PSE&G ECHELON 230/13KV SUBSTATION
TRAFFIC ASSESSMENT REPORT
PREPARED BY:
VAN CLEEF ENGINEERING ASSOCIATES, LLC
3 PARAGON WAY, SUITE 600
FREEHOLD, NJ 07728
APRIL 16, 2021
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
TABLE OF CONTENTS
SECTION PAGE
A. INTRODUCTION………………………………………..…………………………………………………………………….….…1
B. PROJECT DESCRIPTION………………………………………………………………….………………………………………1
C. EXISTING CONDITIONS.…………..…………………………………………………………………………………………….2
a. SITE CONDITIONS……………………………………………………………………..……………………………………..2
b. TRAFFIC VOLUMES..…………………………………………………………………………….…………………………..2
c. TRAFFIC ASSESSMENT……………………………………………………………………………………..…………......3
D. PROPOSED CONSTRUCTION PROJECT……………………………………………………………………………..….…3
a. PROJECT SITE………………………………………………………….............................................................3
b. TRAFFIC VOLUMES………………………………………………………………………………….………………...…….3
E. CONCLUSION…………………………………………………………………….………………………………….………....……4
APPENDICES
APPENDIX A- NJDOT TRAFFIC COUNT DATA
APPENDIX B- TRAFFIC CONTROL PLAN
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
1
A. INTRODUCTION
The purpose of this report is to evaluate the potential traffic impacts associated with the
construction of the PSE&G’s Echelon Substation located along Evesham Road (CR 544) between
Meadow Lane and the North Branch of Cooper River in the Township of Cherry Hill, Camden
County, NJ.
B. PROJECT DESCRIPTION
The proposed substation is located on Block 519.11, Lot 2 and is currently zoned for
Institutional (IN) use based on the Township’s 2016 Zoning Map. The total existing lot size
according to the 2020 Tax Map is 21.11 acres. PSE&G is proposing to subdivide a 10.63 acre
parcel from the existing lot to construct the Echelon substation.
The proposed substation will be un-manned with remote monitoring and controlled by PSE&G
Operations Division. Once the substation is constructed and energized, it will be typically
visited once a week by a single substation mechanic to conduct visual and electrical inspections
of the station.
Below is an aerial image of the existing project site. For the purposes of this report, the site
frontage along Evesham Road (CR 544) runs in an east – west direction.
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
2
C. EXISTING CONDITIONS
a. SITE CONDITIONS
The proposed substation is to be constructed on a vacant lot opposite the Rainwood Residential
Development along Evesham Road (CR 544) in Cherry Hill, Camden County. The vacant lot is
owned by Congregation M’Kor Shalom and PSE&G has acquired a portion of the property to
build the facility. The terrain is fairly flat with heavy vegetation. Existing utility poles run along
the westbound roadside and carry aerial electric and communication services in this area.
Guide rail begins across Peregrine Drive and runs west to shield errant vehicles from getting
into North Branch Cooper River.
Evesham Road (CR 544) exists as a four-lane undivided roadway with two lanes in each
direction. The posted speed limit is 40 MPH and classified as an Urban Principal Arterial. The
roadway serves as an important link between US-30 and NJ Route 73.
b. TRAFFIC VOLUMES
The New Jersey Department of Transportation (NJDOT) owns and operates an extensive system
of traffic count stations throughout the state of New Jersey. There is one 48-hour traffic count
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
3
Station 9 (Station I.D. 130021) on Evesham Road approximately 1,100 feet east of the PSE&G
project site. It should be noted that this traffic data is from 2013 and counted vehicles driving in
the eastbound roadway between Meadow Lane and Route 73. Field observations revealed
similar traffic volumes in the westbound direction during the AM and PM peaks. Traffic counts
on the westbound roadway were not conducted because the proposed development is a very
low traffic generator (unmanned with one 1 vehicle a week).
The NJDOT Traffic Count Data is shown in Appendix A.
c. TRAFFIC ASSESSMENT
Field observations revealed that all the side street stop controlled intersections as well as the
signalized intersections in the vicinity of the project site operate at an acceptable level of
service with minimal delays.
D. PROPOSED CONSTRUCTION PROJECT
a. PROJECT SITE The acquired portion of Block 519.11, Lot 2 will serve as a work site for the construction of the
new PSE&G substation. The property will be provided with security construction fencing and
gates around its entire perimeter to prevent unwarranted vehicles and pedestrians from
entering the work site.
Two temporary access driveways will be constructed along westbound Evesham Road (CR 544)
at the project site for the entry and exit of construction worker vehicles, delivery vehicles,
construction equipment and material, and emergency vehicles. The driveways will be converted
to permanent access driveways meeting Township’s Ordinance upon completion of the
substation and will be limited to right turns in and out of the site. During construction of these
driveways, construction vehicle maneuvers would be done safely through the temporary traffic
control design proposed for this project. Traffic control plan is shown in Appendix B.
A temporary parking lot will be dedicated onsite to accommodate construction worker vehicles
throughout construction, thereby eliminating the need for workers to park along the roadside
or in the neighboring residential areas.
b. TRAFFIC VOLUMES The construction project is expected to generate up to 25 full time workers at the busiest
duration of the project when the Civil and Electrical work overlap. To be conservative, it is
assumed the 25 workers will be generated to and from the site on a daily basis during
construction. It is also assumed that the workers will not carpool, and will individually drive
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
4
their own vehicles (i.e., no transit modes). It is expected that construction workers would
arrive onsite by 6:30 am and leave by 3:30 pm which is outside the peak hours observed in the
field and also identified in the NJDOT Traffic Count Data (AM peak of 8-9 AM and PM peak of 4-
5 PM).
The additional 25 vehicle trips daily will not be considered a significant temporary traffic impact
to the existing traffic network to trigger the need for a detailed traffic analysis or any changes
to the traffic control.
E. CONCLUSION
In conclusion, the project site will have very minimal impacts to the existing traffic network. The
intersections in the vicinity of the project operate at an acceptable service levels and will be
maintained throughout construction. A security fence and gates will be provided to prevent
unauthorized vehicles from entering the work site. Furthermore, a temporary parking lot,
located onsite will be provided to accommodate construction workers on a daily basis. As
stated above, the completed project will not generate additional traffic on a daily basis. A
PSE&G operator (with a utility van) will visit the site approximately once a week to perform
inspections and other maintenance work. For this reason, the study did not need to evaluate
traffic conditions after the completion of construction.
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
5
APPENDIX A- NJDOT TRAFFIC COUNT DATA
!"#$%&'(
!"#$%&'(
!"#$%&'(
!"#$%&'(
")*+,-.%/0,*).")*123
4567.%/0,*).")*123
8/96:.%/0,*).")*123
;7/<*=/6.%/0,*).")*123
>7,.?7/@*+.A/=7./[email protected]#
E)F/=.G)9=092/6.4),7)9/6.H.I,-7)
>E!AJB"KIB
'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2
A*0/,9*=3
%1=0,S.&6/<<3
&*1=,:3
;9,7.B/R7<3
!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.
)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;
>5.$$6786?8:69; @/.$$6786A8:69; 15"$$6786B8:69; C"D$$678968:69; 1<5$$678998:69; E&2$$6789:8:69; >+,$$6789;8:69;
FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I
66J66 U( U( TL TL
69J66 MT MT UO UO
6:J66 'D 'D #O #O
6;J66 M' M' 'T 'T
67J66 (L (L 'D 'D
6KJ66 ''# ''# OL OL
6LJ66 #TV #TV 'DT 'DT
6?J66 UVV UVV #LL #LL
6AJ66 DVO DVO (DL (DL
6BJ66 DD# DD# UMU UMU
96J66 UM# UM# DO# DO#
99J66 DMO DMO VLM VLM
9:J66 UVD UVD VVU VVU
9;J66 DLT DLT DDV DDV
97J66 UTL UTL DDL DDL
9KJ66 V'D V'D DOD DOD
9LJ66 V(L V(L DTM DTM
9?J66 DV( DV( UD# UD#
9AJ66 D(( D(( DLD DLD
9BJ66 OD# OD# OL( OL(
:6J66 (UT (UT (MM (MM
:9J66 #TT #TT #DV #DV
::J66 MVD MVD MTM MTM
:;J66 MM' MM' M#D M#D
4/35-" ''N(TU ''N(TU 'LNULM 'LNULM
H@$M"+N$4/3 DVO DVO VLM VLM
H@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL
H@$M"+N$P& V3LL V3LL ''3LL ''3LL
M@$M"+N$4/3 V(L V(L VVU VVU
M@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL
M@$M"+N$P& 'U3LL 'U3LL 'M3LL 'M3LL
>"+'/.+3$EO, LSTVM LSTVM LSTVM LSTVM
)+23($EO, 'SLLL 'SLLL 'SLLL 'SLLL
HQ3"$EO, LS(VD LS(VD LS(VD LS(VD
M53'"$EO, MSLLL MSLLL MSLLL MSLLL
G/W7.'.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6
&*6670,[email protected]:3 BC8IK
!"#$%&'(
!"#$%&'(
!"#$%&'(
!"#$%&'(
")*+,-.%/0,*).")*123
4567.%/0,*).")*123
8/96:.%/0,*).")*123
;7/<*=/6.%/0,*).")*123
>7,.?7/@*+.A/=7./[email protected]#
E)F/=.G)9=092/6.4),7)9/6.H.I,-7)
>E!AJB"KIB
'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2
A*0/,9*=3
%1=0,S.&6/<<3
&*1=,:3
;9,7.B/R7<3
!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.
)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;
>5.$$678978:69; @/.$$6789K8:69; 15"$$6789L8:69; C"D$$6789?8:69; 1<5$$6789A8:69; E&2$$6789B8:69; >+,$$678:68:69;
FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I
66J66 '(M '(M #T #T #M #M (L (L (V (V O# O# TL TL
69J66 DD DD M' M' MO MO M' M' M# M# MD MD (U (U
6:J66 (D (D 'O 'O T T 'M 'M 'U 'U MO MO ## ##
6;J66 #L #L M# M# MM MM 'M 'M M( M( 'V 'V M# M#
67J66 'D 'D #U #U MD MD (M (M #M #M #L #L 'O 'O
6KJ66 #T #T ''U ''U '#U '#U 'M' 'M' ''V ''V ''' ''' OO OO
6LJ66 'LO 'LO #VL #VL ('D ('D (#V (#V (MT (MT #TU #TU 'VL 'VL
6?J66 M'L M'L UV# UV# UT( UT( DDM DDM DMM DMM D'L D'L #LM #LM
6AJ66 #U' #U' DT' DT' VLV VLV V## V## V(( V(( VDO VDO (T' (T'
6BJ66 (DV (DV D(V D(V DO# DO# DOL DOL DV# DV# DDT DDT UMV UMV
96J66 U'O U'O UMV UMV UD( UD( UOU UOU D'( D'( UUM UUM UV( UV(
99J66 DL# DL# UTM UTM DLO DLO D'( D'( DVO DVO DU' DU' DVL DVL
9:J66 DTU DTU D(# D(# D#L D#L V'O V'O DOO DOO VM( VM( DVM DVM
9;J66 DDT DDT UDU UDU UTT UTT DLD DLD D(M D(M D'' D'' UV( UV(
97J66 VL' VL' DTT DTT VLD VLD DOT DOT DTL DTL DMV DMV D#' D#'
9KJ66 D#L D#L VUU VUU TLM TLM TVD TVD VU( VU( TM# TM# UDD UDD
9LJ66 UU' UU' TM# TM# T'O T'O 'N'(T 'N'(T T'# T'# TLV TLV UTT UTT
9?J66 UL# UL# T'L T'L VDT VDT VUD VUD VO( VO( V(' V(' UOD UOD
9AJ66 (VO (VO D(L D(L V#D V#D VLO VLO DVU DVU DOD DOD UM( UM(
9BJ66 #TM #TM OOD OOD U'V U'V U(O U(O UM# UM# OV' OV' OU( OU(
:6J66 #'D #'D ('# ('# (MM (MM (#T (#T (O# (O# (#( (#( (#L (#L
:9J66 M(U M(U #L# #L# ##D ##D #ML #ML #MD #MD #D' #D' (L# (L#
::J66 '(# '(# 'DT 'DT 'TV 'TV ML( ML( M'L M'L MVO MVO #OT #OT
:;J66 DU DU VV VV 'LL 'LL T( T( 'MD 'MD 'DV 'DV MDV MDV
4/35-" VNVO# VNVO# ''N#UT ''N#UT ''ND(U ''ND(U 'MNMLM 'MNMLM ''NTVM ''NTVM ''NTVV ''NTVV 'LNM'O 'LNM'O
H@$M"+N$4/3 DL# DL# DT' DT' VLV VLV V## V## V(( V(( VDO VDO DVL DVL
H@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL
H@$M"+N$P& ''3LL ''3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL ''3LL ''3LL
M@$M"+N$4/3 VL' VL' TM# TM# T'O T'O 'N'(T 'N'(T T'# T'# TM# TM# DVM DVM
M@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL
M@$M"+N$P& '(3LL '(3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'O3LL 'O3LL 'M3LL 'M3LL
>"+'/.+3$EO, LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM
)+23($EO, 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL
HQ3"$EO, LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD
M53'"$EO, MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL
G/W7.M.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6
&*6670,[email protected]:3 BC8IK
!"#$%&'(
!"#$%&'(
!"#$%&'(
!"#$%&'(
")*+,-.%/0,*).")*123
4567.%/0,*).")*123
8/96:.%/0,*).")*123
;7/<*=/6.%/0,*).")*123
>7,.?7/@*+.A/=7./[email protected]#
E)F/=.G)9=092/6.4),7)9/6.H.I,-7)
>E!AJB"KIB
'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2
A*0/,9*=3
%1=0,S.&6/<<3
&*1=,:3
;9,7.B/R7<3
!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.
)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;
>5.$$678:98:69; @/.$$678::8:69; 15"$$678:;8:69; C"D$$678:78:69; 1<5$$678:K8:69; E&2$$678:L8:69; >+,$$678:?8:69;
FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I
66J66 '(M '(M
69J66 D( D(
6:J66 #M #M
6;J66 #M #M
67J66 M# M#
6KJ66 (' ('
6LJ66 'LT 'LT
6?J66 'DD 'DD
6AJ66 MTD MTD
6BJ66 (DU (DU
96J66 UM# UM#
99J66 DM# DM#
9:J66 D#( D#(
9;J66 DML DML
97J66 DDO DDO
9KJ66 DLM DLM
9LJ66 UU( UU(
9?J66 O(M O(M
9AJ66 OM# OM#
9BJ66 (#( (#(
:6J66 #MO #MO
:9J66 'T( 'T(
::J66 'MD 'MD
:;J66 T' T'
4/35-" VNOVL VNOVL
H@$M"+N$4/3 DM# DM#
H@$M"+N$EO, 'SLL 'SLL
H@$M"+N$P& ''3LL ''3LL
M@$M"+N$4/3 DDO DDO
M@$M"+N$EO, 'SLL 'SLL
M@$M"+N$P& '(3LL '(3LL
>"+'/.+3$EO, LSTVM LSTVM
)+23($EO, 'SLLL 'SLLL
HQ3"$EO, LS(VD LS(VD
M53'"$EO, MSLLL MSLLL
G/W7.#.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6
&*6670,[email protected]:3 BC8IK
PSE&G Echelon 230/13kV Substation
Traffic Assessment Report
6
APPENDIX B- TRAFFIC CONTROL PLAN
LU
F
FA .A EGR
OE
G
No.
L
R
AON
IN
GEN
RO
P
24GE49442
SIS
F
E
O JF N
YES
ER
TAS
EE
WE TE
SNDEIL
EC
TAPER
320'
BUFFER
100'
107'
107'
107'
WORK AREA
DRUMS @ 80' O-C (TYP.)
100'
EVESHAM RD (CR 544)P
ERIG
RIN
E
DR
FULMAR DR
500' 1140'500'
NL
WO
DA
EM
500'500'
100'
1500'
TYP.
53'
SHOWING LEFT ARROW
WITH FLASHING ARROW BOARD
TRUCK MOUNTED ATTENUATOR
TC
WEI
VN
ELG
500'
100'
GUIDE RAIL
CON. CURB CON. CURB
CON. CURB
SIDEWALK
SIDEWALK
SIDEWALK
SID
EW
AL
K
DWY
DWY
DWY
DWY
DWY DWY DWY DWY
DWY DWY DWY DWY
DWY
DWY
DWY
DWY
DWY
DWY
DWY
SID
EW
AL
K
100'
40'
JOB NO.
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
DATE:
NEW JERSEY PROFESSIONAL ENGINEER LICENSE NUMBER 24GE04944200
FOR
1"=50'
Water/Wastewater
Surveying/Aerial Drones/GIS
Site Development
Municipal Engineering
Local/Regional Planning
Landscape Architecture
Geotechnical/Dams
Environmental
Construction Inspection
Bridges/Highways
1 INCH = 50 FT
GRAPHIC SCALE0 25 50 100
NET 230 kV CLASS H SUBSTATIONECHELON-VOORHEES
PSE&G
CHERRY HILL TOWNSHIP, CAMDEN COUNTY, NJ
GEORGE A. AFFUL
07/09/2021
PHONE (732) 303-8700
WEB: WWW.VANCLEEFENGINEERING.COM
3 PARAGON WAY, SUITE 600, FREEHOLD, NJ 07728
VAN CLEEF ENGINEERING ASSOCIATES, LLC
ENGINEERING
VanCleefASSOCIATES
JULY 9, 2021
DATEDESCRIPTION AUTHREV and Eastern Pennsylvania
With Offices in New Jersey
POSTED SPEED = 40 MPH
TRAFFIC FLOW
LEGEND
CONES
CONSTRUCTION SIGN
BREAKAWAY BARRICADE
WITH SIGN
BREAKAWAY BARRICADE
WORK AREA
BUFFER AREA
SHOWING LEFT ARROW
WITH FLASHING ARROW BOARD
TRUCK MOUNTED ATTENUATOR
001
001
544COUNTY
CAMDEN
• MILE
WORK
ROAD W20-1D
48" X 48"
1500 FT
CLOSED
RIGHT LANE
1000 FT
CLOSED
RIGHT LANE
W1-6
48" X 24"
G20-2A
48" X 24" ROAD WORK
END
W20-1F
48" X 48"AHEAD
WORK
ROAD
W20-1F
48" X 48"AHEAD
WORK
ROAD
W20-1A
48" X 48"
1500 FT
WORK
ROAD
W20-5A
48" X 48"
W20-5B
48" X 48"
W20-5A
48" X 48"
W20-1F
48" X 48" AHEAD
WORK
ROAD
G20-2A
48" X 24"ROAD WORK
END
TRAFFIC CONTROL LAYOUT
CR 544 (EVESHAM RD) WB RIGHT LANE CLOSING