General Disclaimer One or more of the Following Statements may affect this Document This document has been reproduced from the best copy furnished by the organizational source. It is being released in the interest of making available as much information as possible. This document may contain data, which exceeds the sheet parameters. It was furnished in this condition by the organizational source and is the best copy available. This document may contain tone-on-tone or color graphs, charts and/or pictures, which have been reproduced in black and white. This document is paginated as submitted by the original source. Portions of this document are not fully legible due to the historical nature of some of the material. However, it is the best reproduction available from the original submission. Produced by the NASA Center for Aerospace Information (CASI) https://ntrs.nasa.gov/search.jsp?R=19760023021 2020-05-13T02:58:53+00:00Z

Upload: others

Post on 13-May-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

General Disclaimer

One or more of the Following Statements may affect this Document

This document has been reproduced from the best copy furnished by the

organizational source. It is being released in the interest of making available as

much information as possible.

This document may contain data, which exceeds the sheet parameters. It was

furnished in this condition by the organizational source and is the best copy

available.

This document may contain tone-on-tone or color graphs, charts and/or pictures,

which have been reproduced in black and white.

This document is paginated as submitted by the original source.

Portions of this document are not fully legible due to the historical nature of some

of the material. However, it is the best reproduction available from the original

submission.

Produced by the NASA Center for Aerospace Information (CASI)

https://ntrs.nasa.gov/search.jsp?R=19760023021 2020-05-13T02:58:53+00:00Z

Page 2: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I

V

I' -

IA

G%10 SARY ' kSL G P-11 5 2,

July530 Rev

976

ASR Y M ISABBREV IATIONSSPACE TRANSPORTATION SYSTEM ANDASSOCIATED PAYLOADS

Abbt .&VIATIONS: SPATE TKAbSPUk'TATION SYSTEMAND ASSOCIATED PAYLGADS (NASA) 144 pHe $5.00 CSCL 051

6

N76-30109

UnclasG3/82 49551

1

S E P 1976

RECEIVED

1 _ ____INPUT BRANCH

NASA STI FACILITY

National Aeronautics andASpace dministrahon ^^^^ I

John F. Kennedy Space Center EKSC ORM G 7^3 *f.l 'ONE TIME FORM REPRINT NOT AUT NORIi FD' E

Page 3: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

_ - \

1

^lJ

a

G'-1ClS2, Rw ^G LOSSARY,

_ ACRONYMS,ABBREVIATIONSSPACE TRANSPORTATION SYSTEM AND 9

ASSOCIATED PAYLOADS

Prepared Bye •

A, M. KOLLER, JR-.-IEPerformance Management and Tracking

Approvals

W. Ca RAINWATERChief, Management Planning and 'Control Office

k ..1

Page 4: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

w

.3

3

FOREWORD

This document was prepared in order to facili tate

3

communications for the Space Transportation System (STS)

and Associated Payloads (see Glossary for definitions.

It contains a glossary and a listing of Acronyms and i;

7

Abbreviations in current use, and is intended for use by j

those who write/interpret/prepare material for publication

relative to the Space Transportation System.

f

It is recognized that the listing is not all inclusive

or complete. This document will periodically be updated to -^ r

provide a current listing of all approved STS and Associatedl

Payloads acronyms and abbreviations.

Recommendations relative to this listing should be

directed to:

Dr. A. M. Koller, Jr., SP-MPC, 867-21263

kDISTRIBUTION: ;

STDL-E

m NWSI-D (200 copies)x _

r71

J

d

N

Page 5: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

| --

^

| || |

SECTION I

GLOSSARY

This section contains a glossary of terms(and definitions) in current usage for theSpace Transportation System (STS) andAssociated Payloads.

ACC^PTANCE TESTSTests to determine that a part, component, subsystem, of facilityis capable of meeting performance requirements prescribed in pur-chase specifications or other documents specifying what consti-tutes the adequate performance capability for the item.

ASSEMBLYA number of parts, or subassemblies and/or any combination thereof,joined together to perform a specific function and capable of dis-assembly. The distinction between an assembly and a subassembly isdetermined by the individual application. An assembly in one in-stance may be a subassembly in another, where it forms a portion ofan assembly.

ATTACHING PARTAn item used to attach assemblies or parts to the equipment, or toeach other.

AUTOMATED PAYLOADS__To___Js­which are supported by an unmanned spacecraft capa-

ble of operating independently of the Space Transportation System

AUXILIARY STAGEA small propulsion unit used with a payload, Nhen required. One ormore of these units may be used with a payload, to provide the addi-tional velocity required to place a payload in the desired orbit or

A propulsion system that is used to provide midcourse trajectorycorrections, braking maneuvers, and/or orbital adjustments.

"

r

Page 6: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I/

BILL OF WOPY fE:'d)A detail ed work schedule which lists all Operation & Maintenance

(0&M) task' s reouired to be performed at each work station for aspecific vehicle turnaround. It also contains applicable informa-tion such as se quence of performance, O&M instruction number, workauthorization number, time allocated, manpower, skill level, and

the start and completion data.

CARGOEverything contained in the Shuttle Payload Bay plus other equipmentlocated elsewhere in the Orbiter which is user unique and not carriedin the standard baseline Orbiter weight budget.

CERTIFICATIONFormal documentation that the individual has reached the prescribedskill or knowledge level as cited in a NASA/KSC specification, con-tract specification, or other appropriate documents.

COMMERCIAL PART OR ITEMA part or item which is manufactured primarily for the commercialrather than the Government market and having both commercial ,<ndGovernment applications. Commercial parts also include parts whichare manufactured in accordance with normal commercial quality con-trolled production runs which meet or exceed the requirements ofGovernment specifications or standards.

COMPONENT^embly or any combination of parts, subassemblies and assem-

blies and assemblies mounted together and normally capable of in-dependent operation in a variety of situations.

CONCURRENT DELIVERY

The delivery of support items concurrently with the end item beingprovisioned.

CONDITION MONITOREDThose items that have neither limited life nor on-condition main-tenance as their primary maintenance process. Condition monitoringis accomplished mainly by in-place instrumentation, sampling, andsubsequent trending analysis which provides data to predict an in-cipient failure.

CONSTRUC-ION AWARDThe effective date of direction From the KSC contracting officer tothe selected contractor authorizing commencement of work. Issue ofthe notice of award by the KSC procurement office completes thismilestone.

CONSTRUCTION COMPLETEApp rooriate facility construction is complete and the facility isavailable for equipment installation. Certification by the DE siteactivation office completes this milestone.

1-2

t

a

Page 7: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

j

I^

r r

CONTRACT AWARD`. The date of direction from the KSC contracting office to

the selected contractor authorizing coiimencement of work. Issue ofnotice of the award by the KSC procurement office completes thismilestone.

CONTRACTOR

^ The supplier of the end item and associated support items to theGovernment under the terms of a specific contract.

CUSTOMER o( ' r-"USER)An organization or individual requiring the services of the Space

Transportation System.

DEDICATED SPACELAB^n extension module devoted to a single discipline which may fly

more than :once a year for several years, and which may be assign-

ed to a payload development center.

DESIGN CHANGEA NASA approved engineering change incorporated into the end item

s which modifies, adds to, deletes, or supersedes parts in the end

item.

^z

DESIGN REVIEWSCritical Design Review (CDR). The completion of a meeting chaired

by the KSC Shuttle Projects Manager, or his designated representa-tive, to assure that the completed designs are in consonance with

Level II and project specifications,

Preliminary Desiqn Review ). The completion of a meeting chair-^(PDRed by the KSC Shuttle Frrojects Manager, or his designated represen-tative, at which preliminary designs are reviewed with prime con-

tractors to assure compliance with system and project requirements.

30% Des ,irn Review. A meeting chaired by the responsible DE project

i engineer, or his designated representative, at which preliminarydesigns are reviewed to assure satisfaction of system and project

requirements.

90% Desi gn Review. A meeting chaired by the responsible DE project

engineer,ever, et' is designated representative, at which final designsare reviewed to assure compliance with system and project sper:ifi-

cations.

DRAWINGS—(Tr-a-c data, including drawings as defined in MIL-STD-100A and pre-

pared in accordance with MIL-D-1000, Category D, aperture cards in

accordance with MIL-C-9877; graphs, or diagrams, industry standardst > and industry specifications, on which details are represented with

sufficient information to define completely, directly or by 'reference,

the end result in the selection, procurement, and manufacture of

i the item required.

¢ l-3

i}r^is

mada

1, -

Page 8: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

tl

1{

6 L

4 3

A

END ARTICLE END ITEMApphys cal - element of the Space Transportation System, It is afunctional physical entity related and selected for the purposeof system development, procurement, and logistics.

END ITEMfinal combination of end products, components parts, or materialswhich is ready for its intended use; e.g., Orbiter, receiver, am-plifier, recorder, ground support equipment, etc.

ESTIMATED ON DOCK (EOD) DATE yThe date the equipment is forecast to arrive on-dock at KSC.. Ini-tially, this date should coincide with the desired contract delivery ^l

date for purchased equipment. Subsequent to contract award, thedate will reflect the vendor's estimate of his ability to deliver.

ji

EXPERIMENTThe system of hardware, software, and procedures for performanceof a scientific or appiications investigation undertaken to: rti

• Discover unknown phenomena• Establish the bads of known laws• Evaluate applications processes and/or equipment

FACILITY NEED DATE )That date when the appropriai:e facility is required to receive pro-gram hardware (Orbiter, SRB, ET) for test and checkout. Firstoperational use of the facility completes this milestone.

FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)An analysis to determine a LRU SRU method and frequency of failureand the resulting effects.

FEDERAL ITEM IDENTIFICATIONcomplete description rn accordance with FED-STD-SD.

FEDERAL SUPPLY CODE FOR MANUFACTURERS (FSCM)Provides a nonsignificant code assigned to identify manufacturers..Normally used with the Manufacturer's Part Number (see Federal 1

Cataloging Handbooks H4-1 and H4-2 for codes).

FIRST MANNED ORBITAL FLIGHT (FMOF)Liftoff of the first manned Space Shuttle from the launch pad at KSCon the first manned orbital flight. Vehicle flight beyond "towerclear" completes this milestone. Subsequent flights use similardefinitions.

Page 9: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i

_ I

,

FLIGHT'hat portion of a mission encompassing the period from Launch to

Larding, or Launch to Termination, of the active life ofa space-craft, The term Shuttle "Flight" means a single Shuttle round tripf i ts launch, orbital activity, and return). One fli g ht might de-

liver more than one payload, More than one flight mi g ht be re-

quired to accomplish oiie mission.

FLIGHT READINESS 'FIRING (FRF)First Shuttle vehicle is stacked on the launch pad, and a Count-down Demonstration Test (CDDT) performed (designed to duplicate tothe fullest possible extent an actual launch countdown). Propel-lant loading occurs in normal launch sequence, culminating a 20-second flight readiness firing. Engine shutdown after 20 secondsof sustained firing completes this milestone.

FREE FLYERAny payload that is detached from the Orbiter during the operational

} phase of that payload, and is capable of independent operations.

GROUND SUPPORT EQUIPMENT (GSE)Non-flightt equipment; implements and the devices re q uired for thehandling , servicing, inspection, testing, maintenance, alignment,adjustment, check, repair and overhaul of an operational end itemor a sub-system or component thereof. This may include equipmentreouired to support another item of ground support equipment asdefined herein.

i,.

HARDWARE DEVELOPMENT COMPLETE ^ !The date all hardware manufacture/procurement has been completed,and hardware is ready to be delivered under terms of the contract. {Notification from the contractor to the responsible KSC officecompletes this milestone.

INDENTUREA method of showing relationships to indicate dependence and anorder of dependence. Indenturing provides a top down breakdown of s

- an item into its assemblies, subassemblies, components, and parts.

INITIAL DELIVERY 1'The date of delivery for the first item of equipment to be deliveredunder terms of the contract. Acceptance of the equipment by the DES

`.` site activation office completes this milestone..

INITIAL OPERATIONAL CAPABILITY (IOC)Point in time at which the first operational confi g ured Space Shuttlevehicle is prepared for flight. Successful completion of DDT&E and

1

certification of flight hardware completes this milestone.

i.,

rc

1-5

'a

Page 10: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

t

i

,

INITIAL OUTFITTING/LAY-TN

The positioning of support items at user levels and at interme- idiate supply and maintenance levels as initial issues in antici-pated support of newly deployed end items.

INSTALLATION COMPLETE

1' t a•te w en t e DE site activation office declares the completesystem has been installed at the facility. Certification by theDE site activation office completes this milestone.

IN-STORAGE MAINTENANCEThe actions performed on a stored item to retain it in a specifiedcondition by providing systematic inspection, detection and pre-vention of deterioration.

INTEGRATED LOGISTICSTfiose interrelated processes which identify and provide the serviceand resources (hardware and data) required to achieve an economicaland timely support of operations. The principal processes are:logistics engineering analyses, maintainability, maintenance, opera- ,•^tional maintenance documentation, supply, transportation/packaging,training, and logistics management information.

INTEGRATIONc^ ombination of activities and processes to assemble components, i

subsystems, and system elements into desired configuration, and toverify compatibility between the constituents of the assembly. 1

INTEGRATION LEVELS

Level I- Cargo/Shuttle Integration; Integration into the Orbiter ofeverything that goes on a single Shuttle flight.

Level II- Element into Cargo Integration; Assembly of Spacecraftelements and/or free flyers (with or without Tug) into acargo for a single Shuttle flight.

r Level III— Instrument to Supporting System Integration; IntegrationOf one or more instrument as «nblies with Spacelab ele-ments (extension module and/or pallet) or the free flyerpayload.

Level IV- Instrument Assembly Integration; Assembly of individualinstruments and their unique su'5porting subsystem into acompatible package of equipment to accomplish specific 1mission_ objectives on a given flight.

1(INTERFACE

a mechanical, electrical, and operational common boundary betweentwo constituents of a system.

s

J

1-6

7

f

Page 11: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

;, r

INTERIM RELEASE

ut oriia ion given a contractor to release support items to pro-

duction or procurement simulataneously with his. production require-ments for like items prior to suimissicn of a Spare Parts Order.

INTERIM UPPER STAGE (IUS)n upper stage caps a of being launched in the cargo bay of the

Orbiter, and intended for use prior to the availability of theSpace Tug. As presently planned, it will be a modification ofan existing stage, may or may not be retrievable for reuse, andwill be capable of the delivery but not the retrieval of payloads.

INVITATION FOR BIDS^IFBThat point in time when the complete assembly of documents relatedto a particular contract award will be provided to the prospectivebidders by a formal advertisement for the purpose of competitivebidding. Issue of the invitation by the KSC procurement officecompletes this milestone.

ITEMAny level of hardware assembly (system, element, subsystem, equip-ment, component, or part).

K-FACTORSseries of terms used to derate Meantime Between Failure (MTBF) to

a Meantime Between Demand (MTBD) on the supply system, Fourexamples are:

Kl Engineering correction based on LRU complexity,greater than 1

K2 Total failure ratio to relevant failure, greater than 1

`sK3 Ratio of operating hours to flying hours

K4 Ratio of demands on supply system to failures

)

1

_MTBF

MTBDh,

r

Kl x K.L x K3 x Kq

,

tLAUNCH PAD

The pad area from which the Space Shuttle will be launched. Thei.stacked Space Shuttle will undergo final prelaunch checkout andcountdown at the launch pad.

3

1-7

ILA

Page 12: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

4 u

I

T 7

LAUNCH PROCESSING SYSTEM (L?S)

A high speed digital computer operated checkout system used tosupport test, checkout, launch control, and operational manage-ment of launch site ground o perations at KSC.

LAUNCH PROCESSING SYSTEM (LPS) SUPPORT AVAILABLE—Pint in time when LP5 tor a given facility is ready for use by

KSC test personnel. Certification by the DE site activationoffice completes this milestone.

LEVEL OF REPAIR ANALYSIS (CORK)A process for recommending repair levels of LRUs, SRUs, assem-blies, and sub-assemblies which will accrue minimum total sup-port costs within o p erational and technical constraints overthe system design life. It forms the basis for assigning repairlevel; repair versus discard-at-failure decision; repair partsprovisioning; Source, Maintenance, and Recoverability (SMR)coding; maintenance planning, and documentation.

LINE REPLACEABLE UNIT (LRU)—item whose rep acement constitutes tks optimum organizational

maintenance repair action for a higher indenture item (i.e., anyassembly which can be removed and replaced as a unit from thesystem at the operating location).

LOGISTICS ENGINEERING ANALYSES (LEA)composite of analysis techniques which are used to identify the

necessary logistics resources to support operation and maintenancefunctions in a timely and economical manner. This includestraining, level of repair, spares determination analyses, etc.

LONG LEADTIME ITEMSThose items which because of. their complexity of design, com-plicated manufacturing processes, or limited production, maycause production or procurement cycles which would precludetimely or adequate delivery, if not ordered in advance of normalprovisioning.

MAINTAINABILITY (H)

A characteristic of an item created during design and/or opera-tion which enables the item to be retained in a specified condi-tion acceptable rate, using prescribed procedures.

MAINTENANCEThe actions taken to retain an item in a specified condition byproviding systematic inspectind, detecting, and servicing forthe prevention of incipient failure and the action taken torestore an item to a specifies operational condition. This in-cludes fault isolation, item replacement, repair and verify service-able.

.-8

Page 13: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

711

1ti

MAINTENANCE CONCEPTA escription of the planned method for accomplishing maintenance.A thought process which relates the maintenance tasks to be per-formed to the maintenance levels to support the operation of thesystem/equipment in the plane—iii o perational environment.

MAINTENANCE ENGINEERING WLYSIS MEAAn analysis of contract ;en item RU/SRU or equivalent items whichdefines the repair tasks necessary to restore a system to opera-tional condition utilizing the . maintenance philosophy, maintain-ability characteristics and other factors,

MAINTENANCE GROUND EQUIPMENT_ MGE)—T e equipem nt whic is used to support the maintenance operations

for vehicle, pevl^u'd, stages, facilities, or other MGE.

MAINTENANCE LEVELSAll maintenance functions performed either directly on the vehicleor in a supporting role categorized in one of the following threecategories:

a. Organizationalizational Level - maintenance performed on vehicle sub-systems and related support equipment in direct suppert of theturnaround flow. It includes scheduled and unscheduled main-tenance actions required to inspect, service, calibrate, re-place, repair and modify in-place, and reverify (sub)systemsand associated components,

b. Intermediate Level - Maintenance that is performed in directsupport of organizational level maintenance and involvesdisposition, repair, service, modification, calibration, andverification of items removed during organizational maintenance.

If c. Repot Level - K,,;ntenance that is performed by designatedmaintenance sources; e.g., manufacturers, USAF Air LogisticsCenters, NASA Centers, etc. It normally consists of mainten-ance that requires MGE, facilities, or skills which are noteconomically available at the intermediate level; e.g., re-pairing, modifying, overhauling, reclaiming, or rebuildingparts, assemblies, subassemblies, components, and and items,manufacturing of unavailable parts; and providing technicalassistance to the organizational and intermediate maintenance'levels.

MAINTENANCE TRAININGDetailed work-oriented instructions on servicing, maintenance, over-haul, and repair of product end items,_ including support and faci-lities equipment.

1-9

d

Page 14: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

^^'I

/

It

-

MANAGEMENT CODING

Th—eassignment of codes consisting of letters and/or numerals

~"' =w " . " , a nd other

MATERIAL SERVICE CENTERS (MSC)An actiVit^y --es-t-a-bTi-sfFeY--adjacent to a facility or work area con-centsupplyservices l ons and functionalacti vi ti es"" ". the immedia te " ,=" p/ ~n. " . require such service.Each MSC will provide a singlepoint of contact with the XSCsupply system, and wi ll , stock, and issue mater al andsupplies required by the area(s) served.

MISSIONThe perfnmmnue of a coherent set of investigations or opera-tions in space to achieve program goals.

Examples,Measure detailed structure uf Sun's chromosphere,Survey mineral resources of North America.

^ The elements of the Space Shuttle will be stacked upon the mobilelaunch p l a tform-- whil e '~ the Vehi cle

^ '-'--`---`g `''-''

- _ stacking, it will be rolled- out ^o ^^w launch pad,

' MODIFICATION COMPLETE

That date wFe—nexisting facilities at XSC have been modified.Certification by the DE site activation office completes this

^ milestone.

MULTIPLE PAYLOADS

^More than one separate payload carried in the cargo bay.

MULTIPURPOSE SPACELAB--^A6^ extension mo6ule involving u variety of disciplines usu-

all: for specific flights, and which may require the services ofu payload integrator or agent.

NATIONAL STOCK NUMBER (NSYJA disorcte 1dpntifying number assigned to each item of supply with-in the Federal Catalog System. A data chain consisting of thefour digit Federal Supply Classification, two digit Country Code

d seven digit Federal Item Identification Nmnhc, in that order.May have a two character oonl Cognizance Code and one characterMaterial Control Code prefix, and u two character Special MaterialIdentification Code suffix.

^" ^

^

Page 15: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

IIIF

u,

N

jt 8

I

OFF-LINE

An activity conducted (by a payload owner) independent of anySTS element (i.e., Tug, Spacelab, or Shuttle). This normallymeans the activity is conducted in a separate facility as well.

OFF-LINE MAINTENANCE..hat maintenance function performed at the 'intermediate and depotmaintenance levels.

ON-CONDITION RAINTENANCEThose items, which will remain in place until an assessment ofthe item's condition indicates that removal is required, areclassified as on-condition items, The assessments are made atintervals determined by the item's failure characteristics, andmany consist of inspections, measurements, test, or any othermeans not requiring disassembly or removal of the item.

ON-LINE MAINTENANCE

- That maintenance function performed at the organizational level. .?:SA

ON-LINE (STS)An activity conducted with payload and orie or more STS elements.This is broken down as follows: ;i

On-Line Shuttle; An activity encompassing a payload, itscarrier, and the Shuttle Vehicle.

On-Line Spacelab; An activity encompassing a payload andits Spacelab.

On-Line Tug/IUS; An activity involving a payload and theTug/IUS.

i ON-THE-JOB TRAINING (OJT)

A planned program which augments classroom training through self-study and supervised instruction to provide expanded knowledge andjob proficiency while the trainee is actually working in a duty

tassignment.i

OPERATIONS AND MAINTENANCE DOCUMENTATION (OMD) <

OMD incomes: engineering drawings and lists, Organizational Op-erations and Maintenance (OM) manuals including OMIs; Standard Re-pair manuals, Illustrated Parts Breakdowns (IPBs), IntermediateMaintenance manuals, Depot Maintenance manuals, Non-destructiveInspection manuals, Work Unit Code (WUC) manuals, Time ComplianceTechnical Instructions (TCTIs).i

s i

,Y

r

1,-11I

'C

a

}

Page 16: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

F

i

w s

- OPERATIONS AND MAINTENANCE MANUALS (OM)'informationOM manuals are organized proce ura specifying

methods of operating and maintaining flight hardware and supportequipment. OM manuals will be used in the performance of day-to-day operations and maintenance tasks.

- OPERATIONAL CHECKOUTThat perio o time when the Operations and Maintenance (OW)

i organization performs crew training, simulations, and proceduralfamiliarization prior to first use on flight hardware. Certifi-

cation of ground test and checkout crew readiness to support theassigned mission prior to receipt of flight hardware completes

this period.

OPERATIONAL READINESS 'DATE ORRDD)That date when a facility, including all systems and equipment, isoperationally ready and is turned over to the user/operator for

II operational training and systems familiarization prior to first1 use in support of flight hardware checkout. Certification by

sthe DE site activation office completes this milestone. v< ..fm'`µ

j OPERATOR NEED DATEThe ate e C operator (O&M organization) requires the equip-fnent/GSE to be made available to them, to accomplish any remain-

- ing work required prior to first use.

OPTIMUM REPAIR LEVELThe maintenance level selected to perform specific tasks and func-tions for a given equipment item. The decision to repair equip-ment at the indicated maintenance level requires that all author-ized maintenance capability (remove, replace, assembly, or test)to provided to that level. This does not prevent some repairfrom being done at a different level of maintenance for a differ-ent task.

j.

OPTIMUM REPAIR LEVEL ANALYSIS (ORLA)See "Level of Repair Analysis".

'C

-0RBITER PROCESS ING FACILITY tOPF)Thin is a bui ding at KSC with two bays in which the Orbiter under-goes post flight inspection, maintenance, and pr-emate checkout.;,prior to payload installation. t`

ORGANIC SUPPORT

In-house NASA/DOD assumption of intermediate or depot supply andmaintenance ac vis -a-vis contractor/vendor support.

k

1

1-12

1

Page 17: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

l

OUTFI17ING AWARDTiTie effective date of direction from the KSC contracting officer

to the selected contractor authorizing commencement of work.Issue of notice of the award by the KSC procurement officecompletes this milestone.

OUTFITTING COMPLETEat ate when all systems/equipment has been emplaced. Certifi-

cation by DE site activation office completes this milestone.

PALLET__Tn external unpressurized platform for mounting telescopes, an-

tennas, and other instruments and equipment requiring directspace exposure for conducting science and applications activities

z, on Space Shuttle Spacelab missions. The pallet may be composedof segments.

a

PARTOne piece, or two or more pieces, joined together which are not

normally subject to disassembly without destruction or impair-ment of designed use.

PAYLOAD CHANGEOUT ROOM

An environmentally controlled room on a movable support structurewhich includes a manipulator system for transferring a payloadvertically between a transport canister and the Orbiter payloadbay.

PECULIAR PARTAny part which must be produced to order in accordance with aparticular drawing and/or specification. Any part requiringflight certification shall be classified peculiar. Also, normal-ly standard parts that must be selectively accepted (to criteriadifferent from the usual standard part requirements) shall beconsidered peculiar.

PHASED PROVISIONING

A refinement to the provisioning process whereby procurement ofP ^p w YP nselected items is phased by time interval into the later stages

d,of production, thereby enhancing the ability of the provisioning

"• activity to select the most favorable mix of requirements.

PRELIMINARY ENGINEERING REPORT (PER) - FINAL RELEASEThat date when preliminary engineering is complete and the finaldocumentation has been released. Distribution of the finaldocumentation completes this milestone.

1-13

i

,

Page 18: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

G,

4

I

i

r

" PRICED SPAREARTS LIST

priced list of items and quantities of spare parts selected rfor procurement under the.contract.

PROCURE/FABRICATE COMPLETET aFi—t date when all procurement and fabrication for a particularfacility has been finished. Certified acceptance by the DE site

activation office completes this milestone.

PROCUREMENT METHOD CODE (PMC)The contractor W't11 use alpha-suffix codes (6, 7 or 8) containedin MIL-STD-7898 to communicate his reason for assignment of aContractor Recommended Code (CRC). Procurement Method Codes

(1 through 5) will always be assigned by government representa-

tives (KSC Provisioning Team) from the CRC codes furnished bythe contractor.

PROGRAMAn activity involving manpower, material, funding, and schedulingwhich are necessary to achieve desired goals (i.e., Shuttle Pro-

gram, Solar Astronomy Program, etc.,).

PROGRAMMING CHECK LIST (PCL)Is used to provide data governing initial provisioning for enditems of Shuttle hardware and related support equipment.

PROVISIONING ACTIVITY 9

The KSC Provisioning Team, Shuttle Project Office, which is res-

ponsible for the selection of, and the determination of require-ments for, provisioned items.

PROVISIONING PERFORMANCE SCHEDULE (PPS)Check List of entries including schedules in the provisioningprocess that is used to monitor such events.

PROVISIONING SCREENINGrovisioning Greening, when required by the Provisioning Require-

ments Statement; will be accomplished in accordance h DOD i

4100.38M. Provisioning and other Preprocurement Screening Manual. s f

PROVISIONING SPECIFICATIONIs the contractural instrument to provide clear and concise instruc-tiorrs which will achieve the objective of providing adequate,timely and economical support, by need dates for systems and end

items entering the inventory. It provides NASA with the flexibil-

ity in selecting minimum essential data for each specific pro-' curement and provides the contractor the detailed guidance to

fulfill provisioning requirements. The finalized Provisioning

Requirements Statement_ and the Provisioning Specification shallbe appended to the end item contract.

1-14

t

f

'

,i

Page 19: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

PROVISIONING TECHNICAL DOCUMENTATION (PTD)Is the generic term used to reference the various types of Pro-visioning Lists, decks of Punch Cards, Mechanized (PCM) or Auto-matic Data Processing (ADP) tapes. PTD shall be furnished bycontractors to KSC Provisioning Activities for the identification,selection, and determination of initial requirements and catalog-ing of support items to be procured through the provisioning pro-cess. Supplementary Provisioning Technical Documentation (SPTD)is also considered to be a part of PTD.

QUALITATIVE REQUIREMENTSQualitative requirements further amplify the maintenance conceptto the designer conveying special features which the operator/user wants designed into the hardware. Specialized qualitativerequirements to be considered for specification insertion are:

Failure Detection rPerformance Degradation Detection s ,,^'"Built-In Test Equipment (BITE)Adjustments

1

GSE-Integrated/Automated/ManualSelf-TestSkill LevelsSpecial ToolsAccessibilityInterchangeability

UANTITATIVE REQUIREMENTSQuantitative requirements provide a firm goal (appointment oftime available for maintenance) for the designer to meet his de-sign and also provide a requirement whose goal can later be de-monstrated during the verification period.

This type of quantitative requirement specified in a Maintainabili-ty activity must be responsive to the operational use of the equip-ment. Times may be specified in manhours, clockhours, or both.Maintenance times may also be broken out and levied for the variouselements that comprise the total repair functions such as faultisolate, remove/replace or checkout. The requirement will also be .:specified for all applicable levels of maintenance; these are or-ganizational, intermediate and depot. A listing of the commontypes of requirements to be considered are:

Maintenance Hours/LaunchMaintenance Hours/Operating HourMean Time To RepairMaximum Repair TimeScheduled Replacement IntervalsInspection Frequency and Maintenance HoursServicing Frequency and Maintenanf.;e Hours

'i1-15

L

Page 20: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a ^;

• f

1.

7

i

l^F

READY TO SUPPORTThat date when equipment/facilities are required to support project/facility milestone. First operational completes this milestone,

REORDER POINTThe inventory level, representing procurement lead time and safetylevel quantitative requirements as on-hand and on-order balances,at which spares item replenishment is to be initiated.

REPAIR PARTSThose support items that are coded to be not repairable (i.e.,Consumable Items).

REPAIRABLE ITEM

a

An item in unserviceable condition that can be economically repair-ed and returned to a serviceable condition.

Note: Repairable status is determined after failure occurs.

REPARABLE ITEMAn item, which because of economic and design characteristics, isdetermined to be subject to repair for return to use when it be-comes unserviceable.

Note: This term reflects the logistics status rather than thea

physical status of the item. Reparable categorization ismade before failure occurs.

REQUEST FOR PROPOSAL (RFP)That int in time whcA the necessary documentation is issued to re-

q proposa ls P P Pnegot iationo Issuefofmtheurequestebb^therKSCrprocurementofficecontract q y p coma

pletes this milestone.

SAFETY TRAININGInstructions which alert a •trainee to those conditions or operationswhich could be substantially dangerous to the operator or other haz-ard that would damage equipment or property.

SCHEDULED DELIVERYWhen NASA provides a required delivery schedule with each SPO, thecontractor shall accept the order and within 30 days notify NASA ofhis acceptance of the schedule or provide a proposed line item de-livery schedule for negotiation. The approvedschedule will be in-

t corporated into the contract by supplemental agreement.

SCHEDULED MAINTENANCEAny repetitive maintenance action deemed necessary to insure the func-tional success of equipment including periodic servicing and replace-ment of time/cycle components.

1-1b

Ji x

4

F

Page 21: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

j'y a

I

J_. a

^

r

1;3

SHARED EQUIPMENT NEED DATE MND)The date equipment/GSE to be used at more than one location is re-quired to support site activation activities at the secondary lo-cations ( s). The need date at the first user's location will bethe (SAND) for that location.

SHOP REPLACEABLE UNIT (SRU)ny item whose replacement constitutes the optimum, intermediate, 1

or depot level of repair action, i.e., a module for an LRU whichcan be removed at an intermediate or depot repair facility,

1

SITE ACTIVATION NEED DATE (SAND)The aate equipment G5E is required on-dock at KSC to support instal-lation and validation. Uncrating, inspection, and handling timemust be allowed in establishing the SAND.

SOURCE, MAINTENANCE AND RECOVERABILITY (SMR) CODEAn SMR code shall be recommended by the end item contractor or de-sign agency for each component/part. The code will be used to com-municate maintenance and supply instructions to the various support/maintenance activities.

SPACELAB—`A(a6oratory designed for space operations and composed of modules

or pallets suitable for accommodating instrumentation for conduc-ting research and application activities on Shuttle sortie flights.On a given flight, the Spacelab configuration can be comprised ofa module only, a pallet only, or a combination of a module and apallet.

iir

SPACE TRANSPORTATION SYSTEM (STS)An integrated system consisting of:

Space Shuttle (Orbiter, External Tank, Solid Rocket Boosters)Upper Stage for boost to extended orbit (IUS, SSUS, TUG)

Spacelab [

Any associated flight hardware and software a

SPACE TUG4 YAn upper stage installed for launch, or recovery and landing, in thecargo bay of the Orbiter. Developed specifically with the capabilityfor delivery, retrieval, and servicing of payloads in orbits and

" trajectories beyond the capability of the Shuttle alone. It is in-tended to be retrievable for refurbishing and multiple reuse.

SPARE PARTS ORDER {_A spare parts provisioning list which has been approved by the NASAContracting Office and released to the contractor for fabrication or procurement.

1-17

F

1

Page 22: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

3

Y

{

{

SPARES-^TFoosse support items that are coded to be repairable ReparableRP P (i.e.( p

)

' SPECIAL TOOLS TEST EQUIPMENT & SUPPORT EQUIPMENT aThose support items that have singe pecu iar application to aspecific end item. ;l

STANDARD PARTr.

Any parlor item which is adequately defined by a recognized. Govern-ment-wide or industry -associated standard drawing and /or specifica-tion, and is normally available from commercial, DSA, and/orGSA sources. (Examples of standard parts and items are nuts, bolts,washers, screws, pins, keys, grommets, rivets, o-rings, clips,,fasteners, clamps, fittings, standard electrical and electroniccomponents, etc.)

STATEMENT OF PRIOR SUBMISSION (SPS)ProvisioningA certification by an offeror/contractor that Technical

Documentation previously furnished to the government may satisfythe immediate Provisioning Technical Documentation requirements,with or without changes, to update the PTO to the end item configura-tion to he or being procured.

STS ASSOCIATED PAYLOAD

j

A specific complement of instruments, space equipment, and supporthardware carried to space to accomplish a mission (or discreteactivity) in space.

SUBASSEMBLY^Tormore parts which form a portion of an assembly or•a component

' replaceable as a whole, but having a part or parts which are in-dividually replaceable. (Examples: telephone dial, mounting boardwith mounted parts.)

SUPPLEMENTARY PROVISIONING TECHNICAL DOCUMENTATION (SPTD)Supplemental ro-visioning Tec nice Documentation is technical data -u d parts/equipment d consists of data s uc h asused to describe parts/equipme an t

specifications, standards, drawings, photographs, sketches anddescriptions, and the necessary assembly and general arrangementdrawings, schematic drawing, schematic diagrams, wiring and cablediagrams, etc. needed to indicate the location and function ofthe item. As a minimum, SPTD must be capable of providing for the(1) technical identification of items for maintenance support con-siderations, (2) preparation of item identifications for the pur-

pose of assigning National Stock Numbers, (3) review for itementry control, (4) standardization,` 5 review for potential inter-

changeability and substitutability, (6) item management coding,

(7) preparation of stock/issue lists, and (8) initial procurementfrom the contractor or original manufacturer.

1-18REPRODUCIB OF T.W

I

Page 23: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

4 ^,

d ^

ip

, r

SUPPORT EQUIPMENTThose support items that are not an integral part of an end itembut are required in the operation of the and item.

SUPPORT EQUIPMENT INSTALLATION 3 CHECKOUT COMPLETEat date when i ndividualsupport equipment —items have been com-

pletely installed and validated at the facility. Certificationby the DE site activation office completes this milestone.

SUPPORT ITEMSItems subordinate to, or associated with, an end item (i.e., spares,repair parts, tools, test equipment, support equipment, and sundrymaterials) and required to operate, service, repair or overhaul an

d •ten i em.

SUPPORT REQUIREMENTS ANALYSIS (SRA)<9

An analysis accomplished during the system design to establish} logistics support requirements. The analysis is a step-by-step

process of predicting operational and maintenance activities anddefining and documenting the required resources.

TRADE STUDIES---T"-dtu iesconducted to compare alternative parameters, materials, or

procedures.

TRAINING REQUIREMENTS ANALYSIS (TRA)An analysis accomplished to determine the skill levels type andquantities necessary to support a maintenance philosophy, throughmaintenance engineering analysis or support requirements analysis.

UNSCHEDULED MAINTENANCEAny maintenance activity required as a result of the random failuresof equipment. It includes the restoration to a serviceable condi-tion of a failed subsystem, end item, replacement package or unit,component, or part. r

VALIDATION

t

Verification that the equipment / system meets the operational needsof the OM user and is part of t°ie turnover process from the design,agency to the OM agency.

VENDOR ITEM

An item which is used in or attached to the end time produced bythe contractor under this contract; and which is procured by the

contractor on the open market or from established sources and forwhich the contractor is not the design activity.

j

l-lg,

7

1

t

Page 24: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

< x

d

WORK STATION^facilfty or functional area where either organizational level l

operations and maintenance tasks are performed in direct supportof a turnaround cycle or intermediate and depot level maintenancetasks on Shuttle components or related GSE are performed.

WORK UNIT CODE (WUC)

A six alphanumeric character indentured equipment identificationcode which uniquely identifies the entire system from top down tocomponent level. It functionally identifies the system, subsystem,assembly, component and significant reparable part on which main-tenance is to be performed:

Page 25: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

Ii

3 1^

SECTION II

WREVIATIONS & ACRONYMS

-A-

A AmpereAlphaAcceleration

A&A Advertise & AwardA/A Air-to-AirA/C Associate Contractor

AircraftA/D Analog-to-DigitalA/G Air-to-GroundA/N Alpha-NumericA/P AirportAA Accelerated Assemblies

Airplane AvionicsAA/AL Airplane Avionics/Autoland

Automatic Approach/Autoland 4, ;•°} AAE Abort Advisory Equipment

Aerospace Auxiliary EquipmentAAFE Advanced Applications flight EquipmentAAIR Advanced Atmospheric Sounder & Imaging RadiometerAAS Abort Advisory SystemAB AirborneABE Airbreathing EngineABES Airbreathing Engine SystemABM Advanced Bill of MaterialsABPS Airbreathing Propulsion Subsystem

' AC Alternating CurrentACC Automatic Control ConsoleACD Accuracy Control Document r

ACE Automatic Checkout EquipmentACCEL Accelerometer

Acceleration! ACCO Audio Central Control Unit

ACES Acceptance Checkout & Evaluation SystemAcceptance Control Equipment Section

ACIL Automatic Controlled Instrument LandingACL Allowable Container LoadACN Ascension Island fi `ACO Acceptance_ Checkout r

Administrative Contracting OfficerACP Audio Control Panel

Astronaut Control PanelACPM Associate Contractor Program Manager

k;ACPO Associate Contractor Projects OfficeACPS Aptitude Control Propulsion Subsystem

' ACRS Advisory Committee on Reactor SafeguardsACS Attitude Control System

Automated Control System

i 2_l

Page 26: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1

4

ACT Acquisition, Control of Test (Units)

ACTA Activate Test ArticleADAP Adaptive Intercommunication Requirement

ADB Aerodynamic Data BookADC Air Data Computer

Analog-to-Digital Computer

ADF Automatic Display FinderAutomatic Direction Finder

ADI Attitude Direction Indicator

ADL Avionics Development Lab (Downey, CA)ADP Acceptance Data Package

Automatic Data Processing

ADPA Air Data Probe AssembliesADPE Automatic Data Processing EquipmentADS Air Data SystemADTA Air Data Transducer AssemblyA6'c Architectural & EngineeringAEC Atomic Energy CommissionAEDC Arnold Engineering Development CenterAF Airframe

Audio FrequencyAft Fuselage

AFAD Armed Forces Acquisition Document

AFB Air Force BaseAFC Automatic Frequency Control

AFCS Automatic Flight Control System

AFD Aft Flight DeckAFEB Award Fee Evaluation BoardAFEC Award Fee Evaluation Committee

AFETR Air Force Eastern Test RangeAFF Acceptance & Ferry FlightAFFTC Air Force Flight Test Center (Edwards AFB)

AN Automatic Fault IsolationA'FLC Air Force Logistics Command

AFM Air Force ManualAFPD Authorization for Program Development

AFO Announced Flight OpportunityAFR Air Force Regulation

AFS Air Force StandardAFSC Air Force Systems CommandAFSCF Air Force Satellite Control Facility

AFSWC Air Force Special Weapons Center (Holloman AFB)AFT Atmospheric Flight Test

Aerodynamic Flight TestAC Artificial GravityAGC Automatic Gain ControlAGE Aerospace Ground Equipment

AGL Above Ground Level

AGO Santiago, Chile (STDN)AGOES Advanced Geosynchronous Observation Environment

Satellite

AID Abbreviated Item Description

AIDS Airborne Integrated Data Subsystem

2-2

i

Page 27: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1

E

1

y

"I

F

AIL Avionics Integration LaboratoriesAILS Automatic Instrument Landing SystemAIM Automated Information ManagementAIR Adaptive Intercommunication RequirementAIRME Apollo Initiator Resistance Measuring EquipmentAIST Agency of Industrial Science and TechnologyAJ Assembly JigA&L Approach and Landing

AL AirlockALAS Approach Landing Autopilot SubsystemALC Automatic Light ControlALDO Activity Level Dependent OperationsALE Airport Lighting EquipmentALERT Acute Launch Emerg ency Reliability TipALIO Activity Level Independent OperationsALS Alternate Landing Site

Advance Logistics, SystemALSA Astronaut Life Support Equipment

ALSS Airlock Support SubsystemALT Approach & Landing Test

Altitude

AM Actuator MechanismAmmeterAwolitude Modulation

AMA Airy Material AreaAMC Automatic Mixture ControlAMDS Advanced Missions Docking SubsystemAMEC Aft Master Events Controller

AMF Abort Motor FacilityAMI Alpha Mach IndicatorAMLC Asynchronous Multiline ControllerAMOOS Advanced Manes+jering Orbit-To-Orbit ShuttleAMPR Aeronautical Manufacturer's Planning Report

Aeronautical Manufacturer's Progress ReportAMPS Atmospheric Magnetospheric & Plasmas in SpaceAMS Acoustic Measurement System

Amplifier SubsystemAMST Advanced Medium STOL Transport

i

„r

WAS Automatic Modal Tuning & Analysis System jAMTD Automatic Magnetic Tape DisseminationAMTF Acoustic Model Test FacilityAN Alpha Numeric

Army/NavyANA Air Force-Navy Aeronautical BulletinANAL Analysis '1

AND Air Force-Navy Aeronautical Design StandardANL AnalogANSI_ American National Standards Institute

ANT Antigua (ETR)}

ADA Abort-Once AroundAngle of Attack

AOCRD Acceptance & Operational Checkout RequirementsDocument

2-3

{t

ff °'

Page 28: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

^. o

i

i

M

G

AOPMADSAOTAPAAPCAPICAPIRD

AP I RL

APKAPLACAPPFAPPLEAPR

APS

APSSAPUAQLA&RCARARAPARCARCSARFDSARINCARPESHARPFARS

ASA

ASACASAP

ASASASCASCIIASCP

ASCSASDTICASE

ASGAS I

ASKASKAASLUASME

Airline Operations Planning ModelAcquisition of SignalAvionics Overall TestAbort Programmer AssemblyAdvanced Propulsion Comparison StudyAutomated Process Information FileAuthorized Procurement Information Requirements

DescriptionAuthorized Procurement Information Requirements

ListAstronaut Preference TestAnalysis Program For Linear Active CircuitsAutomated Payload Processing FacilityAdvanced Prcpulsion Payload EffectsAdvanced Parts ReleaseAft Propulsion System (Subsystem)Airbreathing Propulsion SystemAtmospheric Pressure Supply SubsystemAuxiliary Power UnitAcceptance Quality LevelApplication and Resource ControlAcceptance ReviewAstronaut Rescue Air PackAmes Research Center (Moffett Field, CA)Aft Reaction Control SubsystemAutomatic Reentry Flight Dynamics SimulatorAircraft Radio, IncorporatedAccurate & Reliable Prototype Earth Sensor HeadArmy Pulse Radiation FacilityAtmospheric Revitalization SystemAttitude Reference SystemAir Rescue ScienceAerosurface Servo AmplifierAmerican Standards AssociationAerodynamic Surface Assembly & CheckoutAs Soon As PossibleAerodynamic Stability Augmentation SubsystemAero Surface ControlAmerican Standard Code fog' Information InterchangeAttitude Set Control PanelAttitude Stabilization & Control SystemAnalog Signal to Discrete Time Interval ConverterAdvanced Space EngineAutomatic Support EquipmentAvionics Subsystem GroupAirspeed IndicatorAugmented System IgnitionAmended Shipping InstructionsAugmented Spark IgniterAmplitude-Shift-;KeyingAutomatic Systems for Kinematic AnalysisAntenna Select Logic UnitAmerican Society of Mechanical Engineers

i

-i

i

2-4

rr

Page 29: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

F"'

d

I

i;

E

ASP Airborne Science ProgramASQC American Society for Quality Control rASR Air/Sea RescueASRM Abort Solid Rocket MotorASS Airlock Support SubsystemASSESS Airborne Science Shuttle Experiments System SimulationASSY AssemblyAST AstronomyASTF Aeropropulsion System Test Facility

µ ASTIA Armed Services Technical Information AgencyASTM American Society for Testing MaterialsATA Avionics Test Article

Air Transport AssociationAbort Time Assembly

ATC Air Traffic ControlATCS Active Thermal Control SubsystemATDB Aerothermodynamic Data BookATE Automatic Test EquipmentATF Auditorium & Training facility iATIS Automatic Terminal Information SystemATL Advanced Technology Laboratory 4`"' ^%,ATLAS Abbreviated Test language for Avionics SystemsATO Abort to OrbitATOLL Acceptance, Test, Or Launch LanguageATP Authority To Proceed

Acceptance Test ProcedureATR Air Transport Rack

Air Transport RadioAir Transport Rating•

!. ATS Acceptance Test SpecificationAutomatic Terminal SystemApplications Technology SatelliteAdministrative Terminal System

ATT Acceptance Thermal TestingATU Audio Terminal UnitAUTODIN Automatic Digital NetworkAUTOLAND Automatic LandingAUX Auxiliary

AV AvionicsAero Environment, Inc.

AVE Atmospheric Variability ExperimentAVVI Altimeter Vertical Velocity Indicator

f=AVT Acceptance Vibration TestingAWCS Agency-Wide Coding StructureAWG American Wire GageAWL Automated Wire ListAWS American Welding SocietyAZ Azimuth

i z

^,s

s

} 2-5 1

a

d

Page 30: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i

s' V

B BitB/C Bench CheckB/L BaselineB/W Black and WhiteBA Bank AngleBAC Buffer Access Card

_ Booster Assembly ContractorB.AI Barometric Altitude IndicatorBARS Baseline Accounting and Reporting System

BB BreadboardBBC Before Business ClearanceBC Battery ChargerBCCT Break Control Command TransducersBCE Bus Control ElementBCP Benchmark Control PointBCRD Basic Consolidated Requirements DocumentBCU Bus Control UnitBOA Bermuda (STDN)BECO Booster Engine CutoffBER Bit Error RateBESS Biomedical Experiment Scientific SatelliteBFCS Backup Flight Control SystemBITE Built-In Test EquipmentBIU Buffer Interface Unit e

BLOW Booster Lift-Off WeightBMAP Buffer MapBME Bench Maintenance EquipmentBMS Background Measurement SatelliteBOD Beneficial Occupancy DateBOE Break of Entry`BOF Beginning of FileBOI Break of InspectionBOM Bill of Material

Beginning of MonthBOP CEA Boeing P l astic Analysis Capability for Enginesi g a A Y Y 9PBOT Beginning of TapeB&P Budgetary and PlanningBP BoilerplateBPD Baseline Program DocumentBPI Bits Per InchBPS Bits Per SecondBRAVO Business Risk and Value of Operation in Space [`^

BRRS Banana River Repeater StationB/SC Break Skid ControlBSI Basic Shipping Instructions

BSM Booster Separation MotorsBSRM Booster Solid Rocket MotorBTC Bus Tie ContractorBtu British Thermal UnitBU Backup

- BUOU Backup Optical UnitBUR Backup Rate

BW Bridgewire

2-6

Page 31: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a ^

i

o

-C— r

C CandleCapacitanceCentigradeCycleHundredComplete j

C-C Carbon-CargonC-To-C Computer-To-ComputerC/D CountdownC/F Center FrequencyC/o Checkout

CutoffC/S Counts per SecondCA Cone Angle

Cost Account'CorrectiveAction KR

CAB Civil Aeronautics BoardCACON Cargo ContainerCAD Computer Aided DesignCADE Controller/Attitude-Direct ElectronicsCADS Command and Data SimulatorCADSI Communications and Data Systems IntegrationCADU Control & Display UnitCAL Cornell Aeronautical LaboratoryCAM Computer Aided Manufacturing

Content Addressable Memor y isCAN Certification Analysis Network x

CAP Contractor Acquired PropertyCost Account Package

CAR Corrective Action RequestCertification Approval Request

CARID Customer Acceptance Review Item DispositionCARR Customer Acceptance Readiness ReviewCAS Command Augmentation System l

' CAU Command Acquisition UnitCustomer Acquisition Unit

CB Circuit Breaker •,CBIL Common and Bulk Items ListCBR California Bearing RatioCBX C-Band TranspondehCCA Contract Change AuthorizationCCAFS Cape Canaveral Air Force StationCCATS Command, Communication & Telemetry Subsystem"CCB Configuration Control BoardCCBD Configuration Control Board Directive

s. 2-7

2

Page 32: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

hf

V I I ICCC Controller Checkout Console

Central Computer ComplexCCD Change-Coupled Device

Checkout Command DecoderCCF Converter Compressor facilityCCL Commonality Candidate List

F CCM Controlled Carrier ModulationCrew/Cargo Module

CCMS Command Control & Monitoring SystemCheckout, Control & Monitor Subsystem

CCN Contract Change NegotiationContract Change Notice

CCOH Corrosive Contaminants, Oxygen 5 HumidityCCP Configuration Control Panel

Configuration Change PointContract Change Proposal

CCRA Cape Canaveral Reference AtmosphereCCS Central Control Section

Command and Communication SystemComplex Control Set

CCTV Closed Circuit Television a

CCV Chamber Coolant ValveCCW CounterclockwiseC&D Control & DisplayC&DS, Command and Data Simulator

' CD Candella (luminous intensity)CDA Command & Data Acquisition aCDBFR Common Data BufferCDC Countdown ClockCDDT Countdown Demons*ration TestCDF Circuit Design Fabrication

Confined Detonating FuseCentral Data Facili ty

CDF & TDS Circuit Design, Fabrication & Test Data SystemsCDI Course Deviation Indicator

E CDMS Command Data Management SystemCDPIS Command Data Processing & 'Instrumentation SystemCDQR Critical Design and Qualification Review

- CDR Critical Design Reviewa Commander

tCDRR Contract Documentation Requirements RecordsCOS Central Data System (Subsystem)CDSC Communications Distributing & 'Switching Center,'CDT Countdown Time

Central Daylight Time r

E Command Descriptor Table! CE Civil Engineering

Change EvaluationCEC Control Encoder Coupler

f CEI Contract End Item{ CEIAC Coastal Engineering Information Analysis Center

CEQ Council on Environmental Quality1

FCER Cost Estimating Relationship

2-8

R PRCAUCIBTLI7.'Y OF THE9111 AL PAGE IS POOP

^.

Page 33: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I

1_

CFE Contractor Furnished Equipment F

CFM Cubic Feet Per MinuteCFSTI Clearinghouse For Scientific & Technical InformationCFY Company Fiscal YearCG Center of GravityCGC Command Guidance ComputerCH ChannelCHR Cooper-Harper RatingCI Configuration InspectionCIB Change Impact Board

Change Implementation BoardCIC Control and Information CenterCIF Central Instrumentation FacilityCIL Critical Items ListCIS Central Integration Site

Change Impact. Summary 1

CIU Computer Interface UnitCL Closed Loop

Centerline '`+CLM Care Logic ModuleCLMC Central Logistics Management CenterCLS Contingency Landing Site

CM

Configuration ManagementConsumables ManagementCrew Module

CMA Configuration Management AccountingCMAO Contract Management Assistance OfficerCMAT Compatible Materials List

i CMD CommandCMG Control Moment GyroCMM Condition Monitored MaintenanceCM0 Configuration Management Office aCMRB Contractor Material Review BoardCM&S Communications Maintenance and StorageCMTS Computerized Maintenance Test SystemCNWDI Critical Nuclear Weapons Design InformationC of F Cost of Facilities

i CO Change OrderContracting Officer

CO2 Carbon DioxideCOAS Coarse Optical Alignment Sight AK'`

Crew Optical Alignment Sight

} COB Communications Office BuildingCDC Close Open CloseCOF Construction of facilitiesCOFI_ Checkout & Fault Isolation (Onboard)COFR Certificate of Flight. Readiness

f; COFW Certificate of Flight WorthinessC&M Control and Monitoring

COMAS Combined Orbital Maneuvering & Abort System

Comm CommunicationsCOMPEN CompensatorCOMPOOL Common Data ,Pool

2-g

Page 34: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1 ^

;.

COMPR CompressorCOMR&OSAT Communication Research & Development SatelliteCOMSEC Communications SecurityCONN Connect

CONT ControlCONUS Continental United States

- CDR Contracting Officer Representative s

COS Console Operating SystemCOSATI Committee On Scientific & Technical InformationCOSI Closeout System InstallationCP Circular Pitch

Center of PressureConsole Processor

CPA Critical Path AnalysisContingency Planning Aid ! E

CPAF Cost Plus Award FeeCPC Central Planning Center

Computer Program ComponentCPCR Computer Program Change RequestCPD Crew Procedures DivisionCPDS Computer Program Design (or Development) SpecificationCPE Chief Program Engineer-CPEI Computer Program End ItemCPF Cargo Processing Facility

Cost Per FlightCPFF Cost Plus Fixed FeeCPIF Cost Plus Incentive FeeCPM Computer Program Module

Critical Path MethodCPMP Crew Procedures Management PlanCPR Critical Problem ReportCPS Cycles Per Second

-CPSE Common Payload Support EquipmentCPT Cargo Processing TechnicianCPU Central Processing UnitCR Change,RequestCRAS Cost Reduction Alternative StudyCRB Change Review BoardCRC Cost Reduction CurveCRES Corrosion Resistant SteelCRG Correspondence Review GroupCRIS Calibration Recall 5 Information System

-CRN Contract Revision NumberCRPL Cosmic Ray Physics LaboratoryCRR Critical Requirements Review

Computer Run ReportCRSI Ceramic Reusable Surface InsulationCRT Cathode-Ray Tube

1CRYO CryogenicC/SCSC Cost Schedule Control Systems CriteriaCS Crew Station

Change StatusCSA Cyclic Strain Attenuator

2-10 a

;a

ni

1

Page 35: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

r

CSC Cosecant Computing AmplifierConical Shaped Charge E

CSCSAT Commercial Synchronous Communication SatelliteCSDD Control Systems Development DivisionCSDL Charles Stark Draper Laboratory (MIT)CSE Common Support EquipmentCSF Cost Sensitivity FactorCSI Control Servo InputCSM Common Support ModuleCSR Crew Station Review 4

Check Signal ReturnCSRP Computers & Software Review PanelCSS Care Segment Simulator

Computer Subsystem jControl Stick Steering a

CST Central Standard TimeCrew Station TrainerContract Supplemental Tooling

C&T Communication and TrackingCT Crawler Transporter r

CTA Controlled Thrust AssemblyCTC Chief Test Conductor

Camera, Timing & ControlCTL Control

Canoga Test LaboratoryCTM Crystalline Transitional Material

Contract Technical ManagerCTN Certification Test Network qCTP Communications Timing ProcedureCTR Contract Technical RepresentativeCTS Communications & Tracking System

Computer Test SetCTU Central Timing Unit

CUB Commonality Usage BoardCUC Computer Usage ControlCUE Common Usage Equipment s

CUDS Cumulative Data StatisticsCUIL Common Usage Item ListCUM CumulativeCUP Commonality Usage ProposalCV Coefficient of VariationCVAS Configuration Verification Accounting SystemCVT Concept Verification Test

f` C&W Caution and Warning

CW Continuous WaveClockwise

CWA Clean Work Arear CWG Constant Wear Garment

CY Calendar Year

C

t

E 2-11

^'`7

1

l^f^

Page 36: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

r,

-D-

D DeltaD/A Digital-to-AnalogD/L Downlink

j DABS Discrete Address Beacon SystemDAC Digital-to-Analytical Conversion

Data Acquisition & Control 9DACBU Data Acquisition & Control Buffer Unit lDACS Digital Acquisition & Control SystemDADS Dual Air Density SatelliteDAIS Digital Avionics Information System ?DAL Data Accession List

Data Aided LoopDAP Digital Auto PilotDAR Data Aided Receiver

Digital Autopilot RequirementsDARTS Digital Automated Radar Tracking System rDAS Data Analysis StationDASA Dual Aerospace Servo AmplifierDAU Data Acquisition UnitDB Decibels

Dry Bulb a

DBIU Data Bus Interface Unit tOBRN Data Bank Release NoticeDBUR Data Bank Update RequestD&C Displays and ControlsDC Direct CurrentDCA Design Change Authorization

`.- - DCAA Defense Contract Audit AgencyDCAR Design Corrective Action ReportDCAS Defense Contract Administration ServicesDCC Document Control CenterDCN Document Change Notice

Design Change NoticeDrawing Change Notice

DCOP Displays, Controls $ Operation Procedures t' DCP Data Collection Platform

DCPEI DEU Control Program End ItemDCR Design Certification Review_., r

Document Change RecordDesign Concern Report

O&CS Displays & Controls SubsystemDCS Design Criteria Specification

Data Control SystemDigital Command System (Subsystem)

DCSP Digital Control Signal Processor-bCU Display & Control UnitOCV DC VoltsDO Directives Documentation -DDA Digital Differential Analyzer

2 -12

Page 37: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a

DDAS Digital Data Acquisition System

j9

DD&CS Dedicated Display 5 Control SubsystemDDI Discrete Digital InputDDS Documentation Distribution System F

_DDT&E Design, Development, Test S Evaluation -4;

DDTF Dynamic Docking Test FacilityDOTS Dynamic Docking Test SystemDDU Display Driver UnitDE Design EngineeringDECL Direct Energy Conversion Laboratory (JSC)DECOM DecommutatorDEE Digital Events EvaluatorDECR DecreaseDECU Data Exchange Control UnitDEI Design Engineering IdentificationDEIS Design Engineering Inspection Simulation

Design and Evaluation Inspection SimulatorDEL DeliveryDEMOD DemodulateDEMUX Demultiplexer sDER Drawing Error ReportRESAT DesaturatedDESPOT Design Performance OptimizationDET Digital Event TimerDEU Display Electronics UnitDEW Distant Early darningDF Development Flight

Direction FindingDFCS Digital Flight Control Software

Digital Flight Control SystemDFI Development Flight InstrumentationDFRC Dryden Flight Research CenterDG Display GeneratorDIDS Defense Integrated Data SystemDIM Design Interface MeetingDIPEC Defense Industrial Plant Equipment CenterDIST DistributionDIU Digital Interface UnitDLAT Destructive Lot Acceptance Testing tDLSC Defense Logistics Services Center i

DLTR Data Link Transmission RepeaterDMA Direct Memory AccessDMC Direct Maintenance Cost a'DMCF Deservicing, Maintenance S Checkout Facility tDMS Bata Management System

Docking Mechanism Subsystem 1DMSS Data Management System Simulator (CVT)DNA Does Not ApplyDNP Dynamic Nuclear PolarizationDOD Department of DefenseDOF Direction of Flight

Degrees of freedomDOMSAT Domestic Communications Satellite

2-13_ A

a

9

11i

i

._ III u

Page 38: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i

DOS Disk Operating SystemDOT Department of TransportationDOT/CIAP department of Transportation/Climatic Import i

} Assessment ProgramDP Delayed Procurement

Design ProofDouble PoleDevelopment Phase

j DPI Detail Program InterrelationshipsDPR Definition Phase ReviewDP&S Data Processing & SoftwareDPS Data Processing System (Subsystem)

Data Processing SoftwareOPT Design Proof TestOR Discrepancy Report

Dispatch ReliabilityORB Design Review BoardDRD Data Requirements DescriptionDRI Data Rate IndicatorORL Data Requirements ListDRM Drawing Requirements Manual -'1

Design Reference MissionORR Design Requirements ReviewDRS Data Relay Station

Digital Range Safety

DRSS Discrepancy Report Squawk Sheet 1OSA Defense Supply AgencyDSN Deep Space Network

_i t DSPM Designated Subsystems Project ManagerOSS Deep Space Station

Department Summary ScheduleDST Dimensional Special ToolingDT Drop TankDTA Development Test ArticleDTCS Digital Test Command SystemDTCW Data Transfer Command WordDTMO Design, Test & Mission Operations

Development, Test & Mission OperationsOTMS Digital Test Measurement SystemDTRD Development Test Requirements DocumentOTS Data Transmission System

Data Transfer SystemOU Display Unit

t DUPLX(R) Duplex(er)DVS Design Verification Specification

DWG Drawing

x _

ji

5

2-14F

i

;

d

' •a

{

1

y

Page 39: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

s4

yii

1

t

f

I

P

-E-

E Exempt (From Traceability) dElevation Angle

_ E=E End to EndE/C Encoder CouplerE/O-IMS Engineering/Operations-Information Management System

EAC Estimate At CompletionEAFB Edwards Air Force Base

EAG Expendable AgenaEAR Engineering Analysis Report

EAS Equivalent Air SpeedEAT Environmental Acceptance Test ,

EB Electronic BeamEBW Explosive Bridge Wire

1EC Element ContractorECB Events Control BufferECCB Engineering Change Control Board

ECI Earth Centered InertialECLS Environmental Control and Life SupportECLSS Environmental Control & Life Support SubsystemECO Engine Cutoff

Engine CombustionECP Engineering Change ProposalECR Engineering Change RequestECS Environmental Control System

Engine Control SystemECU Environmental Control UnitED Edge Distance

Engineering DirectiveEDA Electronic Display AssemblyEDB Environmental Data BookEDC Engineering Design ChangeEDCP Engineering Design Change ProposalEDDR Electron Dipole-Dipole ReservoirEOF Engineering Data FileEDLN Engineering Development Logic NetworkEDP Electronic Data Processing

EDP&C Electrical Power Distribution 5 Control

EDR Engineering Design ReviewEDS Emergency Detection SystemEDT Eastern Daylight TimeEED Electro Explosive DeviceEEE Electronic, Electrical, Electromechanical

EFFGRO Efficient Growth (Computer Program)EETB Electronic Electrical Termination BuildingEGA Evolved Gas AnalysisEGT Exhaust Gas TemperatureEHF Extremely High FrequencyEHOT External Hydrogen/Oxygen TankEHP Electrical Horsepower

jl

i

2-15

'00

t

Page 40: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

-11

tr 1

f

EI Electromagnetic Interference

e

End Item

Entry InterfaceEIA Electrical Industries AssociationEIC Experimental IntercomEIDP End Item Data Package

- EIFA Element Interface Functional AnalysisEIS End Item SpecificationEIU Engine Interface UnitEIVT Electrical & Instrumentation Verification Tests

Electronic Installation Verification TestElectrical Interface Verification Test

EKG ElectrocardiagraphEL Elastic LimitELACS Extended Life Attitude Control SystemELMS Elastic Loop Mobility SystemELS Earth Landing System (Subsystem)ELSC Earth Landing Sequence ControllerELT Emergency Locator TransmitterEM Engineering Model

Exception MonitorEMA Electromagnetic AnalysisEMC Electromagnetic CompatibilityEMF Electromotive ForceEMG Surface ElectromyogramsEMI Electromagnetic Interference !EMN Engineering Management NetworkEMP Equipment Mounting PlateEMR Engine Mix RatioEMS Engineering Master Schedule

Entry Monitor SubsystemEMU Extravehicular Mobility UnitENC Encode

•' ' ENDF Evaluated Neutron Data FileENG Engine

EngineeringENVIR EnvironmentalED Engineering Order

Earth Orbit i

EOC Engine Order CapabilityEOD Explosive Ordnance DisposalEOF End Of File ^^°• '^

EOHT External Oxygen & Hydrogen TanksEOL End Of LifeEOM Engineering Operations Manual

Equations Of MotionsEOP Emergency Oxygen PackFOR Earth Orbital RendezvousEOS Emergency Oxygen System

Earth Orbit Shuttle

-Earth Observation Satellite

EO'i End Of Tape iEPC Error Protection Code {

External Power Contractor

2-16

Oi^' ^^•^i,EI`ITYE p^'ROAIIC,1BU

0R7AL O'PA 16 POOR

:a

Page 41: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

s ^.

EPOCS Electrical Power Distribution & 'Control SystemEPD Electrical Power GeneratorEM Engineering Performance Management SystemEPO Element Project OfficeEPRX Emergency Program Release NoticeEPS Electrical Power Subsystem

Experimental Power SupplyEPT Emergency Procedure Trainer

Ethylene Propylene TerpolymerEPTU Events Per Time UnitED EquivalentER Explanation ReportERA Electrical Replaceable AssemblyERAP Earth Resources Aircraft ProgramERB Engineering Review BoardERP Effective Radiation Power

Effected Radiative PowerEye Reference Point

ERRC Expendability Recoverability Repair CapabilityERS Engineering Release SystemERSI Elastomeric Reusable Surface InsulationERTS Earth Resources Technology SatelliteESA Explosive Safe Area

European Space AgencyESCA Electron Spectroscopy for Chemical .AnalysisESE Electrical Support Equipment < < y

Electronic Support EquipmentESPS Experiment Segment & Pallet Simulator aESR Engineering Support RequestESRO European Space Research OrganizationESS Experiment Subsystem SimulatorESSA Environmental Sciences Services AdministrationEST Estimate

Eastern Standard TimeESTL Electronic Systems Test LaboratoryESU Emergency Shutoff ValueESV Emergency Shutoff ValveET External Tank i

Edge ThicknessEvent Timer

ETA Estimated Time of Arrival,ETC Estimate To CompletionETLOW External Tank Lift-Off WeightETR Eastern Test RangeETROD Eastern Test Range Operations DirectiveETS Electrical Test SetETSS External Tank. Separation SubsystemEU Electronic Unit

Experimental UnitEVA Extravehicular Activity g

Earned Value AnalysisEVCON Events Control SubsystemEVF Equipment Visibility File

1

2-171

;a

f ,1

JI

Page 42: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1 ^

0 +

EVM F,rth Viewing Module rEVS Equipment Visibility SystemEVSS Extravehicular Space SuitEWA Estimated Warehouse ArrivalEWE Emergency Window EscapeEWR Engineering Work RequestEXP Experiment

-F- =a1

F Farrad (SI Unit of Capacitance)Fahrenheit

F/E Full Emptyter+

F/F Flip/FlopF/0 Fuel/OxidizerFA Final Assembly

Failure AnalysisFully Automatic

FAA Federal Aviation AdministrationFAB FabricateFAC FacilityFACT First Article Configuration InspectionFACO Final Assembly Checkout

Factory Assembly and Checkout

FAF First Aerodynamic FlightFAIR Fabrication, Assembly, & Inspection RecordFAL First Approach & Landing TestFAR Final Acceptance Review

Federal Aviation RegulationFailure Analysis Report

FAT Flight Attitude TableFAX Facsimile TransmissionFBC Fluidized-Bed CombustionFBCS Fixed Base Crew Station (SMS)FBS Firefighters Breathing System` '-FBV Fuel Bleed Valve

Field Base VisitFC Fit Check

Flight ControlFlight ComputerFuel Cell

FCA Frequency Control AnalysisFCAP Flight Control Applications ProgramFCC Flat Conductor CableFCCP Firm Contract Cost ProposalFCE Flight Crew Equipment

Flight Control Equi"v.ent

2-1$

)

I

{

^`

Page 43: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

_7?1-

L

a 0'

FCEI Facility Contractor End ItemFCF First Captive FlightFCHL Flight Control Hydraulics LaboratoryFCL Froon Coolant LoopFCO Functional CheckoutFCOS Flight Computer Operating System

Flight Control Operating SystemFCP Fuel Cell Power Plant

Firm Cost ProposalFCPS Fuel Cell Power SubsystemFCR Final Configuration ReviewFORT Flight Display CRTFCS Flight Control Subsystem

Flight Crew SystemtCS1. Flight Combustion Stability :MonitorFCT Flight Crew TrainerFD Flight Director

Function DesignatorFDA Fault Detection & AnnunciationFDAI Flight Director Attitude IndicatorFOB Fahrenheit Dry BulbFDF flight Data FileFDI Fault Detection & IsolationFDIIR Fault Detection, Isolation, Identification &

RecompensationFDM Frequency Data Multiplexer

Frequency Division MultiplexingFOS Fluid Distribution SystemFDSC Flight Dynamics Simulation ComplexFOX Full DuplexF&E Facility & EnvironmentFEA Failure Effects AnalysisFEAT Final Engineering Acceptance Test r`FEC Field Engineering ChangeFED Flight Events DemonstrationFEID Flight Equipment Interface Device

Functional Engineering Interface DeviceFEMCPL Facilities and Environmental Measurement

Components Parts ListFEP Front End Processor

Floral Ethyl Propane ,• ,-FF Flip Flop a

z FFnn Functional Flow Block DiagramFFC Final Flight CertificationFFD Functional Flow DiagramFFM Free-Flying (Experiment) ModuleFFP Firmed Fixed PriceFFTO Free Flying TeleoperatorFHF First Horizontal FlightFHP Fuel High PressureFIAR Failure Investigation Action ReportFIFO First In-First Out (High Speed Data Buffers)FIIG Federal Item Identification Guide

2-19

t

Page 44: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

,,

f

i

F I S Facility Interface Sheets

FIT Fault Isolation Test r7

FKB Flight Display KeyboardFL Flowline

Feed Lines_ FtC Federal Library Committee

FLT FlightFM Frequency ModulationF-MEA Failure Modes & Effects AnalysisFMEC Forward Master Events ControllerFMOF First MannedOrbital FlightFRM Field Modification Request 1FMX FM TransmitterFND facility Need Date 1

FO/FS Fail-Operational/Fail-SafeFOB Freight On Board

Flight Operations Building lFOD Flight Operations Directorate WSC)FOF First Orbital Flight ,FOPG Flight Operations Planning Group ^< ..

- FORTRAN Formula TranslationFOSDIC Film Optical Sensing Device for Input to ComputersFOV Field Of Vision

First Orbital VehicleFP Fuel Pressure

Freezing PointFunctional Path

FPB Fuel Preburner i

FPBOV Fuel Preburner b Oxidizer ValveFPE Functional Program ElementEPIF Fixed Price Incentive FeeFPL full Power LevelFPM Feet Per MinuteFPR Flight Performance Reserve

FPS Feet Per SecondFQR Flight Qualification Recorder

FR Firing RoomFRC Flight Research Center (now DFRC) i

FRCS Forward Reaction Control SubsystemFRF Flight Readiness FiringFRR Flight Readiness Review k. rFRRID Flight Readiness Review Item DispositionFiT Flight Readiness TestrS Fail Safe

Federal SpecificationFSAA Flight Simulator for Advanced AircraftFSC Federal Stock ClassificationFSCM Federal Supply Code for ManufacturersFSI Final Systems InstallationFSIM Function SimulatorFSK Frequency Shift KeyedFSLT First Sea Level TestFSN federal Stock Number ".

2-20-

j

Page 45: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

FSS Flight Systems SimulatorFSSR Functional Subsystem Software RequirementsFSTE Factory Special Test Equipment rFT Flight TestFTA Fatigue Test ArticleFTC Flight Test ConductorFTE Factory Test Equipment

Forced Test EndFTIS Flight Test Instrumentation SystemFTOH Flight Team Operations HandbookFTP Functional Test ProgressFTRD Flight Test Requirements DocumentFUNCT FunctionalFUO Follow-up OutputFV Front ViewFVF First Vertical FlightFWB Fahrenheit Wet BulbFWD ForwardFWWM Food, Water & Waste ManagementFWWMS Food, Water & Waste Management SubsystemFY Fiscal Year

G GravityG-A Ground-to-AirG-G Ground-to-GroundG&A General & AdministrativeGA Gyro AssemblyGAC Grumman Aerospace CorporationGAIN Graphic Aids for Investigating NetworksGAM GammaGAD General Accounting Office t

GAP GOAL Automatic ProcedureGAPL Group Assembly Parts List °

3

GATT Gate Assisted Turn Off ThyristorGSI Grand Bahama IslandGBL Government Bill of LadingG&C Guidance & ControlGCA Ground Controlled ApproachGCOC Ground Checkout Display & Control Syste+n

GCI Ground Controlled InterceptionGCS Guidance Cutoff SignalGCTS Ground Communication Tracking SystemGCU Gyro Coupling Unit

Generator Control Unit

2-21€i

a

Page 46: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1i

j

GOBS Generalized Data Base SystemGDS Goldstone, California (STDN)GE General ElectricGEDAC General Electric Detection & Automatic CorrectionGEOPAUSE Geodetic Satellite in Polar Geosynchronous OrbitGEOSEPS Geosynchronous Solar Electric Propulsion StageGERT Graphical Evaluation & Review TechniquesGET Ground Elapsed TimeGETS Ground Equipment Test SetsGF&P Gases, Fluids & PropellantsGFAE Government Furnished Aircraft EquipmentGFD Government Furnished DataGFE Government Furnished EquipmentGFP Government Furnished PropertyGFRP Graphite Fiber Reinforced PlasticGFY Government Fiscal YearGH2 Gaseous HydrogenGHA Greenwich Hour-Angle

General Housekeeping AreaGHe Gaseous Helium ^<<GIM Generalized Information ManagementGITS Ground Interface Technical GroupGdWS Ground Interface Working GroupGLAADS Gun Low Altitude Air Defense SystemGLC Generator Line ContractorGLOW Ground Lift-Off WeightGLY GlycolGMAP General Electric Macro Assembly LanguageGMIL Spaceflight Tracking and Data Network Station (KSC)GMT Greenwich Mean TimeG&N Guidance & NavigationGN2 Gaseous NitrogenGN&C Guidance, Navigation & ControlGNC Guidance and Navigation ControlGNCIS Guidance, Navigation & Control Integration SimulatorGND GroundGNP Gross National ProductGO General Order iG02 Gaseous OxygenGOAL Ground Operations Aerospace LanguageGOCA Ground Operations Control AreaGOPG Ground Operations Planning Group r°GORP Ground Operations Requirements PlanGOSS Ground OperationsSupport SystemGOX Gaseous Oxygen (G02)GP General Purpose 4

General Publication (KSC)GPAS General Purpose Airborne SimulatorGPC General Purpose Computer

Gel Permeation ChromatographGPCB GOAL Program Control BlockGPME General Purpose Mission EquipmentGPRN GOAL Test Procedure Release Notice

i2-22 i

1}

a

f 1I

J'

7

iI

Page 47: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

_

x e

if

GPSS General Purpose Simulation System (IBM)

GPTE General Purpose Test Equipment

GPUR GOAL Test Procedure Update Request fGRID Graphic Retrieval & Information Display ".

GSA General Services Administration

GSC GOAL System Configuration

GSCU Ground Service Cooling Unit

GSDL Ground Software Development Laboratory

GSE Ground Support Equipment

GSEL Ground Support Equipment List

GSFC Goddard Space Flight Center (Greenbelt, MD)

GSVP Ground Support Veri'.ication Plan

GT Grount Test

GT&A Ground Test and Acceptance

GTA Ground Test Article

GTI Grand Turk Island

GUL GSE Utilization List

GVT Ground Vibration Test

GVTA Ground Vibration Test Article

• GW Gross Wei ht-' GWA General Work Area

GWM Guam (STDN)

GWT Ground Winds Tower

GYM - Guaymas, Mexico (Remote Site)

GYROA Gyro A

r

.H.,

H Henry (SI Unit)H2 Gaseous Hydrogen

H/E Heat Exchanger

H/L Hardline

H/S Heat Shield

u H/T Heat Treat

HA Hazard Analysis,.";.Y>

HAA High Altitude Abort

HAFB Holloman Air Force Base -

HAL High-Order Assembly Language

—HAS Holddown Alignment Support

HAST High Altitude Supersonic TargetHAWHawaii (STDN)

HB High Bay

HBW Hot Bridge Wire 7HC Head Count

Hybrid Computer

HCMM Heat Capacity Mapping Mission

2-23

.T >_ - - - - -

Page 48: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

Il

a a

` HDQTRS HeadquartersHONE Hardware }He HeliumHEM Hatchhike Experiment ModuleHEO High Energy OrbitHEPA High Efficiency Particle Accummulator

zl_"

HER HIM Equipment Rack j

HERSCP Hazardous Exposure Reduction & Safety Criteria PlanHESS High Energy Squib SimulatorHF High Frequency

Horizontal FlightHFC Hydraulic Flight Control

Heat Flow & ConvectionHFCT Hydraulic Flight Control PestHFCV Helium Flow Control ValveHFT Horizontal Flight TestHFTF Horizontal Flight Test FacilityHFTS Horizontal Flight Test SimulatorHFX High Frequency TransceiverHGA High Gain AntennaHGDS Hazardous Gas Detection SystemHGM Hot-Gas ManifoldHGR&SPTFAC Hangar and Support FacilityHGVT Horizontal Ground Vibration TestHI Honeywell, Inc.HIM Hardware Interface Module

a

HIPO Hierarchical Input-Process OutputHL Hinge Line

Heel LineHMG Hybrid MicrocircuitHMF Hypergol Maintenance Facility

Horizontal_ Mating FacilityHMP Hypergol Maintenance FacilitiesHMX CycloteramethylenetrinitraimineHNS HezanitrostilbeneHO Hydrogen-OxygenHOL High-Order LanguageHP High Pressure fHPFTP High-Pressure Fuel TurbopumpHPGS High Pressure Gas System s

HPI High Performance InsulationHPOP High Pressure Oxidizer PumpHPOTP High-Pressure Oxidizer TurbopumpHPS Hydraulics Power System ]HPU Hydraulic Power UnitHQ HeadquartersHR Hour

Hydrogen Relief aHRIR High Resolution Infrared RadiometerHRL Horizontal Reference LineHRPS Hazard Reduction Precedence Sequence -HRS Hours a

HRSI High Temperature Reusable Surface Insulation

i

2-24-iy

}

Page 49: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I

t

HRT High Resolution TrackerHS High Speed {

HSCU Hydraulic Supply and Checkout UnitHSF Hypergol Servicing Facility

HSG High Sustained G2 AccelerationHSI Horizontal Situation IndicatorHSL Hardware Simulation Laboratory

- HT Heat TransferHiLL High Test Level LanguageHTPB Hydroxyl Terminated PolybutadieneHTS Heat Transport SystemHUL Hardware Utilization ListHV High VoltageHVAC Heating, Ventilating & Air Conditioning

HVSF Honeywell Verification Simulation Facility

HVSL Holidays, Vacation & Sick LeaveHW Hotwire

HardwareHYD Hydraulics

Hydraulic Subsystem

HYGL Hypergolic 4"

HYPACE Hybrid_ Programmable Attitude Control Electronics

HZ Hertz (cycles per second)

-I-

I Iodine

aa

AI/F Interface

I/FU Interface Unit., L/0 Input/Output

I/T Intertank

- IA Input Axis k

Implementation AgencyIssuing Agency

`Inverter Assembly

1 e AbstractsIAA International Aerospac bs actsIAD Interface Agreement Document

Interface Analysis Document

IAS Indicated Airspeed

•, IAV Inventory Adjustment Voucher

IB Inert BuildingInstruction Book

IBM International Business MachinesIBF Internally Blown Flap

I&C Installation & Checkout

;z

2-25

d

Page 50: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a u

T

IC Intercommunications jInterim ChangeInformation Center rIntegrated CircuitIncremental CostIntercomputer Channel FF

ICA Item Change Analysis' ICAR Investigation & Corrective Action Report

ICS Interim Change BulletinInterrupt Control Block -

ICC Inter-Computer ChannelInterface Control ChartInterstate Commerce Commission

- ICCP Interface Coordination & Control ProcedureICD Interface Control DocumentICDU Inertial Coupling Data UnitICE Instrument/Communication Equipment

Instrument Checkout EquipmentINS Indirect Cost Management SystemICO Integrated CheckoutICR Instruction Change Request ^=ICS Interpretive Computer SimulatorICT Interface Control ToolingING Interface Control Working GroupID Inside Diameter

IdentificationInterface Document i

IDO Interdivisional OperationsIN Intermediates Design ReviewIND Information Definition Requirements DocumentIDS Item Description Sheet

Interface Data SheetIDTA Interdivisional Technical AgreementIDU Interface Demonstration UnitIDWA Interdivisional Work AuthorizationIEA Integrated Electronics AssemblyIF Intermediate FrequencyIFA Interface Functional AnalysisIFB Invitation For BidIFN Inflight MaintenanceIFO Information Systems OfficeIFR Instrument Flight RulesIFTV Interim Hypersonics Test VehicleIG Internal GuidanceIGA Inner Gimble AngleIGDS Iodine Generating & Dispensing SystemIGM Interactive Guidance ModeIHTV Interim Hypersonics Test VehicleILP Integrated Logistics PanelILS Instrument Landing System

Integrated Logistics SupportIMPL ImplementIML Inside Mold Line

2-26

PAGE f

a — k

Page 51: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

r

IMS Inventory Management SystemIMU Inertial Measurement UnitINC Installation Notice CardINCL IncludeINCR IncrementIND IndicatorINIT Initial

InitiateINS Inertial Navigation SystemINSTL Installation aINSTL & C/O Installation & Checkout

1INSTR InstrumentINSTRUM Instrumentation SubsystemINT Integrated TestingINTASAT Instituto National De Techice Aerospacial SatelliteINTV Interim Hypersonics Test VehicleINV MGT Inventory ManagementIO Industrial Operations (MSFC)IDA Input Output AdapterIOB Input/Output Buffer<IOC Initial Operational Capability

Input/Output ControllerI pdirect Operating Costs

IOP Input-Output Processor ?IOPL Integrated Open Problem List 1

IDS Instructor Operator StationIndian Ocean Ship (Tracking)Input/Output Supervision

IP Identification of PositionIntermediate Pressure

IPACS Integrated Power 5 Attitude Control SystemIPAD Integrated Program for Aerospace Vehicle DesignIPB Illustrated Parts Breakdown

Illuminated Push ButtonIPC Intermittent Positive. ControlIPCL Instrumentation Program 3 Component ListIPE Industrial Plant EquipmentIPL Indentured Parts List f

Initial Program Load

IPR Interim Problem Report {IPS Instrumentation Power Subsystem

Inverter Power Su PP'Y jInches Per SecondInternational Pipe Standard

IPT International Pipe ThreadI&R Interchangeability 3 ReplaceabilityI&RS Instrumentation b Range SafetyIR Infrared

Inside RadiusIRAN Inspection & Repairs As NecessaryIRD Information Requirements DocumentIRG Inertial Rate Gyro

2-27

e

Page 52: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I4

IRIG Inertial Rate Integrating GyroInter-Range Instrumentation Group r

IRL Interface Requirement ListIRME Initiator Resistance Measuring EquipmentIRN Interface Revision NoticeIRR Integral Rocket RamjetIRTCMS Integrated Real Time Contamination Monitor SystemIRU Inertial Reference UnitIRV Isotope Reentry VehicleI&S Interchangeability and SubstitutabilityIS Installation SupportISI Initial Systems InstallationISIL Interim Support Items ListISP Initial Specific ImpulseISPG Institutional Support Planning GroupISS Instruction Summary SheetIST Integrated Systems TestISTB Integrated Subsystem Test BedITE Instrumentation Test EquipmentITS Instrumentation Telemetry StationITI Inspection & Test InstructionIU Instrumentation UnitIUCS Instrumentation Unit Updata Command SystemIUS Interim Upper StageIVA Intravehicular ActivityIVAR Internal VariableIVE Interface Verification EquipmentIWBS Indirect Work Breakdown Structure

J Joule (SI Unit)J/M Jettison MotorJAN Joint Army-NavyJAS Journal of Aerospace Science }JB Junction Box IJCL Job Control languageJCT Junction

' JIR Job Improvement RequestJO Job OrderJOC Joint Operations CenterJOD Joint Occupancy DateJOP Joint Operating ProcedureJOR Job Order RequestJP Jet Propellant

Jet PropulsionJPIC Joint Program Integration Committee

2-26

'I

Page 53: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

LL ^,

Y

JPL Jet Propulsion LaboratoryJPP Joint Program PlanJSC Johnson Space Center iJSLWG Joint Spacelab Working GroupJST Joint Systems TestJURG Joint Users Requirements Group

-K_i

K KiloKevin ScaleOne Thousand

K-LBS Thousand Pounds <r ,•°"K-SM KSC Shuttle Management DocumentK-STSM KSC STS Management DocumentK/S Kick StageKAPL Kennedy Approved Parts ListKBPS Kilobits Per SecondKCAS Knots Calibrated AirspeedKCSKDN

Key Configuration StudiesKinetically Designed Nozzler

KHB Kennedy HandbookKHZ KilohertzKIAS Knots Indicated AirspeedKMI Kennedy Management InstructionsKN Kennedy NoticeKNO Kano, Nigeria (Remote Site)KOI Kennedy Operation InstructionKOPS Thousand of Operations Per SecondKPD Kennedy Program DirectiveKPRD Kennedy Program Req u irements Document kKPS Kilometers Per SecondKSC Kennedy Space CenterKVA Kilovoltamphere

KW KilowattKYBD Keyboard y

9

2-29

1

!

Page 54: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

7

a u

F^

L LeftLaunchLumenLevelLength

L/D Lift-to-Drag RatioLength to Diameter

L/0 Lift-OffLA Launch Abort

LanthanumLaunch AreaLaunch AzimuthLightning Arrestor

LACB Landing Aids Control BuildingLAD Los Angeles Division (Rockwell) s< ,.,LAGS Launch Abort Guide SimulationLARC Langley Research Center (Hampton, VA)LARS Laminar Angular Rate SensorLARSYSAA Laboratory for Application of Remote Sensing System

for Aircraft AnalysisLASCOT Large Screen Color Television SystemLAT Latitude

LateralLot Acceptance Test

LB Low BayLoad BankPound

LBOT Low Bay Dolly TugL&C Laboratory and CheckoutLC Launch ComplexLCA Launch Control AmplifierLCC Launch Control Center

Life Cycle Cost iLCCO Launch Commit Criteria DocumentLCD Launch CountdownLCG Liquid Cooled GarmentLCHTF Low Cycle High Temperature FatigueLCR Low Cross RangeLCU Line Coupling Unit

Length to DiameterL&D Landing & DecelerationLDB Launch Data BusLDEC Lunar Docking Events ControllerLDEF Long Duration Exposure FacilityLDS Landing, Deservicing & Safing

Landing/Deceleration Subsystem

2-30

t

F

1

r e

Page 55: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I ..

LE

LEALEDLERCLESLESSLETFLF

LGA

LHLH2LHALIDARLIMLIMSLINJETLIOH

L&LLL

LLCFLLPLMFLMKLMSCLN2LNDGLNGLOL02LOALOAPSLOBLOCLOELORALORANLOS

LOV

LOXLP

LPOLPFTPLPG

I LPMWS

I

i

1

-1

Launch Escape

Leading EdgeLoadsLogistics Engineering AnalysisLight Emitting DiodeLewis Research Center (Cleveland, OH)Launch Escape SubsystemLeading Edge Structure SubsystemLaunch Equipment Test FacilityLaunch FacilityLow FrequencyLoad FactorLow Gain AntennaLeft HandLiquid HydrogenLocal Hour-AngleLaser-RadarLimitLogistics Inventory Management SystemLiquid Injection Electric ThrusterLithium HydroxideLaunch & LandingLong LeadLow LevelLaunch b Landing Computational FacilitiesLaunch & Landing ProjectLower Mid FuselageLandmarkLockheed Missiles & Space CorporationLiquid NitrogenLanding

Liquified Natural GasLaunch OperationsLiquid OxygenLanding Operations AreaList Of Applicable PublicationsLine Of Balance -Launch Operations ComplexLevel Of EffortLevel Of Repair AnalysisLong Range NavigationLine Of SightLoss Of SignalLimit Of Visibility

Loss Of VisibilityLiquid OxygenLow PressureLaunch Pad -Launch Procedure DocumentLow-Pressure Fuel TurbopumpLiquid Propellant GunLaunch Pad Lightning Warning SystemLines Per Minute

2-31

i

Page 56: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

+4.1.

i

1

r__ _. _... _..I _ —_ .,.....i... a. I

V C

LPOP Low-Pressure Oxidizer PumpLPOTP Low-Pressure Oxidizer TurbopumpLpR Line PrinterLPS Launch Processing System

Liters Per SecondLPW Lumens Per WaitLRSI Low Temperature Reusable Surface InsulationLRU Line Replaceable UnitLRV Launch Readiness VerificationLUS Logistics '& SupportLS Limit SwitchLSB ,Lower Side Band

Least Significant ,BitLSC Linear Shaped ChargeLSE Launch 'Support Equipment

Life Support EquipmentLSD Landing Ship DockLSM Life Science ModuleLSR Land Sea Rescue

Launch Site RecoveryLSS Life Support SubsystemLSSL Life Sciences Space LaboratoryLSSM Launch Site Support ManagerLS/ST Light Shield/Star TrackerLST Launch Support Team

Local Standard TimLiquid Storage TankLarge Stellar TelescopeLarge Space Telescope

L&T Laboratories & TestLUT Launcher-;Umbilical TowerLV Launch VehiciE

Lift VectorLow Voltage

LVDC Launch Vehicle Digital ComputerLVOT Linear Voltage Differential TransformerLVLH Local Vertical/Local HorizontalLWR LowerLWS Lightning Warning System

r s

i,

Page 57: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

", sI

rA:

_M_

1

M MeterMercury:Mass

- MandatoryMillionMega

M MaintainabilityM- Time in Days Before Move OperationsM-KG Meter-KilogramM-M-L-S Model-Modes-Loads-StressesM/S Measurement StimuliM/SCI Mission/Safety Critical ItemM/U Mockup pMA Master

Maintenance AbilityMilliamperesMaterial Authorization kMissed ApproachMike Amplifier

Ma Maintenance (STS)MAA Mathematical Association of AmericaMAB Missile Assembly Building e

Mechanical Automation BreadboardMaterials Advisory Board

MAC Mean Aerodynamic ChordMulti-Access Computer

` Maintenance Advisory CommitteeMilitary Airlift Command

MACH MachineMACO Major Assembly CheckoutMACRO Merge & Correlate Recorded Output (Program)MAD Maintenance Analysis Data

Madrid, Spain (STDN)MAF Mixed Amine Fuel

Manpower Authorization fileMichoud Assembly Facility

MAG MagneticMagnitude

W Machine-Aided IndexingMAIDS Management Automated Information Display System

Multipurpose Automatic Inspection & Diagnostic System

MAIR Manufacturing And Inspection RecordMAL Malfunction

Material Allowance ListMALL MalleableMAN Manual

Microwave Aerospace NavigationMAP Missed Approach Point

Message Acceptance PulseMaintenance Analysis Program

t

2-33

Al

k

Page 58: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

-1

t

I

{

MAPOLE Magnetic Dipole Spark TransmitterMATCO Material ControlMATL MaterialKAU Million Accounting UnitsMAX MaximumMAXCO Maximum Dynamic PressureMBCS Motion ­Rase Crew Station (SMS)MBFP Manufacturing, Build and Flow PlanMSPS Megabits Per SecondMBO Management By ObjectiveMB5 Megabits Per SecondMBV Main Base VisitM&C Maintenance & CheckoutMCBF Mean Cycle Between FailuresMC&C Met C d d C t 1asuremen omman- an on roMCC Main Combustion Chamber

Mission Control CenterMCC-DOD Mission Control Center - DODMCC-H Mission Control Center - HoustonMCC-K Mission Control Center - KennedyMCC-NASA Mission Control Center - NASAhCCC Mission Control and Computing CenterMCCS Mission Control Center Simulation (System)MCDS Multifunction Cathode Ray Tube Display SystemMCDU Multifunction CRT Display UnitMCF Maintenance & Checkout FacilityMCIU Manipulator Controller Interface UnitMCL Master Configuration ListMCN Master Change NoticeMCO Mission Control OperationsMCOP Mission Control Operations PanelMCP Master Change Proposal

Master Computer ProgramMeasurements Control ProcedureMission Control ProgrammerMaterials Control Plan

MCR Master Change Record

1

MCS Maintenance & Checkout StationMeasurements Calibration System

MCW Modulated Continuous WaveMD Mission Director

MicrodotMaster DimensionMalfunction Detection

MDA Maintainability Design ApproachMDAC McDonnell Douglas Aircraft CorporationMDAR Malfunction Detection Analysis b RecordingMOAS -Meteorological Data Acquisition System

Mission Data Acquisition SystemMOB Mission Data Book aMDC Main Display Console

^- Mission Director Center,_

2-34

p.VRODUCIBMI C

ORIONAL PAGE ;1

Page 59: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i J."

R

MOCS Maintenance Data Collection SystemMaterial Data Collection SystemMaster Digital Command System

MOD Mate/Demate DeviceMOE Modular Display Electronics

Mission Dependent Equipment- Mission Dependent Experiment

MDF Mating/Demating FacilityMild Detonating Fuse

MDL Master Data LibraryMOM Multiplexer/DemultipiexerMDR Maintenance Demand Rate a

Missing Data ReportMajor Design ReviewMinor Discrepancy RepairMission Data Reduction 1

MORD Mission Data Requirements DocumentMDS Management Data System

Master Development ScheduleMalfunction Detection SystemMinimum Discernible System

MDT Mountain Daylight TimeMeasurement Descriptor TableMean Down TimeMean Detonating Time

ME Main EngineManagement EngineeringMiscellaneous Equipment

MEA Maintenance Engineering AnalysisMain Electronics Assembly 3

MEARS Maintenance Engineering Analysis RecordsMEBO Main Engine Burnout- 1MEC Main Engine Controller

Master Event Controller

MECA Main Engine Controller AssemblyM Computational FacilitiesMECE Main Engine Co ut lon 19 mP

MECH MechanicalMECO Main Engine CutoffMECR Maintenance Engineering Change RequestMED Medium

Medical t

MEDICS Medical Information Computer System''''MEE Mission Essential EquipmentMEG MegohmMEI Master Inspection ItemMEL Minimum Equipment ListMELI Master Equipment List IndexMEOP Maximum Expected Operating PressureMEP Mean Effective Pressure

Management Engineering ProgramMER MeridianMERL Materials Engineering Research LaboratoryMERSAT Meteorology and Earth Observation Satellite

Z-35

If7^°

{

I^ f

Page 60: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

r.1

fz z

I MES Main Engine StartMET Mission Elapsed Time ir

MeteorologicalMF Medium Frequency

Mate and FerryMFA Manned Flight Awareness

_ MFBP Manufacturing Flow & Building PlanMFC Multiple Flight C=p - +or

Multiple Flight ControllerMFD Malfunction Detection

Master file DirectoryMFG Manufacturing

Major Functional GroupMFR Maximum Flight Rate

Multifunctional ReceiverMFT Mean Flight TimeMFV Main fuel ValveMG Magnesium

Mobile GeneratorMGA Middle Gimbal AngleMGE Maintenance Ground EquipmentMGMT ManagementMGSE Mechanical Ground Support EquipmentMGT Major Ground TestMGVT Mated Ground Vibration Test 1MHD Multi-Head DiscMHE Material Handling EquipmentMHF Medium High FrequencyMHZ Megahertz (Megacycles per second)MI Mile

' MIA Multiplex Interface AdapterMIC Management Information Center iMICIS Material Inventory Control & Inventory SystemMICOM Missile Command (Army) 3MICE Management. Information and Control SystemMIL MilitaryMILA Merritt Island Launch AreaMIMOSA Mission Modes and Space AnalysisMIms Medical Information Management System iMIN Minimum

MinuteMIO_ Management Integration OfficeMIP Mandatory Inspection Point

Modification Instruction PackageMIPS Merritt Island Press SiteMIR Malfunction Investigation ReportMIS Management Information System

Mission Information SubsystemMISC MiscellaneousMISS MissionMIT Massachusetts Institute of Technology (CSDL)MITTS Mobile Igor Tracking Telescope SystemMIUS Modular Integrated Utility SystemsKI Mechanical Joint

2=36

Page 61: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

3

I I'- ML Mobile Launcher

r`Mold Line

MLC Mobile Launcher ComputerMLG Main Landing GearMLGS Microwave Landing Guidance SystemMLI Multilayer insulation

- MLP Mobile Launcher PlatformML PED Mobile Launcher Pedestal

,s

MLS Microwave Landing SystemM&M Materials & MaintenanceMM Millimeter

Mass MemoryMan-MonthMain Module

MMC Mission Management CenterMMDF Mission Model Data File14M Monomethyl Hydrazine

Maintenance Man-HourMML Master Measurement List ,?MMLS Model-Modes-Loads-Stresses y• _%'MMOS Multimode.Optical SensorMMSE Multiuse Mission Support EquipmentMMU Manned Maneuvering UnitMO Manufacturing Order

MonthMajor ObjectiveMolybdenum

MOA Make On ArrivalMemorandum Of Agreement

C. MOCF Mission Operations Computational Facilities3

MOCR Mission Operations Control RoomMOCS Multichannel Ocean Color Sensor nMOD Modification

ModulatorModule

MODART Methods of Defeating Advanced Radar ThreatsMODEM Modulator-DemodulatorMOF Manned Orbital Flight i

MORO Mission Operations Requirements Document +MORT Management Oversight and Risk TreeMOS Metal Oxide Semiconductor

Metal Oxide on a SubstrateMOSPO Mobile Satellite Photometric ObservatoryMOT MotorMOU Memorandum Of UnderstandingMOV Main Oxidizer ValveMP Medium Pressure

Management PackageM&P Material & ProcessingMPB Maintenance Parts BreakdownMPG Multipoint GroundingMPHE Material & Personnel Handling Equipment a

Y 2-37

Page 62: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

" MPL Minimum Power LevelMaintenance Parts List r

MPM Manipulator Positioning MechanismMPP Material Processing Procedure

Merit Promotion PlanMPR Maintainability Problem ReportMPS Main Propulsion Subsystem

Master Program ScheduleMPSR Mission Profile Storage& Retrieval a

MPT Main Propulsion TestMPTA Main Propulsion Test ArticleMPTF Main Propulsion Test FacilityM&R Maintenance & Refurbishment

Maintenance & Repair fiMR Mixture RatioMRA Mechanical Readiness AssessmentMRB Material Review BoardMRC ?4aasurement Requirements Committee`MRD Mission Requirements Document ^a

Material Review Disposition

i

MRIR Medium Resolution Infrared RadiometerMRL Material Requirements ListMS Millisecond

Mass SpectrometryMilitary Standard (Parts Designation) eMaster SwitchMachine ScrewMachine SteelMilestone

MSA Material Service AreaMinimum Surface Area

MSB Most Significant BitMSBL5 Microwave Scanning Beam Landing StationMSC Master Sequence Controller

Materials. Service CenterMSDS Multispectral Scanner and Data SystemMSE Maintenance Support Equipment

Medical Support EquipmentMSF Manned Space FlightMSFC Marshall Space Flight CenterMSG Message ur

MSI Maintenance Significant ItemsMSL Mean Sea Level

Mechanical Systems LaboratoryMS/MS Material Science and Manufacturing in Space

MSM Manned Support ModuleMSO Model for Spares OptimizationMSOCC Multisatellite Operations Control CenterMSS Manufacturers Standardization Society

Mission Specialist StationMobile Service StructureMultispectral Scanner System

t

2-38

iz

y

j

a

1%

Page 63: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

- u

MST Mountain Standard TimeMeasurement Status Table

MSU Mass Storage UnitMeasuring Stimuli Units

MSW MicroswitchMT Magnetic Tape

MountMountain TimeMaximum TorqueMaster TimerMechanical TechnicianMaster Tool

MTA Major Test ArticleMass Thermal Analysis

MTS Materials Testing BranchMTBF Mean Time Between FailuresMTBM Mean Time Between MaintenanceMTBMA Mean Time Between Maintenance ActionMTC Master Thrust Control r:.

MTCA Monitor & Test Control AreaMTCU Magnetic Tape Control Unit

0 MTD MountedMTDSK Magnetic Tape DiskMTE Multi-System Test EquipmentMTF Mississippi Test Facility (Now NSTL)MTFO Modular Training Field OptionMTV MountingMTL MaterialMTM Methods Time MeasurementMTO Mission, Task, Objective

Modification Task OutlineMTP Master Test Plan

Mission Test PlanMTR Mean Time to RepairMTS Magnetic Tape Station '(system)MTTA Mean Time to AccomplishMTTF Mean Time to FailureMTTFF Mean Time to First Failure Y_

MTTR Mean Time to RepairMTU Magnetic Tape Unit

Master Timing UnitMobile Training Unit

MU Mobile UnitMultiple UnitMaster Unit

MUA Maximum Usable AltitudeMUF Maximum Usable FrequencyMULT MultipleMUMS Multiple Use Marc SystemMUX MultiplexerMV Manufacturing Verification

MillivoltMVA Megavolt Ampere

I

Page 64: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i

Y T

MVAS

f

Multipurpose Ventricular Actuating SystemMVC Master Volume Control r

Manual Volume ControlMVGVT Mated Vertical Ground Vibration TestMVM Mariner Venus/MercuryMVP Master Verification Plan

_ MW MilliwattMicrowave

MWB Master Work BookMWP Maximum Working PressureMWR Mean Width RatioMWV Maximum Working VoltageMX MultiplexMY Man Years 3

-N- 4'^ W = j

N2 NitrogenN2H4 HydrazineN204 Nitrogen TetroxideN/A Nest AssemblyN/B Narrow BandN/C Normally ClosedN/0 Normally OpenN/P Not -ProvidedNA Not ApplicableNAAL North American Aerodynamic Laboratory (Wind Tunnel)

I. NAC NacelleNAEC Naval Air Engineering CenterNAM National Association of ManufacturersNAP Navigation Analysis ProgramNAR Numerical Analysis ResearchNARS National Archives & Record ServiceNAS National Aircraft Standards

Naval Air StationNational Academy of Sciences

NASA National Aeronautics and Space AdministrationNASCOM NASA Communications NetworkNASTRAN NASA Structural AnalysisNATL NationalNATF Naval Air Test FacilityNAVID Navigation AidNAVSAT Navigation SatelliteNB No Bias (Relay)

Navigation BaseNitrogen BaseNiobium

2-40

y

I

Page 65: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

- V

NBS National Bureau of Standards

NC Numerical ControlNational CoarseNo ChangeNo Comment

- NCC NASA Class CodeNCGS Nuclear Criteria Group Secretary

ND NASA DocumentNeodymium

NDE Non-Destructive Evaluation

NDI Non-Destructive Inspectioni

NOT Non-Destructive Testing iNEC National Electrical CodeNEG Negative aNET NetworkNFPA National Fire Prevention AssociationN&G Navigation & Guidance (G&N is preferred)

NG Narrow GageNH3 Ammonia r:-NH4 Hydrazine-

^..

NHA Next Higher Assembly

NHB NASA Handbook

NI NickelNI-SIL Nickel-Silver )

NIB Non-Interference Basis !

NIC Not In Contract

NIP Nipple

NJP Network Job Processing

NL No LimitNLG Nose Landing Gear

f ' NM Nautical MileNonmetallic

' NMAB National Materials Advisory Board

NMI NASA Management Instruction

NMO Normal Manual Operation

NMR Nuclear Magnetic Resonance' nNOC Network Operation Control

t

Notation of ContentNOES National Operational Environmental Satellite Services

NOR NormalV.

NORAD North American Air Defense CommandNOZ NozzleNP NeptuniumNPC NASA Publication ControlNPD NASA Policy DirectiveNPL Normal Power Level (See RPL)NPS NASA Planning StudiesFNPSH Net Positive Suction Head

NPSP Net Positive Suction PressureNet Positive Static Pressure

NPV Nitrogen Pressure Valve

2-41

f

Page 66: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

NR Not RequiredNumber

NRC Non-Recurring Costs FNRI Non-Recurring InvestmentNRM Non-Recurring MaintenanceNRP Normal Rated Power

- NRS Nonconformance Reporting SystemNRT Near Real TimeNRTS Not Repairable at This StationNRZ Non-Return-To-ZeroNS Nuclear Shuttle

Nickel SteelNSA National Standards AssociationNSI-I NASA Standard Initiator —Type I

tNSN National Stock NumberNSO NASA Support OperationNSP NASA Support PlanNSR National Slow RateNSTL National Space Technology LaboratoryNTO Nitrogen TetroxideNTP Normal Temperature & Pressure

Notice To ProceedNetwork Test Panel

NTS Not To ScaleNTSO NASA Test Support OfficeNUTIS Numerical and TextualNVR Nonvolatile Residue

No Voltage ReleaseNW NASA WaiverNWS Nose Wheel SteeringNWSI New World Services, Inc.tIIWT Nonwatertight

-0- i3

02 Gaseous Oxygen0/D On Dock !O/ET Orbiter/External Tank

:.

O/F Oxidizer-To- Fuel Ratio'O/L-RC Overload-Reverse CurrentO/R Outside Radius s

O/V OvervoltageOA Orbital Assembly

' Output AxisOffice of Applications

OAA Orbiter Access ArmOAFTO Orbiter Atmospheric Flight Test Office

i

2-42

^l "Y Cq-,l^^s^^^,^1:7.v^..L3OD C1 i ypP

^

3

^+

)^Trsk

s

Page 67: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

1

1

r

>s

1,.

? 7

OAS Orbiter Aeroflight SimulatorOrbiter Avionics System

OASPL Overall Sound Pressure LevelOAST Office of Aeronautics and Space TechnologyOAT Overall Test

Operational Acceptance TestOB On Board

Operational BaseOBCO On Board Checkout (Instrumentation)OBCS On Board Checkout SubsystemOBV Oxidizer Bleed Valve0&C Operations & Checkout (CSuilding)

OC On-ConditionOn Center aOpen CircuitOvercurrent

OCC Office of Contract Committ?eOperations Control Center

OCDR Orbiter Critical Design Review ^?OCDV Optics Coupling Data Unit (G&N)OCF Orbiter Computational Facilities

Onboard Computational FacilityOCN Order Control Number 1OCO Open-Close-OpenOCP Output Control PulseOCR Optical Character RecognitionOCS Onboard Checkout System

OCT OctalOD Outside Diameter

Operations DirectiveODB Operational Data Book

ODCDR Orbiter Delta CDRODES Optical Discrimination Evaluation StudyODIN Orbital Design Integration SystemODRAN Operational Drawing Revision Advance NoticeODU Output Display UnitOEAS Orbital Emergency Arresting System 0

OFCO Outboard Engine CutoffOEM Original Equipment Manufacturer

OESS Orbiter/ET Separation SubsystemO&FS Operations & Flight SupportOF Oxygen Fill r"

Outside FaceOFCC Office of Federal Contract ComplianceOFDS- Orbiter Flight Dynamics Simulator'

Oxygen Fluid Distribution SystemOFI Operational Flight Instrumentation

I OFK Offi ci al Flight KitOFP Orbiter Flight ProgramOFT Orbital Flight Test

OG Outer Gimbal (Roll)Oxygen Gage

OGA Outer Gimbal Angle

,

2-43

a

L

t ^•,^

Page 68: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

- i.."

f

4

I

OGE Operating Ground EquipmentOGV Oxygen Gage ValveOH Overhaul

OverheadOHGVT Orbital Horizontal Ground Vibration TestOI Operational Instrumentation

Orbiter Instrumentation- OIA Orbiter Interface Adaptor

OIS Operational Intercommunication SystemOISR Open Item Status ReportOIT Orbiter Integrated TestOJT On the Job TrainingOL Open LoopOLDB On-Line Data BankOLF Orbiter Landing FacilityOLIF Orbiter Landing Instrumentation FacilitiesOLOW Orbiter Lift-Off WeightOLSA Orbiter/LPS Signal AdapterOLSP Orbiter Logistics Support Plan0&M Operation & Maintenance rOM Outer Marker (ILS)

Optical MasterOMB Office of Management and BudgetOMCF Operations & Maintenance Control FileOMD Operations & Maintenance DocumentationOMDR Operations & Maintenance Data Record

` OME Orbital Maneuvering EngineOMI Operations & Maintenance InstructionOML Outside Mold Line

Orbiter Mold LineOMMH Orbiter Maintianance Man-HoursOMNI Omni-Range

Omni directionalOMP Operations & Maintenance PlanOMPR Operational Maintainability Problem Reporting

OMPT Observed 'Mass Point TrajectoryOMR Orbiter Management Review

OperationsRequirementseratio s & MaintenanceP nOMRB Operating Material Review Board i

OMRP Operations & Maintenance Requirements PlanOMRS Operations & Maintenance Requirements SpecificationsOMS Orbital Maneuvering SubsystemOMU Optical Measuring Unitofiv Oxygen Manual Valve

- OND Operator Need DateOOD Orbiter On Dock_

OOMM Organizational Operations & Maintenance Manual

OOS Orbit-to-Orbit Shuttle-Orbit-to-Orbit Stage

OP Oxygen Purge

OPS Oxidizer PreburnerOPBOV Oxidizer Preburner Oxidizer Valve

OPE Other Project Element

s2-44

.

y

c

ff

Page 69: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

L

A t

OPER OperationalOperate

OperatorOPF Orbiter Processing FacilityOPGUID Optimum Guidance TechniqueOPIS Orbiter Prime Item SpecificationOPL Open Problem ListOPNS OperationsOPPAR Orbiter Project Parts Authorization RequestOPPL Orbiter Project Parts ListOPR Office of Primary Responsibility

Operations Planning ReviewOPS Orbiter Project ScheduleOPT Optics

Optimum0&R Overhaul & RepairOR Outside Radius

Oxygen ReliefORB OrbiterORCHIS Oak Ridge Computerized Hierarchical Information SystemsORD Ordnance

Operational Ready DataOperational Readiness Date

ORF OrificeORI Operational Readiness InspectionORLA Optimum Repair Level AnalysisORR Operations Requirements ReviewORSDI Oak Ridge Selective Dissemination of InformationOS Orbiter CEI Specification

Operating SystemOSC OscillatorOSDH Orbiter System Definition HandbookOSE Operating Support EquipmentOSF Office of Space Flight (NASA HQ)

Ordnance Storage FacilityOSHA Occupational Safety and Health ActOSO Ocean Systems OperationOSOP Orbiter Systems Operating ProceduresOSS Optics Subsystems

Orbiting Space StationOrbit-to-Orbit Stage

OSSRH Orbiter Subsystem Requirements HandbookDST Orbiter Support Trolleyc?`^OSTP Orbiting System Test PlanOT Operating Time

i;Operational Trajectory

` OvertimeOTB Orbiting Tanker BaseOTC Orbiter Test ConductorO;D Operational Technical Documentation

OTDA Office of Trackin and Data Acquisition

0TH Over-The-Horizon ?Radar)OTL Ordnance Test Laboratory

2-45

I

Page 70: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

W

w x

OTO One-Time-Only 3

^TP Operations Turnaround PlanOTR Operating Time Record

OuterOTS Off-The-ShelfOTV Operational Television }`OUT Output

_ ,Out^^.tOutside

OUTBO OutboardOV Orbiter Vehicle i

Oxygen Vent aOVBD OverboardOVF OverfillU.'FL OverflowOVHD OverheadOVHT Overheat'OVLD OverloadOVRD OverrideOVV OvervoltageOWF Optimum Working FrequencyOXD Oxide ;<OXiD Oxidizer,OXY OxygenOZ Ounce

Ozone

-P-

P PeriodPitchPole

i

PrimaryP-P Peak-to-PeakP/A Problem AnalysisP/B PushbuttonPi Pitch ControlP/L Parts List

PayloadP/N Part Numba.r

- P/PL Primary PayloadPA Pad Abort

Power AmplifierPulse Amplifier

PAC Problem Action Center

t 2-46

I tj_

Page 71: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a L,

I

Io ^ i

PACC Problem Action Control CenterPACTO Payload Cost Tradeoff OptimizationPAD Program Approval DocumentPAE Preventive Action Engineer

Problem Assessment EngineeringPAF Peak Annual FundingPAFB Patrick Air Force BasePAH Payload Accommodations HandbookPALS Precision Approach Landing SystemPAM Pulse Amplitude ModulationPAO Public Affairs OfficePAR Precision Approa0 Radar

Problem Accountability RacersProblem Action RecordProblem Action Request

j

Product Acceptance Review jPARA ParagraphPARS Property Accountability Record SystemPASS Planning and Scheduling SystemPAT Problem Action TeamPATS Program for Analysis of Time SeriesPAV Pressure Actuated ValvePAX PassengerPB Playback

Phonetically BalancedPBAN Polybutadiene Acrylonitrile (Propellant)PBD Payload Bay DoorPBOM Payload Bay Door Mechanism

PBIC Programmable Buffer Interface CardPBK Payload Bay KitPBM Program Business ManagementPBPS Post-Boost Propulsion SystemsPBW Proportional Band WidthPC Pulsating CurrentPCA Pneumatic Control Assembly

Power Control AssemblyPoint of Closest Approach

PCB Printed Circuit BoardPower Circuit Breaker

FCC Pad Control Center aPCCB Program Configuration Control Board

PCCM Program Change Control Management

PCCP Preliminary Contract Change Proposal

PCI Program Controlled Input'PCIL Pilot-Controlled Instrument Landing

PCIN Program Change Identificaticn Number

PCL Primary Coolant Line

PCM Pulse Code ModulationPunch Card Machine

PCN Program Control Number

PCO Post-CheckoutProcurring Contracting OfficerProgram Controlled Output

2-47

3

Page 72: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

u LY

PCR Publication Change RequestPayload Changeout Room

PCs Power Conversion SystemPermanent Change of Station

PCTE Portable Commercial Test EquipmentPCU Power Control Unit a

- Pressure Control UnitProcess Control Unit

PCV Pre-Check VerificationPurge Control Valve

PCVB Pyro Continuity Verification BoxPCVL Pilot Controlled Visual LandingPD Program Directive

Preliminary DesignProject Directive

PD&RS Payload Deployment & Retrieval SubsystemPDAR Program Description and RequirementsPDARS Program Description and Requirements BaselinePBD Performance Data Book

Power Distribution BoxPDC Procurement Document Change .^ qy•^'PDCS Power Distribution and Control SubsystemPDI Payload Data InterleaverPDL Program Design LanguagePDM Pulse Duration Modulation

Processor Data MonitorPDM/FM Pulse Duration Modulation/Frequency ModulationPDP Program Development Plan

Preliminary Definition PlanProcurement Data PackageProject Definition Phase

POR Preliminary Design ReviewProcessed Data RecorderPreliminary Data Requirements

PDRO Procurement Data Requirements DocumentPDRLrocure nt Data Requirements me List.,uPDRM Payload Deployment & Retrieval MechanismPOS Power Distribution Subsystem

' Package Data System 1Partitioned Data Set

PDU Pressure Distribution UnitPulse Detection Unit

PE Project EngineerPEFO Payload Effects Follow-on StudyPEIR Project Equipment Inspection Record

' PEM Plaf% Engineering and Maintenance 3PER Preliminary Engineering Report jPERT Program Evaluation Review Technique "aPETA Performance Evaluation & Trend AnalysisPETN Petaerythrite Tetranitrate

2-48

f

Page 73: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

^ ( 1 ^ I I i,, _ ^

PF Probability of FailureParachute FacilityPowered FlightPower FactorPreflightPulse FrequencyPrime Function

PFB Pressure Fed BoosterPFC

Preliminary Flight CertificationPerformance Flight Certification

PFL Primary Freon LoopPFM Pulse Frequency ModulationPFP Program Financial Plan

Programmable Function PanelPERT Preliminary Flight Rating TestPG Pressure GagePGA

Pressure Garment AssemblyPower Generating Assembly

PGE PurgePGNrS Primary G&N and Control System

_ PG5 Power Generation SubsystemPH Hydrogen Ion Concentration

Phase 3

PHF Personal Hygiene facilityP&I Performance & Interface (Specification)PI Procurement Item

Preliminary InvestigationProgram Introduction

PIA Pre-Installation AcceptancePIB Pyrotechnic Installation BuildingPIC Pyro Initiator Controller

Pyro Initiator CapacitorsProgrammable Interval Clock

PICP Program Interface Control PlanPICRS Program Information Coordination & Review Service

Program Information Control & Retrieval SystemPIDA Payload Installation-& Deployment AidPIDS Portable Image Display System iPIF Payload Integration FacilityPIGA Pendulous Integrating Gyro AccelerometerPIM Pulse Interval Modulation

y

PIND Particle Impact Nose Detection' lPIO Pilot-Induced Oscillation

Public information OfficePIP Plant Instrumentation Program

Production Instrumentation PackagePayload Interface Plan

PIPA Pulse Integrating Pendulum Accelerometers 3

Pulse Integrating Pendulum AssemblyPIRN Preliminary Interface Revision Notice

PIT Pre-Installation TestPK Peak

2-49

y

"r.

I °a

;

Page 74: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

n

PL PayloadPrelaunchPlugPlatePost Landing

PLACE Position Location Aircraft Communications EquipmentPLBK PlaybackPLH Payload HandlingPLL Phase Locked LoopPLM Payload Management

Payload MonitoringPLMS Program Logistics Master SchedulePLN Program Logic NetworkPLS Post Landing & Safing wPLSL Propellants & Life Support LaboratoryPLSS Portable Life Support SubsystemPM Performance Monitor

Pulse ModulationPhase ModulationPlanetary MissionProgram Milestone

PMAT Page Map Address TablePMC Payload Monitoring & Control

Piutonia-Molybdenum CermetProcurement Method Code

PMDL Palmdale, CaliforniaPMF Performance Monitor FunctionPMHL Preferred Measurement Hardware ListPMI Preventive Maintenance Inspection

Principal Maintenance InspectorPMN Program Management NetworkPMOM Performance Management Operating ManualPMO'N Performance Management Operations NetworkPMP Program Management Plan

Pre-Modulation Processor 1PMR Program Manager's Review

6

PMS Performance Management SystemPerformance Monitoring System

PMT Production Monitoring Test iPMU Pressure. Measuring UnitPN Part NumberPNEU Pneumatic ;.PNL PanelPO Purchase OrderPOA Plan Of ActionPOC Purchase Order CloseoutPOCC Payload Operations Control CenterPOCN Purchase Order Change Notice -POL Petroleum Oil LubricantsPOLAR Production Order Location and Reporting'

tl

POM Printer Output MicrofilmPOP Program Operating Plan

Prelaunch Operations Plan

_2-50

tf

i

1

Page 75: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

f

i

POR Purchase Order RequestPORB Production Operations Review BoardPORCN Production Order Reeords Chan e N +ice9 0PORD Performance and Operations Requirements DocumentPORR Preliminary Operations Requirements ReviewPORT PortablePOS Positive

Pacific Ocean ShipPOST Program to Optimize Simulated TrajectoriesPOT PotentiometerPOV Peak Operating Voltage

Pneumatic Operated ValuePP Peak-to-Peak

Partial PressurePush-Pu11Planning Package

PPB Parts Per BillionProgram Performance Baseline

PPF Payload Processing Facility (USAF)PPL Prices Parts List

Provisioning Parts ListPPM Parts Per Million

Pulse Position Modulation

Pulses Per MinutePPME Pacific Plate Motion ExperimentPPS Pulses Per Second

Pneumatic Power SubsystemProvisioning Performance Schedule

P&R Performance and ResourcesPR Purchase Request

Procurement RegulationsPressure RegulatorPerformance Report

PRACA Problem Reporting and Corrective Action

PRB Panel Review BoardParachute Refurbishment Building

i

V, , I

y

PRC Planning Research Corporation

PRCB Program Requirements Control BoardPRCBD Program Requirements Control Board Directive {PRO Procurement Requirements Document

Procurement Regulation DirectiveProgram Requirements Document (UDS)

PRESS PressurePRF Pulse Repetition Frequency y

' PRi PrimaryPRL Page Revision LogPRM Payload Retention MechanismPRN Program Release Notice a

Pseudo-Random Noise

PROC Procurement_ PROG Program

PROJ ProjectPROM Programmable Read-Only Memory

2-51

i

Page 76: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

s

PROP PropulsionPropellant

PRR Program Requirements ReviewPreliminary Requirements ReviewParts Replacement RequestPulse Repetition Rate

PRS Power Reactant SubsystemPayload Retention SubsystemPersonnel Rescue ServicePrimary Recovery SiteProvisioning Requirements Statement

PRSD Power Reactant Storage and DistributionPower Reactant Supply and Distribution

PRSS Problem Report Squawk Sheet

PS Payload SupportPressure SwitchParachute SubsystemPower Supply

PSA Power Servo AssemblyPower Servo AmplifierPressure Switch Assembly

PSAC Presidential Scientific Advisory CommitteePSC Program Schedule ChartPSCN Preliminary Specification Change NoticePSD Power Spectral DensityPSDR Planning and Scheduling Document RecordPSI Pounds Per Square Inch (Static Pressure)'PSIA Pounds Per Square Inch (Absolute Pressure)PSID Pounds Per Square Inch (Differential Pressure)PSIG Pounds Per Square Inch (Gage Pressure)PSIS Pounds Per Square Inch (Sealed)PSK Phase Shift KeyedPSL Pressure Seal

Programming Support LibraryP&SM Procurement & Subcontract ManagementPSM Propellant Storage Module

Pyro Substitute MonitorPSP Program Support PlanPSPL Priced Spare Parts ListPSRD Program Support Requirements Document: .PSS Payload Specialist Station

Propulsion Support SystemPropellant Supply SubsystemPad Safety Supervisor

PSV Planetary Space VehiclePT Pint

PointPressure Transducer

PTA Propulsion Test ArticlePost-Test Analysis

PTC Passive Thermal ControlPortable Temperature Controller

2-52

}

Page 77: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

K2

{

PTCR Pad Terminal Connection RoomPTCS Propellant Tanking Computer SystemPTD Provisioning Technical DocumentationPTI Total PressurePTM Pulse Time ModulationPTP Point-To-Point PhonesPTR Program Trouble Report

PrinterPTT Push-To-TalkPU Propellant Utilization

Power UnitPickup

PUB PublicationY

PUGS Propellant Utilization & Gaugina System

PUV Propellant Utilization ValvePV&D Purge, Vent and DrainPVA Preburner Valve Actuator -^PVR Precision Voltage ReferencePVRD Purge, Vent, Repressurize, and DrainPVT Pressure/Volume/Temperature

Pyrotechnic Verification TestPVWA Planned Value of Work Accomplished

.- PVWS Planned Value of Work ScheduledPW Pulse WidthPWA Product Work Authorization

Private Write AreaPWB Printed Wire Board

PWSS Program Work Breakdown StructurePWM Pulse-Width ModulationPWR PowerPY Program YearPYRO Pyrotechnics

.: 2-53

_.

lt

a

f

Page 78: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

ii

-Q-

i iQ Dynamic Pressure

i

QA Quality AssuranceQAM Quality Assurance ManualQAP Quality Assurance ProcedureQC Quality ControlQCDR Quality Control Deficiency ReportQCOP Quality Control Operating ProcedureQD Quick DisconnectQDS Quality Data SystemQE Quality EngineerQEC Quick Engine ChangeQGS Quantity Gauging SystemQLDS Quick Look Data StationQPL Qualified Parts List

Qualified Products ListQPRD Quality Planning Requirements DocumentQPS Quality Planning SpecificationQRE Quick-Reaction EstimateQRI Quick-Reaction IntegrationQRIA Quick-Reaction Integration ActivityQRS Quick-Reaction SortieQRSL Quick-Reaction Space LaboratoryQSA Qualification Site ApprovalQSL Qualified Source List

A

QSS Quindar Scanning SystemQT Qualification TestQTP Qualification Test Plan x

QTR Qualification Test ReportQTY QuantityQUAD Quadrant

QuadrangleQuadrature

QUADS Quality Achievement Data SystemQUAL Qualified

Qualification^ 3QUI Quito, Ecuador (STDN)

QUIC Quality Data Information and Control -tQVT Qualified Verification Testing

QVVT Qualified Verification Vibration Testing r

<aa

2-54

)j

dkI

4

t

Page 79: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I

a ^,

_R-

R Reliability

i

RoentgenRatio 1

Rightl

RangeRankineReplaceReceive

R-T Resistance TestR/A Radar AltimeterR/I Receiving Inspection {R/L Remote/LocalR/T Receiver/TransmitterR/W RunwayRAC Reliability Action CenterRACS Remote Automatic Calibration System "sRAD Radiation Dosage

RadiusRadianRapid Access Datafile

RADAR Radio Detection And RangingRAF Requirements Analysis FormRAG Reusable AgenaRAI Roll Attitude IndicatorRAL Responsibility Assignment List =RALT Radar Altimeter 1RALPH Reduction & Acquisition of Lunar Pulse HeightsRAM Responsibility Assignment Matrix f

Random Access MemoryRadar Absorbtion Material

RAMA Recap and Movement AuthorizationRANC Radar Absorbtion Noise 5 ClutterRANN Research Applied to National NeedsRAPCON Radar Approach and ControlRAS Requirements Allocation Sheet

l

RATCC Radar Air Traffic Control CenterRAU Remote Acquisition Unit

Regional Acquisition Unit k`'RAX Remote Access Computing System

Remote Access TerminalRBC Rotating Beam CeliometerRMBT Retrospective Bibliographies on Magnetic TapeRBN Radio BeaconRC Resistance-Capacitance

Range CommandRotation Control

RCC Reinforced Carbon-Carbon3

2-55

1 ^

Page 80: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

N.

RCCB Remote Control Circuit Breaker- RCDR Recorder

RCPT Receptacle i

RCN Reauirements Change NoticeRCS Reaction Control SubsystemRCSC Reaction Control Subsystem ControllerRCV Receive

- RCVR ReceiverRCVY RecoveryR&D Research and DevelopmentR&DO Research and Development Operations (MSFC)RD Requirements Document

Reference DesignatorRDA Resident Data AreaRDC Request for Document Change

r RDD Requirements Definition DocumentRDF Radio Direction FinderRDP Requirements Development PlanROR Raw Data RecorderRDS Rocketdyne Digital Simulator 1RDX CyclotrimethylenetrinitramineRDT&E Research, Development, Test and EvaluationRE Responsible EngineerRE&T Research Engineering_ & Test

REC RecordRECP Request for Engineering Change ProposalRECS Representative Shuttle Environmental Control SystemRECT RectifierRECV ReceiverREF Reference

RefurbishmentREG Regulator (Regulate)REIL Runway End Identification Lights 1REI-M REI-Mollite

REJ Reject 1REL Release 3REM RemoveREPL ReplaceRPS Record and Playback Subsystem tREQ Request

Require

REQMT Requirement X

RESVR Resevoir -,RUT Research Engineering & Test

NETS Reconfigurable Electrical Test Stand

;REV ReverseReviewRevisionRevolution

RF Radio Frequency

RFA Request For ActionRF Authorization (Frequency)

RFB Request For Bid

2-56

^k

i

Page 81: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

u.

If

RCF Radio Frequency ChartsRFCP Request For Computer Program iRFD Requirements Formulation DocumentsRFE Request For EstimateRFEI Request For Engineering Information sRFI Radio Frequency Interference

Request For InformationRemote Facility InquiryRemote File Inquiry

RFP Request For ProposalRFPA Request For Proposal AuthorizationRFQ Request For QuotationRGA Rate Gyro Assembly lRGP Rate Gyro PackageRH Relative Humidity

Right HandRHC Rotation Hand ControllerRHCP Right Hand Circular PolarizationRHEB Right Hand Equipment Bay

.%RHL Residual Hazards ListRHS Rocketdyne Hybrid SimulatorRHT Radiant Heat TemperatureRHU Radioisotope Heater UnitRI Rockwell InternationalRIB Recoverable Item BreakdownRIC Rockwell International Corporation

Resistance Inductance and CapacitanceRID Review Item DispositionRIF Relative Importance FactorRIG Rate Integrating GyroRIL Recoverable Item ListRIR Reportable Item ReportRIS Reporting Identification Symbols j

RISKAC Risk AcceptanceRIU Remote Interface UnitRJC Reaction Jet ControlRJD Reaction Jet DeviceRJDA Reaction Jet Driver-Aft fiRJDF Reaction Jet Driver-FwdRJ/EC Reaction Jet/Engine ControlRJOD Reaction Jet OMS DriverRLEO Request Liaison Engineering Order'xRM Rescue Module'

Reference MissionRMS Remote Manipulator Subsystem

Root Mean SquareRadian Means Per Second

` ROC Record Of CommentsRequest Of Change

ROM Rough Order of MagnitudeRead-Only Memory

ROT Remaining Operating Time jR&P Reserve and Process

2-57

Page 82: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

_^

-"

^ . ,

R8PN Research & Program ManagementRP Repair Period

^ Rocket Propellant1 Relative Pressure^ RPA Request for Procurement Action' RPC Remote Power Controller

KyE Reliability Project Engineer !RPl[ Real Property Installed Equipment

^KPL Rated Power Level .RPM Revolutions Per Minute \KPP Reinforced Pyrn yt c Plastic

^ RP5 Revolutions Per Second^ RPTA Rudder Pedal Transducer Assembly

KPV Remotely Controlled VehicleK Reliability & Quality AssuranceK MTS Requirements

^ 8^R Remove& Replace^ RR Requirements Review

Rendezvous RadarRRL Rudder Reference LineRoP Rudder Reference PlaneKKT Rendezvous Radar TransponderK5 Kawinsonde

' Refurbishment SpareRight Side

KSD Requirements & Specifications DocumentR3F Refurbish & Subassembly FacilitiesRSI Reusable Surface InsulatorRsPL Recommended Spare Parts List CRS3 Root Sum Square

Reactant, Supply SystemR5SPO Resident Spare Shuttle Projects OfficeRSu Remote Service UnitaT Reference TrajectoryRTAC Research G Technology Advisory Committee

! RT8 Resistance Temperature Bulb^ RTC Real-Time Commandi` RTCC Real-Time Computation Center (NASA)^ Real-Time Computer Command (Uplink)^ RTCE Rotation/Translation Control Electronics

RTCP Veal-Time Communications Processor ` |. RTCS Real-Time Computer System{ RTD Resistance Temperature Device

RTE Responsible Test EngineerRTG Radioisotope Thermal Generators/' RTHC Rotation-Translation Hand ControllerKTHS Real-Time Hybrid SystemRTLS Return to Launch Site .RTS Remote Tracking StationRTV Room-Temperature Vulcanized ^^RVPT Interrupt

Rupture `/ a. C

. 2-58

//

`

^ '

'

. !

11

^

Page 83: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

RV Reentry Vehicle rRecovery VehicleRelief ValveRecovery Vessel

RVCF Remote Vehicle Checkout FacilityRVDT Rotary Variable Differential Transducer

Rotary Variable Differential Transformerr

RVN Requirements Verification NetworkRVR Runway Visual Range 1RVS ReverseRYD Real-Year DollarsRX ReceiveRZ Return-to-Zero t

S Y w_S_

S SecondSideStern_

S* Second (Astronomical Tables)S-BD S-BandS-N Stress NumberS/A Site Activation

Safe and ArmSubassemblySpacecraft Adapter

S/AC Stabilization/Attitude ControlS/C Spacecraft i

Software ContractorSubcontractor

S/F Safety Factor}S/G Strain Gage

S/L Sortie LabShops & Labs

S/M Service/MaintenanceS/N Serial Number'

Signal-to-Noise Ratiof

S/0 ShutoffSwitchover

S/P Signal ProcessorSerial to Parallel

S/R Send and ReceiveS/S Samples-Per-Second

Single Sideband

2-59

Page 84: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

i

S/Sys SubsystemS/V Space VehicleSys! SoftwareSA Supplemental Agreement

Shaft Angle_ Subaccount

SA-ALC San Antonio Air Logistics CenterSAAC Schedule Allocation and ControlSAB Storage and Assembly BuildingSAC Strategtic Air Command (USAF)SAD Shuttle Authorized Document

System Allocation DocumentSAE Society of Automotive EngineersSAEF Spacecraft Assembly & Encapsulation FacilitySAFE San Andreas Fault ExperimentSAGE Stratospheric Aerosol Gas ExperimentSAIL Shuttle Avionics Integration Laboratory, JSCSAL Shuttle Avionics LaboratorySAM Shuttle Attachment ManipulatorSAMS Shuttle Attachment Manipulator SystemSAMSO Space and Missile Systems Organization (USAF)SAMTEC Space and Missile Test Center (VAFB, CA)SAND Site Activation Need DateSAP Strain Arrestor PlateSAR Safety Analysis ReportSARP Safety Analysis Report for PackagingSAS Stability Augmentation SubsystemSAT SaturatedSATS Shuttle Avionics Test System

Small Applications Technology SatelliteSAU Strap Around UnitSB Space Base

Synchronization BaseSBA Structure Borne Acoustic

Small Business AdministrationSBCR Stock Balance and Consumption ReportSBD Schematic Block DiagramSBHC Speed Brake Hand ControlSC Signal Conditioner

Service ChargeScaleStatement Capability

SCA Shuttle Carrier AircraftSchedule Change AuthorizationSneak Circuit Analysis

SCAN Selected Current Aerospace NoticeSCAPE Self-Contained Atmospheric Protective EnsembleSCARS Serialized -Control and Record SystemSCB Software Control Board

Schedule Change BoardSpecification Control Board

i

Page 85: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

< 3

1.

1

y 8

SCCM Standard Cubic Centimeters per MinuteSCCS Standard Cubic Centimeters per Second r`SCD Specification Control Document

Source Control DrawingSpecification Control Drawing a

SCDA Safing, Cool Down and Decontamination AreaSCDP Simulation Control Data PackageSCDR Shuttle Critical Design Review

j

Seller Critical Design ReviewSubcontractor Critical Design Review

SCE Signal Conditioning EquipmentSCF Satellite Control Facility

Sequenced Compatibility FiringStandard Cubic Fef:t

SCFH Standard Cubic Feet per HourSCFM Standard Cubic Feet per MinuteSCFS Standard Cubic Feet per SecondSCHEM SchematicsSCIM Standard Cubic Inches per MinuteSCIS Standard Cubic Inches per Second

`?y

SCIT Standard Change Integration and TrackingSCL Secondary Coolant Line J

Specification Change LogSCM Subsystem Configuration ManagementSCMP System Contractor Management PlanSCN Specification Change NoticeSCO Subcarrier Oscillator

Start Checkout a

SCP Specific Candle Power 1I

SCR Sneak Circuit ReportSoftware Change RequestSchedule Change Request

SCS Stabilization and Control SubsystemSCT Scanning TelescopeSCU Secondary Control Unit

a

SD Space Division (Rockwell)Specification Document

SDA Source Data AutomationSDC Spares Disposition Code

Software Development ComputerSOCS Sail Date Communications SystemSOD Softwara Description Document

Shuttle Design DirectiveSoftware Design Document

SDE Space Division EvaluatorSDF System Development Facility (Breadboard)

Single Degree of FreedomSDH Software, Development HandbookSOL Software Development Laboratory

Standard Distribution .ListSDM System Definition Manual tiSON Software Development Note

a

1

j

Page 86: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a 4,

r

SDR Software Design RequirementSystem Design Review

SDRB Software Design Review BoardSDS Shuttle Dynamic Simulation

Software Design SpecificationSDSS Space Division Shuttle SimulatorSOT Structural Dynamic TestSDTA Structural Dynamic Test ArticleSE Support Equipment

System ElementSEA Scanning Electrostatic Analysis

Silicon Elastimeter AblatorSEACF Support Equipment Assembly and Checkout FacilitySEAID Support Equipment Abbreviated Items DescriptionSEB Source Evaluation BoardSEC Secondary

SecondSequential Events ControllerSource Evaluation Committee

SECS Shuttle Events Control SubsystemSE/FAC Support Equipment/FacilitySE&I Systems Engineering and Integration aSEI Support Equipment 'InstallationSEICO Support Equipment Installati.^n and Checkout 4SEM Seller's Engineering Memo

Space Environmental MonitoringSystem Engineering ManagementSystem Exception Manage

SEMS Space Environment Ml.nitor SystemSEND Shared Equipment Nt-VI DateSEO Special Engineering OrderSEOS Synchronous Earth Observation SatelliteSEP SeparationSEPAP Shuttle Electrical Power Analysis ReportSEQ SequenceSER SerialSERB Systems Engineering Review Board

Shuttle Engineering Review BoardSERS Shuttle Equipment Record SystemSES Shuttle Engineering Simulation 4

Special Emphasis StudySESL Space Environmental Simulation LaboratorySF Static Firing 3

Subcontractor FurnishedSquare Feet

SFC Specific Fuel ConsumptionSFCS Survival Flight Control SystemSFL Secondary Freon LoopSFP Single Failure PointSFPA Single Failure Point AnalysisSFPPL Short Form Provisioning Parts ListSFPS Single Failure Point Summary

2-62

Page 87: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

Ii

i

^ Y

SFT Static Firing Test uSimulated Flight Test

SFTA Structural Fatigue Test ArticleSFTF Static Firing Test Fac'',Iity

SFU SMSI Firing UnitSGLS Space Ground Link Station

- SGOS Shuttle Ground Operations SimulatorSH2 Supercritical HydrogenS114A Sidereal Hour AngleSHAG Simplified High Accuracy GuidanceSHERB Sandia Human Error Rate BankSHF Super High FrequencySHLB Simulation Hardware Load BoxesSHF Shaft HorsepowerSI International System of UnitsSIA Software Impact AssessmentSID System Interface DocumentSIL Systems Integration Laboratory

Sound Interference Level 3Silver

4s * /SIM SimulationScientific Instrumentation Module

SIMAS Shuttle Information Management Accountability System jSIMS Shuttle Inventory Management SystemSIN SINESID Systems Integration OfficeSIR Systems Integration ReviewSIS Software Implementation Specifications

Systems Integration ScheduleSoftware Integrated Schedule

SIT Shuttle Integrated TestSoftware Integrated Test

SIVE Shuttle Interface Verification Equipment

SL Sea LevelSpace LabSound Level

SLAC Stanford Linear Accelerator CenterSLAM Side Load Arrest MechanismSLAR Side Looking Airborne RadarSW System Load and InitializationSLS Secondary Landing Site

Statement Level Simulator

SM Support ModuleStable Member

SMAB Solid Motor Assembly BuildingSMC Scientific Manpower Commission

SMCC Shuttle Mission Control CenterSMD Special Measuring DeviceSMES Shuttle Mission Evaluation Simulation

Shuttle Mission Engineering SimulatorSuperconducting Magnetic Energy Storage

SMM Subsystem Measurement ManagementSMMD Specimen Mass Measurement Device

2-63

a

i

Page 88: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

r A

1

f

SM/PM System Management/Performance MonitorSMPM Structural Materials Property ManualSMR Source, Maintenance and Repair (Code)SMRD Spin Motor Run DiscreteSMS Shuttle Mission Simulator }

Separation Mechanism SubsystemSMSI Standard Manned Space Flight Initiator (See NSI-I)SMVP Shuttle Master Verification PlanSMVRD Shuttle Master Verification Requirements DocumentSNF System Noise FigureSNSO Space Nuclear Systems OfficeSOAR Shuttle Orbital Applications and RequirementsSOARS Shuttle Operations Automated Reporting SystemSOATS Support Operations Automated Training SystemSOC System Option ControllerSOCC Satellite Operations Control CenterSODB Shuttle Operational Data BookSOF Safety Of FlightSOFT Spray-On Foam InsulationSOFT Space Operations and Flight TechniquesSOM Standard Operating Manual

Spares Optimization Model(NASA) Ship Operations Manager

SOP Standard Operating ProcedureSubsystem Operating ProcedureSystems Operation PlanSecondary Oxygen Pack

SOR Specification Operational Requirement'SOT Strap-On TankSOV Shutoff Valve

Solenoid Operated ValveSOW Statement Of Work

Subdivision Of WorkSOX Supercritical OxygenSP Shuttle Projects Office (KSC)

Single PoleStandard or Peculiar

SP-AF Air Force STS Liaison Office (KSC Shuttle)SPA Shared Peripheral Area

Signal Processor AssemblySpace Processing Application ...,

SPART Space Research and Technology-SPC, Shipping and Packing Cost

Starting Point CodeSPE Static Phase ErrorSPEC SpecificationSPECT SpectrometerSP-FGS Flight & Ground Systems Office, KSC Shuttle(Was SP-GSP)SPF Spacelab Processing FacilitySPFA Single Point Failure AnalysisSPFP Single .Point Failure PotentialSPG Single Point GroundSP-ILS Integrated Log`ttics Support (KSC Shuttle)

2-64

I

Page 89: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

t0

i

l

a ^.

.,

f

SPI Surface Position Indicator

SPICE Spacelab Payload Integration & Coordination In Europe rSPII Shuttle Program implementation Instruction

SPIMS Shuttle Program Information Management System

SPL Sound Pressure LevelSystem Programming Language

SP-MPC Management Planning and Control Office (KSC Shuttle)SPM Subsystem Project ManagerSP-OPN Operations Planning Office (KSC Shuttle)SPO Spare Parts OrderSP-PAY Payload integration Office (KSC Shuttle)SPPIL Shuttle Preferred Pyrotechnic Items ListSPPL Spare Parts Provisioning ListSPR Software Problem Report 9

Subcontractor Performance Review fSPRAG STS Payload Requirements & Analysis GroupSPS Samples Per Second j

Shuttle Procedures SimulatorService Propulsion Subsystem

SPTO Supplementary Provisioning Technical Documentation .^SQ FT Square FeetSR Support Request

Status ReviewStatus ReportStatus RegisterStandard RerairShift Register

SRA Support Requirements AnalysisSpin Reference Axis

SRB Solid Rocket BoosterSRBAB SRB Assembly BuildingSRBDF SRB Disassembly FacilitySRCB Software Requirements Change BoardSRBD Software Requirements Change Board DirectiveSRD Shuttle Requirements Document

Shuttle Requirements DefinitionSystems Requirements Document

SRDH Subsystems Requirements Definition Handbook

SRF Shuttle Refurbish Facility {SRH Subsystems Requirements Handbook

-SRM Solid Rocket Motor +Specification Requirements Manual``Standard Reference Material

SRN Software. Release Notice

SR&Q - Safety, Reliability and Quality

SR&QA Safety, Reliability and Quality AssuranceSRR System Requirements Review

c ito Readiness Review

SRS Software Requirements SpecificationSpecification Revision Sheet

' Support Requirement System

SFSR Schedule and Resources Status Report

2-65

c

i

Page 90: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

f

SRT Supporting Research and TechnologySpecification Requirements Table

SRU Shop-Replaceable Unit

Shop Replacement UnitSS Space Shuttle

Station SetSpace Station s

SubsystemSS&A Space Systems and ApplicationsSSA Shuttle Simulation AircraftSSAT Shuttle Service and Access TowerSSB Single Sideband

e

Source Selection BoardSSBC Summary Sheet Bar Chart aSSC Subsystem Sequence Controller

Shuttle System ContractorSolid-Solution Cement

SSCA Surface Sampler Control AssemblySSCHS Space Shuttle Cargo Handling System r'SSCL Shuttle System Commonality ListSSDH Subsystem Data HandbookSSE Subsystem Element

Subsystem Support EquipmentSSFGSS Space Shuttle Flight & Ground System SpecificationSSFL Santa Susana Field LaboratorySSHB Station Set HandbookSSI Significant Structural ItemSSIBD Shuttle System Interface Block DiagramSSITP Shuttle System Integrated Test PlanSSM Subsystem ManagerSSME Space Shuttle Main EngineSSMECA- SSME Controller AssemblySSP Space Shuttle Program

Small Sortie PayloadSSPD Shuttle System Payload Data

Shuttle System Payload Definition StudySSPM Space Shuttle Program ManagerSSPO Space Shuttle Program Office 1

SSPPSG Space Shuttle Payload Planning Steering GroupSSPRO Space Shuttle Program Resident OfficeSSPS Space Shuttle Program Schedule ^,. = -

SSPTF Santa Susana Propulsion Test Facility (See SSFL)SSR Station Set Requirement

Shop Support RequestSSRD Station Set Requirements DocumentSSRN System Software Reference NumberSSRR Station Set Requirements Review

SSS Stage Separation SubsystemSSSS Space Shuttle System SpecificationSST Structural Static TestSSTC Space Shuttle Test ConductorSSUS Spin Stabilized Upper StageSSV Space Shuttle Vehicle

2-66

Page 91: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a u:

l

i-

i

i

ST Sequential TimerStar TrackerStructL -r,"Special ijoling 3STA Shuttle Training AircraftStructural Test Article I

Static Test ArticleStation

STAB StabilizerSTADAC Station Data Acquisition and ControlSTAG Shuttle Turnaround Analysis GroupSTAR Shuttle Turnaround Analysis Report

Scientific and Technical ReportSTARR Schedule, Technical and Resources ReportSTC Systems Test Complex

Standard Test ConfigurationSTD Standard iSTON Spaceflight Tracking and Data NetworkSTE Special Test Equipment

System Test EngineerSTF Structural Fatigue TestSTG StageSTIL Software Integration LaboratorySTLOS Star Line Of SightSTM Signal Termination ModuleSTN Software Trouble NoteSTP Shuttle Technology PanelSTPH Static Phase ErrorSTRG SteeringSTRL StructuralSTS Space Transportation SystemSTSR System Test Summary ReportSTU Special Test UnitSU Support UnitSUP SupplySURE Shuttle Users Review and EvaluationSV Space Vehicle

Safety Valve iSolenoid Valve

SVA&C Shuttle Vehicle Assembly and CheckoutSVAB Shuttle Vehicle Assembly Building'`'SVB Shuttle Vehicle BoosterSVc Supervisor CallSVGS Space Vehicle Dynamic SimulatorSW Short Wave

SoftwareSwitcher (Switch)Solar Wine ,.

5WA Support Work AuthorizationSWAD Subdivision of Work Authorization DocumentSWAT Stress Wave Analysis TechniqueSWOB Salaries, Wages, Overhead and BenefitsSWP Safe Working Pressure

-bT

-7: _

Page 92: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I

µ

SXT SextantSYM Symbo l

;rr

SYMM SymmetricalSYN SynchronousSynthetica

SYNC SynchronizeSYS SystemSYSTRAN Systems Analysis Translator

-T-

T Testy..,'

TimeT- Time Prior to LaunchT-0 TakeoffT/A Turnaround iT/C Termination CheckT/D Touchdown

Time DelayT/E Transporter ErectorT/L Talk and ListenT/R Transmit-Receive

Tape RecorderTransformer Rectifier

T/T Terminal TimingTiming/Telem--try

T/TCA Thrust/Translation Contrgl'AssemblyT/V Thermal/VacuumT/W Thrust-to-HeightTA Test Article

f Task AnalysisTrunion Angle Y

Travel Authorization''TAA Technical Assistance AgreementTAC Total Average CostTACAN Tactical Air NavigationTACO Test and Checkout OperationsTAEM Terminal Area Energy ManagementTAG Technical Air-to-GroundTAIR Test Assembly Inspection RecordTALAR Tactical Approach and Landing RadarTAM Thermal Analytical ModelTAP Telemetry Acceptance Pattern

Technical Achievement PlanTotal Air Pressure-

2-68

fi

Page 93: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

W 6:

Test Action RequirementTest Agency Report

1 Technical Analysis RequestTAS Telemetry Antenna Subsystem

True AirspeedTASPR Technical and Schedule Performance Report.TAT Total Air Temperature

_ 78 Talk BackTerminal Base

TB:A To Be AddedT8D To Be Det7rmined

To Be Developed.BE To Be EvaluatedTBN To Be NegotiatedTBP To Be ProvidedTBS Tank Breakdown Structure

To Be SpecifiedTo Be Supplied

T TelecommunicationsThermocoupleTest Conductor (Controller)Temperature CompensatingTraceability CodeTracking CameraThrust Chamber

TCA Thrust Chamber Acsembl

4`• .» 1

iTranslation Controller AssemblyTask Control BlockThermal Control CoatingTest Completion DateTime Crd'° GeneratorTest Configuration IdentifierTrans portation Control and Movement DocumentTransportation Control NumberTest and Checkout PlanTest Checkout ProcedureThermal Concept ReviewTest and Checkout Requirements S pecification DocumentThermal Control SubsystemTest Control SupervisorTime Compliance Technical InstructionTime Compliance Technical Order'Tape Control UnitTechnical DirectiveTerminal distributorTask Description DocumentTine-Division MultiplexingTemperature and DewpointTechnical Design ReviewTechnical Documentation ReportTracking and Data Relay SatelliteTracking and Data Relay Satellite SystemT—+ Rota Cvc r m

ii

TCBTCCICD

TCCTC;DTCMDTCNTCOPTCPTCR"CRSDTCS

TCTiTCTOTCUTO

TOOTDMTOPTOR

TORSTDRSSTnq

Page 94: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

a{

f

TE Test EquipmentTECH TechnicianTELCOM Telecommunications

l+

TEMP TemperatureTEP Technical Evaluation PanelTER Test Equipment Readiness

Time Estimating RelationshipTERL Test Equipment Readiness ListTF Test Facility

Test FixtureTFC Time From Cut;iffTFCS Triplex Flight Control SubsystemTFE Time From EventTFI Time From IgnitionTFL Time From LaunchTFS Telemetry Format SelectionTGA Thermal Gravimetric AnalysisTGS Telemetry Ground System

Telemetry Ground StationTGSE Telemetry Ground Support Equipment ,..TGT TargetTHC Translation Hand Controller gTI Technical Integration 1TIC Technical Information CenterTIFS Total Inflight SimulatorTII Tooling Inspection InstrumentationTL Lot Traceability

Thrust Level JTLM TelemetryTM Member Traceability

Technical ManagementTraffic Model

TMB Transportation Management BulletinTMC Test Monitoring ConsoleTMF Transporter Maintenance FacilityTMO Tool Manufacturing OrderTMP Terminal PanelTMPV Torquemotor Pilot ValveTMU Temperature Measurement Unit±li Technical NoteTO Technical OrderTOC Test Operations Center°

Test Operations ChangeTOL ToleranceTOT TotalTP Transition Period

Test. PointTPA Test Preparation AreaTPSC Thermal Protection and ControlTPE Test Project EngineerTPF Tug Processing Facility

Terminal Phase FinishTPI Terminal Phase Initiation

2-70

1

Page 95: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

A__

t ,

TPM Technical Performance Measurement (system)TPR Test Problem Report

TPS Thermal Protection Subsystem fTPUN Test Procedure Update NoticeTR Test Request

Technical ReportTransportation Request

TRA Training Requirements AnalysisTurnaround Requirements Analysis

TRR Test Readiness ReviewTRS Tug Rotational System

Troubleshooting Record SheetTRSD Test Requirements Specification DocumentTS Serial Traceability

Tensile StrengthTest SiteTechnical Support

TSA Test Start ApprovalTSAC Tracking System Analytic CalibrationTSB Twin SidebandTSC Test Setup Complete"TSD Test Start DateTSE Transportation Support EquipmentTSLD Troubleshooting Logic DiagramTSM Trade Study Management

Tail Service MastTSO Time Since Overhaul

Time Sharing OptionTSP Test Software Program

Twisted Shielded PairTSR Technical Status ReviewTSRA Total System Requirements AnalysisTSS Tug Structural SupportTST Test By SellerTSW Test SwitchTT Thrust Termination

Total TimeTTA Therrtomechanical Test AreaTTCA, Thrust Translation Controller AssemblyTTCV Tracking Telemetry, Command and Voice

Ti:EL Tool and Test Equipment List

TrL Transistor-Transistor Logic.,TTU Timing Terminal UnitTTY TeletypeTU Technical UtilizationTV Thermal Vacuum

TelevisionThrust Vector

TVA Thrust Vector AlignmentTVAR Test VarianceTVC Thrust Vector Control

Thermal Vacuum ChamberTVCD Thrust Vector Control Driver

2-71

I

Page 96: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

^ ' .. .. yAn..., ^._ ..-v.--,.m..-s-•ice•°^rsA*:r^¢R^a.^,'°RT^r•

i

;iTest Verification Network

IP Test Verification Program17, Thermal 'lacuum TestT'ITA Thermal Vacuum Test Article '.

dR Tower

.TWT Tri_sonic 'Wind Tunnel 1rJX Teletype 'dire Transmission

3

'

'U

r

- U Micro (Micron)Uranium v< .,

U/C Under CurrentU/L UplinkU/M UnmannedU/0 Used OnU/V Under VoltageU/'W Used WithUA —Micro Ampere 8

UC Unsatisfactory ConditionUCPa Uniform Control NumberUCR Unsatisfactory Condition ReportUCS Universal Control System

i Utilities Control SystemUD Update xUDB Update BufferUDF Utility and Data, FlowUOL Update LinkUDS Universal Documentation Syste:?UER Unique Equipment Register t

f OF Microfarade UFO User File Directory

UG MicrogramsUHF Ul trafii gh Frequency

1 UI, Unit of Issuei uLL Ullage

ULO Unmanned Launch Operatio5sULT UltimateUMB Umbilical ` t

I UMO Unmanned OrbitalUMVF Unmanned Vertical'F1iohsUPTLM Up-Link Telemetry;Us, United States iUSAF United States Air e. Force

I

I

x4

^ ^

,

C

d

f

Page 97: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

USB Upper Side BandUnified S-Band ^!

USBE Unified S-Band Equipmentr

i

USBS Unified S-Band System

USEC Microsecond JUSNS United States Navy Ship

` USS United States Standard 1

United States Ship

UST United States Testing Company

UT Universal Time t

UTC United Technology CenterUniversal Test Console

UTE Universal Test Equipment

UU Micromicron

UUT Unit Under Test

UV Under VoltageUltravioletMicrovolt

UVD Under Voltage Device

UVF Unmanned Vertical Flight

Uw Microwatt

_V-

V VelocityVoltVoice

V-A Vibro Acoustic

V/C Vector ControlV/H Velocity-to-Height

VA Volt-AmpereVAB Vehicle Assembly Building

VAC Volts - Alternating CurrentVacuumVehicle Assembly and Checkout

VAFB Vandenberg Air Force Base

VAN USNS Vanguard (STDN)

VAR Variable (Variance-Variation)Volt Ampere Reactive

VASI Visual Approach Slope Indicator

VAST Versatile Avionics System Tester

VAT Vibro-Acovitic Test

VATA Vibro-Acoustic Test Article `-

- VATF Vibro-Acoustic Test Facili ty!l

2-73

1

f

^ x

Page 98: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

I I

i

.. — .-_a :."^ ,^'„'-4.•:J'+e't^. ...-tea _..^....*,c wrw^r°4 a^"I

s.

VATVTA Vibro-Acoustic/Thermal/Vacuum Test Article

Y

1 VC 'lector Character iVelocity Ccunte;

VCB Vertical Location, of the Canter of Boo}ancyVCG Vertical Location of the Center of GravityVCI Velocity Change IndicatorVCM Volatile Condensable MatEriclsVC0 Voltage Controlled OscillatorVCT Voltage Control Transfer

„ VCTR Vector

f (VDC Volts - Direct Current

f VDS Vehicle Dynamics SimulatorVEEI Vehicle Electrical Engine InterfaceVEH Vehicle

' VERIF VerificationVERT VerticalVF Vertical Flight

Video FrequencyVFI Verification Flight InstrumentationVFO ' Variable Frequency OscillatorVFR Visual Flight Rules

i VFT Vertical Flight Test (superceded by OFT)VGP Vehicle Ground PointVGT Vehicle Ground TestVHF Very High FrequencyVHF-AM Very Hi7h Frequency Amplitude Modulator

1 VHF-OF Very High Frequency Direction FinderVIA By Means Of (By Way Of)VIB VibrationVID VideoVIS Verification Information System

Visibilityt VISC Viscosity

Vi Vacuum JacketedVLF Very Low FrequencyVLR Very Low RangeVM Voltmeter

Virtual MemoryVMS Velocity Measuring Systemft VolumeVOM Volt.-Ohmmetert0R VHF Omnidirecticnal .dio-Rare ' «`VORTAC, Variable Omni Range Tactical (VOR and TACAN)VOT' VHF Omr.itestVOX Voice Operated TransmitterVP Vertical Polarization

Vacuum PumpVP=P Volt Peak-to-Peak

VPK Volts Peak -

VPM Vehicle Project ManagerVR Voltage RelayVRB VHF Recovery BeaconVRL Vertical Recovery Line

i

2-74

I -

i^

Page 99: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

{,

I

L

T"

r

-': VRMS Volts Root-Mean-Square l

VS Staging Velocity FVSA Variable Stability Aircraft

VSI Vertical Speed Indicator ?;Video Simulation Interface4

VSWR Voltage Standing Wave RatioVTP Vehicle Test Plan

Verification Test ProgramVTR Video Tape RecorderVTS Vertical Test StandVTVM Vacuum Tube VoltmeterVTX Vertex }

VU Volume Unit

VV Vent ValveVX Velocity Along the X-Axis

VY Velocity Along the Y-AxisYZ Velocity Along the Z-Axis

AA

"v,

Ygg a.

d

i

r

W Batt

c

-Wide

{. W/ WithW/B WidebandW/G Water/Glycol f:

W/o WithoutW/T Wind TunnelkP, Wort, Authorization =aHAD Work, Authorization Docwv-nf.-

r WB Wet BulbWBS Work Dreakdoum Structure i^ a

i WBTS Wideband Transmission System 1r^ LU Wire and Cable

WCP tiling Chord Plane

• WCS Work ontrol SystemY^

1i0 Nork Days k

WidthIDEA Weather

- WG Wave GuideWing

WHt, Wheel #WHR Watt-Hour ?:

i WIB When Interrupt BlockWIF hater Immersion Facility

2-75

jX ^

Page 100: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

t

WIP Work In ProgressWL WavelengthWM Waste Management

WO Work OrderWOW Weight-On-Wheels

- WP Working Pressurea Work Package

WPAFB Wright Patterson Air Force BaseWPC Watts Per CandleWPF Work Process Flow

1 WPI Work Progress Indicator

WPM Words Per MinuteWRG Wiring

a WRL Wing Reference Line

WS Wind Shield i

WSMR White Sands Missile Range

WSTF White Sands Test Facility

WSWR Variable Standing Wave Ratio (Rate)WT tWeightWTR Western Test Range tiWTT Wind Tunnel Test

h

WUC Work Unit CodeWX Weather ++

-X-d)

3

1X Times (By, Trans-)XCVR TransceiverXCOR TransducerXFO Crossfeed A.

XFEP, Transfer3 XLTN Translation ^.s XMT Transmit

XPNOR Transpondera XTAL Crystal

X sub '0 Orbiter Structural Body Reference, X-AxisX sub P Payload Structural Body Reference, X-AxisX sub S SRB Structural Body Reference, X-AxisX sub T ET Structural Body Reference, X-Axis

}

2-6

{

Ir

r

Page 101: General Disclaimer One or more of the Following Statements ... · operational use of the facility completes this milestone. FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS (FMECA)

h

-Y-

Y YawHorizontal Axis - 'Width of VehicleY-Axis, Horizontal - Width of Vehicle/Structure

YD YardYP Yield Point

YR YearYS Yield Strength

YST Yearly Spares Cost

YT Station Identification Symbol

Y sub 0 Orbiter Structural Body Reference, Y -AxisY sub P Payload Structural Body Reference, Y -AxisY sub S SRB Structural Body Reference, Y-AxisY sub T ET Structural Body Reference, Y -Axis

-Z-

i

i

Z Zulu (Greenwich Mean Time - GMT)Zone

ZGT Zero Gravity Trainer

ZI Zone of Interior

Z0 Station identification Symbol, Orbiter X-Axis

ZPN Impedance Pneumogram

ZS Station Identification Symbol, SRB Z-AxisZT Station Identification Symbol, ET Z-Axis

Z sub 0 Orbiter Structural Body Reference, Z-Axis

Z sub P Payload Structural Body Reference, Y-Axis

Z sub S SRB Structural Body Reference, Z-Axis

Z sub T ET Structural Body Reference, Z-Axis'a

ai

1

2-77

,ax

}

2,a