lusi status update

31
Tom Fornek LUSI Update [email protected]. edu 12 November 2008 1 SLAC National Accelerator Laboratory LUSI Status Update Tom Fornek Project Manager

Upload: kuri

Post on 13-Feb-2016

48 views

Category:

Documents


0 download

DESCRIPTION

LUSI Status Update. Tom Fornek Project Manager. Project description (1). LUSI will deliver: Three X-ray scattering instruments that have been funded by DOE-BES as a “Major Item of Equipment (MIE)” project: XPPX-ray Pump Probe CXICoherent X-ray Imaging XCSX-ray Correlation Spectroscopy. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20081

SLAC National Accelerator Laboratory

LUSI Status Update

Tom FornekProject Manager

Page 2: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20082

SLAC National Accelerator Laboratory

Project description (1)LUSI will deliver:

Three X-ray scattering instruments that have been funded by DOE-BES as a “Major Item of Equipment (MIE)” project:

XPP X-ray Pump Probe CXI Coherent X-ray ImagingXCS X-ray Correlation Spectroscopy

Page 3: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20083

SLAC National Accelerator Laboratory

61 2 3

4 5

LCLSLUSI

Offset MonochromatorExp. ChamberDetector

Beam Transport

Project description (2)

Near Experimental Hall Far Experimental Hall

XPPXCS CXI

Page 4: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20084

SLAC National Accelerator Laboratory

LUSI Status Changes June-November

LCLS Directorate Organization Developed

LUSI Project Execution Plan Approved

CD-2 Approved Oct. 22, 2008

LUSI Team Leader Meetings Held

Page 5: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20085

SLAC National Accelerator Laboratory

LCLS Directorate Organization LCLS Directorate

Dale KnutsonMark Reichanadter, Deputy

Business Office

Cindy LoweTBD, Deputy

Accelerator Systems Division

John SeemanTBD, Deputy

Engineering Physics Division

Dave SchultzJames Krebs, Deputy

Experimental Facilities Division

Jochen SchneiderJerome Hastings, Deputy

Strategic Projects Division

John Galayda

LUSI Incorporated into LCLS Directorate

Page 6: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20086

SLAC National Accelerator Laboratory

LCLS STRATEGIC PROJECTS DIVISIONLCLS Strategic Projects DivisionJohn Galayda – Division Director

Michael Scharfenstein – ES&HDarren Marsh – QA

Helen O’Donnell – Administrative Support

LCLS Construction ProjectJohn Galayda – Project Director

Mark Reichanadter – Deputy Project DirectorJess Albino – Associate Project Director for Civil Cinstruction

LUSI MIE ProjectTom Fornek – Project ManagerTBD – Deputy Project Manager

LUSI uses LCLS Directorate Services (ES&H, QA, PMCS, Finance)

Page 7: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20087

SLAC National Accelerator Laboratory

LUSI INTEGRATED PROJECT TEAMDOE-HQ

Harriet Kung, Acquisition ExecutiveT.E. Kiess, Program Manager

DOE-SSOH. Joma

DOE Federal Project Director

SLACT. Fornek

LUSI Project ManagerTBD - Deputy

WBS 1.2 XPP IIT

D. Fritz(Instr. Scientist)

J. Langton( Lead Eng)

J. DelorJ. Defever

WBS 1.3 CXI IIT

S. Boutet(Instr. Scientist)

P. Montanez( Lead Eng)

A. BusseK. Fox

WBS 1.4 XCS IIT

A. Robert(Instr. Scientist)

E. Bong(Lead Eng)

T. Osier

WBS 1.5 DCOY. Feng

(Lead Scientist)E. Ortiz

(Lead Eng )T. MontagneM. CampellR. JacksonB. Bigornia

Instrument TeamLeaders

DOE-SSO Support

WBS 1.6

Data Acquisition & Controls

G. Haller(Lead)

LCLSDirectorate Support

EngineeringTechnical Configuration Control Committee

Page 8: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20088

SLAC National Accelerator Laboratory

LUSI ScopeThere are six level 2 WBS elements in WBS 1.0

WBS 1.1 – Project Management

WBS 1.2 – X-ray Pump Probe (XPP)

WBS 1.3 – Coherent X-ray Imaging (CXI)

WBS 1.4 – X-ray Correlation Spectroscopy (XCS)

WBS 1.5 – Diagnostics and Common Optics

Includes XPP, CXI and XCS diagnostics and optics

WBS 1.6 – Controls and Data Acquisition

Includes XPP, CXI and XCS controls and DAQ

Page 9: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 20089

SLAC National Accelerator Laboratory

LUSI Cost BaselineWBS Description CD-2 Est.

($M)

1.1 Project Management 5.5

1.2 X-ray Pump Probe (w/BNL) 5.9

1.3 Coherent X-ray Imaging 9.5

1.4 X-ray Correlation Spectroscopy (w/BNL) 7.7

1.5 Diagnostics & Common Optics 6.4

1.6 Controls & Data Acquisition 7.1

Contingency 13.0

2.0 Other Project Costs 4.9

LUSI Total Project Costs 60.0

Page 10: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200810

SLAC National Accelerator Laboratory

LUSI Funding Profile ($M)

PriorYrs

FY07 FY08 FY09 FY10 FY11 FY12 Total

TEC   0.50 6.00 15.00 15.00 13.50 5.10 55.10

OPC 3.40 1.50           4.90

Total 3.40 2.00 6.00 15.00 15.00 13.50 5.10 60.00

Page 11: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200811

SLAC National Accelerator Laboratory

LUSI ADVANCE PROCUREMENT REQUEST AT CD-2

DESCRIPTION PROCUREMENT REQUEST

BUDGETED COST

BUDGETED COST + CONTINGENCY WBS TOTAL

X-ray Pump/Probe Diffractometer  

Sample tilt Platform 245,321 380,247

Sample Kappa Platform 130,552 228,466

Parts 186,650 281,842

XPP Detector Mover Detector Mover 183,831 292,291 1,182,846

Coherent X-ray Imaging

1.0 micron KB Mirror system (Note 1) 986,450 1,775,610 1,775,610

X-ray Coherent Scattering

Diffractometer System 531,294 929,765

XCS Detector Mover 688,800 1,350,048 2,279,813

Diagnostics & Common Optics

Large Offset Monochromator 1,173,831 1,855,888 1,855,888

  TOTAL 4,126,729 7,094,157 7,094,157

Page 12: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200812

SLAC National Accelerator Laboratory

LUSI Schedule Changes CD-2 Review Recommendation to plan for one CD-3 and one CD-4 incorporated into baseline plan

CD-3 – April, 2010

CD-4 – August, 2012

Early science milestones for XPP and CXI established as Level 2 milestones

XPP – October, 2010

Commissioning readiness in July, 2010

CXI – August, 2011

Commissioning readiness in April, 2011

Page 13: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200813

SLAC National Accelerator Laboratory

CALENDAR YEARS

2008 2009 2010 2011 2012

CD-3 CD-4

XPP Early Science

XPP Procurement Approval

CXI Early Science

LUSI Schedule Baseline

CD-2

Page 14: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200814

SLAC National Accelerator Laboratory

BA Plan & BCWS to Fit BA Profile

$-

$3,000,000

$6,000,000

$9,000,000

$12,000,000

$15,000,000

$18,000,000

$21,000,000

$24,000,000

$27,000,000

$30,000,000

$33,000,000

$36,000,000

$39,000,000

$42,000,000

$45,000,000

$48,000,000

$51,000,000

$54,000,000

$57,000,000

Contingency1.6 - Controls1.5 - DCO1.4 - XCS 1.3 - CXI1.2 - XPP1.1 - Program MgmtFunding

Page 15: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200815

SLAC National Accelerator Laboratory

XPP Instrument Design

X-ray Optics & Diagnostics

Sample Goniometer

Diagnostics

Ultrafast Laser

Detector Mover

Detector

XPPD. Fritz

Page 16: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200816

SLAC National Accelerator LaboratoryCXI Instrument Design

1 micron focusKB system (not shown)

0.1 micronKB system

Sample Chamber with raster stageDetector Stage

(Utilizing the LCLS Detector)Diagnostics &Wavefront Monitor

Particle injector

LCLS Beam

CXIS. Boutet

Page 17: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200817

SLAC National Accelerator Laboratory

XCS Instrument Design

Optical raft (1.4.2)Optics and Diagnostics (1.5)

Diffractometer(1.4.4.1)

Large Angle Detector Stage(1.4.4.3)

XCSA. Robert

Page 18: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200818

SLAC National Accelerator Laboratory

Instrument Team LeadersXPP

K. Gaffney, Photon Science-SLAC (leader)D. Reis, University of MichiganT. Tschentscher, DESYJ. Larsson, Lund Institute of TechnologyA. Nilsson, Photon Science-SLAC

XCSB. Stephenson, ANL (leader)K. Ludwig, Boston UniversityG. Grübel, DESY

CXIJ. Hajdu, Photon Science-SLAC, Uppsala University (leader)H. Chapman, LLNLJ. Miao, UCLA

Page 19: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200819

SLAC National Accelerator Laboratory

Instrument Update

XPPWBS 1.2

Hutch 2

XCS Offset MonochromatorWBS 1.5

X-ray transport tunnel

XCSWBS 1.4

Hutch 6

CXIWBS 1.3

Hutch 1

Page 20: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200820

SLAC National Accelerator Laboratory

Near Experimental HallAMO

Control Room

AMO(LCLS)

XPP EndstationHutch 3

XPPControl Room

Future XPPSAXS Area

Page 21: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200821

SLAC National Accelerator Laboratory

XPP Instrument @ LCLSPhoton Shutter

Photon Shutter

Intensity Monitor

Intensity Monitor

Intensity Monitor

Intensity Monitor

Slits

Slits

Slits

Focusing Lenses

Attenuators

Pulse Picker

Mirrors

Sample Goniometer

Detector Mover

Profile Monitor

Profile Monitor

Profile Monitor

Page 22: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200822

SLAC National Accelerator Laboratory

XPP Schedule

Components Available in Mid-2010 Components Available in 2012 (or before)

Sample Goniometer (Kappa & Tilt Platform) X-ray Focusing Lenses

Detector Mover Harmonic Rejection Mirrors

X-ray Detector System Attenuators

Laser System Optics and Diagnostics Laser Power Amplifier

X-ray Slits Optical Parametric Amplifier

X-ray Pulse Picker

X-ray Diagnostics

Controls & DAQ

Page 23: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200823

SLAC National Accelerator Laboratory

Far Experimental Hall

Coherent X-ray Imaging Instrument(Hutch 5)

Control RoomLab Area

X-ray Correlation SpectroscopyInstrument (Hutch 4)

Hutch 6

Page 24: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200824

SLAC National Accelerator Laboratory

CXI Physics RequirementsRequirement Device

Remove X-ray beam halo X-ray Guard Slits/AperturesTailor X-ray intensity AttenuatorsTailor X-ray repetition rate Pulse PickerCharacterize X-ray pulse intensity Intensity MonitorCharacterize X-ray spatial profile Profile MonitorCharacterize X-ray pulse intensity

before the sample on every shot Non-destructive Intensity Monitor

Characterize X-ray focus Wavefront MonitorAlign experiment without X-ray beam Reference Laser

Maximize X-ray flux on sampleTailor focal spot size to the sample

Focusing optics1 micron Kirkpatrick-Baez Mirrors0.1 micron Kirkpatrick-Baez Mirrors

Minimize air scatter and backgroundPosition sample and final apertures Sample environment

Position sample environment Instrument StandDeliver single particles to the X-ray

beam in the gas phase Particle Injector

Measure X-ray scattering pattern 2D X-ray Detector (Utilizing the LCLS Detector)

Position X-ray area detector Detector StageAnalysis of sample fragments after

Coulomb explosion Ion Time-of-Flight

Photon Shutter

Guard Slits

Attenuators

Pulse Picker

Sample EnvironmentParticle InjectorIon TOF-MS

KB Mirrors

FEH H

utch 5

Wavefront Monitor

Detector Stage

Beam Dump

Guard Slits

Guard Slits

KB Mirrors

Aperture

Aperture

X-ray Transport Tunnel

Diagnostics

Diagnostics

Diagnostics

Guard Slits

Diagnostics

Reference Laser

Page 25: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200825

SLAC National Accelerator Laboratory

Instrument AvailabilityComponents Available in Early

2011“CXI Early Science”

Components Available in 2012(or before)

Alignment Laser 0.1 micron KB System1 micron KB System Sample Chamber for 0.1 micron KBSample Chamber for 1 micron KB Particle Injector2D Detector Ion Time-of-FlightDetector StageDiagnostics & Common Optics

Controls & DAQ

Page 26: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200826

SLAC National Accelerator Laboratory

CXI Major AccomplishmentsAdded 1 micron sample chamber to reduce project risk

Conducted LUSI’s first advance procurement technical reviewCXI 1 micron mirror system - October 8

Developed one micron K-B mirror system mechanical support system concept

Provided hutch 5 specification input to LCLS Conventional Facilities for FEH hutch design

Cornell detector system progressing wellSupport system design developed

Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS”

Page 27: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200827

SLAC National Accelerator Laboratory

Far Experimental Hall

Coherent X-ray Imaging Instrument(Hutch 5)

Control RoomLab Area

X-ray Correlation SpectroscopyInstrument (Hutch 4)

Hutch 6Future XCS

SAXS Area

Page 28: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200828

SLAC National Accelerator Laboratory

XCS Instrument @ LCLS Photon ShutterPrimary Slits

Diagnostics

Secondary SlitsDiagnostics

Split and Delay

Focusing Lenses

Attenuators

Diagnostics

Photon Shutter

Defining Slits

DiffractometerLarge AngleDetector Stage

MonochromatorTransport TunnelFEH

Hutch 4

Harm. Rej. Mirrors

Pulse Picker

Secondary SlitsDiagnostics

Goal Time-resolved observation of coherent diffraction patterns using LCLS coherent hard x-rays (6-25keV)

Tailor and characterize X-ray beam parametersSpatial profileIntensityRepetition RateSpectral Bandwidth

X-ray Photon Correlation Spectroscopy Requirements

Versatility of the instrumentation (SAXS, WAXS, GI)Coherence preservation of x-ray optics (to the extent possible)

Detector with small pixel size/Large sample-detector distance

Key Performance Parameters4-20 keV energy range

Using the fundamental and third harmonic

0.1-0.01% energy resolution

Page 29: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200829

SLAC National Accelerator Laboratory

Device Ready Date4-circle Diffractometer (Horiz. Scattering ) CD-4 (8/2012)Large Angle Detector Mover CD-4 (8/2012)Large Offset Monochromator CD-4 (8/2012)Harmonic Rejection Mirrors CD-4 (8/2012) X-ray Focusing Lens CD-4 (8/2012)Pop-In Profile Monitor (5) CD-4 (8/2012)Pop-In Intensity Monitor (5) CD-4 (8/2012)Intensity-Position Monitors (5) CD-4 (8/2012)Attenuators CD-4 (8/2012)Guard Slits (6) CD-4 (8/2012)Pulse Picker CD-4 (8/2012)

XCS CD-4 Deliverables

Page 30: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200830

SLAC National Accelerator Laboratory

XCS Major Accomplishments

Developed detailed cost and schedule baseline

Provided hutch 4 specification input to LCLS Conventional Facilities for FEH hutch design

Added XCS large offset monochromator back into diagnostics and common optics scope

Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS”

Page 31: LUSI Status Update

Tom Fornek

LUSI Update [email protected]

12 November 200831

SLAC National Accelerator Laboratory

Thank You