Planning of the energy saving and efficiency interventions and of the use of renewable energy resources for the municipal administration of Padua
Assessorato all’AmbienteComune di Padova
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
General analysis of the dimensions and inefficiencies of the electrical and thermal consumption of the municipal administration of Padua
Proposals regarding efficiency interventions, energy saving and renewables
Evaluation of the economic expenses and of the environmental advantages
Articulation of the study into 5 main intervention sectors: public lighting traffic lights buildings transport renewable energy resources
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Methodological approach of the problemA. Analysis of the actual state
B. Elaboration of efficiency and consumption indicators
C. Preliminary definition of the interventions
D. Estimate of the cost and return time of the investments
E. Evaluation of the economic expenses and of environmental advantages
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Energy and money saving is based on the improvement of 3 distinct elements
Supply contract
Quality of the plants (and of the structures)
Management system(and maintainance)
Qualityof the plants(environmental advantages)
Management system (environmental advantages)Supply contract
Hig
hP
oor
ExcellentAbsent
Very bad
Good
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Tipologia utenza Ut. elettriche Ut. termiche
Schools
Asili nido 15 15Scuole materne 16 22Scuole elementari 47 54Scuole medie 23 33
Cultural activities Teatro Verdi, mostre, manifestazioni 13 1
Museums and librariesMusei 10 7Biblioteche 5 4
Social services Uffici, centri sociali, centri polifunzionali 42 23Decentration Uffici, centri civici, centri di quartiere 21 17
Sport facilitiesStadi, palazzetti, palestre 9 8Campi sportivi 15 10Uffici, altri impianti sportivi 25 5
Infrastructures e sport plants Illuminazione, pompe, impianti di sollevamento 20 -Demographical services Uffici, cimiteri 22 3Institutions, judicial services,municipal and residential buildings,Monuments and other sectors
Uffici 35 30
Police Uffici, autorimesse, telecamere 14 5Mobility and traffic Illuminazione, insegne luminose, semafori 175 -Open spaces, parks and gardens Illuminazione, giardini, irrigazione 18 -
Various sectors Magazzini, laboratori, banchi mercato, servizi ambulanti e altre utenze 50 33Total consumer bodies 575 270
Electrical and thermal consumption (excluding public lighting)
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Dimensions and costs of the electricityconsumption for the various sectors (excluding public lighting)
Total energy cons. (kWh) Energy % Total
expenses (€) Expenses %
Schools 2.950.215 19% 439.309,65 21%
Technical and administration services 2.627.785 17% 357.986,60 17%
Judicial services 1.963.965 13% 266.919,65 13%
Cultural services 2.428.070 16% 316.882,45 15%
Social and neighbourhood services 551.422 4% 88.584,65 4%
Municipal Police 104.408 1% 14.164,10 1%
Mobility and traffic 1.445.667 9% 139.927,59 7%
Sports facilities 2.085.021 14% 298.914,72 14%
Open spaces, parks and gardens 86.721 1% 20.077,28 1%
Cemetery services 323.083 2% 48.010,70 2%
Other 796.825 5% 116.938,90 6%
15.363.182 100% 2.107.716,29 100%
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Electricity consumption distribution
Electrical energy cost distribution
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of the electricity consumption for schools
Distribution of the electricity consumption for cultural services
IntroductionIntroduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Supply contractsQuality of the plants(Environmental advantages)
SystemManagement(Environmental advantages)
Supply contracts
Very bad
Good
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Average purchase prices of electrical energy on the fixed market per consumption category
Quality of the plants
systemManagement
Supply contract Very bad
Good
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Average purchase prices of electrical energy on the free market
systemManagement
Supply contract Very bad
Good
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Quality of the plants
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Improvement of the energy supply contract for 21 consumption categories (6 new ones)
1 Museo Eremitani p.zza eremitani sn MT2 Nuovo tribunale via Tommaseo 55 MT3 Aula giudiziaria via due palazzi BT4 Stadio Euganeo via Prospero Alpino MT5 Uffici vari via F. P. Sarpi 2 MT6 Uffici vari via VIII febbraio BT7 Uffici vari via Gozzi sn BT8 Ex caserma VV.F. p.to della Valle 97 BT9 Palasport S. Lazzaro via S. Marco sn MT
10 Uffici Amministrativi via Cassan 9 BT11 Palazzetto sport p.le azzurri D'italia 11 BT12 Sc. media Briosco succ. via Pierobon 19B BT13 Ex dormitori pubblici via Aleardi 30 BT14 Foro Boario c.so Australia sn MT15 Teatro verdi via dei livello 2 BT
16 Sottopasso sottopasso della Stua BT17 Sala Rossini galleria Pedrocchi BT18 Ufficio anagrafe p.zza Capitaniato BT19 Impianto sportivo via Pelosa BT20 Scuola media via Lippi BT21 Cimitero via del Cimitero BT
systemManagement
Supply contract Very bad
Good
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Quality of the plants
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
6. IMPOSTE (dipendono dalle disposizioni fiscaliin essere e dal regime fiscale del punto di prelievo)
Negotiable part of the final price
0102030405060708090100
1. ENERGY
4. TRASPORTO5. MAGGIORAZIONI
2. PERDITE 3. DISPACCIAMENTO
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Annual consumption of electrical energy of about 8.500.000 kWh (8,5 GWh)
Annual contract, renewable for 3 years, with the possibility to add new users at the same contract conditions
Discount of 6,6% with respect to the fixed market for both LV and MV users (on the negotiable part of the energy price)
Saving over 40.000 €/anno
systemManagement
Supply contract Very bad
Good
Introduction Introduction Supply ContractsSupply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Quality of the plants
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Public lighting Qualityof the plants
Management System
Supplycontract
Hig
hPo
or
ExcellentAbsent
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Quality of the plants
systemManagement
Supplycontract
Total number of operating lamps 28.740
Number of derivation lamps 22.206
Number of serial lamps 6.534
Number of yearly replaced lamps 10.000
Annual consumption of electrical energy 18.000.000 kWh
Unit price of electrical energy 0,0958 €/kWh
Annual cost of electrical energy 1.725.000 €
Annual system maintainance cost 1.725.000 €
Annual cost of electrical energyper operating lamp ~ 60 €/lamp.
Annual maintainance cost per operating lamp ~ 60 €/lamp.
Average annual lighting hours (11 h/day) 4.100 h/anno
Total electrical power requested by the system 4.391 kW
Average unit power of the operating lamps 153 W
Hig
hP
oor
Actual state of the plants
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Lamp Typology Nr. of lamps %
Incandescenza 4.886 17,0
Fluorescenza 1.609 5,6
Ioduri metallici 144 0,5
Vapori di mercurio 10.921 38,0
Sodio alta pressione (ellissoidale) 2.931 10,2
Sodio alta pressione (tubolare) 7.415 25,8
Sodio bassa pressione 29 0,1
Sodio altissima pressione 805 2,8
Total lamps 28.740 100Qualitàdegliimpianti
systemManagement
Supplycontract
Hig
hP
oor
Light sources
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
First phase sostituzione dei 9.800 apparecchi illuminanti obsoleti
(“gonnella”) e delle relative lampade a bassa efficienza sostituzione delle restanti 6.007 lampade a bassa
efficienza delle lampade ad alta efficienza mantenimento degli impianti in serie con sostituzione dei
trasformatori a bobina mobile con regolatori statici elettronici
installazione di regolatori di flusso negli impianti in derivazione, ove possibile
progressiva messa a norma dei quadri elettrici di alimentazione e mantenimento temporaneo di tutte le altre parti impiantistiche esistenti (sostegni, alimentazioni, quadri, ecc..)
Qualityof the plants
systemManagement
Supplycontract
Hig
hP
oor
Intervention strategy in two separate and consecutive phases
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Quality of the plants
systemManagement
Supplycontract
Hig
hP
oor
Second phase riprogettazione e razionalizzazione delle restanti parti di
impianto con le risorse economiche liberate dagli interventi della prima fase
ulteriore messa a norma dei quadri elettrici identificazione e destinazione di parti di impianto per la
sperimentazione di nuove tecnologie di lampade, di apparecchiature per la variazione del flusso luminoso e di sistemi di telecontrollo
raggruppamento delle utenze specie in prossimità dei quadri alimentati in media tensione
informatizzazione dei dati di impianto ai fini dell’ottimizzazione della gestione della manutenzione
identificazione cartografica dei punti luce
ExcellentAbsent
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Number and technical data of the installed lamps Power Luminous flux
Before the intervention
4.886 lampade ad incandescenza(potenza media di 250 W ed eff. luminosa pari a 15 lm/W) 1.220 kW 18,3 Mlm
10.921 lampade ai vapori di mercurio(potenza media di 120 W ed eff. luminosa pari a 45 lm/W) 1.310 kW 58,9 Mlm
Total emitted power and luminous flux 2.530 kW 77,2 Mlm
After the intervention
10.538 lampade al sodio ad alta pressione(potenza media di 75 W ed eff. luminosa pari a 85 lm/W) 790 kW 67,2 Mlm
5.269 lampade al sodio a bassa pressione(potenza media di 60 W ed eff. luminosa pari a 145 lm/W) 316 kW 45,8 Mlm
Total emitted power and luminous flux 1.106 kW 113,0 Mlm
Qualityof the plants
systemManagement
Supplycontract
Hig
hP
oorReduction of used power 1.424 kW = 2.530 kW – 1.106 kW
Increase of the luminous flux 35,8 Mlm = 113,0 Mlm – 77,2 Mlm
Annual electricity saving 5.838.000 kWh = 1.424 kW x 4.100 h
Annual energy cost saving 560.000 € = 5.838.000 kWh x 0,0958 €/kWh
Annually spared CO2 emissions 3.853 t = 0,66 t/MWh x 5.838 MWh
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Qualityof the plants
systemManagement
Supplycontract
Hig
hP
oor
Cost/benefit estimate
Investment costs
Sostituzione di 12.300 armature comprensive di lampada 3.690.000 € = 12.300 x 300 €/arm.
Sostituzione dei trasf. serie con 30 regolatori statici 510.000 € = 30 x 17.000 €/conv.
Installazione dei regolatori di flusso 127.500 € = 850 kW x 150 €/kW
Total costs 4.327.500 €Annual economic and environment benefits
Minor consumo per lampade a maggior efficienza 560.000 € 5.838 MWh 3.853 t CO2
Sostituzione trasf. con regolatori statici 22.500 € 235 MWh 155 t CO2
Installazione 100 regolatori di flusso 45.000 € 470 MWh 310 t CO2
Riduzione dei costi di manutenzione (-12%) 200.000 € ----- -----
Titoli di efficienza energetica (472 TEP) 47.200 € ----- -----
Total benefits 874.700 € 6.543 MWh 4.318 t CO2
Return time of the investment 5 years
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Traffic lightsQuality of the plants
systemManagement
Supplycontract
Hig
hPo
or
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lightsTraffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Qualitàdegliimpianti
systemManagement
Supplycontract
Hig
hP
oor
Mobility and traffic sector
Electrical consumption distribution
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lightsTraffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Quality of the plants
systemManagement
Supplycontract
Hig
hP
oor
Number of lamps diam. 300 mm (100 W) 1.389
Number of lamps diam. 200 mm (70 W) 600
Total lamps 1.989
Totale power 60,30 kW
Total annual consumption 440.190 kWh
Total annual consumption (7:00-23:00) 352.152 kWh
Total annual consumption (23:00-7:00) 88.038 kWh
Average electricity price 0,112 €/kWh
Total annual electricity expense 49.301 €
Total annual lamp maintainance expenses 140 €
Total annual maintainance expenses 278.460 €
Total annual expense 327.761 €
Actual state of the traffic light system
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lightsTraffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Incandesc. LEDNumber of lamps diam. 300 mm (100 W) 1.389 1.389Power of each lamp 100 15 WTotal power 46 7 kWTotal annual consumption 338.000 50.700 kWhTotal annual consumption (7:00-23:00) 270.000 40.560 kWhTotal annual consumption (23:00-7:00) 68.000 10,14 kWhAverage electricity price 0,112 0,112 €/kWhTotal annual electricity expense 37.855 5.678 €Total annual lamp maintainance expenses 140 70 €Total annual maintainance expenses 194.460 97.230 €
Total annual expense 232.315 102.908 €
Replacement with LED lamps of only the lamps with diameter 300 mm (100 W)
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lightsTraffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Quality of the plants
systemManagement
Supplycontract
Hig
hP
oor
Cost/benefit estimate
Investment costs
Replacement of 463 traffic lights diam. 300 mm, including supply and installation 463.000 € = 463 x 1.000 €/lamp
Total costs 463.000 €
Annual economic and environment benefits
Reduced electricity consumption 32.177 € 287 MWh 190 t CO2
Reduced maintainance costs 97.230 € ----- -----
Energy efficiency certificates (65 TEP) 6.500 € ----- -----
Total benefits 135.907 € 287 MWh 190 t CO2
Return time of the investment 3,5 years
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lightsTraffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
BuildingsQuality of the plants
System management
Supply contract
Hig
hP
oor
ExcellentAbsent
Very bad
Good
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Subdivision and distinct analysis of electrical and thermal energy (prevailing part)
Estimate of the efficiency degree by confronting specific consumption with reference values according to the sector with a homogeneous user destination
Intervention possibility plant and structures quality consumption management supply contracts
Quality of the plants
Management system
Supply contract
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Electricity consumptionElectricity consumption
Quality of the plants
Supply contract
Average statistical reference values
Management system
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Electricity ConsumptionElectricity Consumption
Quality of the plants
Supply contract
Nr. users
Electricity consumption
(kWh/year)
Average specific electricity
consumption (kWh/m2/year)
Energy expenses (€/year)
Energy saving
(kWh/year)
Economic saving (€/year)
% saving
Asili nido 6 128.087 31,3 21.519 7.765 1.305 6,1%
Scuole materne 15 327.326 27,7 54.991 46.002 7.728 14,1%
Scuole elementari 39 976.004 15,4 163.969 128.616 21.607 13,2%
Scuole medie 18 779.508 14,8 130.957 104.888 17.621 13,5%
Total 78 2.210.925 22,3(Average value) 371.435 287.271 48.262 13,0%
School services
Management system
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Asili nido
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Scuole materne
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Scuole elementari
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Scuole medie
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Electricity consumptionElectricity consumption
Qualityof the plants
Supply contract
Nr. users
Electricity consumption (kWh/year)
Average specific electricity
consumption (kWh/m2/year)
Energy expenses (€/year)
Energy saving
(kWh/year)
Economic saving (€/year)
% saving
Palestre 7 201.016 16,8 33.771 46.711 7.847 23,2%
Campi sportivi 4 33.399 39,2 5.611 5.041 847 15,1%
Total 11 234.415 28,0(Average value) 39.382 51.752 8.694 22,1%
Sport facilities
Management system
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Palestre
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi elettriciConsumi elettrici Campi sportivi
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi termiciConsumi termici
Asili nido
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi termiciConsumi termici
Scuole materne
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Scuole elementari
Consumi termiciConsumi termici
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Scuole medie
Consumi termiciConsumi termici
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi termiciConsumi termici Campi sportivi
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Consumi termiciConsumi termici Palestre
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Thermal consumptionThermal consumption
FUEL BOILERS METHANE BOILERS
Emissioni specifiche
Emissioni totali annue
Emissioni specifiche
Emissioni totali annue
Emissioni annue evitate
Polveri 3,6 mg/kWh 173 kg 0,5 mg/kWh 19 kg 154 kg
CO2 270 g/kWh 12.940 ton 200 g/kWh 7.670 ton 5.270 ton
Transformation of the fuel boilers in methane boilers
Environment benefits
Qualityof the plants
systemManagementSupply
contract
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Thermal consumptionThermal consumptionFUEL BOILERS METHANE BOILERS SAVINGS
Nr. boilers 65 65
Total power15.672.060 kcal/h 9.202.272 kcal/h 6.469.788 kcal/h
18.211 kW 10.693 kW 7.518 kW
Average boiler power241.109 kcal/h 141.573 kcal/h 99.535 kcal/h
280 kW 165 kW 116 kW
Average power heated mc 56 W/mc 30 W/mc 26 W/mc
Total cost (2003/2004) 1.809.120 € 1.397.888 € 411.233 €
Transformation of the fuel boilers in methane boilers
Environment benefits
Quality of the plants
systemManagement
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings Transport Transport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
TransportQualityof the plants
SystemManagement
Hig
hPo
or
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Incidence percentage of transport on polluting emissions
Qualityof the plants
Management system
Hig
hP
oor
ExcellentAbsent
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of the motor vehicles according to typology
Motor vehicle typology
Nr. vehicles % vehicles
Autovetture 212 51,2Autocarri leggeri 67 16,2Motocicli 46 11,1Macchine operatrici 29 7,0Ciclomotori 13 3,1Motocarri 12 2,9Veicoli speciali 11 2,7Autocarri pesanti 9 2,2Rimorchi 9 2,2Quadricicli 6 1,4Total motor vehicles 414 100,0
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of the motor vehicles according to sector
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Sector Nr. vehicles
% vehicles
Polizia municipale 123 29,7Manutenzioni 75 18,1Servizi demografici 39 9,4Verde, parchi, giardini e arr. urb. 29 7,0
Organi istituz. e affari generali 18 4,3Protezione civile 16 3,9Provveditorato 13 3,1Servizi sociali 12 2,9Altro 89 21,5
Total motor vehicles 414 100,0
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of motor vehicles according to alimentation type
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Fuel tipology Nr. vehicles
% vehicles
Benzina 250 60,4GPL 61 14,7Gasolio 49 11,8Miscela 13 3,1Motore elettrico 1 0,2Benzina e metano 1 0,2Non precisato (macch. operatrici) 30 7,2
Nessun carburante (rimorchi) 9 2,2
Total motor vehicles 414 100,0
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of the motor vehicles according to registration year
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Registration period Nr. vehicles % mezzi
1980-1984 13 3,1
1985-1989 28 6,8
1990-1994 55 13,3
1995-1999 136 32,9
2000-2005 176 42,5
Non precisato 6 1,4
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of total expenses in the year 2004
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Voci di spesa Spesa (€) % spesa
Fuel 229.713 40,8
Maintainance 215.728 38,3
Insurance 71.658 12,7
Taxes 34.983 6,2
Car wash 11.091 2,0
Spesa totale 563.173 100,0
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Distribution of fuel expenses in the year 2004
Qualityof the plants
Management systemH
igh
Poo
r
ExcellentAbsent
Fuel typology Expense (€) % spesa
Benzina 154.109 67,1
Gasolio 40.433 17,6
GPL 32.890 14,3
Miscela 2.281 1,0
Total expense 229.713 100,0
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Statistical use of cars and lorries
Qualityof the plants
Management system
Hig
hP
oor
ExcellentAbsent
Motor vehicle type Nr. vehicles
Average fuel cost (€/km)
Average annual distance
covered (km)Autovetture a benzina 160 0,104 7.620
Autovetture a gasolio 12 0,083 11.290
Autovetture a gpl 40 0,084 5.120
Total cars 212 0,100 7.230
Autocarri a benzina 26 0,117 5.650
Autocarri a gasolio 19 0,137 7.630
Autocarri a gpl 21 0,095 7.780
Total lorries 66 0,111 7.020
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Average values of the main polluting emissions
Qualityof the plants
Management system
Hig
hP
oor
ExcellentAbsent
CO (g/km) CO2 (g/km) PM10 (mg/km) Ozono (mg/km)Benzina 2,40 190 2 160Gasolio 0,45 170 60 80GPL 0,75 175 0 90Metano 0,60 140 0 35Elettrico 0,08 70 2 -
96120 120
220
0
50
100
150
200
250
300
Benzina Gasolio GPL Metano
km p
erco
rsi
Average distance per 10 € of fuel
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Comparison between petrol and methane combustion costs (estimated cost for methane plant installation 2000 €)
Qualityof the plants
Management system
Hig
hP
oor
ExcellentAbsent
CARS 10.000 km 15.000 km 20.000 km 25.000 km
Costo a benzina (0,104 €/km) 1.040 € 1.560 € 2.080 € 2.600 €
Costo a metano (0,045 €/km) 450 € 675 € 900 € 1.125 €
Risparmio economico 590 € 885 € 1.180 € 1.475 €
Return time 3,3 years 2,2 years 1,7 years 1,3 years
LORRIES 10.000 km 15.000 km 20.000 km 25.000 km
Costo a benzina (0,117 €/km) 1.170 € 1.755 € 2.340 € 2.925 €
Costo a metano (0,050 €/km) 500 € 750 € 1.000 € 1.250 €
Risparmio economico 670 € 1.005 € 1.340 € 1.675 €
Return time 3 years 2 years 1,5 years 1,2 years
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
The replacement/transformation of 20 motor vehicles running on petrol with bifuel vehicles (40% of the municipal vehicles with an average annual of15.000 km)brings on a saving of 18.000-20.000 €/yearon the fuel expenses with an investment of 40.000 € and a return time of about 2 years
Qualityof the plants
Management system
Hig
hP
oor
ExcellentAbsent
CO (kg) CO2 (t) PM10 (g) Ozon (kg)
Motor cars on petrol 720 56 600 48
Motor cars on methane 180 42 0 10
Annually spared emissions 540 14 600 38
Variation -75% -26% -100% -80%
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Traffic lights BuildingsBuildings TransportTransport RenewablesRenewables
Supply contract
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
RenewablesQuality of the plants
Management system
Supply contractH
igh
Poo
r
ExcellentAbsent
Very bad
Good
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Buildings Transport Traffic lights Buildings Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
Introduction, where possible, of solar panel to produce hot water
Opening of an energy efficiency and renewables counter
Electrical energy production from photovoltaic panels covering municipal parkings
Introduction Supply ContractsIntroduction Supply Contracts Public lightingPublic lighting
Traffic lights Buildings Transport Traffic lights Buildings Transport RenewablesRenewables
Assessoratoall’Ambiente
Comunedi Padova
ass. dott. Francesco Bicciatoprof. ing. Maurizio Fauri
ConclusioniConclusioni
Further activities and initiatives Water cycle analyses Revision of the management and maintainance contract of
public lighting Revision of the heat management contract Behaviour rules (ethical)
Per informazioni Ufficio Agenda21 049-802.24.88 [email protected]