ENGINEERING & INFRASTRUCTURE REPORT
TO SUPPORT A RESOURCE CONSENT APPLICATION
FOR A PROPOSED MIXED-USE COMMERCIAL AND RESIDENTIAL DEVELOPMENT
54 PARKWAY DRIVE, ROSEDALE 0632
FOR LUCY LI
12460-01
November 2017
-
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc Page ii
Document Control Record
GENERAL INFORMATION - Consultant
Document Prepared By:
Airey Consultants Limited Level 8 19-21 Como Street Takapuna Auckland 0740
T (09) 486 4542 F (09) 489 5455 E [email protected] W aireys.co.nz
This report has been prepared solely for the benefit of Lucy Li. No Liability is accepted by this company or any related company or any employee or sub-consultant of the related company with respect to its use by any other person.
This disclaimer shall apply notwithstanding that the report may be made available to other persons for an application for permission or approval or to fulfil a legal requirement.
Quality Assurance Statement
Lucy Li Proposed mixed-use commercial and residential development 54 Parkway Drive, Rosedale 0632
Prepared by: Jeremie Hooi
Reviewed by: Pieter Stellingwerf
Project Manager: Michael Lee
Approved for issue by: Michael Lee
Revision Schedule
Rev. No. Date Description Prepared by Reviewed by Approved by
-
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc Page iii
Executive Summary
This report addresses the civil engineering aspects for the proposed mixed-use commercial and residential
development at 54 Parkway Drive, Rosedale. This report concludes that the development can be serviced by the
proposed infrastructure detailed within this report.
The development will be provided with stormwater, wastewater and water supply service, and will be connected to
the local power and telecommunications reticulation.
-
1
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Contents
Document Control Records ii
1 Introduction 2 2 Site Description 2
2.1 Location 2 2.2 Titles/Zoning 3 2.3 Topography 3 2.4 Geology 3
3 Proposed Development 3 3.1 Flooding Considerations & Overland Flow Path 4
3.1.1 Flood plain and flood sensitive areas 4 3.1.2 Overland flow paths 4
3.2 Geotechnical Engineering 4 3.3 Earthworks 4
3.3.1 Proposed Earthworks 4 3.4 Access 8
3.4.1 Existing Access 8 3.4.2 Proposed Access 8
3.5 Stormwater 9 3.5.1 Existing Stormwater 9 3.5.2 Proposed Stormwater 9 3.5.3 Stormwater Management and Quality 10
3.6 Wastewater 12 3.6.1 Existing Wastewater 12 3.6.2 Proposed Wastewater 12
3.7 Water Supply 13 3.7.1 Existing Water Supply 13 3.7.2 Proposed Water Supply 13 3.7.3 Water Supply Fire Fighting 14
3.8 Utilities 14 3.8.1 Power 14 3.8.2 Telecommunications 14
4 Summary 15 Appendix A – Airey Consultants Plan 12457-01 Sheets 100 - 400 16 Appendix B – Stormwater Management Calculations 17 Appendix C – Wastewater Connection Calculations 18 Appendix D – Water and Wastewater Planning Assessment 19
-
2
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
1 INTRODUCTION
This report covers the engineering aspects for the resource consent application for the proposed mixed-use
commercial and residential development at 54 Parkway Drive, Rosedale.
This Engineering Report identifies the engineering issues related to the proposed development and
highlights the civil works that will be necessary to ensure that the proposed buildings and activities can be
adequately serviced.
2 SITE DESCRIPTION
2.1 Location and Existing Site
The subject site has an area of 7,291m2 and is irregular in shape. The site is bounded by commercial sites to
the north-east whilst there are residential properties to the south. A substation is located next door to the
west, Northshore Police Station is to the east and the Constellation Bus station is located to the north. The
site has frontages off Parkway Drive, towards to north-west corner of the site, and along the south
boundary, off Sunset Road.
The site is currently a greenfields site, with minor vegetation along the western side, a concrete slab and
public reticulation located adjacent to the eastern boundary.
-
3
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
2.2 Titles/Zoning
The legal description of the site is Lot 2 DP 486426. The site is zoned Business – General Zone and Strategic
Transport Corridor Zone under the Auckland Council Unitary Plan Operative in part (AUP).
2.3 Topography
The existing site topography comprises of a moderate slope, from the higher side along the south-west
corner, falling towards the north-west corner. There is approximately 15% average grade fall from each
corner of the site.
2.4 Geology
The New Zealand Geological Survey Industrial Map Series – Rosedale Area shows the site being situated on
the Waitemata Group Formation. This formation typically comprised of Interbedded, graded sandstone and
siltstone or mudstone, local intercalated volcanic grit, breccia and conglomerate and minor bioclastic
limestone.
3 PROPOSED DEVELOPMENT
The proposed development is to construct a mixed commercial and residential development, which will
include the following structures/buildings:
Three mixed-use buildings including:
o A five story mixed commercial and residential building – first level basement, second level
commercial (5 commercial spaces) whilst remaining three top levels are residential (18
apartments)
o A four story retail and office building – first level basement & retail/café (single retail/café
space) whilst remaining three levels are office
o A three story office building – first level basement whilst remaining two levels are office.
Two residential apartment buildings:
o Two five story buildings – first level basement whilst remaining four levels are residential
apartments (27 apartments)
-
4
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
3.1 Flooding Considerations & Overland Flow Path
3.1.1 Flood plain and flood sensitive areas
The site is not situated within a flood plain, flood sensitive or flood prone area. The closest flood plain and
flood sensitive area, as identified by Auckland Council’s GIS viewer (GIS), is located over 180m north-east of
the site, within Constellation Drive, whilst there is a flood prone area 49 Parkway Drive, across the road,
from the subject site.
3.1.2 Overland flow paths
There are no overland flow paths located on the site, as identified by GIS. The closest flow paths are located
within Parkway Drive carriageway to the north and within Sunset Road carriageway to the south.
3.2 Geotechnical Engineering
A geotechnical investigation has been undertaken by KGA Geotehnical Ltd. Their investigation concluded
that the existing greenfields site shows no signs of instability. The proposed earthworks design has been
done in accordance with the recommendations detailed within these documents.
KGA Geotechnical will be engaged during the construction stage and will be closely monitoring the
earthworks operation, to ensure that their recommendations are met.
Please refer to the Geotechnical Report and Addendum Letter for further details regarding the geotechnical
analysis for the proposed development.
3.3 Earthworks
3.3.1 Proposed Earthworks
Earthworks is proposed to be undertaken on site as a part of this proposed development:
Formation of the basement level for the proposed mixed-use structures/buildings
Formation of the walkways between the structures
Civil infrastructure required to service the development
The earthworks disturbance will cover a maximum area of 5,950m² with a cut volume of 12,800m³ and a fill
volume of 1,000m³, with this earthworks operation being undertaken as cut to fill and cut to waste. The
maximum calculated depth of cut is 8.9m. Retaining walls are required to form the design levels and will be
incorporated as a part of the proposed structures. These retaining walls will be designed at building
consent stage.
-
5
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Section E11.4 Activity – Table 11.4.1. Activity Table – all zones and roads of AUP – Land Disturbance Section
states the following:
As the earthworks extent is less than 10,000m² with a slope of less than 10 degrees and is outside the
Sediment Control Protection Area, the proposed earthworks is classed as permitted under the Regional
Plan.
-
6
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Section E12.4 Activity – Table 12.4.1. Activity Table – all zones and roads of AUP – Land Disturbance Section
states the following:
As the earthworks extent is greater than 2,500m² and greater than 2,500m3, the proposed earthworks is
classed as restricted discretionary under the District Plan. As such, the relevant assessment criteria for a
Restricted Discretionary earthworks activity is addressed below.
Prior to earthworks commencing, the site sediment controls will be established. These controls will include
the following:
Topsoil bunds along the site’s lower perimeters and splitting the two catchments – new topsoil
bunds will be established to convey sediment laden runoff, from the proposed earthworks extents,
into two decanting earth bunds (DEBs):
o DEB 1 & 2 – located at the site’s northern corner, capturing sediment from individual 0.3 Ha
catchment areas, filtering it and then discharging into the existing public stormwater
system running within the site
-
7
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Silt fences along the site’s lower perimeter – located just beyond the two DEBs, preventing
uncontrolled sediment laden runoff from discharging/exiting the site
Stabilised construction entrance – a stabilised construction entrance will be established for the
construction works, off Parkway Drive. It will prevent uncontrolled sediment and dust of traffic into
and off site and limit traffic to a single ingress and egress point
All proposed sediment controls, which will be maintained and monitored during the duration of works and
may be varied through construction (for reinstatement and stabilisation), will be erected in accordance
with the requirements of Auckland Council’s GD05 Documentation (Legacy Auckland Regional Council
Technical Publication 90) and the conditions of the Resource Consent.
Please refer to Plan 12460-01 Sheets 102-104 attached in Appendix A for the sediment control layout and
standard details.
The proposed earthworks will take place during one construction season, currently proposed from February
to March 2018, with the expectation that the works will occur over a maximum five week period, as such
works will not be staged. All construction activities are to comply with Construction Noise standards in NZS
6803:1999 and terms detailed within the resource consent:
Single access point, reducing vehicle movement to and from site, decreasing noise, dust and any
additional pollutants that may impact the safety of road users and/or pedestrians
Mitigating the effects of increased traffic by undertaking works in a single stage and over a short
period of time.
These earthworks will also be undertaken during standard construction hours (or hours detailed with the
resource consent), to further ensure no additional noise, dust, traffic or lighting impact on the adjacent
neighbours.
As previously mentioned, a geotechnical review was undertaken by KGA Geotechnical Ltd. The proposed
earthworks was designed in accordance with the recommendations detailed within their project specific
geotechnical report and addendum letter. Please refer to Section 3.2 Geotechnical Engineering for the
geotechnical details.
-
8
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
The site does not contain or is located near any areas of significant ecological value nor cliff faces/tops,
geological or archaeologically significant, Mana Whenua significant sites, historical heritage sites, significant
landscape features or reserves.
As previously mentioned, no flood plain, flood prone areas, flood sensitive areas or overland flow paths
exist within the site. As the proposed earthworks is confined to the site extents, there will be no impact on
the nearby overland flow paths and flood prone areas. Please refer to Section 3.1 Flooding Considerations
& Overland Flow Paths for the flooding and overland flow path details.
Existing services are currently contained within the site in the form of public stormwater and wastewater
systems. As a part of the proposed development, these existing services will be re-aligned. Please refer to
Section 3.5 Stormwater and 3.6 Wastewater for the stormwater and wastewater details. As per the project
specification, both existing and proposed services will be located and protected prior to commencement of
the proposed earthworks, to ensure they are not impacted by these operations.
3.4 Access
3.4.1 Existing Access
As the subject site is currently a greenfields site and no formed access currently exists.
3.4.2 Proposed Access
Private vehicle access to the proposed development will be provided to the respective basement car
parking levels.
Two new vehicle crossings will be provided, one directly off Sunset Road and another directly off Parkway
Drive, providing the necessary connection between the two public roads to these private vehicle
accessways. These vehicle crossings, which will be constructed in accordance with Auckland Transport Code
of Practice standards, will provide two-way vehicle access, catering for both ingress and egress traffic.
Existing light and power poles are located on the proposed vehicle crossing accessing Sunset Road. Both
these poles will need to be re-located minimum 1.0m away from the proposed vehicle crossing, to make
way for this proposed vehicle crossing.
Please refer to Plan 12460-01 Sheet 200 attached in Appendix A for the access details.
-
9
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
A tracking curve analysis has been undertaken by the architects, Archimedia Ltd. Please refer to the
architectural plans for further details regarding the traffic curve analysis for the proposed development.
A traffic assessment has been undertaken by Commute Transportation Ltd. Please refer to their project
specific report for further details regarding the traffic impact of the proposed development.
3.5 Stormwater
3.5.1 Existing Stormwater
Existing public stormwater reticulation runs parallel to the eastern boundary of the site. There is no
stormwater connection, as identified by Auckland Council GIS, however, based on the topography, it is
likely that a connection is coming off existing public stormwater manhole 2000981446, located at the
northern corner of the site, for the future development of the site.
3.5.2 Proposed Stormwater
The proposed development will cover majority of the subject site. As a result of this footprint, the existing
public stormwater reticulation will need to be re-aligned, with some of the existing system being made
redundant:
A new public manhole will intercept the existing public 300mm diameter PE line, within the site,
bisecting the eastern boundary. This area will be undisturbed and is outside the proposed footprint
A new 300mm diameter public concrete inlet pipe will extend off this new public manhole and run
along the eastern boundary
A second new manhole will be constructed upstream, within an outside the proposed footprint
A new 300mm diameter concrete inlet pipe will extend off this second new public manhole and run
along the eastern boundary. Part of this pipe will run under the proposed footprint, within footpath
areas. Necessary building over analysis will be undertaken at engineering approval and building
consent stage
A final new manhole will terminate this proposed public re-alignment. This manhole will intercept
the existing public 300mm diameter pipe
Two existing public manholes, a section of existing 300mm diameter PE line, existing 300mm
diameter concrete pipes and the connection will be made redundant and removed.
A new connection will connect to the proposed public system, at the first new manhole at the lowest point
of the site.
-
10
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
The internal stormwater drainage for the development will be privately owned and managed by the
proposed development’s body corporation. All the internal drainage will be detailed at building consent
stage and, will discharge to the above mentioned new connection.
The existing public stormwater reticulation was constructed recently, with the sole purpose of servicing the
proposed site and another neighbouring site. The upstream catchment for this existing line is therefore
small and as such, should be able to take the capacity of the proposed development and any future
development on the neighbouring site.
Please refer to Plan 12460-01 Sheet 300 attached in Appendix A for the drainage details.
3.5.3 Stormwater Management and Quality
The stormwater management has been designed in accordance with the stormwater management rules
within the Auckland Unitary Plan Operative in Part (AUP):
The site is located within a Stormwater Management Flow Area (SMAF) 2 overlay
The site is located within the Business – General Business and Strategic Transport Corridor Zones.
There is no impervious area threshold on Strategic Transport Corridor Zoned sites. The site is not
located within a riparian area and as such, there is no impervious area threshold subjected to this
site.
3.5.3.1 Stormwater Flow
Given that the site is within a SMAF 2 overlay, there is a requirement for stormwater mitigation, to limit
post-development flows to pre-development rates and provide necessary internal re-use, as per the
following relevant AUP rules:
-
11
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
As the proposed development will see an increase in impervious areas greater than 50m² and is within a
SMAF 2 overlay, the proposed stormwater is classed as restricted discretionary under the AUP. As such, the
relevant assessment criteria for a Restricted Discretionary stormwater mitigation activity is addressed
below.
Please refer to the below table for an overview of the pre-development and post-development impervious
and pervious areas.
Pre-Development Areas (m2) Post-Development Areas (m2)
Roof Area 0 4,180
Impermeable Area 46 1,431
Permeable Area 7,271 1,680
Total 7,291 7,291
Under the listed AUP requirements, the resultant minimum total detention and retention volume required
for the proposed development and its split between buildings is as follows:
Total Detention & Retention = 66.1m3 – mixed-use = 30m3, residential = 36.1m3
Detention = 29.6m3 – mixed-use = 13m3, residential = 16.6m3
Retention = 36.5m3 – mixed-use = 17m3, residential = 19.5m3
Stormwater mitigation devices and related sizing will be detailed and designed to meet the above minimum
volumes, at building consent stage.
-
12
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Please refer to Stormwater Management Calculations attached in Appendix B for the stormwater
mitigation details.
3.5.3.2 Stormwater Quality
Stormwater containment treatment is not required as the development does not create any high
contaminant yielded roofing, spouting, cladding material or architectural features. There is a small amount
of uncovered parking and access are constructed as part of the development, however it is not a high
contaminant generating car park and therefore treatment is not required.
3.6 Wastewater
3.6.1 Existing Wastewater
Existing public wastewater reticulation runs parallel to the existing public stormwater reticulation, along
the eastern boundary of the site. Similar to the stormwater, no wastewater connection exists, as identified
by Auckland Council GIS, however, based on the topography, it is likely that a connection is coming off
existing public wastewater manhole 2596392, located at the northern corner of the site, for the future
development of the site.
3.6.2 Proposed Wastewater
As mentioned, the proposed development will cover majority of the subject site. Similar to the stormwater,
the existing public wastewater reticulation will need to be re-aligned, with some of the existing system
being made redundant:
A new public manhole will intercept the existing public 150mm diameter uPVC line, within the site,
bisecting the eastern boundary. This area will be undisturbed and is outside the proposed footprint
A new 150mm diameter public uPVC inlet pipe will extend off this new public manhole, parallel to
the proposed public stormwater, and run along the eastern boundary
A second new manhole will be constructed upstream, within an outside the proposed footprint
A new 150mm diameter uPVC inlet pipe will extend off this second new public manhole and run
parallel to the proposed public stormwater. Part of this pipe will run under the proposed footprint,
within footpath areas. Necessary building over analysis will be undertaken at engineering approval
and building consent stage
A final new manhole will constructed on the upstream end of this line, within the footpath areas,
intercepting the existing public wastewater alignment.
The grade of the existing pipe will result in negative flow and as such will need to be re-laid at a
new grade. The pipe will remain a 150mm diameter public uPVC inlet pipe.
-
13
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Two existing public manholes, existing 150mm diameter uPVC pipes and the connection will be
made redundant and removed.
A new connection will connect to the proposed public system, at the first new manhole at the lowest point
of the site. Based on the size of the proposed development, the connection will most likely be 150mm
diameter.
Please refer to Wastewater Connections Calculations attached in Appendix C for the wastewater
connection details.
The internal wastewater drainage for the development will be privately owned and managed by the
proposed development’s body corporation. All the internal drainage will be detailed at building consent
stage and, will discharge to the above mentioned new connection.
The existing public wastewater reticulation was constructed recently, with the sole purpose of servicing the
proposed site and another neighbouring site. The upstream catchment for this existing line is therefore
small and as such, should be able to take the capacity of the proposed development and any future
development on the neighbouring site.
Please refer to the Water and Wastewater Planning Assessment completed form attached in Appendix D
for the proposed developments wastewater assessment.
Please refer to Plan 12460-01 Sheet 300 attached in Appendix A for the drainage details.
3.7 Water Supply
3.7.1 Existing Water Supply
Existing public water reticulation runs along the south boundary of the site, with some public sections
actually entering the site. No water connection exists, as identified by Auckland Council GIS.
3.7.2 Proposed Water Supply
An analysis will be undertaken, against the proposed development, to see whether a single connection will
be sufficient enough to service the proposed development. If not sufficient, subsequent water connections
will be provided. Together with the Firefighting Water Supply analysis, assessments and provision will be
undertaken at building consent stage.
-
14
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
3.7.3 Water Supply Firefighting
At this stage, a fire/internal services engineer has not been engaged and as such, the proposed firefighting
system for the development is still to be determined.
Upon determination of the proposed firefighting system, necessary hydrant and flow tests will be
undertaken on these hydrants to ensure that the static pressure complies with the Firefighting Code of
Practice Requirements. These assessments will be undertaken at building consent stage.
Please refer to the Water and Wastewater Planning Assessment completed form attached in Appendix D
for the proposed developments wastewater assessment.
3.8 Utilities
3.8.1 Power
Power will be able to be provided to the proposed development by connecting to the existing power
infrastructure along Sunset Road and Parkway Drive.
As mentioned previously, existing light and power poles are located on the proposed vehicle crossing
location accessing Sunset Road. Both these poles will be re-located minimum 1.0m away from the proposed
vehicle crossing in consultation with Vector.
3.8.2 Telecommunications
Telecommunication will be able to be provided to the proposed development by connecting to the existing
telecommunications infrastructure along Sunset Road and Parkway Drive.
-
15
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
4 SUMMARY
The proposal to construct a mixed-used commercial and residential development at 54 Parkway Drive,
Rosedale is considered feasible through the provision of the illustrated stormwater, wastewater, utilities,
water supply and access, in accordance with relevant Unitary Plan Requirements, Engineering Standards
and Construction Good Practice.
Mitigation of effects of construction and subsequent use are able to be practicably undertaken. Sediment
controls will be erected to mitigate the potential adverse effects of sediment latent runoff from
earthworks. Construction of infrastructure, is feasible to serve the proposed development, with minimal
adverse effects.
Both existing public stormwater and wastewater infrastructure will be re-aligned, with respective
connections to allow discharge from the proposed development to enter the public system. Works will be
constructed to minimise any adverse effect or disruption on any existing downstream infrastructure.
Existing water supply will be reviewed and assessed at building consent stage with required servicing being
provided by connecting to the existing public infrastructure along Sunset Road.
Utility services will be provided by connecting to the existing public infrastructure from either Sunset Road
or Parkway Drive
The parent site is free of identified natural hazards and not considered to be subject to inundation or
stability. It is considered that this site is able to be suitably serviced and that Resource Consent conditions
may be set to allow development in accordance with Council Development Standards.
-
16
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Appendix A
Airey Consultants Plan 12460-01 Sheet 100-300
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
EXISTING & PROPOSED CONTOURSAND SITE PLAN
LUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 100
JH
YEOMANS
JH
PS/ML
6/12/2017
1:250 (A1) 1:500 (A3)
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
2.5
2.5
57.5
10
12.5
NORTHSHORE POLICE STATION
52 PARKWAY DRIVE
234
SUNSET
ROAD
CONSTELLATION
BUS
STATION
SUBSTATION
223
SUNSET
ROAD
54 PARKWAY DRIVE
PROPOSED MIXED-USE COMMERCIAL
AND RESIDENTIAL DEVELOPMENT
S
U
N
S
E
T
R
O
A
D
N
O
R
T
H
E
R
N
B
U
S
W
A
Y
P
A
R
K
W
A
Y
D
R
I
V
E
NOTES:
1. Contractor to confirm all existing services in area of works, prior to
excavation, to achieve required clearances
2. Levels are in terms of Auckland Mean Sea Level 1946
3. All existing services are as per Site Survey unless otherwise stated
4. Contour Interval = 1.0m
5. Refer to drawing 101 for Cut-Fill and Retaining Plan
6. Refer to drawings 102-104 for Erosion & Sediment Control Details
7. Refer to drawing series 200 for Proposed Access Details
8. Refer to drawing series 300 for Proposed Drainage Details
N
PROPOSED RETAINING WALL
EXISTING STORMWATER
EXISTING WASTEWATER
EXISTING WATER
EXISTING POWER
EXISTING POWER/LIGHT POLE
LEGEND:
PROPOSED
EXISTING
H
PR
EX
EX PUBLIC WWMH
2596392
LL = 66.65
IL = 63.28
EX PUBLIC SWMH
2000981446
LL = 66.87
IL = 64.51
EX PUBLIC SWMH
2000981019
LL = 73.52
IL = 71.05
EX PUBLIC WWMH
2596391
LL = 74.12
IL = 71.21
EX PUBLIC SWMH
2000981019
LL = 73.52
IL = 71.05
EX PUBLIC WWMH
2596391
LL = 74.12
IL = 71.21
EX PUBLIC SWMH
2000981725
LL = 76.52
IL = 74.11
EX PUBLIC WWMH
2596389
LL = 76.72
IL = 74.20
uPVC WW PIPE
CONCRETE SW
PIPE
u
P
V
C
W
W
P
I
P
E
C
O
N
C
R
E
T
E
S
W
P
I
P
E
EX PUBLIC WATER
FIRE HYDRANT
EX PUBLIC LIGHT POLE
EX PUBLIC LIGHT
AND POWER POLES
P
E
S
W
P
I
P
E
u
P
V
C
W
W
P
I
P
E
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
CUT-FILL AND RETAINING PLANLUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 101
JH
YEOMANS
JH
PS/ML
6/12/2017
1:250 (A1) 1:500 (A3)
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
2.5
2.5
57.5
10
12.5
234
SUNSET
ROAD
CONSTELLATION
BUS
STATION
SUBSTATION
223
SUNSET
ROAD
S
U
N
S
E
T
R
O
A
D
N
O
R
T
H
E
R
N
B
U
S
W
A
Y
P
A
R
K
W
A
Y
D
R
I
V
E
N
PROPOSED RETAINING WALL
EXISTING STORMWATER
EXISTING WASTEWATER
EXISTING WATER
EXISTING POWER
EXISTING POWER/LIGHT POLE
LEGEND:
PROPOSED
EXISTING
PR
EX
H
NOTES:
1. Contractor to confirm all existing services in area of works, prior to
excavation, to achieve required clearances
2. Levels are in terms of Auckland Mean Sea Level 1946
3. All existing services are as per Site Survey unless otherwise stated
4. Contour Interval = 1.0m
5. Refer to drawing 100 for Existing & Proposed Contours and Site
Plan
6. Refer to drawings 102-104 for Erosion & Sediment Control Details
EARTHWORKS NOTES (TO SUBGRADE):
1.
2.
3.
4.
+0.5m
-3.2m
-2.1m
-3.2m
+1.0m
-3.2m
-3.2m
-0.5m
-5.9m
-8.9m
-5.1m
0.0m
+
1
.2
m
+0.9m
+1.1m
+4.0m
+1.2m
0.0m
PROPOSED RETAINING HEIGHTS
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
PROPOSED EROSION & SEDIMENTCONTROL PLAN
LUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 102
JH
YEOMANS
JH
PS/ML
6/12/2017
1:250 (A1) 1:500 (A3)
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
2.5
2.5
57.5
10
12.5
NORTHSHORE POLICE STATION
52 PARKWAY DRIVE
234
SUNSET
ROAD
CONSTELLATION
BUS
STATION
SUBSTATION
223
SUNSET
ROAD
S
U
N
S
E
T
R
O
A
D
N
O
R
T
H
E
R
N
B
U
S
W
A
Y
P
A
R
K
W
A
Y
D
R
I
V
E
N
PROPOSED STABILISED
CONSTRUCTION ENTRANCE
PROPOSED SILT FENCE
PROPOSED TOPSOIL BUND
PROPOSED DECANTING EARTH BUND
EXISTING STORMWATER
EXISTING WASTEWATER
EXISTING WATER
EXISTING POWER
LEGEND:
EXISTING POWER/
LIGHT POLE
PROPOSED
EXISTING
H
PR
EX
PR TOPSOIL BUND ALONG LOWER
PERIMETER OF EARTHWORKS AREA,
TO BE DIRECTED INTO
DECANTING EARTH BUND
PR DECANTING EARTH BUND TO HAVE
FIT DECANTING EARTH BUND WITH
T-BAR OUTLET DISCHARGING INTO
EX PUBLIC SWMH AND EMERGENCY
SPILLWAY (MINIMUM BOTTOM 1.5m,
DESIGNED TO 1% AEP EVENT
AND 250mm FREEBOARD)
PR SILT FENCE TO CAPTURE ANY
EXCESS RUN-OFF
PR TOPSOIL BUND TO
SEPARATE CATCHMENT
AREAS, TO BE DIRECTED INTO
DECANTING EARTH BUND
PR TOPSOIL BUND ALONG LOWER
PERIMETER OF EARTHWORKS AREA,
TO BE DIRECTED INTO
DECANTING EARTH BUND
EARTHWORKS
CATCHMENT A
0.3 Ha
EARTHWORKS
CATCHMENT B
0.3 Ha
NOTES:
1. All sediment controls are to be established and maintained in
accordance with Auckland Council's GD05 document
2. Contractor to confirm all existing services in area of works, prior to
excavation, to achieve required clearances
3. Levels are in terms of Auckland Mean Sea Level 1946
4. All existing services are as per Site Survey unless otherwise stated
5. Contour Interval = 1.0m
6. Refer to drawing 100 for Existing & Proposed Contours and Site
Plan
7. Refer to drawing 101 for Cut-Fill and Retaining Plan
8. Refer to drawings 103-104 for Erosion & Sediment Control Standard
Details
PR STABILISED CONSTRUCTION
ENTRANCE
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
PROPOSED EROSION & SEDIMENTCONTROL STANDARD DETAIL(SHEET 1 OF 2)
LUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 103
JH
YEOMANS
JH
PS/ML
6/12/2017
N.T.S
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
SILT FENCE
DECANTING EARTH BUND
FLOATING T-BAR DECANT TOPSOIL BUND
NOTES:
1. All sediment controls are to be established and maintained in
accordance with Auckland Council's GD05 document
2. Refer to drawings 102 for Erosion & Sediment Control Plan
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
PROPOSED EROSION & SEDIMENTCONTROL STANDARD DETAIL(SHEET 2 OF 2)
LUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 104
JH
YEOMANS
JH
PS/ML
6/12/2017
N.T.S
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
STABILISED CONSTRUCTION ENTRANCE
NOTES:
1. All sediment controls are to be established and maintained in
accordance with Auckland Council's GD05 document
2. Refer to drawings 102 for Erosion & Sediment Control Plan
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
PROPOSED ACCESS PLANLUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 200
JH
YEOMANS
JH
PS/ML
6/12/2017
1:250 (A1) 1:500 (A3)
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
2.5
2.5
57.5
10
12.5
NORTHSHORE POLICE STATION
52 PARKWAY DRIVE
234
SUNSET
ROAD
CONSTELLATION
BUS
STATION
SUBSTATION
223
SUNSET
ROAD
S
U
N
S
E
T
R
O
A
D
N
O
R
T
H
E
R
N
B
U
S
W
A
Y
P
A
R
K
W
A
Y
D
R
I
V
E
NOTES:
1. All proposed vehicle crossing works to be in accordance with
relevant Auckland Council Transport Code of Practice standards
2. Contractor to confirm all existing services in area of works, prior to
excavation, to achieve required clearances
3. Levels are in terms of Auckland Mean Sea Level 1946
4. All existing services are as per Site Survey unless otherwise stated
5. Contour Interval = 1.0m
6. Refer to drawing series 100 for Earthworks and Erosion & Sediment
Control details
7. Refer to drawing series 300 for Proposed Drainage Details
N
PROPOSED RETAINING WALL
EXISTING STORMWATER
EXISTING WASTEWATER
EXISTING WATER
EXISTING POWER
EXISTING POWER/LIGHT POLE
LEGEND:
PROPOSED
EXISTING
H
PR
EX
EX PUBLIC LIGHT & POWER POLE
TO BE RE-LOCATED 1.0m MIN.
FROM PROPOSED VEHICLE CROSSING
PR VEHICLE CROSSING TO BE CONSTRUCTED
AS PER AUCKLAND TRANSPORT CODE OF PRACTICE
STANDARDS (DRAWING GD017)
PR VEHICLE CROSSING TO BE CONSTRUCTED
AS PER AUCKLAND TRANSPORT CODE OF PRACTICE
STANDARDS (DRAWING GD017)
-
Copyright Airey Consultants Ltd
No. Revision Details Date
CAD Filename
c
Checked
Drawn
Date
Scale
Design
Survey
Job Title.
Dwg. No.File No. Rev.
Drawing Title.
(Current Revision Date : )07/12/2017
PROPOSED DRAINAGE PLANLUCY LIPROPOSED MIXED-USE COMMERCIALAND RESIDENTIAL DEVELOPMENT54 PARKWAY DRIVE, ROSEDALE 0632LOT 2 DP 486426 12460-01 A 300
JH
YEOMANS
JH
PS/ML
6/12/2017
1:250 (A1) 1:500 (A3)
12460-01.dwg
A Issue for Resource Consent 06/12/17
2017
Original S
ize:
0
VIE
WP
OR
T
2.5
2.5
57.5
10
12.5
NORTHSHORE POLICE STATION
52 PARKWAY DRIVE
234
SUNSET
ROAD
CONSTELLATION
BUS
STATION
SUBSTATION
223
SUNSET
ROAD
S
U
N
S
E
T
R
O
A
D
N
O
R
T
H
E
R
N
B
U
S
W
A
Y
P
A
R
K
W
A
Y
D
R
I
V
E
NOTES:
1. All proposed stormwater works to be in accordance with relevant
Auckland Council Stormwater Code of Practice standards
2. All proposed wastewater works to be in accordance with relevant
Watercare Wastewater Code of Practice standards
3. Contractor to confirm all existing services in area of works, prior to
excavation, to achieve required clearances
4. Levels are in terms of Auckland Mean Sea Level 1946
5. All existing services are as per Site Survey unless otherwise stated
6. Contour Interval = 1.0m
7. Refer to drawing series 100 for Earthworks and Erosion & Sediment
Control details
8. Refer to drawing series 200 for Proposed Access Details
N
PROPOSED STORMWATER
PROPOSED WASTEWATER
PROPOSED RETAINING WALL
EXISTING STORMWATER
EXISTING WASTEWATER
EXISTING WATER
EXISTING POWER
EXISTING POWER/LIGHT POLE
LEGEND:
PROPOSED
EXISTING
H
PR
EX
EX PUBLIC WWMH
LID LEVEL TO BE RISEN
EX LL = 78.02
PR LL = 80.56
EX ILin = 74.05
EX ILout = 74.00
u
P
V
C
W
W
P
I
P
E
L
=
2
3
.
3
0
m
@
0
.
5
5
%
PR PUBLIC WWMH 3
LL = 75.45
ILin = 73.87
ILout = 73.82
L
=
3
8
.
8
4
m
@
1
7
.
4
1
%
PR PUBLIC WWMH 2
LL = 68.81
ILin = 67.05
ILout = 67.02
P
R
P
U
B
L
I
C
W
W
P
I
P
E
L
=
2
2
.
0
3
m
@
1
7
.
4
2
%
PR PUBLIC WWMH 1
LL = 66.40
ILin = 63.18
ILout = 63.13
PR WW uPVC
CONNECTION
PR PUBLIC SWMH 1
LL = 66.42
ILin = 64.32
ILout = 64.25
PR SW uPVC
CONNECTION
PR PUBLIC SWMH 3
LL = 75.18
ILin = 71.02
ILout = 70.97
C
O
N
C
R
E
T
E
S
W
P
I
P
E
L
=
3
5
.
5
1
m
@
1
1
.
7
%
C
O
N
C
R
E
T
E
S
W
P
I
P
E
L
=
2
1
.
8
4
m
@
1
1
.
7
%
PR PUBLIC SWMH 2
LL = 68.84
ILin = 66.83
ILout = 66.78
EX PUBLIC SWMH
LID LEVEL TO BE RISEN
EX LL = 77.29
PR LL = 80.54
EX PUBLIC WW ASSETS
TO BE MADE REDUNDANT
AND REMOVED
EX PUBLIC WW ASSETS
TO BE MADE REDUNDANT
AND REMOVED
EX PUBLIC SW ASSETS
TO BE MADE REDUNDANT
AND REMOVED
EX PUBLIC SW ASSETS
TO BE MADE REDUNDANT
AND REMOVED
PR PRIVATE DETENTION TANK
PR PRIVATE DETENTION TANK
-
17
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Appendix B
Stormwater Management Calculations
-
Client: Lucy Li Sheet No:
1
Job: 54 Parkway Drive Job No:
Rosedale 12460-01
Calc's By: JH Phone: Date:
Checked: PS (09) 4864542 Dec-17
Enter Values
Result Cells
Pre-Development
1. Runoff Curve Number and Initial Abstraction
Total Pervious Area Required to be Mitigated (m²) = 7271.00Total Impervious Area Required to be Mitigated (m²) = 46
Pervious Area Curve Number (CN) = 74
Impervious Area Curve Number (CN) = 98
Pervious Product of CN x area = 538054
Impervious Product of CN x area = 4508
Total Pervious and Impervious Product = 542562
Total Pervious and Impervious Area = 7317
CN(weighted) = = 542562.00
7317.00 = 74.15
Ia(weighted) = = 36355
7317.00 = 4.97
2. Calculate Storage
S = [(1000/CN)-10] 25.4 = 88.54 mm
Design Storm
3. Average recurrence interval, ARI = 90th %ile, 24hr yr
4. 24hr rainfall depth P24 = 25 mm
5. Runoff depth Q24 = (P24-la)2/[(P24-la)+S] = 3.70 mm
6. Runoff volume V24 =(Q24/1000) A = 27.0 m3
total product
total area
5 x pervious area
total area
Consulting Civil and
Structural Engineers
Pukekohe Waiuku Takapuna Howick Orewa
TP108 Stormwater Runoff Volume Calculations
12460-01 54 Parkway Drive - Stormwater Mitigation Calculations.xls
-
Post-Development
1. Runoff Curve Number and Initial Abstraction
Total Pervious Area Required to be Mitigated (m²) = 1680Total Impervious Area Required to be Mitigated (m²) = 5611.00
Pervious Area Curve Number (CN) = 74
Impervious Area Curve Number (CN) = 98
Pervious Product of CN x area = 124320
Impervious Product of CN x area = 549878
Total Pervious and Impervious Product = 674198
Total Pervious and Impervious Area = 7291
CN(weighted) = = 674198.00
7291.00 = 92.47
Ia(weighted) = = 8400
7291.00 = 1.15
2. Calculate Storage
S = [(1000/CN)-10] 25.4 = 20.68 mm
3. Average recurrence interval, ARI = 90th %ile, 24hr 5mm yr
4. 24hr rainfall depth P24 = 25 5 mm
5. Runoff depth Q24 = (P24-la)2/[(P24-la)+S] = 12.77 5.00 mm
6. Runoff volume V24 =(Q24/1000) A = 93.1 36.5 m3
7. Total Detention & Retention Volumes Required = 66.1 m3
8. Minimum Retention Volume Required = 36.5 m3
9. Minimum Detention Volume Required = 29.6 m3
5 x pervious area
total area
Detention
Design Storm
Retention
Design Storm
total product
total area
12460-01 54 Parkway Drive - Stormwater Mitigation Calculations.xls
-
18
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Appendix C
Wastewater Connection Calculations
-
Client: Lucy Li Sheet No:
1
Job: 54 Parkway Drive Job No:
Rosedale 12460-01
Calc's By: JH Phone: Date:
Checked: PS (09) 4864542 Dec-17
POST-DEVELOPMENT Enter Values
Result Cells
1. Occupany Allowance
Number of dwellings = 45
Watercare Design Occupancy (per dwelling) = 3
Total occupancy for design purposes = 135
2. Residential Wastewater Flows
Peak Wet Weather Flow (PWWF) (Litres/Person/Day) = 1500
Residential Wastewater Design Flow (Litres/sec) = 2.34
3. Commercial, Industrial or CBD Wastewater Design Flows
Design Flow (Litres/second/hectare) = 0.4 Table 5.1 Watercare CoP
Commercial Floor Area (m²) = 2168
Commercial Wastewater Design Flow (Litres/sec) = 0.09
Total Wastewater Design Flow (Litres/sec) = 2.43
PIPE CAPACITY FORMULA
Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))
u= 1.141 x106 kinematic viscosity of fluid
(water at 15 degrees)
ks= 0.6 mm (effective roughness)
D= diameter
S= hydraulic gradient
R= d/4 (circ. pipes)
Q= VA
Pipe Pipe Pipe PIPE DESIGN
Grade Dia D Vel'y CAP'Y FLOW
S(%) (mm) (m/s) (l/s) (l/s)
1 150 1.00 17.7 2.43
Notes:
1) Grade assume at 1% but most likely steeper.
Consulting Civil and
Structural Engineers
Pukekohe Waiuku Takapuna Howick Orewa
Watercare Code of Practice Wastewater Flow Calculations
12460-01 54 Parkway Drive - Wastewater Calculations.xls
-
19
8 December 2017 AIREY CONSULTANTS LTD 12460-01 54 Parkway Drive infrastructure report.doc
Appendix D
Water and Wastewater Planning Assessment
-
DQ004-13092016
Development Application Form – Water Supply/Wastewater Planning Assessment Date of Application 7 December 2017
Address of Development 54 Parkway Drive, Rosedale
Layout Plan of Proposed Development clearly showing: Aerial photograph
Road names
Boundary of development
Preferred point of connection to existing water supply and wastewater asset
INCUDED IN REPORT
Description Comment
Current Land Use Commercial
Residential Residential (Single family dwellings) / Residential (Multi-unit dwellings) / Residential (Multi-storey apartment blocks) / Commercial / Industrial Proposed Land Use
Retail, commercial and office
Residential (Multi-storey apartment block)
Total Development Area (Ha.) 0.595 Ha
Number of Residential Households (Consent & Ultimate)
45
Three proposed buildings containing apartments:
First building (five stories) – commercial and residential containing 18 residential apartments
Second and third building (five stories) – only residential containing 45 residential apartments
Refer to Water and Wastewater Code of Practice for Land Development and Subdivision Section 6 Water Supply
Water Supply Development Assessment
Average and Peak Residential Demand (L/s)
0.39 l/s average 1.95 l/s peak
45 units, 3 people/unit at 250l/p/day = 0.86 l/s & PF = 5 (Watercare Engineering Standards)
Average and Peak Non-Residential Demand (L/s)
0.09 l/s average 0.17 l/s peak
0.2168 Ha floor area @ 0.4 l/s/ha = 0.09 l/s PF = 2 (Watercare Engineering Standards)
Non Residential Demand Typical Daily Consumption Profile / Trend
Retail/Commercial/Office – 9.5 hr (8:30am to 6:00pm)
Maximum flow calculated for retail/commercial/office over a 9.5 hour period.
Fire- fighting Classification required by the proposed site
Hydrant Flow Test Results ☐ Yes ☐ No
Attach hydrant flow test layout plan and results showing test date & time; location of hydrants tested and pressure logged; static pressure; flow; residual pressure
Sprinkler System in building? ☐ Yes ☐ No
Sprinkler design should consider Watercare Level of Service: minimum pressure at 200kPa and minimum flow at 25 l/min. The building owner shall conduct periodic review of sprinkler design.
-
DQ004-13092016
Further Water Supply comments
Refer to Water and Wastewater Code of Practice for Land Development and Subdivision Section 5 Wastewater
Wastewater Development Assessment
Peak DWF and WWF Residential Design Flows (L/s)
Ultimate PDWF = 1.05 l/s Ultimate PWWF = 2.34 l/s
45 units @ 3 people/unit
PDWF = 225l/p/d x 3.0 peaking factor.
PWWF = 1500 l/p/day
Calculations included in report
Peak DWF and WWF Non-Residential Design Flows (L/s)
Ultimate PWWF = 0.09 l/s
Retail/commercial/office – based on Table 5.1 @ 0.4 l/s/Ha
Calculations included in report
Non-Residential Discharge Profile / Trend (i.e. Operations)
Retail/commercial/office – 9.5 hr (8:30am to 6:00pm)
Maximum flow calculated for retail over a 9.5 hour period.
New Assets Required for Development
N/A
Sewer Capacity Check No existing flows and small upstream catchment
Further Wastewater comments
For internal Watercare use only
Date Application Received
Application Ref No.
Assigned Connections Engineer
Prior Developer Correspondence with Watercare
Neighbouring developments to consider in capacity assessment