EPOS Working Group 10 INFRASTRUCTURE FOR GEORESOURCE Seismic processes induced by human operations Beata Orlecka-Sikora and WG10 Team Institute of Geophysics Polish Academy of Sciences, Poland [email protected]

Upload: carlow

Post on 06-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

EPOS Working Group 10 INFRASTRUCTURE FOR GEORESOURCE Sei s mic processes induced by human operations Beata Orlecka-Sikora and WG10 Team Institute of Geophysics Polish Academy of Sciences , Poland [email protected]. Main results of WG10 Meetings in Kraków in 2013. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS Working Group 10 INFRASTRUCTURE FOR

GEORESOURCESeismic processes

induced by human operations

Beata Orlecka-Sikora and WG10 TeamInstitute of Geophysics Polish Academy of Sciences, Poland [email protected]

Page 2: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Main results of WG10 Meetings in Kraków in 2013

o Short-term implementation plan of the Induced Seismicity Node

o Amendments of WG10 Science Plan o Fundraising strategyo Plan of WG10 promotion at national and

international levelso Short and long term policy of relations with

industrial stakeholderso Intellectual property rights policy from WG10

standpointo IS Node financial plan

Page 3: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013

WG10 Infrastructure for Georesources

Dataset diversity

SE

IM

SI

CD

AT

A

Induce d Se i smic i ty

Ep iso de

GE

OD

AT

A

Page 4: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Implementation of IS Node

Page 5: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013

WG10 Infrastructure for GeoresourcesMIS - Mining Induced SeismicityIIS - Injection Induced SeismicityEIS - Extraction Induced SeismicityRIS - Reservoir Induced Seismicity

MISMIS

EIS

MIS

RIS

RIS

IIS

EIS

MIS

IISRIS

RI to be integrated in short term

RIS

Page 6: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Science Gateway: processing and presentation Data Accuisition and Integration

On-line data loading

Off-line data loading

Data preparation and QoS

Publishing services

New sources integration

Data and Metadata Repositories

Scientific and Technical Coordination

Data Management

Services

Scientific Analysis

And Visualisation

Tools

Open Access

Data Repository

Authentication and Authorization Services

User Registration

& Access Management

Data Backups

Metadata Repository

Technical architecture of IS Node

A first set of services to be integrated with the system have been identified.Preparation of semi-automatic to automatically recreate metadata set for a given data.

Basic technology has been chosen to create Node Gateway (InSilicoLab Technology). Currently basic system allowing registration, authorization and authentication is in testing phase.

Page 7: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Implementation Plan Timeline with Milestones

Phase 1: ImplementationMilestone ISN1-1: Coordination structure and essential staff in placeMilestone ISN1-2: Data repositories are operational Milestone ISN1-3: Process for integration of off-line sources in place, integration activity established Milestone ISN1-4: Process for integration of on-line sources in place Milestone ISN1-5: Science gateway in place with data management module and at least 2 scientific pipelines integratedMilestone ISN1-6: All IS Node services are operational, user registration open, pilot sources integrated

Phase 2: Integration

Milestone ISN2-1: Second phase of integration of on-line sources in place

Milestone ISN2-2: Second phase of integration of off-line sources in place

Milestone ISN2-3: Third phase of integration of on-line sources in place

Phase 3: Maintainance and

evolution Milestone ISN3-1: Sustainability and development plan

Milestone ISN3-2: New RI in place

Milestone ISN3-3: IS Node services expansion phase 2 complete

Milestone ISN3-4: Implementation of EPOS integratated services complete

2014

2015

2016

Page 8: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Intellectual property rights policy and data openness

o At least 3 classes of users: science, industrial partners, other;

o ‚Science’ will have an access to all IS Node resources;

o ‚Industrial partners’ are industrial providers of research infrastructure. ‚Industrial partners’ will have more rights to use IS node resources than users class ‘other’;

o Uploaded infrastructure (data, software, reports) will be basically open. On request of data provider, its small part can be temporarily closed or restricted for specified users. Decisions for such cases will be taken by node management;

o Software openness will be determined by software providers under acceptance of node management.

Page 9: EPOS Working Group 10 INFRASTRUCTURE FOR  GEORESOURCE Sei s mic processes  induced by

EPOS WG Coordination Workshop, 25-27.02.2014 Prague

WG10 Infrastructure for Georesources

Fundraising strategy

IS RI running costs and development National funds within WG10

countries: more than 60 mln € in last 5 years

IS RI integration in IS NODE Partial support of national funding agencies including

EU structural funds

IS NODE implementation within EPOS construction phase EU support