    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 1 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    LIST OF CONTENTS

    1. PLANT DETAILS

    2. TESTING OBJECTIVES

    3. TESTING PROPOSALS

    4. SERVICES REQUIRED

    5. SAFETY PRECAUTIONS

    6. EMERGENCY PROCEDURES

    7. STATE OF THE PLANT

    8. COMMISSIONING PROCEDURE

    9. COMPLETION CRITERIA

    10. APPENDICES

  • 7/29/2019 Ht Swgr Test Sch

    2/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 2 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    1. PLANT DETAILS :

    THIS SYSTEM CONSISTS OF 11 KV AND 3.3 KV HT SWITCHGEARS

    (UNIT SWITCH BOARD BA,BB,CA,CB FOR UNIT #1 AND UNIT #2 AND

    STATION SWITCH BOARD 0BA,OCA FOR 11 KV/3.3 KV STANDBY

    SWITCHBOARD SUPPLY IN CASE OF BOTH GENERATORS OUT OF

    SERVICE)

    NAME PLATE DETAILS

    MAKE: BHEL,BHOPAL

    RATINGS VOLTAGE : 11 KV & 3.3 KV 3PHASE 50 HZ AC

    CURRENT:2750 A

    11 KV SWITCHGEARS

    I.The 1BA Board consists of the following HT Panels :

    1. INCOMER PANEL

    INCOMER FROM UT A (Unit #1)

    2. PT PANELS

    LINE/FEEDER PTBUS PT

    3. TIE BREAKER FROM STANDBY SWITCHBOARD(0BA)

    4 . OUTGOING FEEDERS

    3240 KW Cooling Water Pumps 1 & 2

    2450 KW Primary Air fan A (Unit #1)

    16MVA Unit Aux. Transformer A (1CAT01)

    16MVA Misc. service Transformer(MST-A)

    2MVA Unit service transformer A(1DAT01)

    3MVA VFD transformer (ID Fan 1A Channel 1&2)

    1.25MVA Bunker area service transformer(CHT-4A)

  • 7/29/2019 Ht Swgr Test Sch

    3/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 3 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    1.6 MVA ESP Service transformer (1DCT01,1DDT01,

    1DET01,1DFT01).

    1.25 MVA CHP transformer 1A(CHT-1A)

    0.75 MVA Track Hopper Service Transformer(CHT-2A)

    1.6MVA Fuel oil service transformer (0DCT01).

    7.5 MVA Station aux. Transformer. (0CAT01).

    2 MVA Station Service Transformer(0DAT01)

    6.3 MVA CHP Aux. TFE

    5. Spare feeders

    3240 KW Motor feeder

    2 MVA Transformer feeder

    II.The 2BA Board consists of the following HT Panels :

    1. INCOMER PANEL

    INCOMER FROM UT A(Unit #2)

    2. PT PANELS

    LINE/FEEDER PTBUS PT

    3. TIE BREAKER FROM STANDBY SWITCHBOARD(0BA)

    4. OUTGOING FEEDERS

    3240 KW Cooling Water Pump 4

    2450 KW Primary Air fan A (Unit # 2)

    16MVA Unit Aux. Transformer A (2CAT01)

    16MVA Misc. service Transformer(MST-B)

    2MVA Unit service transformer A(2DAT01)

    3MVA VFD transformer (ID Fan 2A Channel 1&2)

    1.25MVA Bunker area service transformer(CHT-4B)

    1.6 MVA ESP Service transformer (2DCT01,2DDT01,

    2DET01,2DFT01).

    1.25 MVA CHP transformer 1B(CHT-1B)

    0.75 MVA Track Hopper Service Transformer(CHT-2B)

    1.6MVA Fuel oil service transformer (0DCT02).

    7.5 MVA Station aux. Transformer. (0CAT02).

    2 MVA Station Service Transformer(0DAT02)

    6.3 MVA CHP Aux. TFE

  • 7/29/2019 Ht Swgr Test Sch

    4/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 4 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    5. Spare feeders

    3240 KW Motor feeder

    2 MVA Transformer feeder

    III. The 1BB Board consists of the following HT Panels :

    1. INCOMER PANEL

    INCOMER FROM UT B (Unit #1)

    2. PT PANELS

    LINE/FEEDER PT

    BUS PT

    3. TIE BREAKER FROM STANDBY SWITCHBOARD(0BA)

    4. OUTGOING FEEDERS

    10000 KW MD BFP (Unit # 1)

    3240 KW Cooling Water Pump 32450 KW Primary Air fan B (Unit # 1)

    16MVA Unit Aux. Transformer B (1CAT02)

    2MVA Unit service transformer A(1DAT02)

    3MVA VFD transformer (ID Fan 1B Channel 1&2)

    1.6 MVA ESP Service transformer (1DCT02,1DDT02,

    1DET02,1DFT02).

    1 MVA Switchyard Service Transformer(0DHT01)

    2 MVA Ash Sys Compressor Plant Transformer(0DDT01)

    1 MVA Ash Water Power House Service Transformer(0DFT01)

    2 MVA Off Side Plant Service Transformer(0DGT01)

    2 MVA WTP Area Service Transformer(PT-1A)

    2 MVA Station Service Transformer(0DBT01)

    0.5 MVA Raw Water Pump House Service Transformer(RWT-1A)

    1.6 MVA Administration Building Service Transformer(ADMT-1A)

    5. Spare feeders

    2450 KW Motor feeder

    1 MVA Transformer feeder

  • 7/29/2019 Ht Swgr Test Sch

    5/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 5 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    IV.The 2BB Board consists of the following HT Panels :

    1. INCOMER PANEL

    INCOMER FROM UT B (Unit #2)

    2. PT PANELS

    LINE/FEEDER PT

    BUS PT

    3. TIE BREAKER FROM STANDBY SWITCHBOARD(0BA)

    4. OUTGOING FEEDERS

    10000 KW MD BFP (Unit # 2)

    3240 KW Cooling Water Pump 5

    2450 KW Primary Air fan B (Unit # 2)

    16MVA Unit Aux. Transformer B (2CAT02)

    2MVA Unit service transformer A(2DAT02)

    3MVA VFD transformer (ID Fan 2B Channel 1&2)

    1.6 MVA ESP Service transformer (1DCT02,1DDT02,

    1DET02,1DFT02).1 MVA Switchyard Service Transformer(0DHT02)

    2 MVA Ash Sys Compressor Plant Transformer(0DDT02)

    1 MVA Ash Water Power House Service Transformer(0DFT02)

    2 MVA Off Side Plant Service Transformer(0DGT02)

    2 MVA WTP Area Service Transformer(PT-1B)

    2 MVA Station Service Transformer(0DBT02)

    0.5 MVA Raw Water Pump House Service Transformer(RWT-1B)

    1.6 MVA Administration Building Service Transformer(ADMT-1B)

    5. Spare feeders

    2450 KW Motor feeder

    1 MVA Transformer feeder

  • 7/29/2019 Ht Swgr Test Sch

    6/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 6 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    3.3 KV SWITCHGEARS

    I.The 1CA board (unit #1) consists of the following

    1. INCOMER PANELS

    INCOMERS FROM UAT A & B(UNIT #1)

    2. PT PANELS

    LINE PT A & B

    BUS PT A & B

    3. BUS COUPLER PANEL4. BUS TRUNKING PANEL

    5. OUTGOING FEEDERS

    1175 KW FD Fans A & B

    900 KW CEPs A & B

    525 KW Mills A,B,C,D,E,F,G,H,I

    354 KW Boiler Circulated Water Pumps A,B,C

    355 KW DMCW Pumps A,B,C

    270 KW Instrument Air Compressor A & B

    270 KW Plant Air Compressor

    200 KW FF Spray Pump Motor

    200 KW FF Hydrant Pump motor - A

    6. SPARE FEEDERS

    1175 KW motor feeder

    900 KW motor feeder

    II.The 2CA board (unit #2) consists of the following

    1. INCOMER PANELS

    INCOMERS FROM UAT A& B(UNIT #2)

    2. PT PANELS

    LINE PT A & B

    BUS PT A & B

    4. BUS COUPLER PANEL

    5. BUS TRUNKING PANEL

    5. OUTGOING FEEDERS

    1175 KW FD Fans A & B

    900 KW CEPs A & B525 KW Mills A,B,C,D,E,F,G,H,I

    354 KW Boiler Circulated Water Pumps A,B,C

  • 7/29/2019 Ht Swgr Test Sch

    7/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 7 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    355 KW DMCW Pumps A,B,C

    270 KW Insttrument Air Compressor A

    270 KW Plant Air Compressor

    200 KW FF Hydrant Pump motor A & B

    6. SPARE FEEDERS

    1175 KW motor feeder

    900 KW motor feeder

    III.The 0CA board (unit #1) consists of the following

    1. INCOMER PANELS

    INCOMERS FROM SAT- A & B(UNIT #1)

    2. PT PANELS

    LINE PT A & B

    BUS PT A & B

    3. BUS COUPLER PANEL

    4. BUS TRUNKING PANEL

    5. OUTGOING FEEDERS456 KW FA HP Water Pumps 1,2

    380 KW Transport Air Comp 1 ,2&3

    333 KW Ash Slurry Pump Motor- 1,2,3,4 (Stage I & II)

    200 KW BA Slurry Pump Motor

    6. SPARE FEEDERS

    456 KW Spare Motor Feeder

    333 KW Spare Motor Feeder

  • 7/29/2019 Ht Swgr Test Sch

    8/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 8 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    2.TESTING OBJECTIVE:

    TO TEST THE FITNESS OF HT SWITCHGEAR PANELS AND THEIR

    AUXILIARIES (MEASUREMENT,CONTROL CIRCUITS) FOR CHARGING

  • 7/29/2019 Ht Swgr Test Sch

    9/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 9 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    3.TESTING PROPOSAL

    THE FOLLOWING TESTS MUST BE CARRIED OUT IN THE PANEL

    I) INSULATION RESISTANCE MEASUREMENT OF BUS

    BAR(POWER,CONTROL),VCB

    II) BUSBAR,CONTACT RESISTANCE MEASUREMENT

    I) HIGH VOLTAGE TEST BUS

    III) PRIMARY INJECTION TEST - VTs & CTs

    IV) PROTECTION, INTERLOCKS AND METERING CIRCUITS

  • 7/29/2019 Ht Swgr Test Sch

    10/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 10 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    4.SERVICES REQUIRED

    5000V INSULATION TESTER

    3 PHASE 415 AC 5O Hz SYSTEM

    DC CONTROL SUPPLY

    HI POT AC/DC SOURCE

    MEASUREMENT KIT

    CURRENT INJECTION KIT

    MICRO OHM METER

    MILLISECONDS TIMER

  • 7/29/2019 Ht Swgr Test Sch

    11/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 11 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    5.0 SAFETY PRECAUTIONS:

    PLANT

    5.1.1 Extinguisher systems readiness

    5.1.2 Load trip lever is provided

    5.1.3 11 KV/3.3 KV AC panel charged/caution board to be fit

    5.1.4 Men & materials to be kept away from switchgear panel area

    5.1.5 Each test will be carefully planned so that there is no danger of mechanical or

    electrical damage to the equipment under test.

    PERSONNEL:

    5.2.1 The Engineer-In-Charge of the testing team will inform each member of his

    team as to the exact nature and extent of his contribution and responsibilities

    towards the tests carried out.

    5.2.2 Only nominated person will take part in the tests. All others will remain clear

    Of the area.

    5.2.3 All persons must acquaint themselves with the use and location of fire

    extinguishers and first aid posts.

    5.2.4 Adequate lighting facilities will be provided at all times.

    5.2.5 Each test will be carried out under the control of the test team leader.

    5.2.6 A strict and safe method of applying test leads shall be practiced. Bare wires

    shall not be inserted into sockets.

    5.2.7 A record of any alternation made during the test such as shorts or

    disconnections, shall be made and annexed to relevant test procedures.

  • 7/29/2019 Ht Swgr Test Sch

    12/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 12 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    5.2.8 There will be safe and easy access to all equipments under test. And test area

    will be kept clean and clear of all obstructions.

    5.2.9 When high voltage tests are being carried out the area will be cordoned off.

    Danger/Warning Notices shall be fixed at relevant points to ensure safety.

    5.2.10 Incomer shall be kept in withdrawn position.

    5.2.11 The operating personnel must be kept informed of the programme of testing.

  • 7/29/2019 Ht Swgr Test Sch

    13/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 13 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    6.EMERGENCY PROCEDURE

    6.1.1 i) Transformer & control power supply should be isolated

    6.1.2 ii) Emergency trip command may be given

    6.3 Shock treatment chart and first aid box will be made available.

    6.3 Emergency telephone numbers for Hospital and Fire Services shall beprominently displayed.

    6.4 A telephone will be available nearby.

    6.5 If an abnormality is observed during charging, the TIE VCB should be

    switched off immediately.

  • 7/29/2019 Ht Swgr Test Sch

    14/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 14 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    7. STATE OF THE PLANT

    7.1.1 CHECKLIST FOR THE FOLLOWING PANELS ARE CHECKED

    i. INCOMER PANELS (1 & 2)

    ii. OUTGOING FEEDERS

    iii. BUSCOUPLER

    iv. TIE BREAKER

    7.1.2 ALL INCOMING AND OUTGOING CABLES TO INCOMER PANELS

    ARE COMPLETED

    7.1.3 INTERLOCKS FOR CLOSING AND PROTECTION FOR TRIPPING ARE

    TO BE CHECKED AS PER STANDARD CHECK LIST

    7.2.1 11KV Bus Duct/Cable erection from station switchgear to unit switchgear

    complete in all respects.

    7.2.2 The Tie Breakers at station switchgear end of tie is tested and in withdrawn

    position with shutters locked.

    7.2.3 All circuit breakers contained in 11KV unit switchgear in withdrawn position.

    7.2.4 Clearance from Erection Department for carrying out tests on 11KV unit

    switchgear and 11KV Bus duct/cable from unit to station switchgear obtained.

    7.2.5 11KV station switchgear associated with the energising of this unit switchgear

    is live.

    7.2.6 Safety Clearance notification issued and effective for 11KV unit switchgear

    and 11KV ite bus duct/cable.

    7.2.7 The associated DAS/Annunciation scheme is complete, tested and in service.

    7.2.8 The control supplies are available.

  • 7/29/2019 Ht Swgr Test Sch

    15/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 15 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    8. COMMISSIONING PROCEDURE :

    8.1 Check and test all the panels of 11 KV unit switch board and associated

    equipments as per their standard check list. Enter all the above details in

    PICL.

    8.2 Check and test the unit switchgear bus bars and the Tie bus duct/cable to the

    station switchgear as per their standard check lists and enter details in PICL.

    8.3 Check and test supply cables for the DC control bus and the AC heater

    supplies as per their SCL and enter the details in PICL.

    8.4 PRE ENERGISING CHECKS & TESTS

    i) INSPECT ANY PHYSICAL DAMAGE IN THE BUSBAR,

    INSULATION, PANEL DOORS, POWER & SLIDING CONTACTS

    ETC. AND TO BE RECTIFIED IF FOUND

    ii) MAKING THE PANEL INSIDE DUST FREE & FREE FROM

    FOREIGN MATERIALS

    iii) CHECKING THE TIGHTNESS ALIGNMENT & CLEARANCE OF

    BUS BARS ,SMOOTHNESS IN RACKING IN & RACKING OUT

    OF MODULES, PROPER MAKING OF LIMIT SWITCH

    CONTACTS(TEST AND SERVICE), TIGHTNESS OF INPUT

    POWER CABLES AND OUTGOING POWER & CONTROL

    INTERNAL WIRINGS.

    iv) INSPECT ALL RELAYS AND MAKE SURE THAT ANY

    BLOCKING USED FOR SHIPPING PURPOSE IS REMOVED AND

    THE ARMATURE MOVES FREELY.

  • 7/29/2019 Ht Swgr Test Sch

    16/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 16 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    v) CHECK ALL DOORS FOR PROPER MOUNTING WITH RESPECT

    TO THE SWITCH HANDLE.

    vi) CHECK DOOR INTERLOCK MECHANISM

    vii) TEST THE PTs,CTs & RELAYS INVOLVED. KEEP THE

    RECOMMENDED SETTINGS FOR THE RELAYS LIKE OVER

    CURRENT, UNDER VOLTAGE & OVERLOAD PROTECTIONS,

    CALIBRATE THE METERS (AMMETERS, VOLTMETERS,

    POWER METERS & ENERGY METERS ETC)

    viii) TEST THE INSULATION OF BOARDS WITH 5000 V DC MEGGER

    & THE VALUE SHOULD BE AS PER THE RELEVANT IS

    SPECIFICATION (MORE THAN 50 MEGA OHMS)

    ix) CHECK CLOSING & TRIPPING INTERLOCKS,OVERLOAD

    RELAY SETTING OF ALL VCBs IN THE PANEL

    x) MEASURE BUSBAR RESISTANCE,VCBs CONTACT

    RESISTANCE (SHOULD BE LESS THAN 50 MILLI OHMS),

    CLOSING & TRIPPING TIME IF TEST REPORT IS NOT

    AVAILABLE AT SITE.

    xi) CHECK THE PROTECTION CIRCUIT WIRINGS CONNECTION

    BY CONDUCTING PRIMARY INJECTION CURRENT

    xii) CARRY OUT HIPOT TEST FOR 75% OF VOLTAGE MENTIONED

    IN THE TEST REPORT FOR HT BUSES,100 % FOR HT

    INCOMING POWER CABLES AND FIND OUT THE LEAKAGE

    CURRENT

  • 7/29/2019 Ht Swgr Test Sch

    17/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 17 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    xiii) CHECK THE INPUT POWER CABLE TERMINATIONS FROM

    TRANSFORMER SECONDARY

    xiv) ENSURE THE PHASE SEQUENCE OF INCOMING PT WIRINGS

    AND CIRCUIT CLOSING OF CTs ARE PROPER BEFORE

    CHARGING THE PANEL.

    xv) CHECK CLOSING & TRIPPING MECHANISM OPERATES

    SMOOTHLY BOTH MANUALLY AND ELECTRICALLY

    xvi) SPACE HEATERS & THERMOSTAT SHALL BE IN GOOD

    CONDITION

    8.5 Ensure all covers are provided and no conducting part is earthed.

    CHARGING PROCEDURE:

    8.6 Ensure tie breaker in associated station switchgear is in withdrawn position.

    8.7 Ensure all feeder breakers of unit Swtichgear are in withdrawn position.

    8.8 Check and record the final IR of supply cables for the DC control bus and the

    AC heater supplies :

    I R OF SUPPLY CABLES M

    FOR DC CONTROL BUS FOR AC HEATER SUPPLIES

  • 7/29/2019 Ht Swgr Test Sch

    18/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 18 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    + to E

    - To E

    + to E

    8.9 Energise both the supply cables for DC control bus and AC heater supplies.

    8.10 Put the tie breaker in Test position.

    8.11 Put all control fuses for the Tie breaker in position and switch on its control

    supply.

    8.12 Select LOCAL/REMOTE selector switch to local and close and trip the tie

    breaker once check its operation.

    8.13 Check tie isolator. Interlock in closing circuit of tie breaker.

    8.14 Check that tripping relays for Tie breaker and main incomer breaker are not

    operated and are reset.

    8.15 Select Tie breaker Local / Remote switch to REMOTE.

    8.16 Give closing impulse to Tie breaker from UCB and check that the breaker

    closes.

    8.17 Short Terminals (tripping contact of E/F and O/C Relay) and check that

    tripping relay energises and tie breaker trips.

    8.18 Switch off the control supply and reset the tripping relay and remove the

    shorts applied under 8.13 and 8.17.

    8.19 Put the incomer breaker in Test position.

  • 7/29/2019 Ht Swgr Test Sch

    19/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 19 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    8.20 Put control fuses of Incomer breaker in position and switch on control supply.

    8.21 Select Local/Remote switch of Incomer breaker to local and close and trip the

    incomer breaker once to check its operation.

    8.22 Short the terminals ------------ in Incomer breaker cubicle to bypass the

    Generator Breaker closed permissive.

    8.23 Select Incomer breaker Local/Remote switch to Remote.

    8.24 Give closing command by control switch in UCB and check that the breaker

    closes.

    8.25 Switch on the control supply to tie breaker.

    8.26 Short terminals in incomer breaker and check that :

    a. Incomer breaker trips

    b. Tie breaker closes automatically

    8.27 Reset all alarms and relays and remove shorts.

    8.28 Give trip command to incomer breaker control switch in UCB to bring switch

    position corresponding to breaker position.

    8.29 Put check/manual switch for incomer breaker in UCB in MANUAL position.

    8.30 Give closing command to incomer breaker and check that :

    a. Incomer breaker closes.

    b. Tie breaker trips automatically.

    8.31 Reset all alarms and relays.

    8.32 Give trip command to tie breaker control switch in UCB to bring switch

    position corresponding to breaker position.

  • 7/29/2019 Ht Swgr Test Sch

    20/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 20 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    8.33 With incomer breaker ON and check/manual switch in manual position, give

    closing command to the tie breaker and check that :

    a. Tie breaker closes;

    b. Incomer breaker trips.

    8.34 Reset all alarms and relays.

    8.35 Trip the Tie breaker.

    8.36 Switch off the control supplies to both inocmer and ite breakers.

    8.37 Remove all test connections and check that any disconnections made for the

    purposes of testing have been correctly reinstated in tie and incomer panels.

    8.38 Keep incomer breaker in withdrawn position (It will remain in withdrawn

    position till unit auxiliary transformers are commissioned).

    8.39 Check danger/warning notices are fixed at relevant points to ensure safety.

    8.40 Ensure effective communications between UCB and switch board room are

    established.

    8.41 Check and record the final IR value of the following equipments :

    a. Isolator/Tie breaker of associated station switchgear.

    b. Tie breaker of Unit switchgear

    c. Unit switchgear bus bar

    d. Tie bus duct/cable megger used ___________ KV

    IR VALUES . M

    Isolator Tie Breaker Unit Bus Bar Tie Bus Duct /

  • 7/29/2019 Ht Swgr Test Sch

    21/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 21 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    Tie Breaker Cable

    R YBE

    Y BRE

    B RYE

    8.42 Ensure VT is in service position with all its fuses put on.

    8.43 Check all the relay settings in TIE breaker panel are as per their protection

    schedule.

    ENERGIZING PROCEDURE

    8.44 Put the Tie breaker of associated station switchgear in service position and

    close the tie breaker to charge the Tie cable.

    8.45 Observe the cable for any abnormality.

    8.46 Put the tie breaker in service position.

    8.47 Switch on the control supply to the tie breaker.

    8.48 Inform all concerned parties about the intention of charging the unit switch

    board.

    8.49 Put local/remote switch of tie breaker in REMOTE position.

    8.50 Give closing command from the UCB to tie breaker to charge the unit switch

    board.

    8.51 Check and record the unit bus bar voltage for all the three phases.

    8.52 Observe the unit switch board for any abnormality.

    8.53 Put the synch. Check/manual selector switch to CHECK.

    8.54 Check permissive contact in synchronising check relay closes.

  • 7/29/2019 Ht Swgr Test Sch

    22/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 22 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    8.55 Check the phase sequence at unit bus VT secondary terminals as detailed in

    following table. (It shall be same as that of associated station board).

    MEASUREMENT IN VT CUBICLE

    Voltage Measurement Phase sequence RemarksPhases Terminal Nos. Volts

    R - Y

    Y - B

    B - R

    E11 - E31

    E31 - E51

    E51 - E11

    RYB

    RBY

    8.56 Do the phasing out between VT secondaries of station and unit board.

    8.57 Keep the board charged for 24 Hours and observe it for any abnormality.

    8.58 Inspect all equipments externally for any sign of abnormality after being

    charged for 24 Hrs.

    8.59 It will be the duty of the testing team leader to ensure that when the system is

    operating under load conditions that all equipments are externally inspected

    for any sign of stress or abnormality and a copy of the results of their

    inspection is attached as an appendix to this schedule.

    9. COMPLETION CRITERIA

    HT BUSES ARE READY FOR CHARGING. UNIT TRANSFORMERS IN

    CASE OF 11 KV; UATs OR SAT IN CASE OF 3.3 KV ARE CHARGED AND

    11KV/3.3 KV POWER SUPPLY MAY BE EXTENDED TO HT BUSES.

  • 7/29/2019 Ht Swgr Test Sch

    23/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 23 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    10. APPENDICES

    DRAWINGS : SLD OF ELECTRICAL SYSTEM AUX POWER

    DISTRIBUTION

    KEY DIAGRAM OF 11KV SWITCHBOARDS (1BA,1BB,2BA &2BB)

    KEY DIAGRAM OF 3.3 KV SWITCHBOARDS (1CA,0CA,2CA)

    SCHEMATIC DIAGRAM OF 11 KV/ 3.3 KV SWITCHGEARS

    LOG SHEETS : I) IR VALUES,BUS BAR RESISTANCE VALUES

    OF HT SWITCHGEAR

    II) TEST REPORT OF RELAYS,PTs,CTs INCLUDED IN

    THE SYSTEM

    III) UNDERVOLTAGE,OVERCURRENT&

    EARTHFAULT, STANDBY AND RESTRICTED E/F

    SETTINGS RECOMMENDED/KEPT

  • 7/29/2019 Ht Swgr Test Sch

    24/24

    STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

    NTPC REF NO: SIM/1/TS/ /

    SHEET 24 OF 24

    PLANT AREA : ELECTRICAL SYSTEM

    TESTING SCHEDULE : HT SWITCHGEAR

    I ) Insulation Resistance values of HT( KV ) VacuumCircuit Breaker, bus duct.

    Megger details :

    Rating 5KV Sl.NO. Make

    Calibration Due on

    Sl No Terminals

    Vacuum Circuit

    breaker

    Busduct

    1. R E

    2. Y E

    3. B E

    4. R Y

    5. Y B

    6. B R

    II) Contact(Busbar) resistance values of Circuit Breaker

    HT( KV)& Bus duct.

    Kelvins Double bridge/Micro Ohm meter details :

    Sl.NO. Make

    Calibration Due on

    SlNo Terminals

    Generator

    Transformer

    Unit

    transformer Bus duct

    (PH PH)HV

    SIDE

    LV

    SIDE

    HV

    SIDE

    LV

    SIDE

    1. R Y

    2. Y B