  • 8/7/2019 Presentation Enviornment

    1/21

    Maharashtra Institute of Technology,

    Aurangabad

    Procedure

    For Establishing

    AndOperating an Industrial

    Unit

    in

    INDIA

    Presented by

    Vrushali Palodkar

  • 8/7/2019 Presentation Enviornment

    2/21

    Maharashtra Institute of Technology,

    Aurangabad

    As a result of adopting new Economic Policy of Liberalization ,Govt. of India

    made major changes in licensing policy for Industry. In 1991 industrial licensing

    was abolished for all industries except those in specifies sectors.

    The procedure for establishing and operating an industry in accordance with

    regulation for environmental protection and pollution prevention and control issummarized below

    By grouping of various industries into FOUR categories.

    Category-I

    Category-II

    Category-III

    Category-IV

  • 8/7/2019 Presentation Enviornment

    3/21

    Maharashtra Institute of Technology,

    Aurangabad

    Step-by-Step procedure for establishing and operating an industrialunit in India from the environmental view point :

    1. If the small scale industry and investment is less than rupee one Crore, environment clearance is not

    required.

    2. For project under category-I area specific notification is required.

    3. For project under category-II site clearance is required from MEF. After site clearance

    environmental clearance is required by submitting the proposal to Impact Assessment Agencies

    (IAA) of MEF.

    4. For the project under category-III and IV environmental clearance is required by submitting the

    proposal to IAA.

    5. If there are deficiencies in the proposal, IAA may ask the industry to resubmit the proposal or may

    reject the proposal.

  • 8/7/2019 Presentation Enviornment

    4/21

    Maharashtra Institute of Technology,

    Aurangabad

    6. If public hearing is required , it has to be arranged.

    7. IAA may recommend the clearance after its expert committee has given

    its clearance.

    8. If the proposals accepted by IAA following permissions are required :-

    a) Obtain consent to establish for discharge of effluents / emission prior toestablishing the industry as provided under water / air acts or other relevant

    acts.

    b) Obtain consent to operate for discharge of effluents / emission prior to

    commencing operations.

    c) Obtain authorisation for Handling of Hazardous Wastes prior to handling of

    hazardous wastes.

    d) Obtain Site Clearance for specified industrial activities involving handling of

    hazardous chemicals prior to commencing industrial activity.

  • 8/7/2019 Presentation Enviornment

    5/21

    Maharashtra Institute of Technology,

    Aurangabad

    Details of Categories

    Category -I

    Project type Area

    Ports, Harbours, Airports, Tourism,

    Projects between 200-500 meters of high Tide

    Line, Mining Projects

    Doon valley, Coastal Regulation

    Zone, Dhanu, Taluka,

    Maharashtra

  • 8/7/2019 Presentation Enviornment

    6/21

    Maharashtra Institute of Technology,

    Aurangabad

    Category -II

    1. Mining more than 5 hectares.

    2. Pit-head thermal power stations.

    3. Hydro-power, major irrigation projects and / or their combination

    including flood control involving more than 50 crores.

    4. Ports and harbours (excluding minor ports more than 50 crores).

    5. Exploration of minerals (more than 500 hectares).

  • 8/7/2019 Presentation Enviornment

    7/21

    Maharashtra Institute of Technology,

    Aurangabad

    Category -III

    1. Nuclear power and related projects such as heavy water plants, nuclear

    fuel complex, rare earths.

    2. Airports.

    3. Petroleum refineries including crude and product pipelines.

    4. Chemical fertilizers.

    5. Petrochemicals complexes.

    6. Exploration for oil and gas and their production, transportation andstorage.

    7. Synthetic rubber.

  • 8/7/2019 Presentation Enviornment

    8/21

    Maharashtra Institute of Technology,

    Aurangabad

    8. Hydrocyanic acid and its derivatives.

    9. (a) Primary metallurgical industries (such as production of iron and steel).

    (b) Electric arc furnaces (mini steel Plants).

    10

    .C

    hloro-alkali industry.

    11. Viscose staple fiber and filament yarn.

    12.Storage batteries integrated with manufacture of oxides of lead and antimony alloy.

    13. Thermal power plants.

    14. Pulp, paper and newsprint.

    15.Cement.

  • 8/7/2019 Presentation Enviornment

    9/21

    Maharashtra Institute of Technology,

    Aurangabad

    Category -IV

    1. Pesticides (Technical).

    2. Bulk drugs and pharmaceuticals.

    3. Asbestos and asbestos products.

    4. Integrated paint complex including resins and basic raw materials

    required in the manufacture of paints.

    5. Tourism projects.

    6. Highway projects.

  • 8/7/2019 Presentation Enviornment

    10/21

    7. Tarred roads in the Himalayas and / or forest areas.

    8. Distilleries.

    9. Raw skins and hides.

    10. Dyes.

    11. Foundries (individual).

    12. Electroplating.

    Maharashtra Institute of Technology,

    Aurangabad

  • 8/7/2019 Presentation Enviornment

    11/21

    Maharashtra Institute of Technology,

    Aurangabad

    Consent to establishing for discharging of

    effluents under the water act,1974

    If the proposed industrial unit is likely to discharge sewage or trade

    effluents into astream, sewer or land, it is require to obtain Consent

    to establish for discharge of effluents.

    An application is to be submitted to the concerned State Pollution

    Control Board in the prescribed form along with the prescribedapplication fee for this purpose.

  • 8/7/2019 Presentation Enviornment

    12/21

    Maharashtra Institute of Technology,

    Aurangabad

    Consent to establish for emission under Air act,1981

    If the proposed industrial unit is located in an air pollution

    control area declared by the concerned state government, and islikely to emit any air pollutants in the atmosphere, it is required

    to obtain Consent to establish for emission' under Air act 1981.

    For obtaining the Consent to establish, an application is to be

    submitted to the concerned state pollution control board in the

    prescribed form along with the prescribed application fee.

  • 8/7/2019 Presentation Enviornment

    13/21

    Air pollution controlarea

    The state pollution controlboards have declared specificlocations within the state,as air

    pollution control areas underthe Air act1981. The Consentto establish is applicable onlyfor these areas. Thereforeenterpreneurs are required tocheck with the concernedState Pollution Control Boardsthe status of the proposed

    location of the industrial unit,before applying for theConsent to Establish foremission.

    Maharashtra Institute of Technology,

    Aurangabad

  • 8/7/2019 Presentation Enviornment

    14/21

    Maharashtra Institute of Technology,

    Aurangabad

    Grant of environmental clearance by central government

    If the industrial unit comes under the specified project categories

    as listed in the list of projects requiring clearance from the centralgovernment ,then environmental clearance would be required from

    the Ministry of environment and Forests, Government of India

    subject to specific conditions.

  • 8/7/2019 Presentation Enviornment

    15/21

  • 8/7/2019 Presentation Enviornment

    16/21

    Maharashtra Institute of Technology,

    Aurangabad

    The green belt between two adjoining large scale industriesshall

    be one kilometer;

    Enough space should be provided for storage of solid wastes ;

    Having some distance between the industry and township.

  • 8/7/2019 Presentation Enviornment

    17/21

    Maharashtra Institute of Technology,

    Aurangabad

    Sun PharmaceuticalIt is an international

    pharmaceutical company based

    in Mumbai, India. It makes

    many generic and brand name

    drugs that are distributed in theUnited States, Europe, Asia

    and worldwide.Sun

    manufactures both

    pharmaceuticals and active

    pharmaceutical ingredients

    (API), in essence, ingredients

    to be used in finished pharmaceutical products.

  • 8/7/2019 Presentation Enviornment

    18/21

    Maharashtra Institute of Technology,

    Aurangabad

    Environmental PolicyManufacturing: Consistently producing to the world's requirements.Concern for the environment and safety.

    Each of our manufacturing sites is fully equipped with facilities to handle waste and minimize

    environmental contamination. At Sun Pharma, a concern for safety and the environment is part of our

    plans right from the drawing board. We pay close attention to preventing and reducing pollution,avoiding accidents and conserving resources.

    Equipment installed :- Solid waste incinerator.

    Facilities for stream stripping.

    Air scrubbers.

    Isolated incinerators (with steam generation where feasible)

    Dust filters.

    Fire protection systems.

  • 8/7/2019 Presentation Enviornment

    19/21

    With the help of all this rules

    and regulation and legal

    procedure it is easy to

    Establishing and operating

    Industrial Unit in India.

    Maharashtra Institute of Technology,

    Aurangabad

  • 8/7/2019 Presentation Enviornment

    20/21

    Maharashtra Institute of Technology,

    Aurangabad

    Referances :-

    Environmental Management

    - N.K. Uberoi

    Environmental Management

    - Aloka Debi

    www.Google

    .com

  • 8/7/2019 Presentation Enviornment

    21/21

    Maharashtra Institute of Technology,

    Aurangabad

    Thank you!!Thank you!!