment.

    Traffic management Drivers of large vehicles exiting the site shall be madeaware that the vehicle may encroach into the off-sidenorthbound lane.

    Event restrictions Large crowds are expected in the Vauxhall area onNew Years Eve and the contractor shall make

    arrangements for additional security and implementany other measures within the contractors sitesecurity plan.

    River transport As per the CoCPPart A.

    Other Signage shall be provided for pedestrian diversions(eg, the Thames Path) to clearly identify alternativeroutes during construction.

    6 Noise and vibration

    Topic Site-specific requirement

    Control measures

    The noise and vibrationcontrol measures shall bedetailed (and may be modifiedor added to) in Section 61consent applications to thelocal authority.

    Except for the anchor piles, the contractor shallconstruct the cofferdam using push piling unless thisis determined to be impossible. The first 'anchor' pilesshall be installed at a location as far away from theclosest sensitive receptors,including Tintagel House,Camelford House and Vauxhall Cross,as possible.

    Where push piling is determined to be impossible, this

    shall be demonstrated by the contractor,who shallmake an application to the local authority to use an

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    9/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 5

    alternative piling method through the Section 61dispensation process (see Appendix A, Section A.1 inthe CoCPPart A) or through contingency measuresand arrangements if included in the original Section61 consent.

    Material shall be compacted onsite using machinerythat generates the lowest practicable vibration levelsthat can achieve the required level of compaction.Specifically,large vibratory rollers shall only be usedwhere vibration levels can be controlled to less thanthe impact criteria set out in the EnvironmentalStatement,Vol 16: Albert Embankment Foreshore,Tables 9.5.3 and 9.5.4.

    Other N/A

    7 Air quality

    Topic Site-specific requirement

    Vehicle and plant emissions As per the CoCPPart A.

    Dust emissions/control As per the CoCPPart A.

    Odour As per the CoCPPart A.

    Other N/A

    8 Water resources

    Topic Site-specific requirement

    Control of pollution: surfacewater/groundwater

    The area of foreshore between working sites shall bemonitored for spillage of oils, fuels and othermaterials during use. The contractors PollutionIncident Control Plan shall include specific controland mitigation measures for this location.

    Control on abstraction As per the CoCPPart A.

    Ground treatment As per the CoCPPart A.

    Other N/A

    9 Land quality

    Topic Site-specific requirement

    Site works As per the CoCPPart A.

    Site-specific issues/mitigation As per theCoCP

    Part A.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    10/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 6

    10 Waste management and resource use

    Topic Site-specific requirement

    Excavated material As per the CoCPPart A.

    Resource usage As per the CoCPPart A.

    Other N/A

    11 Ecology (aquatic and terrestrial)

    Topic Site-specific requirement

    Protection of habitats A membrane shall be installed between the riverbedand any temporary back fill material to prevent

    contamination of juvenile fish habitat and preservepotential archaeology.

    Areas of foreshore used for temporary works shall berestored to a similar condition with similar materialsas prior to the works.

    Protection of trees Option B: Replacement trees shall be planted forthose lost along Albert Embankment. Retainedvegetation shall be protected during the works.

    Other N/A

    12 Historic environment

    Topic Site-specific requirement

    Other The contractors working methods shall limit the riskof vessels striking the listed Vauxhall Bridge.Protection barriers shall be installed as required butnot attached to the listed structure unless otherwiseagreed with the local authority in consultation with the

    Historic Buildings and Monuments Commission forEngland.

    The contractor shall select suitable operatingprocedures that do not impact on the knownMesolithic timbers in the foreshore within the zone ofsensitivity shown in Figure 13.1 overleaf.

    13 Other

    Topic Site-specific requirementOther N/A.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    11/12

    Albert Embankment Foreshore

    Code of Construction Practice Part B 7

    Figure 13.1 Known Mesolithic timbers in the foreshore

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014

    12/12

    Document comparison by Workshare Compare on 10 February 2014 14:31:36

    Input:

    Document 1 ID interwovenSite://VRT-DMS-01/Legal/34197922/1

    Description#34197922v1 - CoCP Part B AEF Revised 3 Feb

    2014Document 2 ID interwovenSite://VRT-DMS-01/Legal/34241581/1

    Description #34241581v1 - CoCP B AEF - 12 Feb 2014

    Rendering set no change numbers no summary

    Legend:

    Insertion

    Deletion

    Moved from

    Moved to

    Style change

    Format change

    Moved deletion

    Inserted cell

    Deleted cell

    Moved cell

    Split/Merged cell

    Padding cell

    Statistics:

    Count

    Insertions 2

    Deletions 3

    Moved from 0

    Moved to 0

    Style change 0

    Format changed 0

    Total changes 5