lhc upgrades and the larp program - slac group/department public

34
LHC Upgrades and the LARP Program A. Ra6 LBNL Jul 16, 2009

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

LHC Upgrades and the LARP Program 

A.  Ra6 LBNL 

Jul 16, 2009 

LHC Upgrade path •  IniDal operaDon 

–  Ramp up to 1x1034 cm‐2s‐1 

•  Phase I upgrade –  AJer ~2 years of operaDon (~2013.99999) –  Replace 70 mm triplet quads with 120 mm quads 

•  Includes APUL projects (superconducDng separaDon dipoles, feedboxes, etc) 

–  β* goes from 50‐>25 cm –  Luminosity goes to 2.5x1034 cm‐2s‐1 

•  Phase II upgrade –  Second half of next decade (nominally 2020) –  Luminosity goal: 1x1035 

–  Details sDll under study •  New technology for larger aperture quads (Nb3Sn) •  crab caviDes? •  Improved injector chain (PS2 + SPL) 

PSB  SPL’ RCPSB 

SPS SPS+ 

Linac4 

SPL 

PS 

LHC DLHC 

Outpu

t ene

rgy 

160 MeV 

1.4 GeV ~ 5 GeV 

26 GeV 40 – 60 GeV 

450 GeV 1 TeV 

7 TeV ~ 14 TeV 

Linac2 50 MeV 

Proton flux / Beam power 

Injector Upgrade 

PS2 (PS2+) Linac4: PSB injector (160 MeV) SPL: SuperconducDng Proton Linac 

(~ 5 GeV) SPL’: RCPSB injector 

 (0.16 to 0.4‐1 GeV) RCPSB: Rapid Cycling PSB 

 (0.4‐1 to ~ 5 GeV) PS2: High Energy PS 

 (~ 5 to 50 GeV – 0.3 Hz) PS2+: SuperconducDng PS 

 (~ 5 to 50 GeV – 0.3 Hz) SPS+: SuperconducDng SPS 

 (50 to1000 GeV) DLHC: “Double energy” LHC 

 (1 to ~14 TeV) 

M. Benedikt, R. Garoby, CERN DG 7/13/09  3 E. Prebys, DOE Review, FNAL 

New CERN machines 

7/13/09  4 E. Prebys, DOE Review, FNAL 

CERN Mid Range Plans 2010 2011 2012 2013 2014

Priorities Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 1 LHC Operation assumed O O O O O Sh Sh O O Sh O O O Sh O O Sh Sh Sh O O 1 SPS operation and exploitation O O O O O Sh O O O Sh O O O Sh O O Sh Sh Sh O O 1 PS Operation and Exploitation O O O O O Sh O O O Sh O O O Sh O O Sh Sh Sh O O 1 Booster Exploitation and Operation O O O O O Sh O O O Sh O O O Sh O O Sh Sh Sh O O 1 Source/LINAC2 op and exploitation O O O O O Sh O O O Sh O O O Sh O O Sh Sh Sh Sh Sh

Linac3/LEIR/Ions Operation Sh Sh O O O Sh O O O Sh O O O Sh O O Sh Sh Sh O O 1 LHC 3-4 magnet repair for spares C C C C 1 Consolidation all accelerators C C C C C C C C C C C C C C C C C C C C C 2 LINAC4 assumed C C C C C C C C C C C C C C C C Sh Sh Sh O O 2 Inner Triplets assumed C C C C C C C C C C C C C C C C Sh Sh Sh O O 1 AD assumed Sh Sh O O O Sh O O O Sh O O O Sh O O Sh Sh Sh O O 1 AEGIS C? C? C? C? O? O? O? O? O? O? O? O? ? ? 1 ELENA ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? 1 CNGS Sh Sh O O O Sh O O O Sh O O O Sh O O O Sh Sh O O 1 East Hall (PS) Sh Sh O O O Sh O O O Sh O O O Sh O O O Sh Sh O? 0? 1 ISOLDE (REX) Sh Sh O O O Sh O O O Sh O O O Sh O O O Sh Sh O? 0? 1 nToF Sh Sh O O O Sh O O O Sh O O O Sh O O O Sh Sh O? 0? 1 North Area (Compass etc) Sh Sh O O O Sh O O O Sh O O O Sh O O O Sh Sh O? 0? 2 CAST/OSQAR ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? 2 CTF3 Operation O O O O O O O? O? Sh O? O? O? Sh O? O? O? Sh O? O? O? 2 CLIC/ILC St St St St St St St *St? St? Td? Td? Td? Td? Td? Td? Td? Td? Td? Td? Td? Td? 2 Collimation Phase 2 St St St St St St St St St C? C? C? C? C? C? C? C? 2 PS2 Study St St St St St St St St St St St * 2 PS2 Construction C? C? C? C? C? C? C? C? 2 SPL (LP) St St St St St St St St St St St * 2 SPL Construction C? C? C? C? C? C? C? C? 3 HIE ISOLDE C? C? C? C? C? C? C? C? C? C? C? C? 3 High Field Quadrupoles R&D St St St St St St St St St St St St St St St St St St St St St 3 Medical Applications St St St St St St St St St St St St St St St St St St St St 3 Radiation Facilities (HiRadMat) C? C? C? C? C? C? C? C? C? O? O? O? Sh Sh O? O?

O Operation C Construction Sh Shutdown St Studies O? * Council decision

Proposed working plan – not yet official 

What is LARP? 

The LHC Accelerator Research Program was established in 2003 to 

•  Advance InternaOonal CooperaOon in High Energy Accelerators 

•  Advance High Energy Physics •  Help bring the LHC on and up to design performance quickly •  Improve LHC performance by advances in accelerator understanding and 

instrumentaDon •  Use LHC as a tool to gain deeper knowledge of accelerator science and technology •  Extend LHC as a fronDer HEP instrument with a Dmely luminosity upgrade 

•  Advance U.S. Accelerator Science and Technology •  Keep skills sharp by helping to commission the LHC •  Conduct forefront AP research and development •  Advance U.S. capabiliDes to improve the performance of our own machines •  Prepare U.S. scienDsts to design next generaDon colliders •  Develop technologies necessary for next generaDon colliders  

LARP Overview 

•  Advanced accelerator and technology research •  Most tasks are either first in the world or pushing the 

state of the art in some way 

•  Major contribuDons to the community 

•  3 PAC09 invited talks •  33 PAC09 contributed papers 

•  EducaDon •  5 toohig fellows – 3 current, 2 ‘graduated’ •  MulDple postdocs, several PhD thesis  

Org Chart 

LARP ‐ Magnets Development Establish Nb3Sn as a viable technology for the LHC Phase II upgrade 

E. Prebys, DOE Review, FNAL 

A/mm2 

1000 A/mm2 

LHC IR Upgrades Requirements 

•  Phase I upgrade quadrupoles – Aperture 0.12 mm – Gradient 120 T/m  

–  Field 8T –  Conductor  NbTi 

•  Phase II upgrade parameters sDll under study –  Likely requires large aperture high field quadrupoles 

•  need to use of Nb3Sn conductor 

LARP Magnet Program Components

1.  Materials R&D: •  Strand specification and procurement •  Cable fabrication, insulation and qualification •  Heat treatment optimization

2.  Technology development with Racetrack Coils: •  Subscale Quadrupole (SQ) •  Long Racetrack (LR)

3.  Cos 2θ Quadrupoles with 90 mm aperture: •  Technology Quadrupole (TQ) •  Long Quadrupole (LQ)

4.  Cos 2θ Quadrupoles with 120 mm aperture: •  High-Field Quadrupole (HQ) •  Accelerator Quadrupole (QA)

Ongoing 

Completed 

~80% 

~10% 

Present focus: Long Quadrupole (LQ)

Scale up of TQ design from 1 m to 3.6 m length 

•  Coil parts, winding and curing: FNAL •  Coil reac?on and po@ng: FNAL & BNL •  Instrumenta?on traces, strain gauges: LBNL •  Collar structure fabrica?on/assembly: FNAL  •  Shell structure fabrica?on/assembly: LBNL •  Magnet test: FNAL 

LQ Status and Plans  April 2009 review following cool‐down test confirmed LQS Structure Readiness  Four coils received (2 pracDce coils); last 2 LQS01 coils received in May  Coil instrumentaDon & LQS01 assembly in June‐July; test in September‐October  Addi?onal coil fabrica?on and magnet tests are planned for FY10 

LQ coils (2/4) 

Bladders 

LQS  Structure 

LRS02 Magnet 

PracDce coils 

These items are presently at LBNL for assembly – visits are possible 

Accelerator Systems Beam InstrumentaDon and RF  To date the only hardware contribuDons installed to help the LHC reach its opDmal performance  Luminosity monitor described earlier today 

CollimaDon – Next Talk 

Accelerator Physics 

Will present highlights of selected acDviDes 

15

Schowky Monitors  •  Advanced enabling technology for: 

•  Non invasive tune measurement for each ring from peak posiDons 

•  Non invasive chromaDcity measurements from differenDal width 

•  Measure momentum spread from average width 

•  ConDnuous online emiwance monitor from average band power 

•  Measure beam‐beam tune shiJ 

Build in capability to monitor gain variation with time Measure individual or multiple bunches

A. Jansson, R. Pasquinelli - FNAL

16

Schowky ‐ Technical Approach •  Center frequency of 4.8 GHz •  3dB BW ‐ 300 MHz 

–  Sufficient for 25ns bunch spacing 

•  Small longitudinal Z/n – No absorbers allowed 

•  Below frequency of Schowky band overlap  

•  Allows for adequate physical aperture 

•  Matched pairs of SiO2  coax cables 

Synch Light Monitors  Abort Gap 

•  Monitor radiaDon emiwed by dipole bend magnets  and short undulator at low energy (< 2TeV)  

•  Extracted by mirror and transported/focused by a dedicated system –  Image with cameras 

•  Measure  –  beam profile and  –  beam in abort gap 

•  Protons and Heavy Ions    A. Fisher ‐ SLAC 17

SLM ImplementaDon 

LARP provided opDcs knowledge to make this happen before commissioning 

DoE Review June 19‐20, 2008 19 

unstable if νm=νz

AC Dipole Concept 

AC D ipole

CDF D0

Design O rbitNatura l Oscil.Excited Oscil.

Long lasting large coherent oscillation with ε preserved

AC Dipole

Data from AGS 

IP2 IP1

IP3 IP4

Z

(m )(s) =BmL

4π (Bρ)δ

βmβ(s)

δ− := ν −νm

δ+ := (1−ν ) −νm

20 

AC Dipoles 

•  Started by Univ. of Texas –  R. Miyamoto ‐ PhD thesis 

•  Incubated by LARP •  Now at all three hadron colliders 

•  Much faster than other methods •  Linear opDcs measurement 

–  Measure β funcDon and phase advance 

–  Measure β funcDon at IP –  Linear coupling measurement 

•  Local coupling measurement •  Non‐linear driving term 

measurement •  Dynamic aperture measurement 

FNAL TeV @ 150 GeV

DoE Review June 19-20, 2008 Beam Instrumentation- A. Ratti 21

LLRF Modeling  •  Leveraging the experience with PEP‐II the group is acDvely working 

to help model the LHC RF system and its components •  The goal is to adapt and expand the exisDng models to a hadron 

collider and storage ring •  Supported beam commissioning by provided highly experienced 

engineers during the tuning and hardware calibraDons before the 2008 run 

•  Measured transfer funcDons, open and closed loop 

•  Studying noise budget by modeling key components to qualify the impact of noise on emiwance growth (expected large)  

Transfer FuncDon Measurements 

J. Fox, T. Mastorides ‐ SLAC Beam InstrumentaDon‐ A. Ra6  22 

Beam Beam CompensaDon InteracDon between the two crossing beams can be detrimental 

 Up to 16 consecuDve bunches interacDng with each other at the IP before/aJer collissions 

Electron lenses are low energy (5‐10 keV) electron beams, stabilized in a solenoidal field, that interact with a hadron beam 

The main focus of the electron lens work is head‐on beam‐beam compensaDon 

Electron lenses with hollow beams may also be used to improve the collimaDon efficiency by enhancing diffusion for large amplitude parDcles 

Previous beam‐beam work concentrated on experimental long‐range  studies in RHIC with wires, and comparisons with simulaDons 

Beam‐beam compensaDon concept with electron lens 

•  Exact  compensaDon if x3(N1,N2) = x3(0,0) and x’3(N1,N2) =

x’3(0,0) : 

1.  Same amplitude dependent force in p‐beam and e‐beam lens, and 2.  Phase advance between p‐beam and e‐beam lens is ΔΨ = kπ, and 3.  No nonlineariDes between p‐beam and e‐beam lens 

Wolfram Fischer ‐ BNL

24 

p‐beam lens defocuses  e‐beam lens focuses 

p‐beam 

CondiDon 1 cannot be realized with  magnets, requires an electron beam  

beam‐beam kick 

magnet kicks 

4 Labs collaboraDon lead by U. Wienands, SLAC  25 

Possible PS2 Design Report Outline  (Machine physics part) 

•  Coordination and basic lattice design

•  Linear correction systems

•  Non-linear dynamics and correction systems

•  Collective effects and feedback systems –  Space charge studies –  Impedance estimates and instabilities –  e- cloud effects and vacuum system requirements –  Damping system specifications

•  Collimation aspects

•  Machine protection

•  Instrumentation specifications and commissioning strategy

Source: Memo by M. Benedikt & Y. Papaphilippou 

CERN 

LARP! 

U. Wienands, SLAC  26 

The LARP PS2 Subtasks •  Space‐Charge SimulaDons (Ryne, Qiang (LBNL); Spentzouris (FNAL)) 

–  setup & verify model in codes (ML/I, SYNERGIA), simulate op. scenarios, halo development, beam collimaDon 

•  e‐Cloud build‐up & instabiliDes (Furman, Venturini (LBNL); Pivi, Wang (SLAC)) –  simulate build‐up (POSINST, CLOUDLAND), study instabiliDes(WARP), 

emiwance growth, miDgaDon strategies (coaDng) 

•  CollecDve InstabiliDes (Bane, Stupakov (SLAC)) –  analyDc, possibly e‐m & beam simulaDons, growth rates, impedance budget. 

•  MulDbunch instabiliDes & feedback (Rivewa (SLAC)) –  analyDc & simulaDons (PEP‐II codes), growth rates, conceptual design of f/b 

systems. 

•  IPM (de Maria, Brown (BNL); Fisher (SLAC))  –  Define requirements, conceptual design 

SPS feedback control of e‐cloud instability 

•  LHC beam in the SPS (72 bunches per batch, 4 batches) is close to an instability threshold 

•  The instability is transverse, fast (rise Dme of hundreds of turns),  and shows frequencies up to about  1 GHz 

•  The instability is caused by electron clouds and impedance  

•  SPS scrubbing is required every year aJer startup for a few days to reduce the secondary electron yield (SEY) of the chamber walls 

•  A fast transverse feedback is a way to suppress the instability 

J. Byrd (LBNL), J. Fox (SLAC) 

27 

Wolfram Fischer 28 

Wolfram Fischer 29 

Crab CaviDes 

Proposed InternaDonal CollaboraDon ‐ coordinated by R. Calaga (BNL, Toohig Fellow ‘08) 

ProgrammaDc AcDviDes 

•  The LARP program has had good success integraDng US scienDsts into LHC acDviDes –  Toohig Fellowship 

•  2‐3 year PostDoctoral posiDon •  Successful candidates choose their host lab •  Spend ~50% of their Dme at host lab and 50% at CERN 

–  hwp://www.interacDons.org/toohig/index.html 

–  Long Trem Visitors program •  LARP provides support for advanced postdocs or scienDsts to spend extended periods at CERN, working on predetermined projects. 

32 

Status 

•  LARP acDviDes at different maturity levels –  From Beam instrumentaDon – waiDng for beam –  To Magnets – need a few more years of R&D to define phase II upgrade magnets 

•  As in all healthy programs, there are always more good ideas than funding – Many labs support acDviDes through base programs 

•  When larger budgets are needed, the goal is to incubate acDviDes unDl they can be spun off as independent projects 

Conclusions 

•  LARP plans to support the LHC throughout its life cycle, from early commissioning (beam instrumentaDon) to the phase II upgrade 

•  Close integraDon with CERN ensures LARP’s projects are in line with CERN’s needs (ie. PS2) 

•  LARP provides opportuniDes for young (and not!) scienDsts and engineers to contribute to HEP and the LHC