MINUTES OF PROCEEDINGS OF BOARD MEETING OF CANTONMENT BOARD
JABALPUR HELD ON 5TH
DECEMBER 2016 AT 1200 HRS IN THE OFFICE OF THE
CANTONMENT BOARD, JABALPUR
Present
Brig S.U. Dashrath Shri Abhishek Chouksey
President Vice President
Brig Alok Sharma Smt Kavita Bawaria Pasi
SEMO, Member Member
Col Rajeev K Smt. Beena Agrawal
Col Admn & Member Member
Col. Vikas Dhingra Shri Rajendra Padam
Dy Comdt & Member Member
Col. Neeraj Chaudhary Smt. Kiran Thakur
Col. Adm ABW and Member Member
Major Pushpendra Singh Shri Surendra Agrawal
GE &Member Member
Shri Rajeet Yadav
Member
Shri Amit Agrawal
Member
Absent
Shri Chottay Singh
ADM & Member
Special Invitees
Shri Ashok Rohani
Hon’ble Member of Legislative Assembly
Cantonment Constituency
Jabalpur
Shri Rakesh Singh
Hon’ble MP
Jabalpur Parliamentary Constituency
Shri Rahul Anand Sharma
IDES
Member – Secretary
2
Before transaction of the business, Brig Alok Sharma, SEMO, Shri Rahul Anand
Sharma, CEO, Cantonment Board Jabalpur and Col Rajeev K, Adm Comdt took oath to
bear true faith and allegiance of the Constitution of India. PCB, Vice President and other
members have welcomed and wished them a great stint as a Member-Jabalpur
Cantonment Board.
After the oath ceremony, the President Cantonment Board Jabalpur put their points
before the Board for noting and strict compliance.
Committees to monitor all works including completion report. Proper transparency
should be maintained.
Engineering Section to certify that drawings prepared or approved are as per
laws/bye-laws and meeting qualitative requirements and construction on clear and
authorized land.
On Roads and footpaths all potholes to be filled. Interlocking be repaired and side
berms should be constructed on roads.
No construction permitted on Defence land (A1, Analogous A1, A2, B3, B4 etc)
MOD letter has been issued on construction permission on Defence land or
next/adjoining to Defence land.
Documents will not be given to anyone without following proper procedure.
Anyone doing this, is violating office procedure and rules.
All members will be given invitation in any inauguration done by the Board.
1. Purchase of Generic Medicines
Reference CBR No. 35 dated 05-08-2015.
Board is requested to consider the extension of contract of purchase of generic
medicines at already Board approved rates, for three months.
In this regard report of Store Keeper is placed on the table.
Resolution No. 1
Considered and resolved that the contract of purchase of generic medicines be
extended for three months at already Board approved rates.
3
2. Grant of Advance Increment for having Computer Knowledge
To consider an application dated 18.11.2016 received from Steno Typist, Junior
and Senior Clerks of Cantonment Board Jabalpur regarding grant of advance increment
for having Computer Knowledge. M.P Government vide their letter no.
,Q&10/3/2006/1/9 dated 06.02.2006 and letter no. 3732/2015/21- c ¼,d½ dated 23.01.2016
has issued instructions to State Government Departments for grant of advance increment
to their employees who are having Computer Knowledge .
As per Memorandum of Settlement, Pay and Allowances of Cantonment Board
Employees will be at par with the concerned State Government employees in which the
Cantonment Board is situated. Board is requested to grant advance increment to those
employees who are having computer knowledge as per MP Government Orders.
In this regard MP Government orders and application of employees of
Cantonment Board Jabalpur are placed on the table for consideration of the Board.
Resolution No. 2
Considered. It was resolved that an advance increment be granted to Steno Typist,
Junior and Senior Clerks of Cantonment Board Jabalpur having computer knowledge, as
per orders of MP Govt., with effect from the date, as may be applicable to them. It was
also resolved that a proposal be sent to competent authority for approval of the same.
3. Transfer of Right of Collection of Parking Fees: Motilal Nehru Hospital,
Cantt. Jabalpur
Tender notice was invited for transfer of rights of collection of parking fees of
Motilal Nehru Hospital Cantt. Jabalpur vide notice letter No. 6520/,e-,u-,p-@2016 dated
02.11.2016, the same was published in daily newspapers “Pradesh Today” and
“Deshbandhu” on 03/11/16, pasted on all notice boards, distributed to all Cantt.
Members, all old contractors and uploaded on Cantt. Board website for wide publicity. In
response to the same 03 nos of tender forms were sold and received on 16.11.2016.
The details of the tenderers are as under:-
Sr.
no.
Name of Tenderer Address Amount
quoted
Remark
1 Smt. Saira Bano W/o Shri
Salim Qureshi,
724, St. No. 15/2,
Sadar Bazar Cantt.
Jabalpur
Rs 13,786.92
per annum
Ist
2 Shri Rajeev Kumar Mehta
S/o Shri B.N.P. Mehta
1305/1, Jaiprakash
Nagar, Aadhartal
Jabalpur
Rs 13,251/- per
annum
IInd
3 Shri Avdesh Kumar
Shrivastava S/o Late Shri
R.N Shrivastava,
H.No. 19, Imperial
Colony, Tilheri,
Jabalpur
Rs 13,000/- per
annum
IIIrd
4
Smt. Saira Bano W/o Shri Salim Qureshi, 724, St. No. 15/2, Sadar Bazar Cantt.
Jabalpur quoted the highest rate of Rs 13,786.92 per annum for a period of one year.
Previous year highest amount was Rs 12,786.92 per annum for the same.
Relevant documents alongwith report of Revenue Supdt is placed on the table.
Resolution No. 3
Considered and approved the highest rate of Rs. 13,786.92 per annum for a period
of one year for collection of Parking Fees at Motilal Nehru Hospital, Cantt. Jabalpur,
received from Smt. Saira Bano W/o Shri Salim Qureshi, 724, St. No. 15/2, Sadar Bazar
Cantt. Jabalpur.
4. Revision of Rates of Vehicle Entry Tax
Ref:- CBR No. 29 dated 07.07.2011.
To consider to revise the present Vehicle Entry Tax collection from the vehicle
owners/drivers entering within the limit of Cantonment area. The Cantonment Board
vide its CBR mentioned under reference proposed to revise the rates of Vehicle Entry
Tax.
As per SRO No. 7150/VE/Tax Revision /RS/96 dated 13/10/2000, published in
Gazette of India on 06/01/2001, u/s 60 of Cantonment Act, 1924 (now Section 66 of
Cantonment Act, 2006) existing rates being charged, are to propose to be revised as under
considering revenue generation to Board, last revision time period elapsed.
S.No Class of Vehicles Existing
Rates
Proposed
Rates
1 Motor Bus Carrying passengers entering in the Cantt Area
whether loaded or unloaded
25/- 50/-
2 Trucks Carrying goods (6 wheels) entering in the Cantt Area
whether loaded or unloaded
50/- 100/-
3 Trucks Carrying goods (above 6 wheels) entering in the
Cantt Area whether loaded or unloaded
50/- 100/-
4 Trucks Carrying goods (4 wheels) entering in the Cantt Area
whether loaded or unloaded
30/- 60/-
5 Advertisement Car entering in the Cantt Area 50/- 100/-
6 Tractor with trailor carrying goods entering in the Cantt area
whether loaded or unloaded
10/- 20/-
7 Three wheeled auto rickshaw /Temp carrying passengers
entering in the Cantt area whether loaded or unloaded
5/- 10/-
8 Three wheeled auto rickshaw /Temp carrying passengers
entering in the Cantt area whether loaded or unloaded
4/- 10/-
5
9 Jeep/Minibus Carrying passengers entering in the Cantt
Area whether loaded or unloaded
10/- 20/-
Provided that the said tax shall not be payable in the respect
of the following categories’ of vehicles namely:-
(a) Vehicle belonging to the central Govt. or a State
Govt.
(b) Vehicles belonging to the Cantonment Board
Jabalpur or Municipal Corporation, Jabalpur
(c) Vehicles for carrying Solely for funeral parties.
(d) Ambulance for carrying patients.
(e) City buses of Madhya Pradesh State transport
Corporation plying in the town and the Cantonment.
(f) Vehicles deployed in the election.
(g) Tractor of agriculturists used solely for agricultural
purposes.
(h) School buses carrying students plying in the city
And the Cantonment.
(i) Vehicles/ Taxies hired on Govt. duty.
Relevant papers alongwith report of Revenue Supdt. and file are placed on the table
for consideration.
Note: The existing contract has expired on 21-11-2016. Extension of two months
may be given to the contractor on the same approved rates.
Resolution No. 4
Considered and approved the proposed rates as mentioned in agenda side for
Revision of Rates of Vehicle Entry Tax. It was also resolved that the contract of rights of
collection of Vehicle Entry Tax be extended at for two months at already Board approved
rates, as the existing contract has been expired.
Suitable advertisement/public notice be published, to seek public response /
objections, if any, beforend, its finalized.
5. Contract for Installation and running of “Toy Train”, “Children Helicopter”,
“Car” & “Jumping Bounce” etc. Tagore Garden.
Ref:- Tender dated 18.11.2016.
Board has invited the tenders for Installation and running of “Toy Train”,
“Children Helicopter”, “Car” & “Jumping Bounce” etc at Tagore Garden for the period
of 01 year. Tender was invited vide tender notice no. CBJ/Toy Train/RS/201 dated
18.11.2016 and published on 22-11-2016 in daily newspaper Peoples Smachar, tender
pasted on all public notice boards, distributed to all Cantt. Board Members, all previous
and concerned contractors and also uploaded on Cantonment Board website for wide
publicity.
6
In response to the same re-tender only 03 tender forms were sold and received on
28.11.2016. The comparative statement of the same is as under:-
S.
No.
Name of tenderer Amount Quoted Remarks
1. Sabnam Bano D/o Ishmail Qureshi, H.No.
2F, St.No. 05, Peerji Compound Sadar,
Jabalpur
Rs 2,27,000/- p.a. I
2. Mazher Qureshi, St. No.5 Peerji Compound,
Sadar Jabalpur Rs 1,88,786/- p.a. II
3. Nosheen Bano, St. No. 5 Peerji Compound,
Sadar Jabalpur
Rs 1,77,000/- p.a. III
The highest bid amount received by Sabnam Bano D/o Ishmail Qureshi, H.No. 2F,
St.No. 05, Peerji Compound Sadar, Jabalpur Rs 2,27,000/- p.a. for the same. The rates are
reasonable and may be accepted.
Relevant documents alongwith report of Revenue Supdt is placed on the table.
Resolution No. 5
Considered and approved the highest bid received from Smt. Sabnam Bano D/o
Ishmail Qureshi, H.No. 2F, St.No. 05, Peerji Compound Sadar, Jabalpur of
Rs. 2,27,000/- per annum for a period of one year for contract of Installation and running
of “Toy Train”, “Children Helicopter”, “Car” & “Jumping Bounce” etc. at Tagore
Garden.
6. Empanelment of Advocates in Cantonment Board Jabalpur
Ref:- CBR 28 dated 26/08/2010 and subsequent CBR No. 17 dtd 29-06-2012.
The Board has constituted Panel of Advocates in the year 2006, which was
renewed in 2010 and then after in 2012. There was a requirement of new panel of
Advocates for time bound disposal of various court matters and other proceeding. For
that purpose an advertisement was published in daily newspaper. In response to this, the
following Advocates have been shortlisted for engagement as Panel Advocates.
List of Penal Advocate for High Court & Other Tribunals
S. No. Name of Advocate
1. Shri Siddharth Gupta
7
2. Shri Vikram Singh
3. Shri Siddharth Seth
4. Mrs Lehar
List of Panal Advocate for District Court & other authorities
S. No. Name of Advocate
1. Shri Jipendra Singh Yadav
2. Shri Vijay Singh Thakur
3. Shri Abhishek Acharya
4. Shri Sandeep Vishwakarma
5. Shri Umesh Kumar Pagaria
6. Sneh Tiwari
Relevant documents of above mentioned advocates and office file is placed before
the Board for approval.
Resolution No. 6
Considered. It was resolved to engage the panel advocates as mentioned in agenda
side in Cantonment Board Jabalpur for a period of one year. Further it was resolved that
performance appraisal be done after six months.
7. Revision of Fees Slab for Panel Advocates
Ref:- CBR 28 dated 26/08/2010.
The Board had constituted Panel of Advocates in 2006, which was renewed in
2010 and 2012 but their fees slabs had not been changed since 2006, which requires
revision as per current economical state. Some fees structure for various court matter are
also required to be fixed due to constitution of new tribunals and authorities for handling
various new cases. The proposed slab of fee structure for Panel Advocate is as under:-
Fee Structure for Empanelment of Advocates
Types of Cases H.C. Fees D.C. Fees Tribunal & Other
Authorities
1. Election Petition Under
Cantonment Act 2006 and
Electoral Rules and
Regulation PILs.
10000/- + 1500/-
Miscellaneous
Expenses
6000/- +1000/-
Miscelleneous
Expenses
2. Writ Petition of Service
Matters, U/A 226 & 227 of
8000/- +1500/-
Miscellaneous
6000/- +1000/-
Miscellaneous
8000/-+1000/-
Miscellaneous
8
Constitution of India Civil
Appeals. Other matters (where
Cantt Board in formal Party)
Taxation, Imposition of Tax &
Assessment Tax Appeals U/s
93 of Cantt Act 2006, Labour
Law , Other Departmental
Issues
Expenses
Expenses
Expenses
3. Law Suits (Civil ) Both A and
B Category Criminal &
Complain Cases
Misc Appeals/ Revision (Civil
& Criminal.)
8000/- +1500/-
Miscellaneous
Expenses
6000/-+1000/-
Miscellaneous
Expenses
4. Prosecution o U/s 247&244
of Cantt Act 2006 & U/s 289
of Cantt Act 2006
Not applicable 800/-
(Consolidated )
5. Recovery of Tax & other dues
U/s 324 of Cantonment Act
2006
Not applicable 1000/-
(Consolidated )
6. Legal Opinion in writing 3000/- for Sr
Standing counsel
consultation
1500/- for other
then Senior
Counsel
1000 for Tax
Consultation
1000/- 1500/-
7. Administrative Appeals U/s
340 of Cantt Act 2006 Before
Principal Director, Defence
Estate Lucknow GOC-In-C
Headquarter Station Cell,
Lucknow ,
Before GOC-In-
C,
2000/- + Other
Expenditure
Before PDDE
2000 + Other
Expenditure
Board is also requested to consider the mandatory conditions for disposal of bills of
advocates.
1. Bill of Advocate shall be considered for Payment only when certified copy of
Final order sheet/Judgments (for final payments) and copy of reply (for 50% part
payment) found to be enclosed with the Bill.
2. Bill for 50% of final fees amount shall be considered only after filing of reply of
original case/ Petition/ Appeal in Civil nature of Cases. (Applicable only for Serial
No. 1, 2 &3 of Fee Schedule). Copy of online status report/order sheet showing
filing of reply must be enclosed with these kinds of bills.
9
3. Necessary Tax Deduction will be applicable for all payments of bill. (As & when
applicable under Tax Laws.)
Relevant documents of above mentioned fees slab and office file is placed before
the board for approval.
Resolution No. 7
Considered in detail. It was resolved to approve the revised fee slab for Panel
Advocates except miscellaneous expenses which should be same for all type of cases i.e.
Rs. 1000/- instead of Rs. 1500/-. Board also considered the mandatory conditions for
disposal of bills of advocates as mentioned in agenda side and resolved that the same
shall be followed.
Further it was resolved that CEO is authorized to check the bill of advocates
thoroughly.
8. Engagement of contractual staff
To consider application dtd 21-11-2016 of Shri GD Nogriya, Retd SDO, GD-1
requesting for engaging him in Engineering Section on contractual basis. The Board is
requested to consider his engagement in Engineering Section for one year @ Rs. 15,000/-
pm, for dealing the proposals for 20 yrs old encroachment cases and proposal for renewal
of expired lease cases under CLAR Rule 1937 and other land related works.
Resolution No. 8
Considered and resolved that Shri GD Nogriya,Retd SDO GD-1 be engaged in
Engineering Section on contractual basis for eleven months @ Rs. 15,000/- per month.
9. Engagement of Translator on contractual basis
To consider application dtd 21-11-2016 of Shri Anthony Abraham for his
engagement as Translator in administration Section for eleven months @ Rs. 10,000/- per
month. The Board is requested to consider his engagement as there are directions from
DGDE, PDDE and Nagar Rajbasha Kriyanvayan Samiti for doing the maximum work in
Hindi / Bilingually. Besides this every month Board Agenda has to be translated in Hindi
language.
In this regard report of Office Supdt is placed before the Board.
Resolution No. 9
Considered and resolved that Shri Anthony Abraham be engaged as Translator in
Administration Section on contractual basis for eleven months @ Rs. 10,000/- per month.
10
10. Monthly Accounts
To consider and approve monthly accounts for June, July, Aug and September,
2016.
Detail June,16 July,16 Aug,16 Sept,16
Opening Balance 5,39,36,669 4,36,39,995 2,61,41,582 1,76,73,964
Receipts during
the month
2,41,26,961 54,83,161 3,12,06,688 6,23,90,190
Expenditure
during the month
3,44,23,635 2,29,81,574 3,96,74,306 4,06,38,040
Closing Balance 4,36,39,995 2,61,41,582 1,76,73,964 3,94,26,114
Cash in Hand 400 20,860 21,745 17,624
Relevant papers are placed on the table.
Resolution No. 10
Considered and approved.
11. Grant of 3rd
ACP to Dr. (Mrs) Rupa Sarkar, RMO.
To consider grant of 3rd
ACP to Dr. (Mrs.) Rupa Sarkar, RMO as per instructions
contained in MP State Govt. Health & Family Planning Order No. F.4-
1/2008/satrah/Medi-1, Bhopal dated 26-08-2008. The 3rd
ACP of Dr. (Mrs.) Rupa Sarkar,
RMO is due from 01-09-2015.
All relevant documents and papers are placed on the table.
S. No
Name & Designation
Date of Appointment
Date of Promotion if any (with pay scale, if financial benefit given)
Grant of 1st
financial benefit given, if any (on completion of 6 years services)
Grant of 2nd
financial benefit given, if any (on completion of 12 years services)
Grant of ACP/ Selection grade on completion of 18 yrs of service
Existing pay scale and grade pay
Proposed pay scale and grade pay
Effective date
EOL if any
Remark
Pay Scale
Effective date
Pay Scale
Effective date
I II III IV V VI VII VIII IX X XI XII XIII XIV
11
1 Dr. Smt.
Rupa
Sarkar,
Lady
Medical
Officer
01-09-
1997
- 1560
0-
3910
0 +
6600
01-09-
2003
1560
0-
3910
0
+760
0
01-
09-
2009
IIIrd 15600-
39100
+7600
37400-
67000
+8700
01/09/2
015
No 2nd
ACP
is
pending
too.
Resolution No. 11
Considered and approved. It was resolved that a proposal be sent to PDDE, CC,
Lucknow for approval of the same.
12. Amendment in CBR No. 03 dated 30-11-2015
Reference CBR No. 03 dated 30-11-2015
To consider the amendment in CBR No. 03 dated 30-11-2015 in respect of serial
no. 02 Shri Rajkumar, Mali whose effective date of 3rd
Time Bound was wrongly
mentioned as 01-07-2014 but the right effective date of 3rd
Time Bound is 11-06-2015
and at the serial no. 21 Smt. Meera Bai Arjun, Sweeper whose designation was not
mentioned in the list.
Resolution No. 12
Considered and approved.
13. Time Bound Advancement Scheme and Time Scale Pay to Cantonment Board
Employees after completing 30 years of service.
To consider grant of Time Bound Advancement Scheme to Cantonment
Board Employees (Class IV) as per instructions contained in MP State Govt. letter
No. F-11-17/2014/Niyam/char dated 30/09/2014. As per above letter the Time
Bound Advancement Scheme is applicable to the employees who have got only
IInd Time Bound from the date of appointment and completing 30 years of
services on 01/07/2014 and after.
The employees are eligible under the condition laid down by M.P State
Govt. letter No. F-11-17/2014/Niyam/char dated 30/09/2014.
12
LIST OF ELIGIBLE EMPLOYEES TO GET BENEFITS TIME BOUND SCALE
AFTER COMPLETION OF 30 YEARS OF SERVICE (as per M.P GO Letter No. F-11-
17/2014/Niyam/char dated 30/09/2014 )
S.
no
Name &
Designation
Date of
Appointment
Date of
Promotion
if any
Grant
of ACP/
Selectio
n grade
on
complet
ion of
30 yrs
of
service
Existing
pay scale
Revised
pay
scale
Effective date
as per GO
Whether
the
concerned
employee
fulfills all
the
condition
of GO
1 2 3 4 5 6 7 8 9
1 Shri Pappu Ganesh,
S/w
1/12/1984 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/12/2014 Yes
2 Shri Rajkumar,
Mali
11/6/1985 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
11/06/2015 Yes
3 Shri Shyamlal
Mannu, S/w
1/12/1984 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/12/2014 Yes
4 Smt. Kamla Bai
Premlal, S/w
01/06/1982 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
5 Shri Ratan
Gopichand, S/w
1/07/1983 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
6 Shri Gorelal, Mali 11/11/1983 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
7 Shri Raju Shanker,
S/w
01/10/1981 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
8 Smt. Meera Bai
Papa, S/w
01/12/1984 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/12/2014 Yes
9 Smt. Maya bai
Ramesh, S/w
01/06/1982 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
10 Smt. Phoolmati
Ishwarlal, S/w
01/01/1985 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/01/2015 Yes
11 Shri Chottelal
Heeralal, S/w
01/10/1981 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
12 Smt. Usha Prakash,
S/w
01/11/1983 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
13 Smt. Munnalal
Param, S/w
01/10/1981 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
14 Smt. Rama Mohan, 01/08/1980 - IIIrd 5200- 5200- 01/07/2014 Yes
13
S/w 20200+1
800
20200+
1900
15 Shri Moolchand
Annantu, Mali
16/02/1984 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
16 Shri Mohanlal
Babulal, Mali
24/10/1983 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
17 Smt Basanti
Shyamlal, S/w
01/06/1982 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
18 Smt. Tulsa Balram,
S/w
01/11/1983 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
19 Shri Chottelal
Ganpat, Mali
02/07/1984 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
02/07/2014 Yes
20 Smt. Laxmi
Nathulal, S/w
01/09/1980 -
IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
21 Smt. Meera Bai
Arjun, S/w
01/07/1985 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2015 Yes
22 Shri Papa Babulal,
S/w
01/02/1980 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
23 Shri Rahees Mohd.
Bhisty
01/10/1981 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
24 Smt. Sona Bai
Bhuvneshwar, S/w
10/03/1976 -
IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
25 Shri Deepchand
Sonelal, S/w
01/02/1980 - IIIrd 5200-
20200+1
800
5200-
20200+
1900
01/07/2014 Yes
26 Smt. Dasoda
Sunder, S/w
18/07/1974 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
27 Smt. Premi bai
Laxman, S/w
18/07/1974 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
28 Smt. Tarachand
Kallu, S/w
01/08/1980 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
29 Shri Sitaram
Moolchand, CJ
7/9/1978 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
30 Shri Premchand
Indraj, CJ
1/12/1984 1/4/2006 IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/12/2014 Yes
31 Smt. Laxmi
Phoolchand, S/w
01/07/1983 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
32 Smt. Mamta
Bhagwandas, S/w
10/09/1973 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
33 Shri Balwant Rao,
Peon
02/09/1980 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
34 Shri Deepchand 01/12/1984 - IIIrd 5200- 5200- 01/12/2014 Yes
14
Gayadeen, S/w 20200+1
800
20200+1
900
35 Shri Shaheed Khan,
CJ
01/10/1981 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
36 Shri Vinod
Chandra,
Chowkidar
01/12/1982 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
37 Shri Mukesh
Ramkumar, CJ
01/08/1980 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
38 Shri Gopal Rajak,
Peon
01/12/1982 - IIIrd 5200-
20200+1
800
5200-
20200+1
900
01/07/2014 Yes
Relevant papers are placed on the table for the consideration of the Board.
Resolution No. 13
Considered and approved.
14. Time Bound Advancement Scheme and Time Scale Pay to Cantonment Board
Employees after Completing 12 years of service.
To consider grant of Time Bound Advancement Scheme to Cantonment Board
Employees (Class III) as per instruction contained in MP State Govt. Letter No.
1477/2796/1/3/05 dated 03-09-2005. As per above letter the Time Bound
Advancement Scheme is applicable to the employees who have completed 12
years of service.
The employees are eligible under the condition laid down by M.P State
Govt. Letter No. 1477/2796/1/3/05 dated 03-09-2005.
LIST OF ELIGIBLE EMPLOYEES TO GET BENEFITS TIME BOUND SCALE
AFTER COMPLETION OF 12 YEARS OF SERVICE S.
no
Name &
Designation
Date of
Appointment
Date
of
Pro
moti
on if
any
Grant of
ACP/
Selection
grade on
completio
n of 12
yrs of
service
Existing pay
scale
Revised pay
scale
Effective
date as per
GO
Whethe
r the
concern
ed
employe
e fulfills
all the
conditio
n of GO
1 2 3 4 5 6 7 8 9
1 Smt Richa
Pandey, A.T.
09-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
09-07-2016 Yes
2 Smt. Shalini
Jaiswal, A.T.
09-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
09-07-2016 Yes
3 Smt.
Shraddhabala
Yadav, A.T.
09-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
09-07-2016 Yes
15
4 Smt. Krishna
Sen, A.T.
09-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
09-07-2016 Yes
5 Smt. Manjula
Yadav, A.T.
09-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
09-07-2016 Yes
6 Shri Dayanand
Mathaniya, A.T.
10-07-2004 - Ist 5200-20200 +
2400
9300-34800 +
3200
10-07-2016 Yes
Relevant papers are placed on the table for the consideration of the Board.
Resolution No. 14
Considered and approved. It was resolved that a proposal be sent to PDDE, CC,
Lucknow for approval of the same.
15. Supply and installation of Eco-friendly prefabricated Bio-Toilet
Reference CBR No. 27 dated 30-11-2015.
Board is requested to consider purchase of 16 nos. of 02 Toilet Blocks @ Rs.
1,24,900/- each and 02 nos. of 4 Toilet Blocks @ Rs. 2,09,900/- each from M/s
Perception, Shop No. 104, R.C. Arcade, Madan Mahal Square, Jabalpur. The rates have
already been approved by the Board vide CBR No. 27 dated 30-11-2015.
The CEO is authorized to incur the expenditure accordingly.
Resolution No. 15
Considered and approved. The CEO is authorized to incur the expenditure for the
same. It was resolved that instructions with pictures for using the bio toilets must be
placed on the Bio toilets in Hindi and also the Logo of Cantonment Board Jabalpur must
be placed on the bio toilets.
16. Sanitation maintenance with removal of rubbish of Gora Bazar/Karondi
Area
Reference CBR No. 02 dated 06-11-2015.
Board is requested to consider the extension of contract of Sanitation maintenance
with removal of rubbish of Gora Bazar/Karondi Area at already Board approved rates, for
three months as the existing contract has been expired on 05-11-2016.
16
In this regard report of Sanitary Section is placed on the table.
Resolution No. 16
Considered and resolved to extend the contract of Sanitation maintenance with
removal of rubbish of Gora Bazar / Karondi Area for three months at already Board
approved rates.
17. Hiring of Private Security Services
Reference CBR No. 36 dated 27-08-2015.
Board is requested to consider the extension of contract of Hiring of Private
Security Services at already Board approved rates, for three months as the existing
contract has already been expired.
In this regard report of Sanitary Section is placed on the table.
Resolution No. 17
Considered and resolved to extend the contract of Hiring of Private Security
Services for four months at already Board approved rates.
18. “Unauthorized Construction on Sy.No.317, St. Aloysius College, Jabalpur
Cantt.”
To consider report dated 15-11-2016 of Engineering Section stating that
The Principal, St. Aloysius College, Jabalpur Occupier of Sy.No.317, known as St.
Aloysius College, Jabalpur Cantt. is constructing the following Unauthorized
Construction:-
“Unauthorized construction by making hall on Ground Floor, First Floor,
Second Floor in the Sy. No. 317, known as St. Aloysius college, Jabalpur Cantt.
The Ground floor hall is admeasuring (1)64’x25’ (approx). The First floor hall is
admeasuring (1)64’x25’(approx). The Second Floor hall is admeasuring
(1)64’x25’ (approx).”
The site in question comprises the Sy.No. 317, Jabalpur Cantt. The site is
situated outside Civil and Bazar area placed under the management of DEO,
Jabalpur Circle, Jabalpur from land point of view.
17
Report of Engineering Section is placed on the table for issue of notice and
prosecution u/s 244, 247, 248 and 249of Cantonments Act, 2006.
Resolution No. 18
Considered and resolved that notice u/s 248 and 249 of the Cantonments
Act, 2006, be issued to The Principal, St. Aloysius College, Jabalpur for stop &
removal of unauthorized construction failing which another notice u/s 320 of the
Act ibid be issued, to remove the Unauthorized Construction and on their failure to
comply, the same be removed by the agency of the Cantt Board at the risk and cost
of defaulter as per Cantt. Act, 2006. The Board also authorized the CEO to initiate
prosecution u/s 244 & 247 of the Cantonments Act, 2006, against the defaulter.
19. “Unauthorized Construction on Sy.No.372/54A, H. No. 142, Gora
Bazar, Jabalpur Cantt.”
To consider report dated 24-10-2016 of Engineering Section stating that
Shri Pawan Gupta S/o Late Shri Jamna Prasad Gupta Occupier of H.No.142(pt),
Gora Bazaar, Jabalpur Cantt. is constructing the following Unauthorized
Construction:-
“Unauthorized construction by making room on Ground Floor, First
Floor and Second Floor in the Sy. No. 372/54A, H. No. 142, Gora Bazaar,
Jabalpur Cantt. The Ground floor room is admeasuring (1) 10’6”x18’. The First
floor room is admeasuring (1) 10’6”x18’ The Second floor room is admeasuring
(1) 10’6”x18’. Brick work on second floor is in progress on the day of visit.”
The site in question comprises the Sy.No. 372/54A, H. No. 142, Gora
Bazar, Jabalpur Cantt. The site is situated inside Civil and Bazar area placed under
the management of this office from land point of view.
Report of Engineering Section is placed on the table for issue of notice and
prosecution u/s 244, 247, 248 and 249of Cantonments Act, 2006.
Resolution No. 19
Considered and resolved that notice u/s 248 and 249 of the Cantonments
Act, 2006, be issued to Shri Pawan Gupta S/o Late Shri Jamna Prasad Gupta
for stop & removal of unauthorized Construction failing which another notice u/s
320 of the Act ibid be issued, to remove the Unauthorized Construction and on
their failure to comply, the same be removed by the agency of the Cantt Board at
the risk and cost of defaulter as per Cantt. Act, 2006. The Board also authorized
18
the CEO to initiate prosecution u/s 244 & 247 of the Cantonments Act, 2006,
against the defaulter.
20. “Building Plan for Proposed Construction of First Floor in H. No. C-47, Vijay
Nagar Extension, (Part of Kh. No. 40/22, Mouza Karondi) Ranjhi, Jabalpur
Cantonment.”
To consider the building plan and application u/s 235 of Cantonments Act, 2006
submitted by Shri Praveen Kumar Das S/o Shri Jesu Das and 2. Smt. Pramila Das
w/o Shri Praveen Kumar Das for the proposed construction of First Floor in the H. No.
C-47, (Kh. No. 40/22, Mouza Karondi) Ranjhi, Jabalpur Cantt.
The land in question is situated outside the notified civil area comprising H. No.C-
47, Vijay Nagar Extension,(Kh. No. 40/22, Mouza Karondi), Ranjhi, Jabalpur Cantt.
The plan was referred to DEO Jabalpur Circle, Jabalpur for obtaining ‘NOC’ from
land point of view as required u/s 238 (3) of Cantonment Act, 2006, for the proposed
construction. The same has been returned by the DEO to this office vide letter
No.DEO/JBP/Building Plans/Gen/Karondi/Vol-I/25, dated-28-10-2016, with the remark
that “There is no defence land involved in the proposed construction, as the proposed
work is on first floor. This office has therefore no comments to offer on the building
plan.”
Proposed construction admeasures as under:-
Residential
Plot area - 485.00 sq.ft
Existing Ground Floor area - 485.00 sq.ft
Proposed First Floor area - 485.00 sq.ft
Total proposed construction - 485.00 sqft
The approximate assessed construction cost @ Rs-950/- per sq.ft. would be
Rs-4,60,750/-, process fee @ 5% of above amount Rs-23,038/-.
The plan along-with report of Engineering Section are placed on the table.
19
Resolution No. 20
Considered and resolved that building plan in respect of 1. Shri Praveen Kumar
Das S/o Shri Jesu Das and 2. Smt. Pramila Das w/o Shri Praveen Kumar Das for the
proposed construction of First Floor in the H. No. C-47, Vijay Nagar Extension, (Part of
Kh. No. 40/22, Mouza Karondi) Ranjhi, Jabalpur Cantt be sanctioned u/s 238 of the
Cantonment Act 2006 on payment of process fee of Rs.23,038/- The applicant shall
inform the CEO in writing the date of commencement and completion of the building
work. The work shall be completed within one year from the date of commencement. The
sanctioned plan must adhere to in every detail and particulars. Any deviation from the
sanctioned plan shall entail action under sections 239, 244, 248, 249 and 320 of the
Cantonment Act 2006 and other legal actions as the Board may take, including
demolition of unauthorized construction.
21. “Building Plan for Proposed Construction of Second Floor in Sy. No. 68
(part), H. No. 68 (Kh. No. 773/4, 774/4, 775/3, 776/4) A.P.R. Colony, Katanga,
Cantonment Jabalpur .”
To consider the building plan and application u/s 235 of Cantonments Act, 2006
submitted by Shri Madhukar Rao S/o Shri Surya Narayan Rao for the proposed
construction of Second floor in the Sy. No. 68 (part), H. No. 68 (Kh. No. 773/4, 774/4,
775/3, 776/4) A.P.R. Colony, Katanga, Jabalpur Cantt.
The land in question is situated outside the notified civil area comprising Part of
Sy. No. 68 , H. No. 68 (Kh. No. 773/4, 774/4, 775/3, 776/4), APR Colony, Katanga,
Jabalpur Cantt.
The plan was referred to DEO Jabalpur Circle, Jabalpur for obtaining ‘NOC’ from
land point of view as required u/s 238 (3) of Cantonment Act, 2006, for the proposed
construction. The same has been returned by the DEO to this office vide letter
No.DEO/JBP/Building Plans/Gen/Katanga/Vol-II/57, dated-25-10-2016, with the remark
that “As per the GLR of this office the proposed construction falls on GLR Sy. No. 68
(pt), which is classified as B-2 land under the management of the State Govt. Hence NOC
cannot be given by this office for the proposed construction. Please take further action at
your end.”
Proposed construction admeasures as under:-
Residential
Plot area - 1500.00 sq.ft
20
Existing Ground Floor area - 877.00 sq.ft
Existing First Floor area - 792.00 sq.ft
Proposed Second Floor area - 357.00 sqft
Total proposed construction - 357.00 sqft
The approximate assessed construction cost @ Rs-950/-per sqft would be
Rs-3,39,150/-, process fee @ 5% of above amount Rs-16,958/-.
The plan along-with report of Engineering Section are placed on the table.
Resolution No. 21
Considered and resolved that building plan in respect of Shri Madhukar Rao S/o
Shri Surya Narayan Rao for the proposed construction of Second Floor in the Part of
Sy. No. 68, H. No. 68 (Kh. No. 773/4, 774/4, 775/3, 776/4), APR Colony, Katanga,
Jabalpur Cantt be sanctioned u/s 238 of the Cantonment Act 2006 on payment of process
fee of Rs.16,958/- The applicant shall inform the CEO in writing the date of
commencement and completion of the building work. The work shall be completed
within one year from the date of commencement. The sanctioned plan must adhere to in
every detail and particulars. Any deviation from the sanctioned plan shall entail action
under sections 239, 244, 248, 249 and 320 of the Cantonment Act 2006 and other legal
actions as the Board may take, including demolition of unauthorized construction.
22. “Mutation in respect of Sy. No. 143/126, H. No. 268, Sadar Bazar, Jabalpur
Cantt”
An application dt. 15.02.2016 received from Shri Dhirendra Chouksey, Smt. Asha
Chouksey & Shri Sidharath Chouksey for mutation in respect of GLR Sy.No.143/126,
H.No.268 admeasuring 1848 sq.ft. classified as B-3 land as per GLR recorded HOR Smt.
Harba Bai wd/o late Ramphal Chouksey, Shri Dhirendra Kumar Chouksey S/o Gaya Ram
Chouksey, Smt. Amit Kumar Chouksey S/o Bhimsem Chouksey minors grandsons in the
guardianship of Smt. Harba Bai held on old grant under the management of Cantonment
Board Jabalpur.
The applicants Shri Dhirendra Chouksey, Smt. Asha Chouksey & Shri Sidharath
Chouksey vide their application dated 15-2-2016 intimated that the above said property
came to their share by way of Batwara through Court order dated 21-01-2016 in Civil
Court Case No.114/A/2013 by XIV Civil Judge Class I Jabalpur. In this regard the above
said applicant has also submitted the admission deed dated 19-07-2016 and affidavit
dated 11-07-2016. In the site inspection report dated 20-09-2016 submitted by
21
Engineering section it has been observed that there are no encroachment and no sub
division of site but change of purpose and unauthorized construction is involved.
As such the proposal for change of purpose from old grant site of above said
Sy.No. may be forwarded to competent authority for obtaining Govt. sanction as per
instruction vide Dte. Defence Estate Central Command Lucknow letter No.41190/ land
policy dated 31-08-2010.
The relevant documents along with the report is placed on the table.
Resolution No. 22
Considered and it was resolved that a proposal be sent to competent authority for
mutation in the GLR Sy. No. 143/126, H. No. 268, Sadar Bazar, Jabalpur Cantt. It was
further resolved that after receiving of sanction of competent authority, mutation shall be
done.
23. “Compounding of unauthorized encroachment in respect of Sy. No. 159,
Jhiriya, Jabalpur Cantt”
The applicant has encroached open defence land by constructing room on Sy. No.
159 which is admeasured 18’x32’. In this regards this office has issued a show cause
letter vide letter no. Sy. No. 159(pt)/Jhiriya/06/1524 dt 31st Jan 2006 against the
encroacher Shri Pappu Anthony S/o Shri Munna Anthony. A notice u/s 185 of Cantt Act
1924 (new 248(1) of Cantt Act 2006) has also issued against the encroacher vide notice
no. Sy. No. 159(Part)/Jhiriya/Unauthorized Const./06/173 dt 04.05.2006 with the
authority of CBR No. 28 dt 27.04.2016. The applicant has been filed an appeal u/s 340 of
Cantt Act 2006 before the Appellant Authority i.e. GOC-In-C, CC Lucknow on dt
18.05.2006.
An application dt. 14.10.2016 has been received from Shri Pappu Anthony S/o
Shri Munna Anthony for compounding of unauthorized construction in respect of GLR
Sy.No.159, classified as B-3 land.
The Appellant Authority passed an interim order in respect of appeal no. PEND
60/2013 on dt. 08.11.2016 to be resolved the compounding application in Board.
As per GLR recorded HOR Shri Mool Chand S/o Shri Bal Mukand Tamholi
Chowrasia Jubbulpore described as Temple held on Old grant under the management of
DEO, Jabalpur Circle Jabalpur Cantt. Sy. No. 159 described as Temple but not for
residential purpose. The applicant constructed a room for residential purpose and he is
living at present. The above said construction has constructed on open defence land
which comes under the category of encroachment.
Resolution No. 23
It is resolved that the compounding application is not considerable because
encroachment has been done by the Appellate by way of unauthorized construction on
22
Sy. No. 159(pt). The applicant encroached the above said land through unauthorized
construction. Which cannot be considered for composition under byelaws and
encroachment may be removed.
24. Supply & fixing of L.E.D. Lights and L.E.D. Street Lights
To consider supply & fixing of 500 LED Street Lights 25 W and 500 LED Tube
Lights 18 w from Kendriya Bhandar Bhopal under DGS&D rates. Kendriya Bhandar is
an authorized agency by Govt of India, Ministry of Personnel, Public Grievances &
Pensions (DOPT) from which we can directly purchase the items without calling for
quotation.
Board is requested to consider the same.
Resolution No. 24
Considered and approved.
25. Cancellation of tender for replacement of existing light to 25 w LED of M/s
Arya Filaments Pvt. Ltd.
The Board vide its CBR No 24 dtd 29-06-2016 has approved the rates of M/s
Arya Filaments Pvt. Ltd Indore for replacement of existing light to 25w LED. In
continuation of the same the Board asked the agency to submit Rs. 15,000/- as security
deposit along with a non-judicial stamp paper of Rs. 100/- and also asked sample and
technical specifications certificate as per the tender terms. The agency has not submitted
the security deposit and non-judicial stamp paper after repeated telephonic conversations
and written letters. Also the sample of LED lights produced by the agency did not match
to the specifications of our tender. The same was also intimated to M/s Arya Filaments
Pvt.Ltd. and it was also directed to them to produce the samples as asked vide our tender
terms. The agency besides our continuing verbal and written instructions did not produce
the sample as per our specifications nor submitted the security deposit till date.
Therefore the Board is requested to cancel the tender of M/s Arya Filaments
Pvt.Ltd. and forfeit its earnest money of Rs. 12,000/- deposited vide FDR of State Bank
of India.
Relevant file is placed on the table for consideration of the Board.
23
Resolution No. 25
Considered. It was resolved to cancel the tender of M/s Arya Filaments Pvt. Ltd.
and forfeiting its earnest money of Rs. 12,000/- deposited vide FDR of State Bank of
India.
26. Payment of DPR of Sewer Line & STP
The Cantonment Board has got prepared the DPR of Sewer Line project under
JNNURM scheme from M/s Snow Fountain. The Consultancy Charges of the project was
1.21 %. JNNURM scheme has stopped and in its place Amrit Yogna has been started.
The Cantonment Board has made payments of two installments to snow fountain
as consultancy charges (15%+15%= 30%). The DPR that was prepared for the sewer line
in the year 2013 the cost of the same has increased to 98.2 Crore. The firm snow fountain
is demanding the increased cost of Rs 4,50,429/-(First 15 % of the bill amount).
Cantonment Board has prepared a new DPR for the sewer line which has been
sent to “Additional Director Regional Centre for Urban & Environmental Studies
Lucknow U.P.”
Relevant documents along with the report of the Engineering Section is placed
before the Board.
Resolution No. 26
Considered and approved the payment of Rs. 4,50,429/- (first 15% of the bill
amount) to M/s Snow Fountain as the increased cost of fee of preparing DPR. The CEO
is authorized to incur expenditure for the same.
27. Conversion of old mali quarters in Commercial complex cum Residential
housing in Ashok Marg (Part of Sy.No.127)
To consider the letter dated 21-11-2016 Vice President Shri Abhishek Chouksey
requested to construction of commercial complex cum residential Housing in Ashok
Marg (Part of Sy.No.127) at old Mali Quarter. At present old Mali quarter is in
dilapidated condition and it is a prime location suitable for commercial complex cum
residential housing. The complex is proposed to be constructed on part of Sy.No.127
classified as ‘C’ class land part of which has Class IV staff Accommodation (Mali
Quarter).
24
The total built up area shall be 1619 sqm and the estimated cost of work is Rs 200
lacs, which is based on MES SSR,2010. The features of the proposed building are :
1) R.C.C. footing 2) PCC 1:3:6 for the base. 3) R.C.C. 1: ½ :3(M-20) for
superstructure 4) Framed structure. 5) Vitrified floor tiles.
The work has to be carried out through T.C. contractor M/s Deepak Construction
at already approved rate @ 38.00% above MES SSR,2010. Budget provision exists under
the maintenance head.
Relevant estimate along with report of Engineering section are placed on the table.
Resolution No. 27
Considered and approved. The CEO is authorized to incur expenditure
accordingly under respective head.
Further it was resolved that a Site Inspection Committee be constituted
which consists the following members and submit their report regarding feasibility
of the same.
1. Vice President
2. GE
3. Cantt Engineer
4. Shri Ajay Padam
28. Construction of Anganbadi Centre for children use after converting of
existing Bathroom at St.No.19 infront of Pramod Tiwari House, Sadar
Bazar, Jabalpur Cantt.
To consider and approve an estimate of Rs 3,00,000/- towards the
construction of Anganbadi Centre for children use after converting of existing
bathroom at St.No.19 infront of Pramod Tiwari House, Sadar Bazar, Jabalpur
Cantt and its classified as class ‘C’ land comes under the management of
Cantonment Board, Jabalpur. This works involves brick work, plaster, tiles,
galbanum corrugated steel sheet with steel frame work.
The work has to be carried out through T.C. Contractor M/s Neeraj Dutt
Mishra at already approved rate 36.90 above MES SSR,2010. Budget provision
exists under maintenance head.
Relevant estimate along with report of Engineering Section are placed on
the table.
25
Resolution No. 28
Considered and approved. Further it was resolved that one Anganbadi shall
also be constructed in ward no. 6 at the cost of Rs. 3.00 lacs if the funds are
released by the State Govt. The CEO is authorized to incur expenditure
accordingly under respective head.
29. Re-carpetting of 25mm thick SDBC at Mall Road, Jabalpur Cantt.
To consider and approve an estimate of Rs 41.20 lacs for 25mm thick SDBC at
Mall road. The Mall road was previously repaired about 10 years ago and it classified as
‘C’ Class land, Sy.No.441 comes under the management of Cantonment Board,
Jabalpur. The total length of road is 1800m and width is 9.0m. This work involves for
preparation of surface, profile corrective course, 25mm thick SDBC, etc
The work has to be carried out through M/s M.K.S. Engineering Services at
already approved rate.Budget provision exists under maintenance head.
Relevant estimate along with report of Engineering Section are placed on the
table.
Resolution No. 29
Considered and approved. As per GE suggestion 40 mm SDBC be done
with profile corrective course / potholes. The CEO is authorized to incur
expenditure accordingly under respective head. After preparing the revised
estimates the matter should be placed before next Board Meeting.
30. Revision of Building Bye-laws
Instructions issued vide PDDE letter No.3528/Bye-laws/ building/ LC-7/2 dated
10-06-2016 and DGDE letter No. 12/1/Bldg Bye-laws/Gen/DE/2015 dated 23-05-2016 to
prepare the building bye-laws of each of the Cantonment Board. Cantonment Board
prepared the building bye-laws as per section 251 and 380 of the Cantonment Act,2006.
Cantonment Board Jabalpur has prepared the building bye-laws in Hindi and
English and same is put up before Board for approval and further submission to
competent authority for obtaining sanction.
Relevant documents are placed on the table.
26
Resolution No. 30
Considered and approved. Army suggestions may be considered, if any.
31. Repair/ construction of bathroom at Gora Bazar Ward No.6, Jabalpur
Cantt.
To consider and approve an estimate of Rs. 95,000/- for repair / construction of
bathroom at Gora Bazar Ward No.06, Jabalpur Cantt. The major works involves brick
work, glazed ceramic tiles, floor and pre-painted GI sheet.
The work has to be carried out through T.C. Contractor M/s Sunil Ku.
Shriavastava and Sons at already approved rate @ 35.30% above MES SSR,2010.
Budget provision exists under maintenance head.
Relevant documents are placed on the table.
Resolution No. 31
Considered and approved. The CEO is authorized to incur expenditure accordingly
under respective head.
32. To consider and approve following works / estimates under maintenance
Head.
S.
No.
Name of Work Scope of
Work
dimension/
Qty.
Ward
No.
Estimated cost of
Work
Remark
1 Repair of Existing
drain to RCC drain
in the Part of
Sy.No.67-B, Infront
of Katanga School
Jabalpur Cantt.
150 mtr
0.60 wide
0.60 high
1 Rs-5,63,500/- Part of Sy.No.67-B
Class “C” land
under the Board
management
2 Repair of Existing
drain to RCC drain
in the Part of
Sy.No.144, GK
100 mtr
0.60 wide
0.60 high
3 Rs-3,76,000/- Part of Sy.No.144
Class “B-3” land
under the Board
management
27
Hussain Compound
Jabalpur Cantt.
3 Repair of Existing
drain to RCC drain
in the Part of
Sy.No.143/823,
St.No.11, Gita
medicos to cantt
garage Jabalpur
Cantt.
250 mtr
0.60 wide
0.60 high
5 Rs-9,40,000/- Part of
Sy.No.143/823
Class “C” land
under the Board
management
4 Providing Cement
concrete road over
existing road infront
of Luxmi Narayan
mandir Gora bazar
Jabalpur Cantt
300 mtr
3mt wide
0.20 thick
6 Rs-6,84,500/- Sy.No.372/113 part
Class “C” land
under the Cantt
Board management
5 Repair and
maintenance of
existing Urinal at
part of Sy. No.133,
near Ganesh Chowk
infront of Kassi
Hotel, Sadar Bazar,
Jabalpur Cantt.
5 Rs 1,00,000/- Sy.No. 133, part
Class “C” land
under the Cantt
Board management.
6 Repair and
maintenance of
existing Urinal at
part of Sy.
No.143/823, infront
of Babadeen Shop,
Sadar, Jabalpur
Cantt.
4
Rs 1,00,000/- Sy.No. 143/823 part
Class “C” land
under the Cantt
Board management
7 Construction of
Cement concrete
road at St.No.11/3
Sadar Bazar,
Jabalpur Cantt.
53mtr x10
63mtr x 5
5 Rs 7,65,000/- Sy.No. 133, part
Class “C” land
under the Cantt
Board management
8 Construction of
cement concrete
road in St.No.5,
Ashok Marg to Azad
Chowk, Sadar
Bazar, Jabalpur
Cantt.
150mtr x 7
5 Rs 10,00,000/- Sy.No. 133, part
Class “C” land
under the Cantt
Board management
9 Renovation and
repairing of Tagore
7 Rs 6,00,000/- Class “A-1”
Analogous land.
28
Primary School,
Karondi, Jabalpur
Cantt.
10 Construction of
Urinal at Empire
Check post, Jabalpur
Cantt.
6 Rs 2,00,000/- Sy.No.443 side
berms Class “C” land under the Cantt
Board management
11 Construction of ATM
building in
Cantonment Board at
Norris road side,
Jabalpur Cantt.
L=7.5 mtr
W=3 mtr
5 6,00,000/- Class “C” land
under the Cantt
Board management
12 Repair /Construction
of drain at Hyder
Compound
200 mtr 4 Rs. 6,00,000/- Part of Sy. No. 134
Class ‘B-3’ land
under the
management of
Cantonment Board.
Board is requested to note that as per the records, the works done on other than
“C” Class land as the Board is maintaining the works on these lands since last 20 years.
Resolution No. 32
Considered. It was resolved that works be done through approved TC Contractors
on already Board approved rates except for item No. 9 which is on A-1 analogous land.
The CEO is authorized to incur expenditure accordingly under respective head.
33. Revised Estimates
To consider the revised estimates of the following works:
S.No. Name of Work Amount
approved
CBR No. and
date
Revised
Amount
Remark
1 Recarpetting of
Narmada road
86,50,000/- CBR No.18
dated 29-2-
2016
1,12,75,431/- Due to
heavy pot
holes and
uneven
surface of
the road.
2 Providing
bituminous patch
work with WBM at
Empire crossing to
YMCA Mandla
15,00,000/- CBR No.07
Sr.No.105
dated 29-9-
2016
Rs
21,00,000/-
Due to
major
potholes
repair work
with WBM
29
road, Jabalpur including
seal coat of
Pot holes.
Reports of CE are placed before the Board with corresponding Measurement
Books about the satisfactory nature of work.
Resolution No. 33
Considered and approved. The CEO is authorized to incur the expenditure for the
same. PCB advised that estimates must be made comprehensive and for escalation in
estimates, CE should give reasons for the same.
34. Conversion of Old Public Group Latrine at Passi Mohalla, Jabalpur Cantt.
To consider the letter dated 26-11-2016 of Smt. Beena Manmohan
Agrawal, Member Ward No.2 Cantonment Board, Jabalpur requested to demolish
an old male public group latrine at Passi Mohalla, Jabalpur Cantt. and to construct
the shop on this portion.
Smt. Beena Manmohan Agrawal, Ward No.2, Member explained that as per
‘Swachh Bharat Abhiyan’ maximum number of people constructed their toilets
inside their houses and those who are not constructed Toilets, partly Ladies toilet
converted into Gents toilet those are situated nearby area.
She is also stated that ‘Old male Public Group Latrine is in dilapidated
condition and demolished all the latrines and the whole area utilized for
constructing the shops to generate the revenue.
The estimated cost of work if Rs 17 lacs. The major work involves brick
work, RCC, plaster, tiles white/ colour wash. The work has to be carried out
through TC approved Contractor M/s Neeraj Dutt Mishra at already approved rate
@ 36.90% above MES SSR, 2010.
Relevant estimates along-with report of Engineering Section are placed on the
table.
Resolution No. 34
Considered in detail. As per the request of all members, it was resolved that 10
seater public group latrine be constructed @ Rs. 5.00 lacs and the remaining amount of
Rs. 12.00 lacs is being utilized for construction of shops to generate the revenue for
Board.
30
35. Noting of Minutes of Board by Circulation of Agenda
To note agenda circulated and approved by the Board –
(i) Dtd 01-12-2016 regarding Declaration of Cantonment Board Jabalpur as
Open Defacation Free.
(ii) Dtd 28-09-2016 for allotment of Shivani Ground for Garba
(iii) Dtd 07-10-2016 for approval for vetting fee of DPR regarding laying of
Sewer Line in Civil area of Jabalpur Cantonment.
Resolution No. 35
Considered and noted.
36 Payment of Fee of DPR of Water Supply System
The Cantonment Board has got prepared the DPR of Water Supply system
JNNURM scheme from M/s Snow fountain. The consultancy charges of the project were
1.07%. JNNURM scheme has stopped and in its place Amrit Yogna has been started.
The Cantonment Board has made payments of two installments to snow fountain
as consultancy charges (15%+15%=30%). The DPR that was prepared for the water
supply system in the year 2013 the cost of the same was increased to 65.91 crore. The
firm snow fountain is demanding the increased cost of Rs 1,88,887/- (First 15% of the
bill amount).
Relevant documents along-with the report of the Engineering Section is placed
before the Board.
Resolution No. 36
Considered and approved the payment of Rs. 1,88,887/- (first 15% of the bill
amount) to M/s Snow Fountain as the increased cost of fee of preparing DPR. The CEO
is authorized to incur expenditure for the same.
37. Approval for vetting fee DPR of regarding water supply system in Civil
area in Jabalpur Cantt.
The Cantonment Board has prepared a DPR(Detailed Project report) regarding the
water supply system. The DPR has now to get vetted from a concerned Govt. agency. In
this connection Regional Centre for Urban and Environmental Studies, Lucknow was
contacted for the purpose. The said Central Govt. Authority through its letter No.
31
URC/1063/AD24/2016-2017 dated 05-08-2016 communicated his consent for vetting
DPR on payment of fee (charges) of Rs 5 lacs out of which 2 lacs shall be payable to him
in advance. Hence the matter is pending for approval of charges.
Relevant documents along-with the report of the Engineering Section is placed
before the Board.
Resolution No. 37
Considered and approved the charges / fee of Rs 5.00 lacs for vetting of DPR of
Water Supply System by Regional Centre for Urban and Environmental Studies,
Lucknow. The Board also approved the advance payment of Rs 2.00 lacs out of Rs. 5.00
lacs to Regional Centre for Urban and Environmental Studies, Lucknow.
38. Renewal of lease of CF Building standing on survey No. 127(part) Jabalpur
Cantt. to State Bank of Indore for ATM purpose.
REF : CBR No.47 dt.12/8/2014
With ref. to above, the percentage for increasing lease rent mentioned in
resolution side is 50% which may be read as 20% ,values remaining the same.
Further to above, the lease period has expired on 31/12/2015, therefore term of
lease is required to be renewed for further period of 03 years w.e.f. 01.01.2016 to
31.12.2018 by enhancing 20% rent from Rs.17328/- p.m to Rs 20794/- p.m. for each shop
plus service tax as applicable.
Relevant Documents alongwith report of Revenue Supdt. are placed on the
table.
Resolution No.38 Considered and resolved to correct the CBR No. 47 dtd 12-08-2014 where it was
mentioned the rent be increased as 50%. The same is to be read 20% and value remaining
the same.
Further it was also resolved that the lease of State Bank of India ATM, Cantt.
Branch be renewed for further period of 03 years w.e.f. 01-01-2016 to 31-12-2018 by
enhancing 20% rent which comes to Rs 20794/- p.m. plus service tax as applicable. It is
also resolved that necessary agreements be executed with State Bank of India and arrears
of rent be recovered from them.
32
39. Correction in Renewal of lease of CF Building standing on Survey No.
127(part) Jabalpur Cantt. to State Bank of Indore for Bank purpose.
Ref :- CBR No. 46 dated 12.08.2014.
With reference to above, the percentage for increasing lease rent mentioned in resolution
side is wrongly entered as 50% , it may be corrected and read as 25% as per lease
condition and value be corrected from Rs.26,025/-p.m to Rs.21,688/- p.m w.e.f
28/4/2014 to 27/4/2019 plus service tax as applicable.
Relevant Documents alongwith report of Revenue Supdt. are placed on the table.
Resolution No.39 Considered and resolved to correct the CBR No. 46 dtd 12-08-2014 where it was
mentioned the rent be increased as 50%. The same is to be read 25% and value be
corrected from Rs. 26025/- per month to Rs. 21688/- per month for 5 years w.e.f. from
28-04-2014 to 27-04-2019 plus service tax as applicable. It is also resolved that
necessary agreements be executed with State Bank of India and arrears of rent be
recovered from them.
40. Renewal of lease of CF 03 nos of Shops standing on survey No. 127(part)
Jabalpur Cantt. to M/s Rajani Sales and Service Private Ltd., Jabalpur
Ref :- CBR No. 1( FCR No.21 dt. 22/9/14) dt. 18/10/2014
With ref. to above , the lease period has been expired on 31/12/2014, therefore term of
lease is required to be renewed for further period of 03 years w.e.f. 01.01.2015 to
31.12.2017 by enhancing 20% rent from Rs.14440/- p.m to Rs 17328/- p.m. plus service
tax as applicable for each shop.
Relevant Documents alongwith report of Revenue Supdt. are placed on the table.
Resolution No.40 Considered and unanimously approved. It is also resolved that the lease of M/s
Rajani Sales and Service Private Ltd., Jabalpur be renewed w.e.f. for further period of 03
years 01-01-2015 to 31-12-2017 by enhancing 20% rent comes Rs 17328/- p.m. plus
service tax as applicable. It is also resolved that necessary agreements be executed with
State Bank of India and arrears of rent be recovered from them.
33
41. Reimbursement of Medical bill
Shri Gorelal Sahu, Mali submitted his medical bill for reimbursement on 31-12-
2015. The bill was forwarded to RMO, Motilal Nehru Hospital for scrutiny and checking
the rates as per CSMA rules of Govt. of India with restrictions of admissibility.
1. Shri Gorelal Sahu, Mali – Rs. 1,17,379/-
After scrutiny of medical bill by RMO, Motilal Nehru Hospital part payment Rs.
49,000/- was given to Shri Gorelal Sahu under CEO’s power and the rest amount of Rs.
68,379/- is to be paid after approval of the Board.
Relevant documents are placed on the table.
Resolution No. 41
Considered and approved.
42. For Approval of Reply to the complaint by Hari Shankar Chansoriya againt
renovation/butification on Sy No. 340
The office of the Director General Defence Estate, Govt. Of India, Ministry of
Defence, Delhi Cantt vide letter No 70/VIP Ref-160/Jabalpur/C/DE/16 dt 15-11-2016
sought comments/report on complaint dt 3-11-2016 submitted by complainant Adv Hari
Shankar Chansoriya R/o 11-C, Kigsway, Ganesh Chouk, Sadar, Jabalpur regarding
construction of water fountains by Cantonment Board Office Jabalpur at sy No. 340,
Kobra Ground and inside Kept. Vikram Batra Mess without obtaining prior approval of
competent authority. Copy of which has also been served to this office.
It is found from perusal of detailed complaint that the complainant is challenging
construction of water fountains on ‘’A-1” land from cantonment fund and even without
prior approval of competent authority.
The report/comments have been prepared which requires approval of Board due to
involvement of previous resolutions of this Board.
Relevant documents and case file is presented before the board.
Resolution No. 42
Considered. Board unanimously resolved that the work executed as fountain was
for public welfare by the Board and the Board is in agreement that the reply placed before
the Board is suitable.
34
43. Revision of timing and remuneration of contract engagement of Legal
Advisor
Advocate Vijay Singh has been engaged as Legal Advisor in 2011 purely on
contract basis in the year 2011. The period of contract has been renewed by the Board
continuously on the basis of satisfactory performance in all kind of legal work and
responsibilities.
Currently contract for engagement of legal advisor has been renewed through
CBR No 8 dt 30-04-2016 for period of 11 months on consolidated remuneration of Rs.
15000/- per month. He has been engaged for attending office between 3:30 PM to 5:30
PM [2 hours] in every working day since 2011 but due to increasing numbers of legal
litigations, matters and compliances now a days in various courts and tribunals which
needed more frequent monitoring and consumed much more time for follow-ups hence
the working hours of Legal Advisor required to be extend.
Therefore it is proposed that term of engagement of Legal Advisor for attending
Cantonment Board Office should be revised for 3 hours in place of 2 hours daily and
consolidated remuneration of Legal Advisor should also be revised from 15,000/- to
20,000/- due to increasing time consumption.
Relevant Documents are placed before the board for consideration.
Resolution No. 43
Considered. It was resolved that the timings of Legal Advisor for attending
Cantonment Board Office be revised for 3 hours in place of 2 hours daily and the
consolidated remuneration from 15,000/- to 20,000/- due to increasing time
consumption.
44. Repair/Renovation of Work other then ‘C’ class Land.
Previously Cantonment Board has undertaken various works of construction in
other then ‘C’ class Land. These works are situated in B-2 State Government Land, B-3/
B-4 Land under the management of DEO/CEO. A-1 land is under the management of
Local Military Authority.
35
At present Cantonment Board has stopped all the construction work other then ‘C’
Class Land as per direction of the higher authority.
Currently the construction needs various types of repairs and renovation works
other then ‘C’ Class Land that was executed previously. Elected Ward member are
forcing to execute the work. The board may decide about this matter.
Resolution No. 44
Considered. It was resolved that any land which is vested with Cantt Board and
handed over for the management the works should be executed on those lands only, by
the Board.
45(a) Revision of rates of collection of damage charges from vendors occupying
platforms of Narbada Road
Ref :- CBR No. 23 dt.29/6/2012
To consider revision of damage charges to be collected from the vendors
occupying platforms of Narbada Road. Cantonment Board have provided sheds and
constructed pucca platform at the side of Narbada road and the vendors are selling
vegetables / fruits etc on temporary basis from these platforms. There are about 15
vendors who are charged damages @ Rs.20/- per day for each platform.
Existing Rate Proposed Rate
Rs.20/- per platform (daily) Rs.50/- per platform
Relevant documents alongwith report of Revenue Supdt. are placed on the table.
(b) Revision of rates of collection of damage charges from vendors occupying
platforms of Bhaisasur Road Chari Marg
To consider revision of damage charges collected from the vendors occupying platforms
at the side of Bhaisasur road Chari Marg. Cantonment Board have provided sheds and
constructed pucca platforms at the side of Bhaisasur road and the vendors are selling
Chicken/Mutton/Fish etc on temporary basis from these platforms. There are about 35
vendors who are charged damages @ Rs.1000/- monthly for each platform.
Existing Rate Proposed Rate
Rs.1000/- per platform (monthly) Rs.2000/- per platform
Relevant documents alongwith report of Revenue Supdt. are placed on the table.
36
Resolution No. 45(a)
Considered and approved.
Resolution No. 45(b)
Considered and approved the proposed rates as Rs. 1500/- per platform per month.
46. Noting of Directions of DGDE/PDDE
1. DGDE, Delhi Cantt letter no. 25/Misc/C/DE/2004 dtd 06-10-2016 and PDDE, CC
letter No. 82562/RULING/LC-6/C-124 dtd 13-10-2016 regarding recruitment to fill
vacancies and promotions in Cantonment Boards.
2. DGDE, Delhi Cantt letter no. 25/Misc/C/DE/2004 dtd 26-11-2016 and PDDE, CC
letter no. 41190/Land Policy dtd 02-12-2016 regarding Checking of unauthorized
constructions and change of purpose in the properties situated on Defence Land inside
Cantonment.
Resolution No. 46
Considered in detail. It was resolved that the directions contained in the above
letters be strictly followed.
Supplementary item taken with the permission of the Chair.
47. Budget Estimates For The Year 2016-17(R) & 2017-18 (O).
To consider and decide the Budget Estimates for the year 2016-17(R) & 2017-
18(O) which have been scrutinized approved from Principal Director, Central Command
vide letter no. 42112 BE/Jabalpur/2016-17/LC-8 dated 24.11.2016, as the various heads
of budget estimate for the 2016-17(R) & 2017-18(O) has been curtailed total Rs
13,80,00,000/- for 2016-17(R) and Rs 15,35,00,000/- have been curtailed from the
budget estimates.
37
The head-wise detail of all curtailed head is as under:- EXPENDITURE
Budget Head Cut Proposed for
2016-17 (Revised)
Cut Proposed for
2017-18 (Original)
Head-A-4 Contingencies (-)3800000 (-)700000
Head- B-2(b) Revenue Contingencies 0 (-)200000
HeadB-2(c) Misc. Revenue (-)200000 (-)200000
Head-D-2(a) Other Building (-)40000000 (-)50000000
Head D2(a)ii School Building (-)5000000 (-)7000000
Head D2(a)i Hospital Building (-)10000000 (-)1000000
Head D2(b) Road (-)18000000 (-)29500000
Head D2(c) Drainage (-)20000000 (-)15000000
Head D2(d) Water Supply (-)27500000 (-)10000000
Head D2(e) Stores 0 (-)2000000
Head D2(f) Misc. Public Impro. (-)3000000 (-)17000000
Head- E-2(b) Light Contingency (-)1000000 (-)6000000
Head- E-6(b) Garden Contingency (-)1000000 (-)1000000
Head- F-1(b) Hospital Contingency (-)500000 (-)4000000
Head-F4(b) Sanitation Contingency (-)4000000 (-)6800000
Head- F5(b) Water Supply Contingency 0 (-)100000
Head- G1(b) School Contingency (-)3000000 (-)2000000
Head- K Cost of Water (-)1000000 (-)1000000
Total (-)138000000 (-)153500000
Considering the above modifications, the revised income and expenditure for 2016-
17(Revised) and 2017-18(Original) are as under:-
INCOME
Budget Head 2016-17 (Revised) 2017-18 (Original)
(I) (a) Rates and Taxes 162516000 154442500
(b) Service Charges 550000000 600000000
(II) Realization 233500 211000
(III) Revenue Derived 168797751 169931751
(IV) Misc. 4990000 7505000
Income from Local sources 886537251 932090251
(V)
Contribution
from other
sources
Ordinary Grant 45500000 12500000
Special grant under Amrit
Yojna 135000000 139500000
Grant Creation of Capital
Assets 157000000 170000000
State Govt Contribution 550000 550004
(VI) Extra Ordinary & Debt 158665157 175000000
Opening Balance 90652499 111516730
Total Income 1473904907 1541156985
Cantonment Board has to pay about 40,00,000/- p.a., as a cost of water supply
payment and due to shortage of water recovery, the Board pay less amount for the
38
same and huge pending amount is increasing per year for water supply and heavy arrear
is due.
Therefore, the above huge curtailed all section heads are required to reduce from
aforesaid budget expenditure for the year 2016-17(R) & 2017-18(O) .
Relevant document alongwith budget estimate are placed for the table.
Resolution No. 47
Considered and approved that the amount mentioned in the proposed curtailment
should consider the requirements of the Cantt Board as the expenditure has already been
incurred in certain heads and there is requirement of funds for the remaining financial
year.
Sd/- Sd/-
(Rahul Anand Sharma) (Brig S U Dashrath)
Member – Secretary President
Dated: 5th
December 2016 Dated: 5th
December 2016