managing construction projects in a 5d world...lake constance 5d-conference 2015 04/05/2015 managing...
TRANSCRIPT
Lake Constance 5D-Conference 2015
Managing construction projects
in a 5D+ world
Dr.-Ing. A. Ripberger
sfirion AG, Munich
Lake Constance 5D-Conference 2015
1. Introduction
2. The Company
3. Our 5D+ world
4. The design phase
5. Project supervision, project control and documentation
6. Your benefit
04/05/2015 2Managing construction projects in a 5D+ world
structure
Lake Constance 5D-Conference 2015
1. Introduction
Why should design and construction processes be 5D+ visualized?
04/05/2015 3Managing construction projects in a 5D+ world
Lake Constance 5D-Conference 2015
04/05/2015 4Managing construction projects in a 5D+ world
=> to accelerate decision-making processes
24. Febr. 2015
Lake Constance 5D-Conference 2015
04/05/2015 5Managing construction projects in a 5D+ world
=> to optimize management of processes
Dec. 2013, Road
construction in India
(Himachal Pradesh):
Bituminous mixing plant
for road pavement
Lake Constance 5D-Conference 2015
04/05/2015 6Managing construction projects in a 5D+ world
=> to avoid errors and achieve higher quality, cost and time savings
Dez 2014, Power plant in
the Caribbean Island:
- plant design in 3D
- civil design in 2D
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 7
2. The company
Dr.-Ing. Albert Ripberger
Education
Technical University of Munich – Civil Engineering (Dipl.-Ing.)
Graduation as Doctor of Engineering (Dr.-Ing.)
Profession
Project Manager for Infrastructure Major Projects
Founder and CEO of sfirion AG, Munich
• consultancy services in construction and plant engineering
• software development
Lectureship
• HFT Stuttgart
• University of Applied Sciences Biberach
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 8
Services and portfolio
Consultancy Services
• project control and project management,
• contract and claim management,
• documentation (as-built, maintenance)
• organizational and it-consultancy,
• visualization of planning and construction phases
Software
• document management
• financing, fund management and cost control
• project diary
• 5D+ visualization
• control and monitoring
Lake Constance 5D-Conference 2015
04/05/2015 9Managing construction projects in a 5D+ world
3. Our 5D+ world
Needed software tools
Lake Constance 5D-Conference 2015
04/05/2015 10Managing construction projects in a 5D+ world
Process oriented data structure for project management
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 11
Visualization of project management data by linking the building elements
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 12
4. The design phase
State of the art in plant engineering
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 13
State of the Art in construction engineering
Not closed line
overlapping lines Not closed line
overlapping lines
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 14
clip diary
5. Project supervision, project control and documentation
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 15
clip diary
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 16
clip management data and analysis
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 17
clip management data and analysis
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 18
clip traffic flow
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 19
6. Your benefit
Preparation and Brief
Strategic Definition
Concept Design
Developed Design
Technical Design
ConstructionHandover & Close Out
In Use
5D+ MODEL DEVELOPMENT
Cos
ts, S
ched
ule,
M
odel
Upd
ate
Act
ual D
ata
Mod
el U
pdat
e
3D M
odel
(c
once
ptua
l)
Stu
dies
, P
roje
ct B
ound
arie
s
project visualization
schedule visualizations (comparisons)
clash detection
Comparisons, reports,
evaluations, visualizations
As
built
doc
umen
tatio
nde
ficie
ncy
Dat
a
Ope
ratin
g D
ata
warranty claims,certify
substainability
maintanancemanagement,
monitoring operating cost
Lake Constance 5D-Conference 2015
04/05/2015 Managing construction projects in a 5D+ world 20
Thank you for your attention
and see more about 5D+ on our
website www.sfirion.de