Page 1: Coiled Tubing Introduction

Coiled Tubing Introduction

• Surface equipment

• BHA assemblies

• Some problems and observations

8/25/2015 1 George E. King Engineering

GEKEngineering.com

Page 2: Coiled Tubing Introduction

Coiled Tubing Introduction

• Surface equipment

• BHA assemblies

• Some problems and observations

8/25/2015 2 George E. King Engineering

GEKEngineering.com

Page 3: Coiled Tubing Introduction

8/25/2015 3 George E. King Engineering

GEKEngineering.com

Page 4: Coiled Tubing Introduction

W o rld W id e C T R e c o rd s

L a rg e st C T in U se 3 -1 /2 "

M a x D e p th 2 4 ,0 0 0 '

M a x H o riz o n ta l 1 7 ,0 0 0 ' (8 0 d e g )-W y tc h B P

L o n g e st B H A 1 5 0 0 ' - p e rf g u n s - U K

L o n g e st S tr in g s 2 3 ,0 0 0 ' o f 2 -3 /8 "

2 8 ,0 0 0 ' o f 1 -1 /2

M a x W e l lh e a d P re ssu re 9 8 0 0 p si

M a x D e p lo y m e n t P re ss 4 5 0 0 p si

M a x B H T e m p 7 0 0 F - M e x , 7 8 0 F J a p a n

M a x A c id a t T e m p 2 8 % a t 2 8 0 F in D u b a i

C T in H 2 S 7 5 % in G re e c e

9 8 %/3 0 0 F - G u l f o f M e x ic o

(str in g u se d o n e tim e )

C T in C O 2 1 5 % - (str in g ru in e d )8/25/2015 4

George E. King Engineering GEKEngineering.com

Page 5: Coiled Tubing Introduction

Power Pack

Injector Reel Operator’s Cab

Transports and Pumpers

wind

Typical CT Layout

8/25/2015 5 George E. King Engineering

GEKEngineering.com

Page 6: Coiled Tubing Introduction

CT Reel Configurations

•CT Reels available in number of configurations –Truck mounted (fixed) - permanently fixed to the truck

chassis

–Truck mounted (skid) - may be changed out

–Skid mounted - for offshore operations

–Trailer mounted - for large capacity (length) or heavy weight strings

–CT logging reel - fitted with electrical swivel/collector

–Special application reel - typically for completion applications

•Local conditions/nature of CT operations determine type of reel required

8/25/2015 6 George E. King Engineering

GEKEngineering.com

Page 7: Coiled Tubing Introduction

8/25/2015 7 George E. King Engineering

GEKEngineering.com

Page 8: Coiled Tubing Introduction

8/25/2015 8 George E. King Engineering

GEKEngineering.com

Page 9: Coiled Tubing Introduction

Coiled Tubing Rig up in Alaska. Two wells on the same pad are being.

8/25/2015 9 George E. King Engineering

GEKEngineering.com

Page 10: Coiled Tubing Introduction

8/25/2015 10 George E. King Engineering

GEKEngineering.com

Page 11: Coiled Tubing Introduction

CT Equipment Basics

• Components

– Coil

– Power pack

– Component Controls

– Reel

– Injector (with guidearch)

– Well Control Components

8/25/2015 11 George E. King Engineering

GEKEngineering.com

Page 12: Coiled Tubing Introduction

Coil Types and Availability

• CT diameters

• CT wall thickness

• CT tapered strings

• CT strength ranges

• CT metal choices

• Composite CT

8/25/2015 12 George E. King Engineering

GEKEngineering.com

Page 13: Coiled Tubing Introduction

CT Diameters

• 1/2, 3/4 and 1” early diameters

• 1-1/4” and 1-1/2” workhorses (1-3/4)

• 1-3/4 to 2-3/8” larger workstrings (3-1/2)

• 3-1/2 and 4-1/2” (and larger) - flowlines

8/25/2015 13 George E. King Engineering

GEKEngineering.com

Page 14: Coiled Tubing Introduction

CT production for For 1996

• 1” 1.52 MM ft

• 1.25” 14.2 MM ft

• 1.5” 6.2 MM ft

• 1.75” 3.3 MM ft

• 2” 1.22 MM ft

• 2-3/8” 0.56 MM ft

• 2-7/8” 0.43 MM ft

• 3-1/2 0.45 MM ft

• 4&4.5” 0.125 MM ft

8/25/2015 14 George E. King Engineering

GEKEngineering.com

Page 15: Coiled Tubing Introduction

Tapered Strings

• Common is I.D. taper - weld area taper

• Uncommon is O.D. taper - deeper wells, some hydraulic problems

8/25/2015 15 George E. King Engineering

GEKEngineering.com

Page 16: Coiled Tubing Introduction

Junction weld in flat strip

Butt Weld – early string joiner and common repair weld.

8/25/2015 16 George E. King Engineering

GEKEngineering.com

Page 17: Coiled Tubing Introduction

Bias weld in flat strip

The bias weld offsets the weld ends on the strip as it is formed into a tube – much stronger.

8/25/2015 17 George E. King Engineering

GEKEngineering.com

Page 18: Coiled Tubing Introduction

Field Welds

• Always a Butt weld.

• Can decrease tensile strength of CT by 50% or more.

• Quality of field welds varies enormously

• Avoid field welds when you can.

– Upper part of tubing is worst place for a butt weld.

8/25/2015 18 George E. King Engineering

GEKEngineering.com

Page 19: Coiled Tubing Introduction

Material Strengths

• 55,000 psi (limited)

• 70,000 to 80,000 psi (still in use)

• 100,000+ psi (now very common)

8/25/2015 19 George E. King Engineering

GEKEngineering.com

Page 20: Coiled Tubing Introduction

Trade-Offs

• strength vs cost

• ductility/weakness vs strength/cost

• corrosion possibilities

• strength vs service life

• In general, high strength CT lasts longer and is more

fatigue resistant. But, what about corrosion? Hardness matters. Stress Corrosion cracking and embrittlement.

8/25/2015 20 George E. King Engineering

GEKEngineering.com

Page 21: Coiled Tubing Introduction

Analysis of Coiled Tubing

Mod A606 Mod A607

Carbon 0.08-0.15 0.08-0.17

Manganese 0.60-0.90 0.60-0.90

Phosphorus 0.030 max 0.025 max

Sulfur 0.005 max 0.005 max

Silicon 0.30-0.50 0.30-0.45

Chromium 0.45-0.70 0.40-0.60

Nickel 0.25 max 0.10 max

Copper 0.40 max 0.40 max

Molobidum 0.21 max 0.08-0.15

Cb-V 0.02-0.048/25/2015 21 George E. King Engineering

GEKEngineering.com

Page 22: Coiled Tubing Introduction

Yield Strength HRB HRC Min. Elong.

(psi)

50,000 22

70,000 85-94 30%

80,000 90-98 28%

90,000 94 22 25%

100,000 20-25 22% est.

110,000 22-28 18% est

SPE 46052

New CT Properties

8/25/2015 22 George E. King Engineering

GEKEngineering.com

Page 23: Coiled Tubing Introduction

Composites

• Limited Use

• Composites lighter/more flexible than steel.

• More costly than steel

• Limitations:

– Creep under load

– Temperature

– Downhole Buckling resistance

8/25/2015 23

George E. King Engineering GEKEngineering.com

Page 24: Coiled Tubing Introduction

Surface Equipment

• Power Pack

• Reel

• Controls

• Injector

• Seals

8/25/2015 24 George E. King Engineering

GEKEngineering.com

Page 25: Coiled Tubing Introduction

Power pack – usually diesel driven hydraulic pumps.

Requirements set by equipment in use.

8/25/2015 25 George E. King Engineering

GEKEngineering.com

Page 26: Coiled Tubing Introduction

Typical Layout of Control Cabin Controls and Instruments (1)

Layer 1

OPEN

STRIPPER# 2

LEVELWIND ARM

UP

DOWN

EMERGENCYTRACTION SUPPLY

INJECTOR INSIDE TRACTION PRESSURE

1500 PSI MAX

TOP

ON

OFF

ON

OFF

ON

OFF

MIDDLE

BOTTOM

INSIDE TRACTION

PRESSURE ADJUST

INSIDE TRACTIONSUPPLY PRESSURE

BLEEDPRESSURE

INJECTOR OUTSIDETENSION PRESSURE

150 PSI MAX

PRESSURE

PRESSURE

PRESSURE

STRIPPER# 1

RETRACT NEUTRAL PACKRETRACT NEUTRAL PACK

STRIPPER SYSTEM PRESSURE5000 PSI MAX

STRIPPERPRESSURE ADJUSTAIR REG. CONTROL

# 2STRIPPER

# 1STRIPPER

BOP SUPPLYBOP PRESSURE BOP SUPPLY PRESSURE

ON

OFF

CLOSE OPEN CLOSE OPEN

CLOSE OPEN CLOSE OPEN

BLIND RAM

PIPE RAM

SHEAR RAM

SLIP RAM

BOP

HIGH

LOW

INJECTORSPEED

REEL BRAKE

OFF

REEL PRESSURE

REEL PRESSURE ADJUST

REEL CONTROLLEVELWINDOVERRIDE

INSIDE TRACTIONPRESSURE DRAIN

CLOSE

INJECTORMOTOR PRESSURE

INJECTOR MOTOR PRESSURE ADJUST

INJECTORCONTROL

INJECTOR DIRECTIONALCONTROL VALVEPILOT PRESSURE

PRIORITY PRESSURE2,000 PSI MAX

IN

OUT

ON

OFF

ON

OFF

AIP SUPPLYPRESSURE

30 GPMPUMP

60 GPMPUMP

THROTTLE

ENGINESTOP

EMERGENCYSTOP

AIR HORN

INJECTOR CHAINLUBRICATION

REEL TUBINGLUBRICATION

WELLHEAD PRESSURECIRCULATING PRESSURE

TUBING WEIGHT INDICATOR

Schlumberger

Dowell

Looks more complex, but main data is from load, wellhead pressure and annular pressure.

Main controls are injector head and coil spooling.

8/25/2015 26 George E. King Engineering

GEKEngineering.com

Page 27: Coiled Tubing Introduction

8/25/2015 27 George E. King Engineering

GEKEngineering.com

Page 28: Coiled Tubing Introduction

8/25/2015 28 George E. King Engineering

GEKEngineering.com

Page 29: Coiled Tubing Introduction

Principal Gauges

–Wellhead Pressure Gauge • displays wellhead pressure at the BOP pressure port

–Circulating Pressure Gauge

• displays pressure at the reel-manifold pressure sensor

–Weight Indicator

• displays weight exerted by the tubing on the injector head

8/25/2015 29 George E. King Engineering

GEKEngineering.com

Page 30: Coiled Tubing Introduction

8/25/2015 30 George E. King Engineering

GEKEngineering.com

Page 31: Coiled Tubing Introduction

Running Speeds

• First time into a well - 40 to 70 ft/min

• Normal run in operations - 50 to 100 ft/min

• Spool-out? – depends on the well, the BHA, coil equipment, friction and operator.

• Runaway - experienced 800 to 900 ft/min.

8/25/2015 31 George E. King Engineering

GEKEngineering.com

Page 32: Coiled Tubing Introduction

Typical CT Reel - Side View

8/25/2015 32 George E. King Engineering

GEKEngineering.com

Page 33: Coiled Tubing Introduction

8/25/2015 33 George E. King Engineering

GEKEngineering.com

Page 34: Coiled Tubing Introduction

What’s Different Than Jointed Pipe?

All fluids injected from the surface enter the CT at the bed-wrap end. All fluid has to travel through all of the coil.

That influences friction since friction is near constant w/ CT whether you a injecting fluid at 1 foot into the well or 10,000 ft into the well.

8/25/2015 34 George E. King Engineering

GEKEngineering.com

Page 35: Coiled Tubing Introduction

Some of the extra fittings in the input plumbing allow a ball to be inserted and “dropped” (pumped through the coil). The ball travel may take several minutes to clear the coil and enter the well.

8/25/2015 35 George E. King Engineering

GEKEngineering.com

Page 36: Coiled Tubing Introduction

A flow control manifold. This one allow reverse circulation through coiled tubing.

8/25/2015 36 George E. King Engineering

GEKEngineering.com

Page 37: Coiled Tubing Introduction

Reel Drum Capacity

B

A

Freeboard

C

Freeboard is normally not much of an issue, but can become very important if the CT is not spooled tightly and the drum is nearly full for a deep well CT job.

8/25/2015 37 George E. King Engineering

GEKEngineering.com

Page 38: Coiled Tubing Introduction

8/25/2015 38 George E. King Engineering

GEKEngineering.com

Page 39: Coiled Tubing Introduction

8/25/2015 39 George E. King Engineering

GEKEngineering.com

Page 40: Coiled Tubing Introduction

Reel Information for Various Sizes of CT

CT Diam. Reel Hub Diam. Guide Arch (Reel Width) Approx. Capacity

(in) (in) (in) (in) (ft)

0.75 48 48

1 60 48-54

1.25 72 48-72 117 17500

1.5 84 (48)-72 128 15000

1.75 96 72-96 148 18000

2 96 72-96

2.375 108 90-120

2.875 108 90-120

3.5 120 90-120

Selected Reel Diameter Information

8/25/2015 40 George E. King Engineering

GEKEngineering.com

Page 41: Coiled Tubing Introduction

The level-wind (like a bait-casting fishing reel) helps feed the coil onto the reel.

8/25/2015 41 George E. King Engineering

GEKEngineering.com

Page 42: Coiled Tubing Introduction

Depth Measurement Equipment

•Depth measuring equipment -Electronic or mechanical •Frequently mounted on injector head

•Depth information commonly acquired by two methods: • Friction-wheel counter between injector chains and stripper

• Encoder assembly on injector-head chain drive shaft

8/25/2015 42 George E. King Engineering

GEKEngineering.com

Page 43: Coiled Tubing Introduction

Injector Guide Arch

•Guide arch

–Turn tubing through angle between wellhead and CT reel

–CT supported by rollers at ±10-in. intervals around gooseneck

• guide arch radius significantly affects fatigue in CT string

8/25/2015 43 George E. King Engineering

GEKEngineering.com

Page 44: Coiled Tubing Introduction

Comparison of Guide Arch Sizes

50-in. radius

(HR 240)

120-in. radius

(HR 480)

72-in. radius

(HR 260)

8/25/2015 44 George E. King Engineering

GEKEngineering.com

Page 45: Coiled Tubing Introduction

Recommended Guide Arch Radii

Coiled

Tubing OD

(in.)

0.750

1.000

1.250

1.500

1.750

2.000

2.375

2.875

3.500

Typical Reel

Core Radius

(in.)

24

20-30

25-36

30-40

35-48

40-48

48-54

54-58

65-70

Typical Guide

Arch Radius

(in.)

48

48-54

48-72

48-72

72-96

72-96

90-120

90-120

96-120

8/25/2015 45 George E. King Engineering

GEKEngineering.com

Page 46: Coiled Tubing Introduction

CT Injectors

• Injector

• Gripper Design and Effect on the Tube

• Power Requirements

• Load Cells

• Wear and Failure Points

• Control vs “micro” control

8/25/2015 46 George E. King Engineering

GEKEngineering.com

Page 47: Coiled Tubing Introduction

Injector Head Components

•Principal components of injector head: –Drive and brake system

–Chain assembly

–Traction and tension system

–Guide-arch assembly

•Secondary or support systems: –Weight indicator

–Depth sensor mounts

–Stripper mount

8/25/2015 47 George E. King Engineering

GEKEngineering.com

Page 48: Coiled Tubing Introduction

Injector Head Drive Systems

•Injector heads hydraulically driven –Two or four hydraulic motors

–Motors connected/synchronized through gear system

–Drive directed to chain drive sprockets via drive shafts

–Rotation/speed of motors controlled by valve on power pack

–Hydraulic system pressure/rate controlled from CTU control console

–Pressure relief/crossover relief valves • protect tubing/hydraulic components

8/25/2015 48 George E. King Engineering

GEKEngineering.com

Page 49: Coiled Tubing Introduction

Typical Injector Head

Stripper assembly

Gooseneck or guide-arch

Injector drive motor

8/25/2015 49 George E. King Engineering

GEKEngineering.com

Page 50: Coiled Tubing Introduction

8/25/2015 50 George E. King Engineering

GEKEngineering.com

Page 51: Coiled Tubing Introduction

Injector Head Brake Systems

•Brake hydraulically controlled –Hydraulic pressure required to release brake

• fail-safe in operation

–Application of brake is automatic • controlled by drive system hydraulic pressure

• applied when hydraulic pressure below preset value

•Some hydraulic motors have high/low gear option –Selected remotely from the CTU the control console

–Allows injector head to operate more efficiently

8/25/2015 51 George E. King Engineering

GEKEngineering.com

Page 52: Coiled Tubing Introduction

Injector Head Chain Assembly

•Most injector heads have two sets of opposing endless chains –Series of gripper blocks mounted on each chain

–Gripping profile of each block suits a specific tubing size

•Entire CT string load held by face of the gripper block or insert –Often achieved under significant force

–Selection/operation/maintenance of chain components should minimize risk of damage to CT string

8/25/2015 52 George E. King Engineering

GEKEngineering.com

Page 53: Coiled Tubing Introduction

Injector Head Chain Gripper Inserts •Removable gripper inserts on most injector heads

–Run range of tubing sizes without removing/replacing entire

chain assembly

–Reduce time/effort required to reconfigure injector head • when running a different size of CT string

• when running a tapered CT string

–Reduce cost of replacement when worn

8/25/2015 53 George E. King Engineering

GEKEngineering.com

Page 54: Coiled Tubing Introduction

8/25/2015 54 George E. King Engineering

GEKEngineering.com

Page 55: Coiled Tubing Introduction

Ribbed injector block.

8/25/2015 55 George E. King Engineering

GEKEngineering.com

Page 56: Coiled Tubing Introduction

Smooth faced injector

8/25/2015 56 George E. King Engineering

GEKEngineering.com

Page 57: Coiled Tubing Introduction

SS800 Chain Assembly

8/25/2015 57 George E. King Engineering

GEKEngineering.com

Page 58: Coiled Tubing Introduction

8/25/2015 58 George E. King Engineering

GEKEngineering.com

Page 59: Coiled Tubing Introduction

Bottom sprocket on injector.

8/25/2015 59 George E. King Engineering

GEKEngineering.com

Page 60: Coiled Tubing Introduction

8/25/2015 60 George E. King Engineering

GEKEngineering.com

Page 61: Coiled Tubing Introduction

Traction and Tension Systems

•Injector head traction or inside chain tensioner system –Also known as skate system

–Provides force to securely grip tubing

–Force applied through 3 separate sets of hydraulic cylinders • reduces risk of major operating failure if component fails

•Outside chain tensioner system –Ensures adequate tension in chain section outside vertical

drive plane

–Tension provided by hydraulic rams

8/25/2015 61 George E. King Engineering

GEKEngineering.com

Page 62: Coiled Tubing Introduction

Backpressure Adjusted to Provide Suitable Tension

Incorrect

Correct

8/25/2015 62 George E. King Engineering

GEKEngineering.com

Page 63: Coiled Tubing Introduction

8/25/2015 63 George E. King Engineering

GEKEngineering.com

Page 64: Coiled Tubing Introduction

8/25/2015 64 George E. King Engineering

GEKEngineering.com

Page 65: Coiled Tubing Introduction

Coiled Tubing

Deployment

Kill Line

, 50.8 mm

Flowline,

101.6 mm

Wellhead

ESD

(Tester)

Flow Line,

101.6 mm

Drilling Spool,

179.4 mm, 35 MPa

Coiled Tubing BOP

179.4 mm, 35 MPa Blind/Shear Ram

Slip/Pipe Ram

Flow Spool

Annular Preventer

Conventional

Rig BOP

BHA

Deployment BOP

179.4 mm, 35 MPa

Gate Valve,

179.4 mm

Locating Ram Upper

Pipe Ram

Lower Pipe /Slip Ram

Deployment BOP

BJ Services

8/25/2015 65 George E. King Engineering

GEKEngineering.com

Page 66: Coiled Tubing Introduction

Physical Brace

• If there is a long space (length is a variable with pipe diameter, wall, and buckling force) then a brace between the bottom of the injector and the first seal is necessary.

8/25/2015 66 George E. King Engineering

GEKEngineering.com

Page 67: Coiled Tubing Introduction

Snubbing/Stripping Forces on CT

• Force to push CT through stuffing box/stripper (opposite running)

• Force on CT from Well Head Pressures - (upward)

• Force to overcome friction (opposite running)

• Force from weight of CT & BHA (downward)

8/25/2015 67 George E. King Engineering

GEKEngineering.com

Page 68: Coiled Tubing Introduction

0.072”

0.108”

Problem in rig up height and lubricator length.

8/25/2015 68 George E. King Engineering

GEKEngineering.com

Page 69: Coiled Tubing Introduction

P re ssu re In d u ce d S n u b b in g F o rce V S W e ll H e a d P re ssu re fo r V a rio u s C o ile d

T u b in g S iz e s, (M u st a d d strip p e r frictio n fo rce )

0

2 0 0 0 0

4 0 0 0 0

6 0 0 0 0

8 0 0 0 0

1 0 0 0 0 0

1 2 0 0 0 0

1 4 0 0 0 0

1 6 0 0 0 0

0 2 0 0 0 4 0 0 0 6 0 0 0 8 0 0 0 1 0 0 0 0 1 2 0 0 0 1 4 0 0 0 1 6 0 0 0

We ll He ad Pr e s s ur e , ps i

Ba

se

Sn

ub

bin

g F

orc

e,

lbs

1 " CT

1 - 1 /4 " CT

1 - 1 /2 " CT

1 - 3 /4 " CT

2 " CT

2 - 3 /8 " CT

2 - 7 /8 " CT

3 .5 " CT

Snubbing Force on CT at Wellhead

8/25/2015 69 George E. King Engineering

GEKEngineering.com

Page 70: Coiled Tubing Introduction

8/25/2015 70 George E. King Engineering

GEKEngineering.com

Page 71: Coiled Tubing Introduction

Gap between the injector and the stuffing box – The pipe in this area is very susceptible to bending – Note the brace around the CT.

8/25/2015 71 George E. King Engineering

GEKEngineering.com

Page 72: Coiled Tubing Introduction

Seals

• Stuffing Box - Primary sealing mechanism for isolating the wellbore. Positioned above the BOP, just underneath the injector head. A connector attaches the box to the BOP.

• BOP - multi-level control for closing in the well, shearing the CT, sealing around the CT and gripping the CT. May be used in pairs in extreme applications.

8/25/2015 72

George E. King Engineering GEKEngineering.com

Page 73: Coiled Tubing Introduction

Weight Indicator Equipment

Front weight

sensor Rear weight

sensor

8/25/2015 73 George E. King Engineering

GEKEngineering.com

Page 74: Coiled Tubing Introduction

Typical Loads: 1.5” CT, 5000 psi

• snub force = (1.767 in2 x 5000 psi) =8835 lb

• stuffing box friction (drag force =2000 lb

• total =10835 lb at start of the CT run-in

8/25/2015 74 George E. King Engineering

GEKEngineering.com

Page 75: Coiled Tubing Introduction

Load Changes w/CT inserted

• 1.5:, 0.109” wall, 1.623 lb/ft

• one foot of CT in well = 10833 lb

• 1000’ CT in well=10835-(1000 x 1.623) =9212 lbs

• 10,000’ CT in well= 10835-(10,000x1.623) = -5395 lbs

• this assumes no wall friction

8/25/2015 75 George E. King Engineering

GEKEngineering.com