projec business

8
PROJECT BUSINESS CASE STUDY

Upload: lapp-india-pvt-ltd

Post on 07-Aug-2015

73 views

Category:

Engineering


5 download

TRANSCRIPT

Page 1: Projec business

PROJECT BUSINESSCASE STUDY

Page 2: Projec business

1. THE CHALLENGE

2. SOLUTION

3. CABLES SUPPLIED

4. VALUE ADDITION

Page 3: Projec business
Page 4: Projec business

The Challenge

Power cables to draw power from their captive power plants.

Power cables to transmit power from the captive power plant to internal substations.

Power cables to supply power from the internal substations to individual machines.

Cables to cater to the control applications in the different machines, conveyor belts and chlorine plant.

Instrumentation cables to establish efficient communication between control panels and system units.

Page 5: Projec business

The Lapp Solution

High current carrying cables for heavy duty power transmission.

Cables to provide protection against high level of mechanical stress.

Flexible cables for stressful operations.

Page 6: Projec business

Cables Supplied

Page 7: Projec business

Time irrespective customer support

Cable longevity ensured

Value Addition Click icon to add picture

Sample image

Page 8: Projec business

THANK YOU FOR YOUR ATTENTION

Know more at www.thelappstore.com