southern regional load despatch centre
DESCRIPTION
PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST May, 2005. by V.K AGRAWAL AGM, SRLDC. POWER GRID CORPORATION OF INDIA LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. PRESENTATION OVERVIEW. SR GRID AND IPP’ ROLE - QUICK FACTS - PowerPoint PPT PresentationTRANSCRIPT
1SOUTHERN REGIONAL LOAD DESPATCH CENTRE
POWER GRID CORPORATION OF INDIA LIMITED
PRESENTATION ON
ROLE OF REGULATORS
IN
SELLING EXCESS POWER FROM CPPs
31ST May, 2005
by
V.K AGRAWAL
AGM, SRLDC
2
PRESENTATION OVERVIEW
SR GRID AND IPP’ ROLE - QUICK FACTS
OPEN ACCESS REGULATIONS – RECENT CHANGES
IMPACT OF CHANGES – CASE STUDIES
SHORT TERM OPEN ACCESS – EXPERIENCES
REGULATORS DELIGHT – MORE BUT LESS
STATE SECTOR – CHALLENGES & TASKS AHEAD
3
THANK YOU
4
SOUTHERN REGIONAL GRID
QUICK FACTS
5
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
INSTALLED CAPACITY
NORTHERN :- 31,230 MW
EASTERN :- 17,697 MW
SOUTHERN :- 32,734 MW
WESTERN :- 32,354 MW
NORTH-EASTERN :- 2,357 MW
TOTAL 116,372 MW
REGIONAL GRIDS
6
SOUTHERN REGION – GEOGRAPHY
ANDHRA PRADESH
TAMIL NADU
KARNATAKA
KE
RA
LA
POPULATION :- 22.5 CRORES ( 22% OF INDIA)
AREA :- 651 (‘000 SQ KM)(19% OF INDIA)
INSTALLED CAPACITY:- 32,734 MW(28.1%)
PER CAPITA CONSUM. – 700 unit (A. I. – 567)
WEATHER :- South-west monsoon
North-east monsoon
SEA COAST :- AROUND 4000 KM
7
INSTALLED CAPACITY IN SR
The above capacity does not includes
--- About 1342 MW of Wind Mill Capacity in Tamil Nadu.
--- Micro and Captive plants in different states.
STATES HYDRO THERMAL NUCLEARDIESEL/
GASWIND/
OTHERS TOTAL %
AP 3586 2993 --- 272 2 6853 21%
KAR 3277 1470 --- 128 5 4879 15%
KER 1811 -- --- 235 2 2047 6%
TN 1987 2970 --- 423 19 5400 17%
PONDY --- -- --- 32 --- 32 0.1%
C.S --- 8090 830 360 --- 9280 28%
IPP 278 387 --- 2506 1071 4243 13%
TOTAL 10939 15910 830 3956 1099 32734
% 33% 49% 3% 12% 3%
8
SOURCE-WISE INSTALLED CAPACITY OF SR
15910 (49%)
10939 (33%)830 (3%)1099 (3%)
3956 (12%)
HYDRO THERMAL GAS WIND/OTHERS NUCLEAR
IN MW
32,734 MW
HYDRO
THERMAL
WIND/OTHERSNUCLEAR
GAS
GENERATING UNITS IN SOUTHERN REGION
A.PKAR
TNKER
TYPICAL
GENERATOR
SPREAD
IN SR
UNIT CAPACITY AP KAR KER TN CGS TOTAL
THERMAL (500 MW) 2 8 10
THERMAL
(200-250 MW)10 7 13 15 45
GAS/THERMAL
(100-150 MW)9 2 3 9 23
HYDRO
(>50 MW)27 27 16 15 85
TOTAL 48 36 19 37 162
- HYDRO
- THERMAL
- GAS / NAPTHA
- NUCLEAR
GENERATING STATIONS ABOVE 1000 MW
GENERATING STATIONS 500 – 1000 MW
GENERATING STATIONS BELOW 500 MW
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
VISAKHAPATNAM
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAHDAVANAGERE
KAIGA
115
317
RSTPP
BHADRAVATI
130x216
4x2
182
151
181
173
302
308172
277
279
155
178x
2
PONDICHERY
BANGALORE
SIRSI
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
PALLOM
KAYANKULAMEDAMON
TALCHER
JEYPORE
63
187
2x78
2x221
54
HOSUR
KADRA
KODASAALY
Nagjhari
1
120
60
MAPS
P
SSLMM
MMDP
THIRUVANATHAPURAM
ALMATHI
NELLORE
400 KV LINE PRESENTLY
OPERATED AT 220 KV
NELAMANGALA
KURNOOL
GAZUWAKA(AP)
SIMHADRI NTPC
HIRIYUR
189
195
267x
2
258
242
175
179
127
130x
2
221x2
146x252x2
197x2
301x2
8x4
15x2
300
28
330
ABOUT 12000 CKM 400KV TRANSMISSION
TALGUPPA
GRID MAP
GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC
KOODANKULAM
THIRNELVALI
TYPICAL FLOWS ARE FROM NORTH TO SOUTH
QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW
11
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
TIME IN HRS --->
DE
MA
ND
IN
MW
---
>
MONSOON SUMMER WINTER
TYPICAL LOAD CURVE OF SR
WINTER
MONSOON
SUMMER
EVENING PEAK
WEATHER
RESERVOIR CONSUMPTION
12
DEEP VALLEY
DEEP VALLEY
SHARP
PEAK
13
GRID OPERATION
TYPICAL ISSUES IN THE PAST
14
GRID OPERATION – TYPICAL ISSUES IN PAST
• LOW / HIGH FREQUENCY PROBLEMS
– FREQUENCY EXCURSES TO LOW/HIGH VALUES
• LOW / HIGH VOLTAGE OPERATION
– CRITICALLY LOW VOLTAGES AT LOAD CENTRES
– SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS
• SYSTEM BROWNOUTS / BLACK OUTS
– SEPERATION OF SYSTEMS / LOSS OF LOAD
• ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES– UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT
15
GRID PRESENT STATUS
16
47.00
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
% OF TIME --->
FR
EQ
IN H
Z -
-->
2004-05
2003-04
<49.049.0 & <49.5
49.5 & <50.5
50.5 & Above
Max Min Avg FVI
2004-05 0.13 8.49 91.21 0.17 50.90 48.62 49.85 0.83
2003-04 2.30 22.03 75.23 0.44 51.17 48.18 49.69 1.95
2002-03 49.48 14.48 34.03 2.01 51.37 47.69 48.95 18.86
2002-03
FREQUENCY DURATION CURVE 2002-03, 2003-04 & 2004-05
17
320
330
340
350
360
370
380
390
400
410
42000
:05
01:0
5
02:0
5
03:0
5
04:0
5
05:0
5
06:0
5
07:0
5
08:0
5
09:0
5
10:0
5
11:0
5
12:0
5
13:0
5
14:0
5
15:0
5
16:0
5
17:0
5
18:0
5
19:0
5
20:0
5
21:0
5
22:0
5
23:0
5
TIME IN HRS --->
VO
LT
AG
E IN
KV
---
>
REALITY BITE:
FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.
EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!
COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES
Jan 02
Jan 03
18
SOUTHERN REGION LOSS*
2002 2003 2004** 2005**
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
LOAD (MW)
LOSS (MW)
LOSS %
AP 6510 408 6.27 5983 264 4.41 7234 311 4.30 7557 279 3.69
KARNATAKA 4078 265 6.50 4609 237 5.14 5158 228 4.42 5285 183 3.46
KERALA 1928 82 4.25 2227 101 4.54 2479 86 3.47 2453 66 2.69
TAMILNADU 6135 224 3.65 6888 240 3.48 7421 198 2.67 7522 216 2.87
PONDICHERRY 215 0 0.00
CENTRAL GENERATING STATION 472 0 0.00 684 0 0.00 538 0.00 121 0 0.00
SOUTHERN REGION 19123 979 5.12 20391 842 4.1 22830 823 3.6 23153 744 3.2
•*Source : Report of System Studies conducted for Accessing Shunt Compensation requirement in Southern Region – March 2004 and March 2005 - SREB ,CEA
•** Projected figures 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS
19
GRID PRESENT STATUS
CARDINAL EVENTS
20
GRID PRESENT STATUS -- CARDINAL EVENTS
• AVAILABILITY BASED TARIFF
• UNIFIED LOAD DESPATCH SCHEME
• GENERATION ADDITION
• INTERREGIONAL AC / HVDC LINKS
• OPERATIONAL EXCELLANCE
21
AP KAR KER TN PONDY
Total UI exported(-) /
Imported(+) in MUs
-4441 4132 1210 1163 -140
Total amount paid in Crores
Rs.-899 768 204 344 28
Average rate of UI in paise/unit 202 186 169 296 203
SUMMARY OF UI – 124 WKS(FROM 01/JAN/03 TO 15/MAY/05)
22
UI IN SR (FROM 01/01/03 TO 15/05/05)
• TOTAL UI TURNOVER :- 7792 MU
• TOTAL UI AMOUNT DISBURSED:- 1600 CR
• AVG WEEKLY TRANSACTION:- 63 MU
• AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR
23
GRID OPERATION:GRID OPERATION: A TIGHT ROPE WALK A TIGHT ROPE WALK
BLACK-OUTVOLTAGE
COLLAPSE IN-ECONOMIC
OPERATION
INSTABILITYPOWER
SWINGSINCREASED
LOSSES
24
UI TRANSACTION ON 31/08/03
HIGHLIGHTS OF UI TRANSACTION ON 31.08.03 (SUNDAY, GANESH CHATURTHI)
• UI imported from ER : 6.07 MU• UI imported from WR : 2.81 MU• Total UI imported from C. Grid by SR : 8.88 MU• Average UI rate of C.Grid : 93 Ps/Unit • Average UI rate in SR for C.Grid : 213 Ps/Unit • Max. Power transfer in UI from ER : 510 MW• Max. Power transfer in UI from WR : 350 MW• Total Max. Power transfer in UI from C.Grid : 860 MW• Amount saved for the SR constituents : 107 Lacs• Total Number of HVDC Operations : 50 no.s