engineer's opinion $ 1,275,250

18
Massachusetts Connecticut Rhode Island New Hampshire Maine Vermont New York New Jersey Pennsylvania South Carolina Florida Pottstown Charleston Fort Myers 4210 Metro Parkway, Suite 250 Fort Myers, FL 33916 tel: 239-437-4601 fax: 239-437-4636 www.westonandsampson.com April 10, 2014 Mr. Robert Middleton, Utilities Director Sent via e-mail City of Naples 380 Riverside Circle Naples, Florida 34102 RE: Bid Analysis for Reclaimed Water Option T-8 Dear Mr. Middleton: Weston & Sampson has reviewed the bid proposals submitted for the Reclaimed Water Option T-8, which were received by the City of Naples and publicly opened at 2:00 PM on April 7, 2014 at the City’s Purchasing Department. The project consists of installation of approximately 3,750 linear feet of reclaimed water main. The purpose of Reclaimed Water Option T-8 is to improve the reclaimed water system hydraulics in the southern portion of the City. Beginning with a connection to the existing reclaimed system on 4 th Street South and Central Avenue, then east along Central Avenue North on 6 th Street South, then east on 2 nd Avenue North Concluding with a connection to the existing reclaimed system at the intersection with 10 th Street North and 2 nd Avenue North Nine bids were received by the City of Naples. Those bids, along with the Engineer’s Opinion of Probable Construction Cost, are presented below: Bidder Total Amount Bid Andrew Sitework, LLC $ 812,567.00 Metro Equipment Service, Inc. $ 831,000.00 Gregory Electric Company, Inc. $ 848,587.00 Mitchell & Stark $ 928,300.00 TB Landmark 1 $ 994,950.00 Quality Enterprises USA $ 1,020,382.45 Douglas Higgins $ 1,051,905.00 Kyle Construction $ 1,103,200.00 Denco Construction $ 1,186,600.00 Engineer's Opinion $ 1,275,250.00 1 There was a $10,000 error between unit cost and extended price in Bid Item No. 1-1. Bid amount submitted on TB Landmark’s bid was $984,950.00. The apparent low bidder is Andrew Sitework LLC, 4696 Elevation Way, Fort Myers, FL 33905. Their bid, as well as the other bids, has been verified for mathematical correctness.

Upload: others

Post on 15-Feb-2022

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineer's Opinion $ 1,275,250

Massachusetts Connecticut Rhode Island New Hampshire Maine Vermont New York New Jersey Pennsylvania South Carolina Florida

Pottstown Charleston Fort Myers

4210 Metro Parkway, Suite 250 Fort Myers, FL 33916

tel: 239-437-4601 fax: 239-437-4636 www.westonandsampson.com

April 10, 2014

Mr. Robert Middleton, Utilities Director Sent via e-mail City of Naples 380 Riverside Circle Naples, Florida 34102

RE: Bid Analysis for Reclaimed Water Option T-8 Dear Mr. Middleton:

Weston & Sampson has reviewed the bid proposals submitted for the Reclaimed Water Option T-8, which were received by the City of Naples and publicly opened at 2:00 PM on April 7, 2014 at the City’s Purchasing Department.

The project consists of installation of approximately 3,750 linear feet of reclaimed water main. The purpose of Reclaimed Water Option T-8 is to improve the reclaimed water system hydraulics in the southern portion of the City.

Beginning with a connection to the existing reclaimed system on 4th Street South and Central Avenue, then east along Central Avenue

North on 6th Street South, then east on 2nd Avenue North

Concluding with a connection to the existing reclaimed system at the intersection with 10th Street North and 2nd Avenue North

Nine bids were received by the City of Naples. Those bids, along with the Engineer’s Opinion of Probable Construction Cost, are presented below:

Bidder Total Amount Bid

Andrew Sitework, LLC $ 812,567.00

Metro Equipment Service, Inc. $ 831,000.00

Gregory Electric Company, Inc. $ 848,587.00

Mitchell & Stark $ 928,300.00

TB Landmark 1 $ 994,950.00

Quality Enterprises USA $ 1,020,382.45

Douglas Higgins $ 1,051,905.00

Kyle Construction $ 1,103,200.00

Denco Construction $ 1,186,600.00

Engineer's Opinion $ 1,275,250.00

1 There was a $10,000 error between unit cost and extended price in Bid Item No. 1-1. Bid amount submitted

on TB Landmark’s bid was $984,950.00.

The apparent low bidder is Andrew Sitework LLC, 4696 Elevation Way, Fort Myers, FL 33905. Their bid, as well as the other bids, has been verified for mathematical correctness.

Page 2: Engineer's Opinion $ 1,275,250

Letter Report to Mr. Robert Middleton

Bid Analysis for Reclaimed Water Option T-8

April 10, 2014

Page 2 of 3

Weston&Sampson®

The following items have been prepared and are included as exhibits to this letter:

Bid Tabulation, presenting a summary of bids, Engineer’s Opinion of Probable Construction Cost, minimum unit price bid, average unit price bid, and maximum unit price bid.

Responses from References for apparent low bidder and second low bidder

Review Of Bid Documents Submitted By Apparent Low Bidder: Andrew Sitework, LLC

Bid documents listed below appear to be in order as it:

Has been signed by Mr. Ralph C. Andrew III, President. According to information contained on the Florida Secretary of State website, Ralph C. Andrew III is an officer in the corporation.

From the Florida Department of Business and Professional Regulation website, Ralph C. Andrew III is a Certified Underground Utility and Excavation Contractor, License Number CUC1225033, Status - Current, Active, Expires: 08/31/2014

The address of record for Mr. Andrew is Andrew Sitework, LLC, 4696 Elevation Way, Fort Myers, FL 33905.

Provided 3 references on the City’s required form. Those references, along with information provided by the references when contacted by phone on April 9, were:

- Luis Soto from Lee County BOCC - Jay Morris from Toho Water Authority - Dayne Atkinson from Collier County (has not responded as of 04-09-2014)

Includes a Bid Bond in the amount of five percent (5%) of Amount Bid.

Certificate of Insurance did not include Weston & Sampson as an additional insured (required)

From a web-search, Andrew Sitework LLC their website indicates they provide construction services to major utilities including water, sewer, and stormwater conveyance. The company was started in 2008.

Review Of Bid Documents Submitted By Apparent 2nd Low Bidder: Metro Equipment Service, Inc.

Has been signed by Jorge L. Godoy. According to information contained on the Florida Secretary of State Website, Jorge L. Godoy is an officer in the corporation.

From the Florida Department of Business and Professional Regulation website, Metro Equipment Service is a Certified Underground Utility and Excavation Contractor, License Number CUC054912, Status - Current, Active, Expires: 08/31/2014

The address of record is Jorge L. Godoy, Metro Equipment Service, Inc., 9415 Sunset Drive, Suite 131, Miami, FL 33173.

Includes a Bid Bond in the amount of five percent (5%) of Amount Bid.

Certificate of Insurance did not include Weston & Sampson as additional insured (required)

Provided 3 references on the City’s required form. Those references were contacted via telephone during the week of April 8th.

- Margaret Blank from Key Largo WWT District - Clece Aurelus from City of Hollywood (has not responded as of 04-09-2014) - Rodney Carrero from City of North Bay Village (has not responded as of 04-09-2014)

Page 3: Engineer's Opinion $ 1,275,250

Letter Report to Mr. Robert Middleton

Bid Analysis for Reclaimed Water Option T-8

April 10, 2014

Page 3 of 3

Weston&Sampson®

Horizontal Directional Drilling (HDD) Capabilities of Andrew Sitework LLC

As this project mainly involves installation of 16-inch HDPE reclaimed water transmission main by HDD, we contacted Andrew Sitework regarding their HDD capabilities and intent. Based on email and telephone discussions with Brian P. Brandfass, Estimator / Project Manager for Andrews Sitework:

Their initial intent is to utilize a subcontractor (ADS, LaBelle FL) for HDD. ADS/Centerline is the subcontractor that provided HDD services for Option T-7. A list of recent HDD projects performed by Andrew Sitework and ADS/Centerline is attached.

The guidance system to be used for installation of the directional drill bore path includes Tensor True Tracking Steering Tool and Truegyde Software used W/(MGS) Magnetic Guidance Probe

Summary and Conclusions

The low bidder for this project is Andrew Sitework LLC, with a bid of $812,567.00.

The low bid is less than the Engineer’s Opinion of Probable Construction Cost ($1,275,250.00).

Bid documents appear to be in order.

Metro Equipment Service, Inc. was the second lowest bidder, with a bid of $831,000.00.

The 2nd lowest bid is also less than the Engineer’s Opinion of Probable Construction Cost ($1,275,250.00).

Bid documents appear to be in order.

Recommendations

The City of Naples should consider the award of this contract to Andrew Sitework LLC in the amount of $812,567.00.

It is the opinion of Weston & Sampson that a reasonable course of action for the City of Naples would be to issue a Notice of Award and subsequently enter into an agreement with Andrew Sitework LLC to perform the work associated with the Reclaimed Water Option T-8, subject to the following:

• Concurrence by City of Naples Legal Counsel and City Purchasing Department.

• Receipt of appropriate performance bond(s), payment bond(s) and insurance certificates.

• While not included in the bidding documents, the City may wish to include a “City-Controlled Contingency” in the amount of $50,000 in the construction contract award amount to account for unforeseen issues during construction, similar to other construction projects undertaken by the City

Should you have any questions, or wish to further discuss this matter, please let us know.

Very truly yours,

WESTON & SAMPSON

Jeffrey A. Wilson, P.E. Regional Manager Enclosures: As noted

Page 4: Engineer's Opinion $ 1,275,250

City of Naples, Florida

Reclaimed Water Distribution System Expansion

OPTION T-8 BID TABULATION ANALYSISBID OPENING DATE: APRIL 7, 2014

Item Item Description Unit Qty Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount

1-1 Mobilization/Demobilization LS 1 56,700.00 56,700 42,000.00 42,000 77,797.50 77,798 75,000.00 75,000 40,000.00 40,000 32,000.00 32,000 71,000.00 71,000 40,269.00 40,269 30,661.00 30,661

1-2 Preconstruction Audio/Video Recording LS 1 2,500.00 2,500 10,000.00 10,000 862.50 863 2,500.00 2,500 3,000.00 3,000 2,000.00 2,000 9,000.00 9,000 839.00 839 1,980.00 1,980

1-3 Maintenance of Traffic LS 1 17,000.00 17,000 50,000.00 50,000 13,800.00 13,800 15,000.00 15,000 14,000.00 14,000 3,000.00 3,000 14,000.00 14,000 9,318.00 9,318 38,364.00 38,364

1-4 Preparation of As-built Drawings LS 1 8,300.00 8,300 30,000.00 30,000 3,450.00 3,450 2,500.00 2,500 13,500.00 13,500 5,000.00 5,000 21,000.00 21,000 8,417.00 8,417 1,237.00 1,237

DIVISION 1 SUB-TOTAL

Item Item Description Unit Qty Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount Unit Cost Amount

2-1 Furnish & Install Water Mains (RWM)

2-1A 16" HDPE RWM DR-9 (directional drill method) LF 3700 205.00 758,500 105.00 388,500 202.03 747,511 248.00 917,600 182.00 673,400 210.00 777,000 211.00 780,700 232.00 858,400 135.60 501,720

2-1B 16" DI RWM class 350 (trench method) LF 50 800.00 40,000 440.00 22,000 656.66 32,833 500.00 25,000 193.00 9,650 230.00 11,500 290.00 14,500 316.00 15,800 589.00 29,450

2-2 Furnish & Install Valves & Boxes

2-2A 12" Gate Valve EA 3 2,800.00 8,400 5,000.00 15,000 6,261.75 18,785 5,500.00 16,500 3,100.00 9,300 2,500.00 7,500 5,400.00 16,200 2,630.00 7,890 4,651.00 13,953

2-2B 16" Gate Valve EA 6 4,750.00 28,500 15,000.00 90,000 9,087.70 54,526 10,000.00 60,000 6,500.00 39,000 5,900.00 35,400 8,700.00 52,200 6,058.00 36,348 7,242.00 43,452

2-3 Furnish & Install Automatic Air/Vacuum Valves

2-3A 2" ARV EA 4 3,550.00 14,200 2,500.00 10,000 6,526.25 26,105 3,500.00 14,000 3,400.00 13,600 3,800.00 15,200 1,900.00 7,600 2,826.00 11,304 3,719.00 14,876

2-4 Furnish & Install Connections to Existing Reclaimed Water Main

2-4A Connect to Existing 16-inch Main at 4th

Street South LS 1 10,000.00 10,000 15,000.00 15,000 6,003.00 6,003 8,500.00 8,500 7,400.00 7,400 6,100.00 6,100 34,000.00 34,000 9,049.00 9,049 40,026.00 40,026

2-4B Connect to Existing 12-inch Main at 10th

Street North LS 1 10,000.00 10,000 10,000.00 10,000 6,198.50 6,199 8,500.00 8,500 9,487.00 9,487 5,200.00 5,200 30,000.00 30,000 6,989.00 6,989 22,993.00 22,993

2-5 Disposal of Unsuitable Material

2-5A Disposal of Unsuitable Material CY 50 17.00 850 10.00 500 57.50 2,875 30.00 1,500 85.00 4,250 8.00 400 20.00 1,000 29.00 1,450 43.00 2,150

2-6 Surface Restoration

2-6A Surface Restoration LS 1 40,000.00 40,000 148,000.00 148,000 29,635.50 29,636 40,000.00 40,000 12,000.00 12,000 28,000.00 28,000 52,000.00 52,000 45,832.00 45,832 71,705.00 71,705

DIVISION 2 SUB-TOTAL

BID SUMMARY

DIVISION 1- MOBILIZATION & MAINTENANCE OF TRAFFIC

DIVISION 2- RECLAIM WATER (Plans/Specs prepared by Weston & Sampson)

Total Bid as contained on actual bid form

Difference

778,087.00$

-$

740,325.00$

812,567.00$

812,567.00$

TB Landmark Metro Equipment Service Quality Enterprises USA

699,000.00$

831,000.00$

1,186,600.00$

10,000.00$ -$ -$

984,950.00$ 831,000.00$

95,910.00$

924,472.45$

1,020,382.45$

1,020,382.45$

95,910.00$

924,472.45$

Gregory ElectricGregory Electric

95,000.00$

Quality Enterprises USA

Denco Construction

Denco Construction Gregory Electric

699,000.00$

Metro Equipment Service

831,000.00$ 1,020,382.45$ 994,950.00$ TOTAL BID

84,500.00$

84,500.00$

994,950.00$

132,000.00$

DIVISION 2- RECLAIM WATER (Plans/Specs prepared by Weston & Sampson) TB Landmark Metro Equipment Service

DIVISION 1- MOBILIZATION & MAINTENANCE OF TRAFFIC TB Landmark

778,087.00$

Denco Construction Gregory ElectricGregory Electric

95,000.00$

DIVISIONS 1 Through 2 SUB-TOTAL

132,000.00$

Quality Enterprises USA

Sub-total

Sub-total 910,450.00$

910,450.00$

778,087.00$

Gregory Electric

1,091,600.00$

1,091,600.00$

848,587.00$

1,186,600.00$

-$

848,587.00$

1,186,600.00$ 848,587.00$ 848,587.00$

Mitchell & Stark Kyle Construction Douglas Higgins

42,000.00$ 115,000.00$ 58,843.00$

Mitchell & Stark Kyle Construction Douglas Higgins

886,300.00$ 988,200.00$ 993,062.00$

886,300.00$ 988,200.00$ 993,062.00$

Mitchell & Stark Kyle Construction Douglas Higgins

-$

812,567.00$

928,300.00$ 1,103,200.00$ 1,051,905.00$

928,300.00$ 1,103,200.00$ 1,051,905.00$

-$ -$ -$

70,500.00$

70,500.00$ 42,000.00$ 115,000.00$

928,300.00$ 1,103,200.00$ 1,051,905.00$

58,843.00$

Andrew Sitework

72,242.00$

740,325.00$

72,242.00$

Andrew Sitework

Andrew Sitework

Reclaimed Water Option T-8 Page 1 of 2

Page 5: Engineer's Opinion $ 1,275,250

City of Naples, Florida

Reclaimed Water Distribution System Expansion

OPTION T-8 BID TABULATION ANALYSISBID OPENING DATE: APRIL 7, 2014

Item Item Description Unit Qty

1-1 Mobilization/Demobilization LS 1

1-2 Preconstruction Audio/Video Recording LS 1

1-3 Maintenance of Traffic LS 1

1-4 Preparation of As-built Drawings LS 1

DIVISION 1 SUB-TOTAL

Item Item Description Unit Qty

2-1 Furnish & Install Water Mains (RWM)

2-1A 16" HDPE RWM DR-9 (directional drill method) LF 3700

2-1B 16" DI RWM class 350 (trench method) LF 50

2-2 Furnish & Install Valves & Boxes

2-2A 12" Gate Valve EA 3

2-2B 16" Gate Valve EA 6

2-3 Furnish & Install Automatic Air/Vacuum Valves

2-3A 2" ARV EA 4

2-4 Furnish & Install Connections to Existing Reclaimed Water Main

2-4A Connect to Existing 16-inch Main at 4th

Street South LS 1

2-4B Connect to Existing 12-inch Main at 10th

Street North LS 1

2-5 Disposal of Unsuitable Material

2-5A Disposal of Unsuitable Material CY 50

2-6 Surface Restoration

2-6A Surface Restoration LS 1

DIVISION 2 SUB-TOTAL

BID SUMMARY

DIVISION 1- MOBILIZATION & MAINTENANCE OF TRAFFIC

DIVISION 2- RECLAIM WATER (Plans/Specs prepared by Weston & Sampson)

Total Bid as contained on actual bid form

Difference

TOTAL BID

DIVISION 2- RECLAIM WATER (Plans/Specs prepared by Weston & Sampson)

DIVISION 1- MOBILIZATION & MAINTENANCE OF TRAFFIC

DIVISIONS 1 Through 2 SUB-TOTAL

Sub-total

Sub-total

Unit Cost Amount

40,000.00 40,000 30,661.00 51,714.17 77,797.50 77% 100%

2,500.00 2,500 839.00 3,631.28 10,000.00 83% 120%

25,000.00 25,000 3,000.00 19,386.89 50,000.00 72% 56%

10,000.00 10,000 1,237.00 10,378.22 30,000.00 130% 135%

Unit Cost Amount

275.00 1,017,500 105.00 192.29 248.00 95% 66%

175.00 8,750 193.00 446.07 800.00 43% 110%

5,000.00 15,000 2,500.00 4,204.75 6,261.75 74% 62%

7,500.00 45,000 4,750.00 8,137.52 15,000.00 80% 87%

2,500.00 10,000 1,900.00 3,524.58 6,526.25 96% 136%

15,000.00 15,000 6,003.00 15,119.78 40,026.00 49% 49%

10,000.00 10,000 5,200.00 12,151.94 30,000.00 78% 95%

30.00 1,500 8.00 33.28 85.00 255% 283%

75,000.00 75,000 12,000.00 51,908.06 148,000.00 23% 16%

Minimum Price

BidAverage Price Bid

Maximum Price

Bid

Low Bidder

Prices as Percent

of Avg Price Bid

Low Bidder

Prices as Percent

of Engr's Opinion

of Price

42,000.00 85,110.56 132,000.00 83% 91%

699,000.00 890,166.27 1,091,600.00 87% 65%

812,567.00 975,276.83 1,186,600.00 87% 67%

812,567.00 975,276.83 1,186,600.00 87% 67%

1,275,250.00$

1,197,750.00$

1,275,250.00$

Low Bidder Unit

Prices as Percent

of Engr's Opinion

of Price

Low Bidder Unit

Prices as Percent

of Engr's Opinion

of Price

ENGR OPINION

ENGR OPINION

ENGR OPINION

Minimum Unit

Price Bid

Average Unit Price

Bid

Maximum Unit

Price Bid

Low Bidder Unit

Prices as Percent

of Avg Price Bid

1,197,750.00$

Average Unit Price

Bid

Maximum Unit

Price Bid

Low Bidder Unit

Prices as Percent

of Avg Price Bid

77,500.00$

Minimum Unit

Price Bid

77,500.00$

Reclaimed Water Option T-8 Page 2 of 2

Page 6: Engineer's Opinion $ 1,275,250

RESPONSES FROM REFERENCES SUBMITTED BY APPARENT LOW BIDDER:

ANDREW SITEWORK, LLC

Lee County, FL Toho Water Authority, FL Collier County, FL

Person Contacted Luis Soto

Project Manager

[email protected]

(response by telephone)

Jay Morris, PE

[email protected]

(response by telephone)

Dayne Atkinson

[email protected]

What project(s) has Andrew Sitework

constructed for your City in the past 2 years?

Only 1 project: Pine Ridge Rd.

pipe replacement.

24” WM replacement with a 30”

HDD under the Florida Turnpike.

No response as of 04-09-2014

What was the approximate contract value? $1,350,000 $1,200,000

Were there any non-owner initiated change

orders on the project? If so, please describe.

None None

Were there any significant issues during the

construction of the project?

No. None

Did the contractor complete the work within

the original contract time?

Yes Yes

On a scale of 1 to 10, with 10 being the best,

how would you rate the quality of the

contractor’s work?

9 9

Would you use Andrew Sitework on future

pipeline projects for your City?

Yes Yes

Are there any other comments that you

would like to provide?

Good to work with since the

expectations were set up from

the beginning of the project.

Good company to work with and

they were pleased with the

quality of work.

Page 7: Engineer's Opinion $ 1,275,250

RESPONSES FROM REFERENCES SUBMITTED BY APPARENT 2nd

LOWEST BIDDER:

METRO EQUIPMENT SERVICE, INC.

Key Largo WWT District City of Hollywood City of North Bay Village

Person Contacted Margaret Blank

[email protected]

Clece Aurelus

[email protected]

Rodney Carrero

[email protected]

What project(s) has Metro Equipment

constructed for your organization in the past

2 years?

Vacuum collection system in

Basin C (4”-10” diameter pipes),

South Transmission Main (6”-18”

diameter pipes).

No response as of 04-09-2014

Reference is on vacation and

due back on 04-15-2014

No response as of 04-09-2014

What was the approximate contract value? $4,000,000 each

Were there any non-owner initiated change

orders on the project? If so, please describe.

None

Were there any significant issues during the

construction of the project?

None

Did the contractor complete the work within

the original contract time?

Yes

On a scale of 1 to 10, with 10 being the best,

how would you rate the quality of the

contractor’s work?

8.5

Are there any other comments that you

would like to provide?

They would recommend for

future projects.

Page 8: Engineer's Opinion $ 1,275,250

ANDREW SITEWORK LLC.

4696 Elevation Way, Fort Myers, FL 33905

O: (239) 226-1606 F: (239) 226-1605

References and past project log

Project: Pine Ridge Road Sewer ReplacementLocation: Fort Myers, FLContractor: Andrew Sitework LLC.Contract: $1,430,000.00Completed: 2012Owner: Lee County BOCCAddress: 1500 Monroe Street, Fort Myers, FL 33901Contact: Luis Soto PMNumber: 239-533-8151email: [email protected]: 1,300 LF 30” HDPE Single Pull By HDD, 2800 LF 24” PVC by Open Cut, 370 CY Grouting Existing Main

Connection to Existing Utilities, Asphalt Drives and Sidewalk Replacement & Restoration etc.

Project: Greenlea East/West InterconnectLocation: Clearwater, FLContractor: Andrew Sitework LLC.Contract: $1,400,000.00Completed: 2012Owner: City of Clearwater BOCCAddress: PO BOX 4748, Clearwater, FL 33758Contact: Rob Maue, City EngineerNumber: 727-562-4827email: [email protected]: 15,000 LF of 12" PVC Reclaimed Main by Directional Drill. 6,000 LF of 4" to 8" PVC by HDD

Asphalt pavement replacement Keen Road, Asphalt Drives and project restoration

Page 9: Engineer's Opinion $ 1,275,250

Project: Winter Garden Trunk Line C Phase-6Location: Winter Garden , FLContractor: Andrew itework LLC.Contract: $735,000.00Completed: 2012Owner: City of Winter Garden BOCCAddress: 1516 Hillcrest Street, Suite 212, Orlando, FL 32803Contact: Art Miller, Engineer, PMNumber: 407-841-4084 Ext. 201email: [email protected]: 4,700 LF 18" PVC Force Main, 4,500 LF 12" Water Main by open cut, 1,200 LF 12" & 18" by Directional Drill.

Project: Montgomery Ave & White Road Reclaimed Water MainLocation: City of Ocoee, FLContractor: Andrew Sitework LLC.Contract: $972,000.00Completed: 2011Owner: City of Ocoee BOCCAddress: 150 N. Lakeside Drive, Ocoee, FL 34761Contact: David Wheeler, EngineerNumber: 407-905-3100email: [email protected]: 6,000 LF 16" HDPE by Directional Drill, 2,00 LF 4"-12" HDPE and PVC by Directional Drill.

Project: Northcliffe Force Main ReplacementLocation: Hernando County, FLContractor: Andrew Sitework LLC.Contract: $850,000.00Completed: 2010Owner: Hernando County BOCCAddress: 20 N. Main Street, Room 365, Brooksville, FL 34601Contact: Mark Morgan, Hernando County EngineerNumber: 352-754-4037email: [email protected]: 6,700 LF 16" FPVC by Directional Drill, 280 LF Steel Casing by Jack & Bore, & Restoration

Page 10: Engineer's Opinion $ 1,275,250

Project: Osceola Parkway/FL Turnpike Water Main CrossingLocation: Kissimmee, FLContractor: Andrew Sitework LLC.Contract: $1,230,000.00Completed: 2013Owner: Toho Water AuthorityAddress: 951 Martin Luther King Blvd, Kissimmee, FL 34741Contact: Jay Morris, Engineer CPHNumber: 407-425-0452email: [email protected]: 1,500 LF Single Directional Bore of 30" FPVC Water Main, 1,500 LF 24" FPVC Carrier Pipe By HDD crossing

the Florida Turnpike in Kissimmee, FL.

Project: Bryan & Bama Fire Protection Improvements ProjectLocation: Brandon, FLContractor: Andrew Sitework LLC.Contract: $1,661,000.00Completed: 2014Owner: Hillsborough County BOCCAddress: 601 E. Kennedy Blvd., Tampa, FL 33602Contact: Mark Dillman, PMNumber: 813-209-3058email: [email protected]: 21,000 + LF 6" & 8" PVC by Directional Drill, 400 + Water Services, 95 Fire Hydrants, Complete Restoration.

Project: Country Club Estates Water Main ReplacementLocation: City of Deland, FLContractor: Andrew Sitework LLC.Contract: $735,000.00Completed: 2011Owner: City of Deland BOCCAddress: 1102 S. Garfield Ave, Deland, FL 32724Contact: Keith Riger, City EngineerNumber: 386-626-7197email: [email protected]: 17,000 LF 4" - 8" HDPE Water Main by Directional Drill, 125 Water Services, Numerous Fire Hydrants,

8,000 SY Asphalt Restoration, Concrete Driveway and Sidewalk Restoration.

Page 11: Engineer's Opinion $ 1,275,250

Project: Water Distribution Interconnect With Moore HavenLocation: Lake Alfred, FLContractor: Andrew Sitework LLOC.Contract: $122,000.00Completed: 2013Owner: City of Lake Alfred BOCCAddress: 155 E. Pomelo Street, Lake Alfred, FL 33850Contact: John Deaton, City EngineerNumber: 863-291-5270email: [email protected]: 1,100 LF 10" HDPE Water Main by Directional Drill, Double Flow Meter Assembly & Connections to Existing

Project: Capital Water System Improvements ProjectLocation: Holy Hill, FLContractor: Andrew Sitework LLC.Contract: $665,000.00Completed: 2012Owner: City of Holy Hill BOCCAddress: 4401 East Port Pkwy., Port Orange, FL 32127Contact: Andrew Giannini, EngineerNumber: 386-761-6810email: [email protected]: 9,800 LF 4", 6", & 8" PVC and HDPE by open cut and Directional Drill methods,

Numerous Water Services, Fire Hydrants, and Restoration etc.

Project: Deland Water Mains 2012Location: Deland, FLContractor: Andrew Sitework LLC.Contract: $540,000.00Completed: 2012Owner: City of Deland BOCCAddress: 1102 S. Garfield Ave, Deland, FL 32724Contact: Keith Riger, City EngineerNumber: 386-626-7197email: [email protected]: 6,000 LF 6" & 8" PVC & HDPE Water Main by open cut and Directional Drill Methods,

Numerous Water Services, Fire Hydrants, and Restoration etc.

Page 12: Engineer's Opinion $ 1,275,250

Project: Riverwood Water Main Replacement ProjectLocation: Naples, FLContractor: Andrew Sitework LLC.Contract: $895,000.00Completed: 2012Owner: Collier County BOCCAddress: 3301 Tamiami Trail E. Bldg H, Naples, FL 34112Contact: Dayne Atkinson PMNumber: 239-252-5337email: [email protected]: 11,500 LF 8" RPVC by Directional Drill, 290 Water Services, BFP's Fire Hydrants, Mill & Overlay Asphalt

and complete project restoration.

Project: Holiday Drive Waterline ReplacementLocation: Tarpon Springs, FLContractor: Andrew Sitework LLC.Contract: $158,000.00Completed: 2013Owner: City of Tarpon Springs BOCCAddress: 300 Pine Street, Tarpon Springs, FLContact: Steve Weyer PMNumber: 727-942-5615email: N/ADiscription: 1,560 LF 6" & 8" HDPE by Directional Drill, Water Service Replacement and project restoration.

Project: Chippewa Trail Water Main ImprovementsLocation: Maitland, FLContractor: Andrew Sitework LLC.Contract: $290,000.00Completed: 2013Owner: City of Maitland BOCCAddress: Maitland, FLContact: Robert Hyden, City EngineerNumber: 407-875-2115email: [email protected]: 3,100 LF 8" PVC by Directional Drill and Open Cut Methods. Numerous Water Services, Fire Hydrants etc.

Page 13: Engineer's Opinion $ 1,275,250

Project: Galvanized Pipe Replacement Section-1Location: City of Cape CoralContractor: Andrew Sitework LLC.Contract: $2,727,900.00Completed: On goingOwner: City of Cape CoralAddress: 1015 Cultural Park Blvd. CC, FL 33990Contact: William H. Sperry, PE Number: 239-574-0729email: [email protected]: 32,000 LF of 2" 4" 6" and 8" C-900 by open cut. Directional Drilling of Decrotive Drives, several hundred

water services, fire hydrant replacements, asphalt, concrete brick paver driveway replacement.

Page 14: Engineer's Opinion $ 1,275,250

Page 1.

ADS/CENTERLINEAccurate Drilling Systems, Inc.

ANDREW SITEWORK LLC. ADS/CENTERLINE DRILLING.4696 Elevation Way, Fort Myers, FL 33905 LaBelle, FL

O: (239) 226-1606 F: (239) 226-1605 O: (863) 674-0803 F: (863) 517-1335

Project References: City of Naples Option T-8

Project: SR 46 Reclaimed Water & Force MainLocation: Sanford, FLContractor: GarneyContract: N/ACompleted: 2010/2011Owner: N/AAddress: N/AContact: 1.) Dan Smolik 407-832-2291Contact: 2.) Randy Bratcher 407-947-5789email: N/A

Discription: 1,300 LF 24" FPVC Reclaimed Main by Directional Drill. Completed by Lauro Acevedoat ADS Drilling.

Project: RCID Reclaimed Water Main Improvements 2013Location: FLContractor: Garney ConstructionContract: N/ACompleted: February 6th, 2014Owner: N/AAddress: N/AContact: Dan SmolikNumber: 407-832-2291email: [email protected]

Discription: 1,360 LF 16" FPVC by Directional Drill. Reclaimed Water Main Completed by Lauro Acevedo at ADS Drilling.

Page 15: Engineer's Opinion $ 1,275,250

Project: Lakewood Ranch Water Main Phase-III (SR-70 & I-75)Location: Sarasota, FLContractor: Wright Construction GroupContract: N/ACompleted: 2013Owner: N/AAddress: N/AContact: Jim PowellNumber: 239-481-5000email:

Discription: 2,200 LF of FPVC Reclaimed Main by Directional Drill. Completed by Lauro Acevedo at ADS Drilling.

Project: Eastside Wastewater Transmission SystemLocation: Bradenton, FLContractor: Stately ContractorsContract: N/ACompleted: 2012Owner: N/AAddress: N/AContact: Project ManagerNumber: 941-756-4700email:

Discription: 1,170 LF 24" FPVC Wastewater Transmission Main by Directional Drill,crossing the Tropicana Plant in Bradenton, FL. Bore Completed by Lauro Acevedo at ADS Drilling.

Project: Waterway Estates InterconnectLocation: N. Fort Myers, FLContractor: Cabana Construction of SWFL, Inc.Contract: N/ACompleted: 2012Owner: Waterway EstatesAddress: N/AContact: Kenny CabanaNumber: 239-332-1665email: N/ADiscription: 1,100 LF 30" Directional Bore completed by Lauro Acevedo at ADS Drilling.

Page 16: Engineer's Opinion $ 1,275,250

Project: Pine Island Road CrossingLocation: N. Fort Myers, FLContractor: Cabana Construction of SWFL, Inc.Contract: N/ACompleted: 2012Owner: Lee County BOCCAddress: N/AContact: Kenny CabanaNumber: 239-332-1665email: N/ADiscription: 1,160 LF 18" Directional Drill. Completed by Lauro Acevedo at ADS Drilling.

Project: NW 79th Street CrossingLocation: Miami, FLContractor: FP Excavation Inc.Contract: N/ACompleted: 2008/2009Owner: N/AAddress: N/AContact: GilbertoNumber: 305-824-5361email: N/ADiscription: 1,376 LF Single Directional Drill pulling Seven (7) 8" Pipes bundled, running a 48" reamer.

Bore completed by Lauro Acevedo at ADS Drilling.

Project: Bay PinesLocation: Clearwater, FLContractor: EquiboreContract: N/ACompleted: 2012Owner: N/AAddress: N/AContact: Burke HedegesNumber: 727-420-0515email: N/ADiscription: 2,170 LF 20" Pipeline. Directional Drill completed by Lauro Acevedo at ADS Drilling.

Page 17: Engineer's Opinion $ 1,275,250

Project: Pasco County Sewer ReplacementLocation: Pasco County, FLContractor: EquiboreContract: N/ACompleted: 2011Owner: Pasco CountyAddress: N/AContact: Burke HedegesNumber: 727-420-0515email: N/ADiscription: 1,200 LF 30" Sewer Forcemain by Directional Drill. Bore completed by Lauro Acevedo at ADS Drilling.

Project: Sand Lake Road, Longwood, FLLocation: Longwood, FLContractor: Tri-Sure CorpContract: N/ACompleted: 2013Owner: City of LongwoodAddress: N/AContact: JasonNumber: 863-557-9483email: N/ADiscription: 800 LF 20" Directional Bore completed by Lauro Acevedo at ADS Drilling.

Project: Treasure Island CauswayLocation: Treasure Island, FLContractor: Mac DrillersContract: N/ACompleted: 2014Owner: Treasure IslandAddress: N/AContact: Steve W/Mac DrillersNumber: 561-719-7746email: N/ADiscription: 2,330 LF 20" Directional Drill. Completed by Lauro Acevedo ot ADS Drilling.

Page 18: Engineer's Opinion $ 1,275,250

Project: Subaqueous Crossing Belvedere FeederLocation: West Palm Beach, FLContractor: Danella Utility ConstructionContract: N/ACompleted: 2013Owner: FPLAddress: N/AContact: Fredie Brady, PMNumber: 954-605-3668email: N/ADiscription: A Single 4,900 LF Subaqueous Directional Bore of 24" Main. This was one of the most difficult

Directional Bores ever completed and was done by Lauro Acevedo at ADS Drilling.

Project: Victory Way Reclaimed Water System ImprovementsLocation: Saratoga SpringsContractor: Garney ConstructionContract: N/ACompleted: March of 2014Owner: Reedy Creek Improvements DistrictAddress: N/AContact: Dan SmolikNumber: 321-221-2826email: [email protected]: (5) five bores, (Bore 1) 1800 LF 30" FPVC (Bore 2) 1360 LF 16" FPVC (Bore 3) 1190 LF 30" FPVC

(Bore 4) 840 LF 16" FPVC (Bore 5) 760 LF 16" FPVC