JUNE 2014 HOLYOKE, MA. Demand Resource Strategy Department. ISO New England, Inc. Demand Resources Working Group. Demand Resources Working Group Meeting Agenda for June 4, 2014. 1.Welcome, Introductions9:00 9:10 Henry Yoshimura - PowerPoint PPT Presentation

TRANSCRIPT

  • JUNE 2014 HOLYOKE, MADemand Resource Strategy Department

    ISO NEW ENGLAND, INC.

    Demand Resources Working Group

  • Demand Resources Working Group Meeting Agenda for June 4, 2014*1.Welcome, Introductions9:00 9:10Henry Yoshimura

    2.FERC Order 745 Court of Appeals Decision9:10 9:40Henry Yoshimura

    3.DRWG Vice-Chair Election (includes time for brief remarks from nominees)9:40 10:10Henry Yoshimura

    15 Minute Break

    4.Final Results - Winter Dispatches/Audits/Winter Reliability Program10:25 10:45 Doug Smith

    5.Recent Changes to Monitored CPS Area in FCTS10:45 11:05Abimael Santana

    6.ISO-NE May PRD Presentation to MC - Q&A11:05 11:25Henry Yoshimura

    Wrap Up & Adjourn

  • Demand Resource Asset Enrolled MWs* by Demand Resource Type and Load Zone (as of 6/04/2014)**Enrolled MWs are the Max Interruptible Capacity values supplied by the Lead Participant as part of the asset registration process. Enrolled MWs are summed for Assets that are Ready to Respond and mapped to a Resource on the as of date.

  • *Preliminary Capacity Supply Obligation (CSO)* MW by Demand Resource Type and Load Zone (as of 6/04/2014)*CSO values include applicable T&D loss factor and reserve margin gross-ups and are net of bilaterals and reconfigurations. These are preliminary numbers which may change. Final Capacity Supply CSO MW by Demand Resource Type for this month will be available in the next COO Report.

  • Demand Resource Asset Enrolled MWs* by Demand Resource Type and Load Zone (as of 6/04/2014)***Enrolled MWs are the Max Interruptible Capacity values supplied by the Lead Participant as part of the asset registration process. Enrolled MWs are summed for Assets that are Ready to Respond and mapped to a Resource on the as of date.

  • Transitional Price-Responsive Demand (TPRD) Enrolled MWs (as of 6/04/2014)*Displayed data is Enrolled MWs for Ready to Respond assets.

  • Active Demand Resource Asset Enrolled MWs* by Demand Resource Type, Load Zone and Dispatch Zone (as of 6/04/2014)** Passive Demand Resource assets are not included as they are not dispatchable and may not have a Dispatch Zone identified. TPRD MWs are included in RTDR MWs.

  • Active Demand Resource Asset Enrolled MWs* by Demand Resource Type, Load Zone and Dispatch Zone (as of 6/04/2014)** Passive Demand Resource assets are not included as they are not dispatchable and may not have a Dispatch Zone identified. TPRD MWs are included in RTDR MWs.

  • Demand Resource Asset and TPRD Asset Enrolled MWs by Month (as of 6/04/2014)**TPRD MWs and DALRP MWs are included in RTDR MWs.

  • Next DRWG meeting is Wednesday, July 23, 2014 in the Connecticut conference room.

    Link to Resettlement Data Submission deadlines: http://www.iso-ne.com/stlmnts/deadlines/index.html

    Upcoming data submission deadlines:

    Any questions regarding these deadlines should be directed to Customer Service.

    3. Final Capacity Supply Obligation (CSO) MW by Demand Resource Type for this month will be available in the next COO Report which will be posted at:http://www.iso-ne.com/committees/comm_wkgrps/prtcpnts_comm/prtcpnts/mtrls/index.html

    Additional Information*