SPCC Plans Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: Applies to any facility that has or could discharge oil in harmful quantities • 1,320 above ground storage • 42,000 under ground storage • Containers <55 gallons not included in storage tally

Upload: earl-dixon

Post on 23-Dec-2015

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

SPCC Plans– Also known as…Spill Prevention, Control, &

Countermeasures Plan

• Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan:– Applies to any facility that has or could discharge oil in

harmful quantities

• 1,320 above ground storage

• 42,000 under ground storage

• Containers <55 gallons not included in storage tally

Page 2: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

SPCC Plans

– Should reduce the physical and environmental hazards from storage & distribution of oil to navigable waters

– Should be preventative rather than reactive– Should be updated every 5 years or when Plan changes

Note: Includes petroleum and non-petroleum oils (i.e. animal fats)

Page 3: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

SPCC Plans

• Duke has five SPCC Plans

• Steam Plant

• Transportation

• Medical Center

• Campus

• Marine Lab

Page 4: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

SPCC Plans

• The Plan is broken down into twelve sections that detail the following:– General Location Map– Oil Storage Locations– Appendices

– Checklists– Review & Revision Records– Training Records– Cross Reference to 40 CFR 112– Spill Response Supplies & Inventory– OESO Spill Response Policy

Page 5: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

General Facility Information

• Names the Facility

• Specific facility location including longitude & latitude

• Describes the process of the facility

• Names the Spill Plan Team and where the Plan is located.

Page 6: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

General Facility Information

• Plan Coordinator • Personnel designated by University & Medical

Center

• Members• Duke University Spill Team

• E&O/FMD Trained Personnel

• Contractors Trained to Duke’s Plans requirements

Page 7: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Petroleum Storage Facilities

• Describes all oil storage and handling facilities covered under the Plan (including used cooking oil)

• Describes any modifications and implementation schedules necessary to be in compliance with the regulations

Page 8: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Spill Events, Containment Structures, & Spill Migration

• Describes the locations of the nearest navigable water

• Describes the predicted potential spill scenarios, spill quantities, flow rates, and spill destinations if a storage vessel described in Section 2 had a release.

Page 9: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Spill Prevention Measures

• Describes the practices and procedures in place at the facility to minimize the risk of spills and leaks of petroleum products.

Page 10: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies
Page 11: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Secondary Containment – Tanker Unloading

Page 12: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Petroleum Product Spill Containment and Cleanup

• Describes the types and the locations of spill response materials and appropriate response measures

• Includes initial notification procedures and post response activities

Page 13: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Notification of Spill Events

• Contains the information for internal and external reporting of a release.

• The campus police should be notified first

• The police shall then notify the correct people beginning with the Spill Response Team.

– The Plan Coordinator or the Director of Environmental Programs will notify external agencies, if necessary.

Page 14: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Inspections & Testing

• Describes required equipment inspections, frequency, and the required or recommended test method

Page 15: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Review & Amendment

• Plan must be reviewed at least every 5 years by a professional engineer or whenever there is a change in facility design, construction, operation or maintenance that has the potential to impact the nature or quantity of a discharge.

Page 16: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Recordkeeping

• Details the type of records and procedures that MUST be signed, dated and kept on file at the facility for a period of 3 years.

• Details the records that MUST be retained for the life of the tank, piping, or ancillary system.

Page 17: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Training

• All operating and maintenance personnel involved in the storage and handling of petroleum shall receive instructions on the Plan

• All spill response personnel shall receive instruction to insure adequate understanding on the Plan.

• Training shall occur at least once a year and more frequently if a spill occurs or inspections reveal inadequacies in implementation of the plan.

Page 18: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Security & Lighting

• Describes procedures in place to ensure that access to the storage areas is controlled and storage areas are monitored at all times.

Page 19: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Majority of fuel storage areas serve diesel emergency generators dedicated to a particular building or parking garage.

• Golf Course, Duke Gardens, FMD Grounds, and Duke Forest have fuel oil storage areas for equipment fueling

Page 20: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

•Fuel deliveries 1. will be scheduled by the

supervisor responsible for the facility.

Page 21: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

2. Delivery truck will back into containment area adjacent to the tanks prior to dispensing fuel (unless site has built in secondary containment).

Page 22: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

3. Maintenance Staff will use the SPCC Checklist to record the amount of fuel delivered.

Page 23: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

INSPECTIONS & TESTINGROUTINE EQUIPMENT CHECKS

• Maintenance Staff familiar with the storage tanks and their operation should make the following weekly checks of oil storage areas (i.e. any area storing >55 gallons) as part of routine observations or preventive maintenance procedures:

– Check secondary containment for damage and integrity (will not leak);

– Check tanks, foundations and supports for obvious signs of leakage, distortion, or other damage; and

– Check piping systems, particularly at connections for obvious signs of leakage.

• Note: Any problems observed must be reported to the SPCC Coordinator or designee

Page 24: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

INSPECTIONS & TESTINGFORMAL INSPECTIONS

• An SPCC inspection program has been designed to insure continued integrity of all oil storage and handling equipment. Inspections of all oil and used oil storage areas are conducted quarterly and/or annually in accordance with the schedule and requirements included in Table 2 of the plan. Records of inspections are to be signed by the inspector and maintained for at least three (3) years. Any problem detected during a formal inspection requires immediate notification of the SPCC Coordinator.

1. Quarterly Inspections

2. Annual Inspections

Page 25: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

YES NO COMMENTS

GENERALHas there been any change in facility design, construction, operation, or maintenance since the last inspection? If yes, update the SPCC plan accordingly.

Is there any new petroleum bulk storage at the DUMC?

SPILL CLEANUP SUPPLIES

Are the Spill Kits located in the areas identified in Section 5?

Do the kits contain the items identified in Section 5 at a minimum?

TANKER UNLOADING

Are procedures in place to ensure a trained employee is present for the entire filling operation?

Are procedures being followed to ensure adequate tank capacity such as manual tank level gauging?

Is there a physical barrier available, such as a chock, to prevent premature tanker truck departure in place?

Are drip pads readily available for placing beneath each connection?

Any sign of tanker leaks?

OIL STORAGE AREAS

Is documentation on file verifying the accuracy of tank float gauges or electronic monitoring systems within the last year?

Are the tanks and all associated valves and piping in good condition and free from leaks and excessive corrosion?

Are all tanks without double walls stored in appropriate locations inside the containment dikes, such that any spill will be contained?

Are the dikes or double walls in good condition, showing no signs of leaks, damage, or excessive wear?

Page 26: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Quarterly Inspections• Spill supplies are checked on a quarterly basis to ensure the supplies

are adequate and all materials are properly stored.

• In addition, all oil storage and transfer areas are to be inspected on a quarterly basis to ensure the following:

– Containers are in good condition and are overpacked if necessary;

– Containers are properly labeled;

– Containers are stored in appropriate locations identified in the SPCC Plan;

– Appropriate secondary containment is provided where required;

– Adequate space is maintained in storage areas for maneuvering of drums, handcarts, or forklifts, as appropriate;

– Spill kits are adequately stocked and appropriately located;

Page 27: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Quarterly Inspections- cont.– Procedures outlined in the SPCC Plan are adhered to;

– Piping systems, tanks, and transfer equipment are in good condition;

– Repairs are made at the storage locations as required;

– Quarterly inspections are documented using the form in Appendix 1; and

– Records of such inspections and any associated repairs are kept with the master copy of the SPCC Plan by the SPCC Coordinator.

Page 28: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Annual Inspections• In addition to the quarterly inspection requirements listed above, the

annual inspection includes the following general activities which are also recorded on the inspection checklist included in Appendix 1:

– Annual equipment inspection and maintenance requirements as described in the inspection checklist in Appendix 1;

– Confirm that SPCC procedures are being followed and that they are adequate for the university;

– Ensure that the university maintains the capability to respond to releases; and

– Ensure that records are being retained as described in Section 9.0.

Page 29: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Testing• In addition to regular inspections, the university will conduct tank and

piping integrity testing and internal tank inspections by an inspector who is authorized to perform the relevant tests (see Table 2).

• A signed report and recommendations will be submitted by the testing agent following test completion and retained for the life of the tank.

• The test results will then be reviewed to determine subsequent testing requirements or necessary repairs.

Page 30: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Integrity Testing• The testing and the minimum testing frequency that are required for

each tank or piping system to ensure continued integrity of the oil storage and handling facilities, can be found in Table 2 of the Plan. The following slide contains an excerpt from that table.

Page 31: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

SOURCE TANK TYPE VISUAL MONITORING

(Frequency)

CHECK INTERSTICE FOR FUEL & WATER

(Frequency)

VERIFY PROPER OPERATION OF LEAK DETECTION SYSTEM

(Frequency)

PRESSURE TIGHTNESS TEST WITH INERT GAS

(Frequency)

METAL LOSS TESTING OR OTHER

NDE* (Frequency)

(1) Lennox–Baker Children’s Hospital – 500 gal diesel AST

Single-wall; tank bottom NOT in

contact with support surface and is visible

YES(Quarterly)

NA YES - If equipped.(Quarterly)

NOT REQUIRED NOT REQUIRED

(2) North Pavilion – 5,000 gal diesel AST

Single-wall; tank bottom NOT in

contact with support surface and is visible

YES(Quarterly)

NA YES - If equipped.(Quarterly)

NOT REQUIRED NOT REQUIRED

(3) Center for Living: Aesthetics – 150 gal diesel AST

Double-wall; outer shell in contact with

support surface

YES(Quarterly)

YES(Quarterly)

YES - If equipped.(Quarterly)

YES(Every 10 years)

NOT REQUIRED

(4) Center for Living: Fitness – 150 gal diesel AST

Double-wall; outer shell in contact with

support surface

YES(Quarterly)

YES(Quarterly)

YES - If equipped.(Quarterly)

YES(Every 10 years)

NOT REQUIRED

(5) – (2) 30,000 gal diesel USTs

UST's NA YES(Per 40 CFR Part 280)

YES(Per 40 CFR Part 280)

Consult 40 CFR Part 280 for Test and Frequency.

NA

(6) OESO – 125 gal diesel AST

Double-wall; outer shell in contact with

support surface

YES(Quarterly)

YES(Quarterly)

YES - If equipped.(Quarterly)

YES(Every 10 years)

NOT REQUIRED

(7) Duke South Medical Center: West Entrance – 2,000 gal diesel UST

UST's NA YES(Per 40 CFR Part 280)

YES(Per 40 CFR Part 280)

Consult 40 CFR Part 280 for Test and Frequency. Required for cathodic

protection systems.

Complete per 40 CFR Part 280 for cathodic

protection systems.

Page 32: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Record Keeping• The following records and procedures must be signed, dated and

retained for a minimum of three years:– Inspections and testing procedures;

– Records of scheduled inspections and any corrective actions taken.

– Equipment maintenance records;

– Records of visual inspection of discharges from diked containment area; and

– Records of employee training and annual briefings.

Page 33: SPCC Plans –Also known as…Spill Prevention, Control, & Countermeasures Plan Required as part of 40 CFR Part 112 – Oil Pollution Prevention. The Plan: –Applies

Plan Implementation

• Training• The SPCC Coordinator shall see that all operating and maintenance

personnel involved in the storage and handling of petroleum receive instructions on the following:

– Operation and maintenance of equipment to minimize risk of equipment failure and subsequent release;

– Good Housekeeping Practices which ensure a clean, safe, workplace and minimize the risk of spills and leaks;

– Location and use of all spill control materials;

– Spill Prevention and Response; and

– Emergency notification procedures.