ohjausryhmä, koulukeskushanke
DESCRIPTION
OHJAUSRYHMÄN TOIMEKSIANTO: ESITYS KOKONAISRATKAISUSTA (TILANTARVE, MITKÄ YKSIKÖT SIJOITTUVAT UUTEEN KOULUKESKUKSEEN, KOKO KOULUVERKON TARKASTELU)TRANSCRIPT
11.9.2013 Kati Fonsell-Laurila
KHAL 22.4.2013 § 127 (OTTO-OIKEUS KH PJ; SIVISTYS 9.4.2013 § 31, § 32 )
KHAL 6.5.2013 § 131 ◦ OHJAUSRYHMÄN NIMEÄMINEN: KATI FONSELL-LAURILA (PJ), JANI
KURVINEN, ARTO KOIVU, JOUKO ELO JA MATTI HÄRKÖNEN
◦ TOIMEKSIANTO: ESITYS KOKONAISRATKAISUSTA (TILANTARVE, MITKÄ YKSIKÖT SIJOITTUVAT UUTEEN KOULUKESKUKSEEN, KOKO KOULUVERKON TARKASTELU)
11.9.2013 Kati Fonsell-Laurila
RATKAISUNSA PERUSTAKSI OHJAUSRYHMÄN TULEE SELVITTÄÄ MM. SEURAAVAT ASIAT: ◦ YLÄKOULU, LUKIO JA OPISTO, KUSTANNUSARVIO ◦ YHTENÄISKOULU, LUKIO JA OPISTO (ERI LUOKKAVAIHTOEHDOILLA) ◦ ALUSTAVA HUONETILAOHJELMA ◦ OPPILASHUOLTOKYSYMYKSET ◦ NYKYISEN KOULURAKENNUKSEN (ERVIN OSAN) UUSIOKÄYTTÖ ◦ SIJAINTIPAIKKA NYKYINEN, KAAVATILANNE ◦ KIIRUUN KOULUN PURKULUPA JA PURKAMISEN KUSTANNUSARVIO ◦ MUUT MAHDOLLISET SIJOITUSPAIKAT, KAAVATILANNE ◦ VAIKUTUKSET NYKYISEEN KOULUVERKKOON ◦ HANKKEEN AIKATAULUTUS ◦ VALTIONAVUSTUKSET JA RAHOITUSSUUNNITELMA
11.9.2013 Kati Fonsell-Laurila
OHJAUSRYHMÄN TOIMINNAN PERUSLÄHTÖKOHDIKSI KIRJATAAN SEURAAVAT VOIMASSA OLEVAT PÄÄTÖKSET: ◦ VALTUUSTON PÄÄTÖS 27.3.2013 § 53; KIIRUUN KOULUHANKE TOTEUTETAAN
UUDISRAKENNUSHANKKEENA JA ALUSTAVA KUSTANNUSARVIO ON 15-17 M€ SEKÄ SELVITETÄÄN MAHDOLLISUUS SÄILYTTÄÄ NYKYISEN KOULUN RAKENNUSHISTORIALLISESTI TÄRKEIN OSA.
◦ TEKNINEN LAUTAKUNTA ON PYYTÄNYT (16.4.2013 § 37) ERI HALLINTOKUNNILTA SELVITYKSEN KIIRUUN KOULUN MAHDOLLISESTA KÄYTTÖTARKOITUKSESTA 05/2013 LOPPUUN MENNESSÄ.
◦ VALTUUSTON PÄÄTÖS 8.6.2009 § 54; KOULU LAKKAUTETAAN VAIN SIINÄ TAPAUKSESSA, ETTÄ SEN OPPILASMÄÄRÄ KAHTENA PERÄKKÄISENÄ LUKUVUOTENA JÄÄ ALLE 25 OPPILAAN JA ETTÄ TARKASTELUAIKA ALKAA LUKUVUODESTA 2010-2011. PÄÄTÖKSENTEON POHJANA KÄYTETÄÄN NK. TILASTOPÄIVÄN OPPILASMÄÄRÄÄ.
11.9.2013 Kati Fonsell-Laurila
SOMERON PERUSKOULUJEN OPPILASENNUSTE lv. 2013-2020 (2 VUOTTA ALLE 25 OPPILASTA):
◦ HÄNTÄLÄ 19 → 22 (lv. 2014-2015)
◦ JOENSUU 319 → 229 ◦ KIRKONMÄKI 119 → 87 ◦ LAHTI-PITKÄJÄRVI 60 → 45 ◦ OINASJÄRVI 55 → 31 ◦ OLLILA 28 → 29 ◦ TERTTILÄ 27 → 14 (lv. 2017-2018)
◦ KIIRUU 290 → 291
◦ 917 → 748
11.9.2013 Kati Fonsell-Laurila
◦ LÄHTÖKOHTANA UUDEN KOULUKESKUKSEN SIJOITTAMINEN NYKYISELLE TONTILLE (TONTTI 1,7 ha, RAKENNUSOIKEUTTA n. 7000 m2)
◦ SYNERGIAEDUT: KOULU – LIIKUNTAPAIKAT – KIRJASTO - SOMERO-OPISTO
◦ VAIHTOEHTOINEN SIJOITUSPAIKKA JOENSUUN KOULUN LÄHEISYYDESSÄ (RAKENNUSOIKEUTTA n. 20 000 m2)
◦ EI TEKNISIÄ ESTEITÄ, LIIKENNEJÄRJESTELYIDEN OSALTA HUONOMPI VAIHTOEHTO
11.9.2013 Kati Fonsell-Laurila
◦ PURKAMINEN/RAKENTAMINEN ETENEE VAIHEITTAIN; 1. VAIHEESSA PURETAAN RUOKALA JA KOULUN ”TOIMISTOSIIPI” MAHDOLLISTAA RAKENTAMISEN ALOITTAMISEN
◦ NYKYISTÄ KOULUA TARVITAAN OPETUSKÄYTÖSSÄ KOKO RAKENTAMISPROSESSI AJAN TILOJEN KUNNOSTA HUOLEHTIMINEN
◦ VÄISTÖTILAT
◦ AKTIIVIHIILISUODATTIMET
◦ PAHIMPIEN LUOKKATILOJEN ”ERISTÄMINEN”
11.9.2013 Kati Fonsell-Laurila
◦ PURKULUPAPROSESSI:
VIRKAMIESPÄÄTÖS (HALLINTOSÄÄNTÖ)
PURKULUPAAN LAUSUNNOT MAAKUNTAMUSEO JA ELY-KESKUS
OIKAISUVAATIMUSAIKA 14 VRK → KÄSITTELY YMPÄRISTÖLTK
OIKAISUVAATIMUKSEN VOI TEHDÄ: KAUPUNKI, ELY-KESKUS, YHDISTYKSET JA YHTEISÖT
HALLINTO-OIKEUS (KÄSITTELYAIKA n. 1 V) → KHO (KÄSITTELYAIKA n. 1,5 V)
◦ MAAKUNTAMUSEON LAUSUNTO: ERVIN SUUNNITTELEMILLE KOULUN VANHIMMILLE OSILLE SEKÄ RUOKALARAKENNUKSELLE EI TULE MYÖNTÄÄ PURKULUPAA
11.9.2013 Kati Fonsell-Laurila
◦ KUSTANNUKSET TOTEUTUNEISSA KOULUHANKKEISSA n. 2600 €/m2 ◦ TILANTARVE 4800 m2 (YLÄKOULU/LUKIO) → 13 M€ ◦ TILANTARVE 4800 m2 + n. 800 m2 (YLÄKOULU/LUKIO + 5-6 lk:t) → 13 M€ + n. 1,7 M€ = n. 15 M€ ◦ TILANTARVE:
YLÄKOULU + LUKIO UUSIEN OPPIMISMENETELMIEN HUOMIOIMINEN MM. SÄHKÖISET OPPIKIRJAT,
TILOJEN MUUNNELTAVUUS LIIKUNTA-/JUHLASALI, RUOKAILUTILA AUDITORIO SOMERO-OPISTO (HALLINTOTILA + 2 LUOKKAA, ERILLINEN KUVATAIDETILA
KORVAMERKITTY OPISTOLLE) NUORISOTOIMI (TILANTARVE ILTAPÄIVÄ/ILTA) SOSIAALITOIMI (PÄIVÄKÄYTTÖ)
11.9.2013 Kati Fonsell-Laurila
◦ ELY-OHJELMA: LASKENNALLINEN TILANTARVE, LASKENNALLINEN KUSTANNUS (RAKENNUSKUSTANNUKSET EI MUKANA)
◦ PAALUTUKSEN MERKITYS RAKENNUSKUSTANNUKSIIN (SAVIPATJA) ◦ VALTIONAVUSTUS VAIN PERUSOPETUKSEN TILOIHIN (EI LUKION TILOIHIN) ◦ VALTIONAVUSTUS (JÄLKIRAHOITTEINEN); TIETTYJEN EDELLYTYSTEN
TÄYTTYMINEN, RAKENTAMISEN ALOITTAMINEN, PÄÄTÖKSEN ODOTTAMINEN VARAUTUMINEN RAKENTAMISEEN OMANA HANKKEENA, OMALLA RAHOITUKSELLA
11.9.2013 Kati Fonsell-Laurila
◦ OPPILASENNUSTEET V. 2016-2018 (UUDEN KOULUN VALMISTUMINEN):
5-6 lk:n OPPILAIDEN SIJOITTAMISELLE UUTEEN KOULUKESKUKSEEN EI OLE TARVETTA
◦ KOULUVERKKO V. 2017 SYYSLUKUKAUDEN ALKU:
UUSI KIIRUUN KOULU = YLÄKOULU + LUKIO (311 + n. 150)
JOENSUU (298, OLLILA V. 2017→)
KIRKONMÄKI (126, HÄNTÄLÄ V. 2014 →)
OINASJÄRVI (48, TERTTILÄ V. 2015 →)
LAHTI/PITKÄJÄRVI (52, YKSI YKSIKKÖ)
11.9.2013 Kati Fonsell-Laurila
◦ KOULUVERKKO V. 2019-2020 – MAHDOLLISUUKSIA:
5-6 lk:n OPPILAIDEN (KOKO SOMERO) SIJOITTAMINEN JOENSUUHUN, MUIDEN LUOKKA-ASTEIDEN OSALTA OPPILAIDEN TASAUKSET JOENSUU-KIRKONMÄKI
VAIHTOEHTOISESTI KIRKONMÄELLE 1-2 lk:n OPPILAAT (KESKUSTAAJAMAN ALUE) = PIENTEN KOULU, JOENSUULLE 3-6 lk:n OPPILAAT
ÄÄRIPÄISSÄ (OINASJÄRVI JA LAHTI/PITKÄJÄRVI) LUOKAT 1-4 + ESKARI/PÄIVÄKOTI SAMASSA PIHAPIIRISSÄ
11.9.2013 Kati Fonsell-Laurila
◦ KOULUVERKKO V. 2019-2020 – MAHDOLLISUUKSIA: 5-6 lk:n OPPILAIDEN (KOKO SOMERO) SIJOITTAMINEN
JOENSUUHUN
ÄÄRIPÄISSÄ (OINASJÄRVI JA LAHTI/PITKÄJÄRVI) LUOKAT 1-4 + ESKARI/PÄIVÄKOTI SAMASSA PIHAPIIRISSÄ
PIENRYHMÄN SÄILYMINEN JOENSUULLA
RUOTSI/SAKSA, FYSIIKKA-KEMIA, HISTORIA – OPETUSMAHDOLLISUUDET UUDESSA KOULUKESKUKSESSA AINEOPETTAJILLE TÄYDET TUNNIT HOUKUTTELEVUUS/VAKINAISET VIRAT
KIINTEIDEN KUSTANNUSTEN PIENENEMINEN
TILOJEN TEHOKAS KÄYTTÖ
PEDAGOGINEN SUUNNITTELU
SYNERGIAEDUT; KOULUTOIMI-VARHAISKASVATUS (ap/ip –TOIMINTA)
11.9.2013 Kati Fonsell-Laurila
◦ KOULUVERKKO V. 2019-2020 – MAHDOLLISUUKSIA:
5-6 lk:n OPPILAIDEN (KOKO SOMERO) SIJOITTAMINEN JOENSUUHUN
ÄÄRIPÄISSÄ (OINASJÄRVI JA LAHTI/PITKÄJÄRVI) LUOKAT 1-4 + ESKARI/PÄIVÄKOTI SAMASSA PIHAPIIRISSÄ
VAIN YKSI ISO INVESTOINTI (UUSI KOULU)
VÄISTÖTILOJEN (TAI OSAN) MAHDOLLINEN SIIRTO LAHTI/PITKÄJÄRVI YKSIKKÖÖN UUDEN KOULUKESKUKSEN VALMISTUTTUA
KOULUKULJETUSTEN JÄRJESTELYT HELPOTTUVAT (ITÄ-LÄNSI AKSELI)
SYNERGIAEDUT YLI HALLINTOKUNTIEN – ÄÄRIPÄISSÄ ”KUNNALLISTEN PALVELUJEN KESKUS” (TERVEYDENHOITO/NEUVOLA, SOSIAALITOIMI, SOMERO-OPISTO, ATERIAPALVELUT, YM.)
11.9.2013 Kati Fonsell-Laurila
◦ HUOMIOITA:
KUSTANNUSVAIKUTUSTEN HUOMIOINTI ERI TOIMIALOJEN BUDJETEISSA
KEITTIÖVERKKOSELVITYKSEN PÄIVITTÄMINEN JA SIITÄ AIHEUTUVAT INVESTOINNIT (JOENSUUN KOULUN JA TERVEYSKESKUKSEN KEITTIÖ)
UUDEN KOULUN SUUNNITTELU (HUONETILAOHJELMA, SUUNNITTELUN TOTEUTUS; ARKKITEHTIKILPAILU VS. NORMAALI KILPAILUTUS)
VANHAN KOULUN PURKAMINEN
VALTIONAVUSTUKSEN HAKEMINEN, PÄÄTÖKSEN ODOTTAMINEN
VÄLIAIKAISTEN RUOKALATILOJEN JÄRJESTELYT (PESUKONTIT, SÄHKÖTYÖT, RUOAN KULJETUKSEN ORGANISOINTI)
VARHAISKASVATUKSEN SIIRTO SIVISTYSTOIMEN ALAISUUTEEN