sunil puri resumea jan 2017
TRANSCRIPT
MANAGER/LEAD & TRAINER – ELECTRICAL/INSTRUMENTATION ENGINEERINGSunil Kumar PuriAddress: Tuart Hill, Western AustraliaMobile: +61 (0) 41 615 4025email: [email protected]
Page 1 of 4 January 2017
SUNIL KUMAR PURI – LEAD/MANAGER & TRAINER SENIOR ELECTRICAL/ INSTRUMENTATION ENGINEERING
EDUCATION & TRAINING: B.Eng (Electrical), 1977 Certificate IV, Enterprise Trainer & Assessor (Aust.)
PROFESSIONAL AFFILIATIONS: Chartered Engineer
Corporate Member of Institution of Electrical Engineers (UK)Corporate Member-Institute of Measurement and Control (UK)
Professional Engineer (P.Eng, Australia)
PERSONAL STATEMENTElectrical, Instrumentation & Control Engineering - Greenfields and Brownfields.
FEED, BFS; Detail Design; Tender Analyses & Recommendations. Installation Documents: SoWs, Work packs SITE: Construction Support – Technical Support, Liaison –intra and cross-discipline, TQ’s etc. SITE: Completions; Precommissioning, Commissioning. Training: Training Technicians, Graduate & Junior Engineers, setting up workshops.
PERSONAL ATTRIBUTES: Driven, Assertive, Motivated Excellent command of English Excellent interpersonal skills
SUMMARYINDUSTRIES
Water Gas Plants and Pipelines; Mining & Mineral Processing Materials Handling Chemical & Petrochemicals
TECHNICAL ATTRIBUTES Project Management Detail Design
- Instrumentation, Control, and MV/LV Electrical- CCTV, Fire & Gas, PA Systems- Well acquainted with Australian and International Standards- Communication Networks (including FO backbones etc.)- DCS systems – Honeywell, Yokogawa, ABB; PLC systems – Rockwell, HMI systems.- Hazardous Areas IEC/ANZ conformance, ESDs and F & G Detect/Protect Systems,
Explosion Protection, NACE, SIL, AS/IEC61508 & AS/IEC61511 concepts/applications etc, HAZID, HAZOP, CHAZOP, SIL Studies.
- Functional Specs, Control Philosophies- Variable speed drives and large scale rectifiers ( 20,000 Amps)- Large Package Plants eg. Mills and Several MegaWatt Electric Furnaces.- Providing Training in Design
SITE- FATs, SATs, Installation Support, Commissioning, As-Building, Training.- Training
Page 2 of 4 January 2017
SUNIL KUMAR PURI – LEAD/MANAGER & TRAINER SENIOR ELECTRICAL/ INSTRUMENTATION ENGINEERING
EMPLOYMENT HISTORYOctober 2016– PresentCalibre GroupInstrumentation/Controls Engineer
Design and Documentation for Qube Picton Storage Facility
September 2016– November 2016Project Management Vision(PMV)EIC Assessor/Trainer
Development of Assessments, Training of Technicians.
Site EI Construction support and completions.July 2015– September 2015Roy HillLead Instrumentation/Controls Engineer
Site EI Construction support and completions. Reporting directly to the Project Director, coordinating all disciplines, on conveyors electrical
installation work. This work had been seriously hampering progress. Providing informal site training
September 2014– March 2015CKJV - Chevron Gorgon Gas. $50 Billion projectLead Instrumentation/Electrical Engineer
Site(Barrow Island) EI Construction support, completions, pre-commissioning. Streamlining the construction support process to report on and receive client input to technical
queries. Co-coordinating as-building drawings, and QA/QC work. Site training of emerging engineers
July 2012 – June 2014Matricon - McArthur River Mining, $400 million Zinc Plant Expansion.Lead Instrumentation/Electrical Engineer
Site visits to ensure accuracy and completeness of installation equipment. Creation of DCS performance auditing plan. Assessment of hazardous area equipment to Australian Standards
September 2010 – July 2012Calibre ProjectsSenior Electrical/Instrumentation Engineer
FMG Christmas Creek expansion. Worsley Alumina - Remote Isolation System Marradong Overland Conveyor. World’s longest
belt conveying system. Irving Island Iron Ore - Power Plant Feasibility Study
April 2010 – August 2010Worley Parsons, Perth WASenior Electrical/Instrumentation Engineer
Roy Hill $5 Billion Iron Project - Bankable Feasibility Study. Creation of project wide standard specifications, equipment datasheets and numbering
systems.
July 2007 – March 2010Sandwell (Australia) (now Ausenco), Perth WASenior Electrical/Instrumentation Engineer
Sino Iron Project, $5 Billion CP Mining project- Creation of Standards for Control Systems, Instrumentation and Services (Fire, VoIP
system, CCTV)- RO Desalination Plant design.- Construction of EI interfacing in China to accommodate very late construction plans
February 2002 – July 2007WorleyParsons Pty Ltd, Perth WASenior Electrical/Instrumentation Engineer
Conoco-Phillips – EtE Project - Bayu Undan Gas Platform. Required keen and careful coordination for small time window of shutdown
Woodside Energy – Angel Gas Platform Project Worsley Alumina – Liquor Burning Odour Control & Development Capital Projects
Page 3 of 4 January 2017
SUNIL KUMAR PURI – LEAD/MANAGER & TRAINER SENIOR ELECTRICAL/ INSTRUMENTATION ENGINEERING
Caspian Sea Area Oil and Natural Gas Pipelines project - FEED.
May 2001 – January 2002Lycopodium Ltd, Perth WALead Electrical / Instrument Engineer
Newcrest Mining – Ridgeway Gold, Orange, NSW. Included detailed investigation of running Yokogawa DCS system on sister Cadia Plant to tie-in without a shutdown.
September 1997 – May 2001Clough Engineering Ltd, Perth WALead Instrument / Electrical Engineer
Kuwait National Petroleum Company - Hydrogen Transfer Project Kuwait National Petroleum Company – Coke Calcination Plant Engineering design and development of packages for:
- Gas Separation Plant in Thailand- Gas Pipeline project in Qatar- Gas Lift Project in Kuwait
July 1996 – August 1997Proteus Engineers, Perth WALead Electrical and Instrumentation Engineer
Worsley Alumina - 3rd Train Expansion Project Aurora Gold - Toka Tindung Mine Gold Plant, Indonesia
September 1995 – June 1996Fluor Daniel, Perth WASenior Electrical / Instrumentation Engineer
BHP DRI Materials Handling (Port Hedland
June 1994 – August 1995Signet Engineering, Perth WASenior Control and Instrumentation Engineer
Pancontinental Mining - Paddington Gold Mine Expansion (Kalgoorlie)
1992 – 1993Ashanti Goldfields Corporation, Ghana & Perth WASite Senior Electrical / Instrumentation Engineer
Sansu 1000,000 ounce/year Oxide and Bio-Oxidation Plant Plant maintenance
1990 – 1991Minestone (Zambia) LtdProject Engineer, Electrical / Mechanical – Abattoir Installation to EEC standards
1980 – 1990Zambia Consolidated Copper Mines LtdSite Senior Assistant, then Section Engineer Instrumentation – Maintenance and Projects.
REFERENCES Steve Silich, Principal Electrical/Instrument Engineer, Calibre Projects., mob: +61 (0)423 536
800 email: [email protected] Sanjiv Manchanda, Project Director Roy Hill, phone: +61 (08) 6242 1000 Leighton Brunn, Electrical Manager, RCR Tomlinson, mobile: 61 (0)400 018 984, email: [Not
known] Paul Wilkinson, Electrical Manager, ProjecTech, ph: +61 (0)447 954 285,
email: [email protected]: Available on request.