PSE&G ECHELON 230/13KV SUBSTATION

TRAFFIC ASSESSMENT REPORT

PREPARED BY:

VAN CLEEF ENGINEERING ASSOCIATES, LLC

3 PARAGON WAY, SUITE 600

FREEHOLD, NJ 07728

APRIL 16, 2021

Page 2: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

TABLE OF CONTENTS

SECTION PAGE

A. INTRODUCTION………………………………………..…………………………………………………………………….….…1

B. PROJECT DESCRIPTION………………………………………………………………….………………………………………1

C. EXISTING CONDITIONS.…………..…………………………………………………………………………………………….2

a. SITE CONDITIONS……………………………………………………………………..……………………………………..2

b. TRAFFIC VOLUMES..…………………………………………………………………………….…………………………..2

c. TRAFFIC ASSESSMENT……………………………………………………………………………………..…………......3

D. PROPOSED CONSTRUCTION PROJECT……………………………………………………………………………..….…3

a. PROJECT SITE………………………………………………………….............................................................3

b. TRAFFIC VOLUMES………………………………………………………………………………….………………...…….3

E. CONCLUSION…………………………………………………………………….………………………………….………....……4

APPENDICES

APPENDIX A- NJDOT TRAFFIC COUNT DATA

APPENDIX B- TRAFFIC CONTROL PLAN

Page 3: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

1

A. INTRODUCTION

The purpose of this report is to evaluate the potential traffic impacts associated with the

construction of the PSE&G’s Echelon Substation located along Evesham Road (CR 544) between

Meadow Lane and the North Branch of Cooper River in the Township of Cherry Hill, Camden

County, NJ.

B. PROJECT DESCRIPTION

The proposed substation is located on Block 519.11, Lot 2 and is currently zoned for

Institutional (IN) use based on the Township’s 2016 Zoning Map. The total existing lot size

according to the 2020 Tax Map is 21.11 acres. PSE&G is proposing to subdivide a 10.63 acre

parcel from the existing lot to construct the Echelon substation.

The proposed substation will be un-manned with remote monitoring and controlled by PSE&G

Operations Division. Once the substation is constructed and energized, it will be typically

visited once a week by a single substation mechanic to conduct visual and electrical inspections

of the station.

Below is an aerial image of the existing project site. For the purposes of this report, the site

frontage along Evesham Road (CR 544) runs in an east – west direction.

Page 4: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

2

C. EXISTING CONDITIONS

a. SITE CONDITIONS

The proposed substation is to be constructed on a vacant lot opposite the Rainwood Residential

Development along Evesham Road (CR 544) in Cherry Hill, Camden County. The vacant lot is

owned by Congregation M’Kor Shalom and PSE&G has acquired a portion of the property to

build the facility. The terrain is fairly flat with heavy vegetation. Existing utility poles run along

the westbound roadside and carry aerial electric and communication services in this area.

Guide rail begins across Peregrine Drive and runs west to shield errant vehicles from getting

into North Branch Cooper River.

Evesham Road (CR 544) exists as a four-lane undivided roadway with two lanes in each

direction. The posted speed limit is 40 MPH and classified as an Urban Principal Arterial. The

roadway serves as an important link between US-30 and NJ Route 73.

b. TRAFFIC VOLUMES

The New Jersey Department of Transportation (NJDOT) owns and operates an extensive system

of traffic count stations throughout the state of New Jersey. There is one 48-hour traffic count

Page 5: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

3

Station 9 (Station I.D. 130021) on Evesham Road approximately 1,100 feet east of the PSE&G

project site. It should be noted that this traffic data is from 2013 and counted vehicles driving in

the eastbound roadway between Meadow Lane and Route 73. Field observations revealed

similar traffic volumes in the westbound direction during the AM and PM peaks. Traffic counts

on the westbound roadway were not conducted because the proposed development is a very

low traffic generator (unmanned with one 1 vehicle a week).

The NJDOT Traffic Count Data is shown in Appendix A.

c. TRAFFIC ASSESSMENT

Field observations revealed that all the side street stop controlled intersections as well as the

signalized intersections in the vicinity of the project site operate at an acceptable level of

service with minimal delays.

D. PROPOSED CONSTRUCTION PROJECT

a. PROJECT SITE The acquired portion of Block 519.11, Lot 2 will serve as a work site for the construction of the

new PSE&G substation. The property will be provided with security construction fencing and

gates around its entire perimeter to prevent unwarranted vehicles and pedestrians from

entering the work site.

Two temporary access driveways will be constructed along westbound Evesham Road (CR 544)

at the project site for the entry and exit of construction worker vehicles, delivery vehicles,

construction equipment and material, and emergency vehicles. The driveways will be converted

to permanent access driveways meeting Township’s Ordinance upon completion of the

substation and will be limited to right turns in and out of the site. During construction of these

driveways, construction vehicle maneuvers would be done safely through the temporary traffic

control design proposed for this project. Traffic control plan is shown in Appendix B.

A temporary parking lot will be dedicated onsite to accommodate construction worker vehicles

throughout construction, thereby eliminating the need for workers to park along the roadside

or in the neighboring residential areas.

b. TRAFFIC VOLUMES The construction project is expected to generate up to 25 full time workers at the busiest

duration of the project when the Civil and Electrical work overlap. To be conservative, it is

assumed the 25 workers will be generated to and from the site on a daily basis during

construction. It is also assumed that the workers will not carpool, and will individually drive

Page 6: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

4

their own vehicles (i.e., no transit modes). It is expected that construction workers would

arrive onsite by 6:30 am and leave by 3:30 pm which is outside the peak hours observed in the

field and also identified in the NJDOT Traffic Count Data (AM peak of 8-9 AM and PM peak of 4-

5 PM).

The additional 25 vehicle trips daily will not be considered a significant temporary traffic impact

to the existing traffic network to trigger the need for a detailed traffic analysis or any changes

to the traffic control.

E. CONCLUSION

In conclusion, the project site will have very minimal impacts to the existing traffic network. The

intersections in the vicinity of the project operate at an acceptable service levels and will be

maintained throughout construction. A security fence and gates will be provided to prevent

unauthorized vehicles from entering the work site. Furthermore, a temporary parking lot,

located onsite will be provided to accommodate construction workers on a daily basis. As

stated above, the completed project will not generate additional traffic on a daily basis. A

PSE&G operator (with a utility van) will visit the site approximately once a week to perform

inspections and other maintenance work. For this reason, the study did not need to evaluate

traffic conditions after the completion of construction.

Page 7: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

5

APPENDIX A- NJDOT TRAFFIC COUNT DATA

Page 8: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

!"#$%&'(

!"#$%&'(

!"#$%&'(

!"#$%&'(

")*+,-.%/0,*).")*123

4567.%/0,*).")*123

8/96:.%/0,*).")*123

;7/<*=/6.%/0,*).")*123

>7,.?7/@*+.A/=7./[email protected]#

E)F/=.G)9=092/6.4),7)9/6.H.I,-7)

>E!AJB"KIB

'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2

A*0/,9*=3

%1=0,S.&6/<<3

&*1=,:3

;9,7.B/R7<3

!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.

)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;

>5.$$6786?8:69; @/.$$6786A8:69; 15"$$6786B8:69; C"D$$678968:69; 1<5$$678998:69; E&2$$6789:8:69; >+,$$6789;8:69;

FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I

66J66 U( U( TL TL

69J66 MT MT UO UO

6:J66 'D 'D #O #O

6;J66 M' M' 'T 'T

67J66 (L (L 'D 'D

6KJ66 ''# ''# OL OL

6LJ66 #TV #TV 'DT 'DT

6?J66 UVV UVV #LL #LL

6AJ66 DVO DVO (DL (DL

6BJ66 DD# DD# UMU UMU

96J66 UM# UM# DO# DO#

99J66 DMO DMO VLM VLM

9:J66 UVD UVD VVU VVU

9;J66 DLT DLT DDV DDV

97J66 UTL UTL DDL DDL

9KJ66 V'D V'D DOD DOD

9LJ66 V(L V(L DTM DTM

9?J66 DV( DV( UD# UD#

9AJ66 D(( D(( DLD DLD

9BJ66 OD# OD# OL( OL(

:6J66 (UT (UT (MM (MM

:9J66 #TT #TT #DV #DV

::J66 MVD MVD MTM MTM

:;J66 MM' MM' M#D M#D

4/35-" ''N(TU ''N(TU 'LNULM 'LNULM

H@$M"+N$4/3 DVO DVO VLM VLM

H@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL

H@$M"+N$P& V3LL V3LL ''3LL ''3LL

M@$M"+N$4/3 V(L V(L VVU VVU

M@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL

M@$M"+N$P& 'U3LL 'U3LL 'M3LL 'M3LL

>"+'/.+3$EO, LSTVM LSTVM LSTVM LSTVM

)+23($EO, 'SLLL 'SLLL 'SLLL 'SLLL

HQ3"$EO, LS(VD LS(VD LS(VD LS(VD

M53'"$EO, MSLLL MSLLL MSLLL MSLLL

G/W7.'.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6

&*6670,[email protected]:3 BC8IK

Page 9: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

!"#$%&'(

!"#$%&'(

!"#$%&'(

!"#$%&'(

")*+,-.%/0,*).")*123

4567.%/0,*).")*123

8/96:.%/0,*).")*123

;7/<*=/6.%/0,*).")*123

>7,.?7/@*+.A/=7./[email protected]#

E)F/=.G)9=092/6.4),7)9/6.H.I,-7)

>E!AJB"KIB

'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2

A*0/,9*=3

%1=0,S.&6/<<3

&*1=,:3

;9,7.B/R7<3

!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.

)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;

>5.$$678978:69; @/.$$6789K8:69; 15"$$6789L8:69; C"D$$6789?8:69; 1<5$$6789A8:69; E&2$$6789B8:69; >+,$$678:68:69;

FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I

66J66 '(M '(M #T #T #M #M (L (L (V (V O# O# TL TL

69J66 DD DD M' M' MO MO M' M' M# M# MD MD (U (U

6:J66 (D (D 'O 'O T T 'M 'M 'U 'U MO MO ## ##

6;J66 #L #L M# M# MM MM 'M 'M M( M( 'V 'V M# M#

67J66 'D 'D #U #U MD MD (M (M #M #M #L #L 'O 'O

6KJ66 #T #T ''U ''U '#U '#U 'M' 'M' ''V ''V ''' ''' OO OO

6LJ66 'LO 'LO #VL #VL ('D ('D (#V (#V (MT (MT #TU #TU 'VL 'VL

6?J66 M'L M'L UV# UV# UT( UT( DDM DDM DMM DMM D'L D'L #LM #LM

6AJ66 #U' #U' DT' DT' VLV VLV V## V## V(( V(( VDO VDO (T' (T'

6BJ66 (DV (DV D(V D(V DO# DO# DOL DOL DV# DV# DDT DDT UMV UMV

96J66 U'O U'O UMV UMV UD( UD( UOU UOU D'( D'( UUM UUM UV( UV(

99J66 DL# DL# UTM UTM DLO DLO D'( D'( DVO DVO DU' DU' DVL DVL

9:J66 DTU DTU D(# D(# D#L D#L V'O V'O DOO DOO VM( VM( DVM DVM

9;J66 DDT DDT UDU UDU UTT UTT DLD DLD D(M D(M D'' D'' UV( UV(

97J66 VL' VL' DTT DTT VLD VLD DOT DOT DTL DTL DMV DMV D#' D#'

9KJ66 D#L D#L VUU VUU TLM TLM TVD TVD VU( VU( TM# TM# UDD UDD

9LJ66 UU' UU' TM# TM# T'O T'O 'N'(T 'N'(T T'# T'# TLV TLV UTT UTT

9?J66 UL# UL# T'L T'L VDT VDT VUD VUD VO( VO( V(' V(' UOD UOD

9AJ66 (VO (VO D(L D(L V#D V#D VLO VLO DVU DVU DOD DOD UM( UM(

9BJ66 #TM #TM OOD OOD U'V U'V U(O U(O UM# UM# OV' OV' OU( OU(

:6J66 #'D #'D ('# ('# (MM (MM (#T (#T (O# (O# (#( (#( (#L (#L

:9J66 M(U M(U #L# #L# ##D ##D #ML #ML #MD #MD #D' #D' (L# (L#

::J66 '(# '(# 'DT 'DT 'TV 'TV ML( ML( M'L M'L MVO MVO #OT #OT

:;J66 DU DU VV VV 'LL 'LL T( T( 'MD 'MD 'DV 'DV MDV MDV

4/35-" VNVO# VNVO# ''N#UT ''N#UT ''ND(U ''ND(U 'MNMLM 'MNMLM ''NTVM ''NTVM ''NTVV ''NTVV 'LNM'O 'LNM'O

H@$M"+N$4/3 DL# DL# DT' DT' VLV VLV V## V## V(( V(( VDO VDO DVL DVL

H@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL

H@$M"+N$P& ''3LL ''3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL V3LL ''3LL ''3LL

M@$M"+N$4/3 VL' VL' TM# TM# T'O T'O 'N'(T 'N'(T T'# T'# TM# TM# DVM DVM

M@$M"+N$EO, 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL 'SLL

M@$M"+N$P& '(3LL '(3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'U3LL 'O3LL 'O3LL 'M3LL 'M3LL

>"+'/.+3$EO, LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM LSTVM

)+23($EO, 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL 'SLLL

HQ3"$EO, LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD LS(VD

M53'"$EO, MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL MSLLL

G/W7.M.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6

&*6670,[email protected]:3 BC8IK

Page 10: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

!"#$%&'(

!"#$%&'(

!"#$%&'(

!"#$%&'(

")*+,-.%/0,*).")*123

4567.%/0,*).")*123

8/96:.%/0,*).")*123

;7/<*=/6.%/0,*).")*123

>7,.?7/@*+.A/=7./[email protected]#

E)F/=.G)9=092/6.4),7)9/6.H.I,-7)

>E!AJB"KIB

'#LLM'N.N.!K.O((.PQ7<-/R.!*/@H'LST#N.LLLLLO(($$N.PQ7<-/R.K+2

A*0/,9*=3

%1=0,S.&6/<<3

&*1=,:3

;9,7.B/R7<3

!"#$%"&'"($)"*+&,-".,$/0$1&+.'*/&,+,2/.

)+23($4/35-"$0&/-$6789:8:69;$,<&/5=<$678:98:69;

>5.$$678:98:69; @/.$$678::8:69; 15"$$678:;8:69; C"D$$678:78:69; 1<5$$678:K8:69; E&2$$678:L8:69; >+,$$678:?8:69;

FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I FGH) C I

66J66 '(M '(M

69J66 D( D(

6:J66 #M #M

6;J66 #M #M

67J66 M# M#

6KJ66 (' ('

6LJ66 'LT 'LT

6?J66 'DD 'DD

6AJ66 MTD MTD

6BJ66 (DU (DU

96J66 UM# UM#

99J66 DM# DM#

9:J66 D#( D#(

9;J66 DML DML

97J66 DDO DDO

9KJ66 DLM DLM

9LJ66 UU( UU(

9?J66 O(M O(M

9AJ66 OM# OM#

9BJ66 (#( (#(

:6J66 #MO #MO

:9J66 'T( 'T(

::J66 'MD 'MD

:;J66 T' T'

4/35-" VNOVL VNOVL

H@$M"+N$4/3 DM# DM#

H@$M"+N$EO, 'SLL 'SLL

H@$M"+N$P& ''3LL ''3LL

M@$M"+N$4/3 DDO DDO

M@$M"+N$EO, 'SLL 'SLL

M@$M"+N$P& '(3LL '(3LL

>"+'/.+3$EO, LSTVM LSTVM

)+23($EO, 'SLLL 'SLLL

HQ3"$EO, LS(VD LS(VD

M53'"$EO, MSLLL MSLLL

G/W7.#.*X.#&)7/,[email protected]'O...U3MT3#VG? 8ZL#3FGH)$HH)1$$96RLA6 C$HH)1$6 I$HH)1$96RLA6

&*6670,[email protected]:3 BC8IK

Page 11: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

PSE&G Echelon 230/13kV Substation

Traffic Assessment Report

6

APPENDIX B- TRAFFIC CONTROL PLAN

Page 12: PSE&G ECHELON 230/13 KV SUBSTATION TRAFFIC …

LU

F

FA .A EGR

OE

G

No.

L

R

AON

IN

GEN

RO

P

24GE49442

SIS

F

E

O JF N

YES

ER

TAS

EE

WE TE

SNDEIL

EC

TAPER

320'

BUFFER

100'

107'

107'

107'

WORK AREA

DRUMS @ 80' O-C (TYP.)

100'

EVESHAM RD (CR 544)P

ERIG

RIN

E

DR

FULMAR DR

500' 1140'500'

NL

WO

DA

EM

500'500'

100'

1500'

TYP.

53'

SHOWING LEFT ARROW

WITH FLASHING ARROW BOARD

TRUCK MOUNTED ATTENUATOR

TC

WEI

VN

ELG

500'

100'

GUIDE RAIL

CON. CURB CON. CURB

CON. CURB

SIDEWALK

SIDEWALK

SIDEWALK

SID

EW

AL

K

DWY

DWY

DWY

DWY

DWY DWY DWY DWY

DWY DWY DWY DWY

DWY

DWY

DWY

DWY

DWY

DWY

DWY

SID

EW

AL

K

100'

40'

JOB NO.

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

NEW JERSEY PROFESSIONAL ENGINEER LICENSE NUMBER 24GE04944200

FOR

1"=50'

Water/Wastewater

Surveying/Aerial Drones/GIS

Site Development

Municipal Engineering

Local/Regional Planning

Landscape Architecture

Geotechnical/Dams

Environmental

Construction Inspection

Bridges/Highways

1 INCH = 50 FT

GRAPHIC SCALE0 25 50 100

NET 230 kV CLASS H SUBSTATIONECHELON-VOORHEES

PSE&G

CHERRY HILL TOWNSHIP, CAMDEN COUNTY, NJ

GEORGE A. AFFUL

07/09/2021

PHONE (732) 303-8700

WEB: WWW.VANCLEEFENGINEERING.COM

3 PARAGON WAY, SUITE 600, FREEHOLD, NJ 07728

VAN CLEEF ENGINEERING ASSOCIATES, LLC

ENGINEERING

VanCleefASSOCIATES

JULY 9, 2021

DATEDESCRIPTION AUTHREV and Eastern Pennsylvania

With Offices in New Jersey

POSTED SPEED = 40 MPH

TRAFFIC FLOW

LEGEND

CONES

CONSTRUCTION SIGN

BREAKAWAY BARRICADE

WITH SIGN

BREAKAWAY BARRICADE

WORK AREA

BUFFER AREA

SHOWING LEFT ARROW

WITH FLASHING ARROW BOARD

TRUCK MOUNTED ATTENUATOR

001

001

544COUNTY

CAMDEN

• MILE

WORK

ROAD W20-1D

48" X 48"

1500 FT

CLOSED

RIGHT LANE

1000 FT

CLOSED

RIGHT LANE

W1-6

48" X 24"

G20-2A

48" X 24" ROAD WORK

END

W20-1F

48" X 48"AHEAD

WORK

ROAD

W20-1F

48" X 48"AHEAD

WORK

ROAD

W20-1A

48" X 48"

1500 FT

WORK

ROAD

W20-5A

48" X 48"

W20-5B

48" X 48"

W20-5A

48" X 48"

W20-1F

48" X 48" AHEAD

WORK

ROAD

G20-2A

48" X 24"ROAD WORK

END

TRAFFIC CONTROL LAYOUT

CR 544 (EVESHAM RD) WB RIGHT LANE CLOSING

DDDDD

D

D

D

D

D

D